About this file
Asbestos Survey Report dated January 26,2012 referenced in Section 020850 Asbestos Abatement
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
General Services Administration
Federal Building & U.S. Post Office
Asbestos Survey Report
January 26, 2012
Federal Building & U.S. Post Office 56 South Main Street
St. Albans, VT 05478-2202
Prepared By
Federal Occupational Health JFK Building Room E-110
Government Center Boston, MA 02203
GSA 2011 Asbestos Survey Report – Federal Building & U.S. Post Office
Table of Contents
I. List of Abbreviations
II. Executive Summary
Table 1 - SUMMARY OF ACM IDENTIFIED AT THE SITE
III. Introduction and Background
IV. Project Tasks
V. Sample Locations & Sample Analysis
Table 2 - SUMMARY OF PLM ANALYTICAL DATA
VI. ACM Condition Assessment
Table 3 – SUMMARY OF ACM PHYSICAL CONDITION
Table 4 – POTENTIAL FOR DISTURBANCE OF SUSPECT MATERIAL
VII. Sampling Protocol
Asbestos Sample Collection
VIII. Analytical Methods
Asbestos Samples
IX. Waste Management
X. Record Keeping
XI. Summary and Recommendations
XII. References
Attachments:
Appendix – A: Asbestos Containing Materials – Certified Laboratory Analytical Results Appendix – B: Photographs of ACM Building Materials Sampled Appendix – C: Asbestos Sampling Locations – Floor Plans and Drawings Appendix – D: Inspector Licenses and Company Certifications
I. List of Abbreviations ACM Asbestos-Containing Material
AHERA Asbestos Hazard Emergency Response Act
DS Dispersion Staining
EA Each
EPA Environmental Protection Agency
Flame AAS Flame Atomic Absorption Spectroscopy
FOH Federal Occupational Health
GSA Government Services Administration HA Homogeneous Area LF Linear Feet NESHAP National Emissions Standards for Hazardous Air Pollutants OSHA Occupational Safety and Health Administration O&M Operation & Maintenance PLM Polarized Light Microscopy PPE Personal Protective Equipment SF Square Feet SOW Scope of Work TEM Transmission Electron Microscopy US United States USEPA United States Environmental Protection Agency VDH Vermont Department of Health
VTH Vermont Department of Health
II. Executive Summary
On December 08 and 09, 2011, Mr. Patrick Bomba and Mr. Michael J. Reeder, who are representatives of the Federal Occupational Health (FOH) on behalf of the General Services Administration (GSA), conducted an asbestos survey of the U.S. Post Office and Customs House located at 56 South Main Street in St. Albans, Vermont (Site).
The purpose of this assessment is to determine if asbestos containing material (ACM) is present at the Site by collecting non-destructive samples of accessible suspect ACM throughout the interior of the Site. The exterior of the Site was not evaluated as part of this survey.
During the collection of suspect ACM samples, the FOH representatives implemented controls, techniques, and protocols to minimize occupational exposure to asbestos, which are in accordance with the Vermont Department of Health and other applicable laws and regulations.
All sampling and analysis of the suspect ACMs were performed in accordance with applicable requirements by qualified FOH inspectors and by laboratories accredited by the EPA.
During the course of the asbestos survey, FOH asbestos inspector(s) were accompanied by:
Mr. Jack Darling, GSA Building Manager and/or designated representative.
The FOH asbestos inspectors collected a total of one hundred nine (109) individual suspected ACM samples throughout accessible areas of the Site. According to analytical results (Appendix B), asbestos was identified in thirteen (13) of the one hundred nine (109) samples collected.
The ACMs and associated quantities identified at the Site are summarized in the following Table:
Table 1 - SUMMARY OF ACM IDENTIFIED AT THE SITE
SAMPLE
NUMBER
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-05 Tan Window Caulk Stored Windows in Attic 1-2% Chrysotile 5 Stacks of Windows
162747-16A
162747-17A
162747-18A
9” X 9” White Floor Tile
& Black Mastic
Room 225
Room 224
Room 220
2-4% Chrysotile
1,800 SF
162747-43
162747-44
162747-45
Hard Mud Joint
Room 131 Pipe
Room 131 Pipe
Room 131 Pipe
5-10% Chrysotile
10-15% Chrysotile
10-20% Chrysotile
196 EA
NUMBER
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-65
162747-66
162747-67
White Pipe Insulation
Room B35
Room B35
Room B35
10-20% Chrysotile
10-20% Chrysotile
10-20% Chrysotile
340 LF
162747-68
162747-69
162747-70
Brown Pipe Insulation
Room B35
Room B35
Room B35
3-6% Chrysotile
3-6% Chrysotile
3-6% Chrysotile
390 LF
Note: All Quantities are estimates. SF=Square Feet, LF=Linear Feet, and EA = Each
III. Introduction and Background
According to supplied information, the Site includes an approximate 64,564-square foot, two-story, with basement and attic Federal Building and U.S. Post Office.
IV. Project Tasks
Project tasks included:
Reviewing existing drawings and specifications provided by the GSA for original construction and renovation information (as available) regarding the installation of suspect ACM.
Reviewing historic asbestos inspection reports (as available) to determine the existence of previously identified homogeneous areas (HAs) at each functional space.
Verify if previously conducted asbestos inspection was performed in accordance with the Asbestos Hazard Emergency Response Act (AHERA) regulations. If not, the number of additional bulk samples necessary for compliance with the AHERA regulations will be calculated.
Developing sampling protocols in accordance to AHERA regulations.
Sampling and analyzing various interior building materials to determine if ACM are present.
Developing maps for each floor showing areas where suspect ACM samples were collected and ACM was identified.
Note all areas identified as inaccessible (e.g., pipe chases, wall voids, elevator shafts, locked doors, etc.) during the sampling event.
Asbestos bulk samples of various building materials and surfaces were collected at the Site and submitted to the FOH Denver Asbestos Laboratory to undergo Polarized Light Microscopy with Dispersion Staining (PLM/DS) analysis in accordance with the “Method for the Determination of Asbestos in Bulk Building Materials” (US EPA Method 600/R-93/116, July 1993).
V. Sample Locations & Sample Analysis
FOH’s accredited asbestos inspectors conducted the survey and collected samples of suspected ACM in general accordance with the Environmental Protection Agency’s (EPAs) interpretations and guidelines of AHERA. The inspectors surveyed the Site and collected samples of all suspected ACM. The PLM analytical data of asbestos samples collected at the Site is summarized in Table 2.
Table 2 - SUMMARY OF PLM ANALYTICAL DATA
NUMBER
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-01
162747-02
162747-03
Brown Fiber Board Roof
Panel
Attic Ceiling
Attic Ceiling
Attic Ceiling
ND
ND
NA
162747-04
162747-05
162747-06
Tan Window Caulk
Stored Windows in Attic
Stored Windows in Attic
Stored Windows in Attic
ND
1-2% Chrysotile
5 Stacks of
Windows
162747-07
162747-08
162747-09
Tan Carpet Mastic
Room 204
2nd Floor Main Corridor
Room 202A
ND
162747-10
162747-11
162747-12
Brown Sheet Flooring
Room 204
Room 206
Room 202A
ND
162747-13
162747-14
162747-15
White Plaster
2nd Floor Janitor Closet
Room 224 Wall
Room 220 Wall
ND
162747-16
162747-17
162747-18
9” X 9” White Floor Tile
Room 225
Room 224
Room 220
2-4% Chrysotile
1,800 SF
162747-19
162747-20
162747-21
White Pipe Mastic
Above 2nd Floor Hallway
Above 2nd Floor Hallway
Above 2nd Floor Hallway
ND
162747-22
162747-23
162747-24
Black Wall Mastic
Room 223 Exterior Wall
Room 224 Exterior Wall
Room 220 Exterior Wall
ND
162747-25
162747-26
162747-27
Tan Cove Base Mastic
Room 224
Room 223
Room 220
ND
162747-28
162747-29
162747-30
Gray Wall Grout
Men’s Restroom 2nd Floor LL
Men’s Restroom 2nd Floor LL
Men’s Restroom 2nd Floor LL
ND
162747-31
162747-32
162747-33
2’ X 5’ White Ceiling Tile
Room 131
1st Floor Elevator Lobby
2nd Floor LL Hallway
ND
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-34
162747-35
162747-36
Black Wall Mastic
Room 131 Exterior Wall
Room 131 Exterior Wall
Room 131 Exterior Wall
ND
162747-37
162747-38
162747-39
Room 131 Wall
1st Floor Elevator Lobby Wall
Room B36 Wall
ND
162747-40A
162747-40B
162747-41A
162747-41B
162747-42A
162747-42B
Sheetrock &
Joint Compound
Room 204 Closet
ND
ND
ND
162747-43
162747-44
162747-45
Hard Mud Joint
Room 131 Pipe
5-10%
Chrysotile
10-15%
Chrysotile
10-20%
Chrysotile
196 EA
162747-46
162747-47
162747-48
Tan & Black Carpet Mastic
Room 131 Corner Office
Room 131
Room 131
ND
162747-49
162747-50
162747-51
Room 120A
Room 153A
ND
162747-52
162747-53
162747-54
12” X 12” White Floor Tile
Basement Hallway
Basement Hallway
Basement Hallway
ND
162747-55
162747-56
162747-57
12” X 12” Gray Floor Tile
Basement Break Room
Basement Break Room
Basement Break Room
ND
162747-58
162747-59
162747-60
12” X 12” White & Gray
Floor Tile
Basement Hallway
(Stairwell Landing)
Basement Hallway
(Stairwell Landing)
Basement Hallway
(Stairwell Landing)
162747-61 White Pipe Mastic Basement Boiler Room ND NA
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-62
162747-63A
162747-63B
162747-64A
162747-64B
Boiler Flue Insulation
Basement Boiler Room
ND
162747-65
162747-66
162747-67
White Pipe Insulation
Room B35
Chrysotile
10-20%
Chrysotile
Chrysotile
340 LF
162747-68
162747-69
162747-70
Brown Pipe Insulation
Room B35
Room B35
3-6% Chrysotile
3-6% Chrysotile
3-6% Chrysotile
390 LF
162747-71
162747-72
162747-73
White Ceiling Texture
Basement Hallway
Basement Hallway
Basement Hallway
ND
162747-74
162747-75
162747-76
Brown Duct Mastic
Room B21
Room B21A
Room B21A
ND
162747-77A
162747-77B
162747-78A
162747-78B
162747-79A
162747-79B
Green Speck Sheet
Flooring & Tan Mastic
Room B21A
ND
ND
ND
162747-80A
162747-80B
162747-81A
162747-81B
162747-82A
162747-82B
Gray Speckled Sheet
Flooring & Black Mastic
Room B14
ND
ND
ND
162747-83
162747-84
162747-85
Room B14 Wall
Room B23 Wall
Basement Men’s
Restroom Wall
MATERIAL
TYPE
MATERIAL
LOCATION
ASBESTOS
CONTENT
QUANTITY
(SF/LF/EA)
162747-86
162747-87
162747-88
Room B23
Room B14
Room B24
ND
162747-89
162747-90
162747-91
2’ X 5” White Ceiling Tile
Room B14
Room B12
ND
162747-92
162747-93
162747-94
2’ X 2’ White Ceiling Tile
Room B23
Room B23
ND
162747-95
162747-96
162747-97
Black Vapor Barrier
Room B15A
Room B15A
Room B15A
ND
162747-98A
162747-98B
162747-99A
162747-99B
162747-100A
162747-100B
ND
ND
ND
162747-101
162747-102
162747-103
Gray Duct Mastic
Garage
Garage
Garage Mechanical Room
ND
162747-104A
162747-104B
162747-105A
162747-105B
162747-106A
162747-106B
1st Floor Hallway
Room 142A
GSA Main Hallway
ND
ND
ND
162747-107
162747-108
162747-109
2’ X 2’ Rough White
Ceiling Tile
1st Floor Hallway
Room 142A
GSA Main Hallway
ND
Note: All Quantities are estimates. SF=Square Feet, LF=Linear Feet, EA = Each, & ND=Non-Detected
VI. ACM Condition Assessment
The FOH asbestos inspector(s) categorized the various suspect ACMs (Surfacing Material, Miscellaneous Material, and Thermal System Insulation) collected at the Site by visual inspection and classified these materials by referencing the following definitions:
Surfacing and Miscellaneous Material
Good Condition (GC) – Material with no visible damage or deterioration, or showing only very limited damage or deterioration.
Damaged (D) – The surface is crumbling, blistered, water-stained, gouged, marred or otherwise abraded over less than one-tenth (1/10) of the surface if the damage is evenly distributed (one-quarter if the damage is localized).
Significantly Damaged (SG) – The surface is crumbling or blistered over at least 1/10 of the surface if the damaged is evenly distributed (one-quarter if the damage is localized); 1/10 (one-quarter, if localized) of material hanging from surface, deteriorated, or showing adhesive failure; and/or water stains, gouges, or mars over at least 1/10 of the surface if the damage is evenly distributed (one-quarter if the damage is localized).
AHERA Definition of Damaged Friable Surfacing Miscellaneous ACM:
“Friable surfacing miscellaneous ACM, which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that the bond to the substrate (adhesion) is adequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.”
Thermal System Insulation
Good Condition (GC) – Material with no visible damage or deterioration, or showing only very limited damage or deterioration.
Damaged (D) – A few water stains or less than 1/10 of insulation with missing jackets and/or crushed insulation or water stains, gouges, punctures, or mars on up to 1/10 of the insulation if the damage is evenly distributed (or up to one-quarter if the damaged is localized).
Significantly Damaged (SG) – Missing jackets on at least 1/10 of the piping or equipment and/or crushed or heavily gouged or punctured insulation on at least 1/10 of pipe runs/risers, boiler, tank, duct, etc., if the damage is evenly distributed (or up to one-quarter if the damaged is localized).
Note: Accumulation of powder, dust, or debris similar in appearance to the suspect material on surfaces beneath the pipe/boiler/tank/duct, etc. can be used as confirmatory evidence.
AHERA Definition of Damaged or Significantly Damaged Thermal System Insulation:
“Thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment which has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges, or other signs of physical injury to ACM;
occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints. Asbestos debris, originating from the ACBM in question may also indicate damage.”
Table 3 – SUMMARY OF ACM PHYSICAL CONDITION
SAMPLE
No.
162747-
MATERIAL
TYPE
Surfacing Material Thermal System Insulation Miscellaneous Material
Friable Non-
Friable
Condt. Friable Non-
Friable
Condt. Friable Non-
Friable
Condt.
Tan Window
Caulk
√ GC
16A
17A
18A
9” X 9” White
Floor Tile
√ GC
Hard Mud Joint √ GC
White Pipe
Insulation
√ GC
Brown Pipe
Insulation
√ GC
Note: GC = Good Condition, D = Damaged, and SD = Significantly Damaged
The FOH asbestos inspector(s) also determined the ACMs potential for contact, the influence of vibration, and the potential for air erosion by referencing the following definitions:
Potential for Contact with the Material
High: Service workers work in the vicinity of the material more than once per week, or
The material is in a public area (e.g., hallway, corridor, auditorium) and accessible to building occupants.
Moderate: Service workers work in the vicinity of the material once per month to once per week, or
The material is in a room or office and accessible to the occupants.
Low: Service workers work in the vicinity of the material less than once per month, or
The material is visible but not within reach of building occupants.
Influence of Vibration
High: Loud motors or engines present (e.g., some fan rooms), or
Intrusive noises or easily sensed vibrations (e.g., major airports, a major highway).
Moderate: Motors or engines present but not obtrusive (e.g., ducts vibrating but no fan in the area), or
Occasional loud sounds (e.g., a music room)
Low/None: None of the above.
Potential for Air Erosion
High: High velocity air (e.g., elevator shaft, fan room).
Moderate: Noticeable movement of air (e.g., air shaft, ventilator air stream).
Low/None: None of the above.
Table 4 – POTENTIAL FOR DISTURBANCE OF SUSPECT MATERIAL
No.
162747-
MATERIAL
TYPE
Potential for Contact Influence of Vibration Potential for Air Erosion
High Moderate Low High Moderate Low High Moderate Low
Tan Window
Caulk
16A
17A
18A
9” X 9” White
Floor Tile
Hard Mud Joint √ √ √
White Pipe
Insulation
Brown Pipe
Insulation
VII. Sampling Protocol
Asbestos Sample Collection
Representative bulk samples of suspect asbestos containing building materials (ACMBs) were collected at the Site building. The building was divided into separate and distinct project areas.
For the purpose of this survey, each area was inspected and sampled as a separate functional space having separate and distinct homogenous materials. Homogenous material determination was based on the following criteria:
Similar physical characteristics (same color and texture, etc.)
Application (sprayed-on, troweled-on, assembly into a system etc.)
Material function (thermal insulation, floor tile, wallboard system etc.)
Samples of suspected ACM were collected and placed into sealed plastic bags and shipped via overnight delivery to the FOH Denver Asbestos Laboratory to undergo PLM/DS analysis in accordance with the “Method for the Determination of Asbestos in Bulk Building Materials” (US
EPA Method 600/R-93/116, July 1993).
VIII. Analytical Methods
Asbestos Samples
Polarized Light Microscopy Analysis Methodology
The FOH Denver Asbestos Laboratory, which is a National Voluntary Laboratory Accreditation
Program certified laboratory, provided the asbestos analytical services. The laboratory analyzed the suspected ACM by PLM utilizing the EPAs Test Methods: Methods for the determination of Asbestos in Bulk Building Materials (EPA 600/R-93/116, July 1993) and the
McCrone Research Institute’s The Asbestos Particle Atlas as method references. Additional treatment and tests may be required to accurately define the sample composition (i.e. ashing, extraction, acetone treatment, and transmission electron microscopy).
The sample analysis was performed by using the bulk sample for visual observation and slide preparation(s) for microscopic examination and identification. The lab analyzed the samples for asbestos (chrysotile, amosite, crocidolite, anthophyllite, and actinolite/tremolite), fibrous non-asbestos constituents (mineral wool, cellulose, etc.) and non-fibrous constituents. Using a stereoscope, the microscopist visually estimated relative amounts of each constituent by determining the volume of each constituent in proportion to the total volume of the sample.
IX. Waste Management
FOH representatives did not generate any waste material while conducting the asbestos survey at the Site. The small amount of material collected while conducting these surveys was submitted to the laboratories for analysis, and there was no excess amount of material left that required disposal.
X. Record Keeping
In order to document the progress of this project, the FOH inspector maintained field notes, developed site sketches, and made notations on site diagrams and floor plans as the fieldwork progressed. Copies of the certified laboratory asbestos analytical reports and chain–of-custodies are included in Appendix A. Photos of the suspected ACM are included in Appendix B.
Copies of asbestos sample locations are included in Appendix C and company certifications and inspector licenses are included in Appendix D.
XI. Summary and Recommendations
During the period of December 08 and 09, 2011 FOH inspectors collected a total of one hundred nine (109) individual suspected ACM samples at the Site. Analytical results of the asbestos samples collected indicated that thirteen (13) of the one hundred nine (109) suspected ACM samples contained at least one percent or more of asbestos. An unknown amount of assumed ACM pipe insulation exists inside pipe chases within the building.
Since asbestos was identified in concentrations greater than one percent, any construction or renovation activities performed in the future are subject to applicable rules and regulation concerning the disturbance or removal of the ACM. The Vermont Department of Health rules apply to all buildings which are subject to public occupancy, or to which the general public has access. Any person disturbing, removing, or encapsulating asbestos in any public building including, renovation, dismantling, or demolition, shall notify the Vermont Department of
Health in writing ten (10) working days prior to the start date of the abatement project. It is the responsibility of the building Owner or it’s Representative to ensure that only current Vermont
State license asbestos abatement companies and workers engage in asbestos related activities.
The U.S. EPA regulations do not require removal of asbestos-containing materials that are in good conditions. However, personnel who may be involved with building renovations will need to be advised of the presence of asbestos, and appropriate measures may be warranted in order to assure the identified ACM in the building are not disturbed during renovation activities. If the ACM left in place is disturbed during renovation activities, the materials must be handled and disposed in accordance with the applicable State and Federal regulations.
XII. References
EPA, Guidance on Systematic Planning Using the Data Quality Objective Process, EPA, QA/G-4, February 2006.
EPA, Guidance for Quality Assurance Project Plans, EPA QA/G-5, December 2002.
EPA, Framework for Investigating Asbestos-Contaminated Superfund Sites, OSWER Directive #9200.0-
68, September 2008.
EPA, Guidance on Choosing a Sampling Design for Environmental Data Collection, EPA QA/G-5S, December 2002.
Appendix – A
Asbestos Containing Materials Certified Laboratory Analytical Results
Appendix – B
Photographs of ACM Building Materials Sampled
GSA 2011 Asbestos Survey Report – Courthouse and U.S. Post Office
1. Sample Numbers 162747-04, 05 & 06 which include tan window caulk.
2. Sample Numbers 162747-16, 17, & 18 which include 9” X 9” white floor tile.
3. Sample Number 162747-43 which includes a hard mud joint. 4. Sample Number 162747-44 which includes a hard mud joint.
5. Sample Number 162747-45 which includes a hard mud joint. 6. Sample Number 162747-65, which includes white pipe insulation.
GSA 2011 Asbestos Survey Report – Courthouse and U.S. Post Office
7. Sample Number 162747-66 which includes white pipe insulation.
8. Sample Number 162431-67, which includes white pipe insulation.
9. Sample Number 162747-68 which includes brown pipe insulation.
10. Sample Number 162747-69, which includes brown pipe insulation.
11. Sample Number 162431-70, which includes brown pipe insulation.
Appendix – C
Asbestos Sampling Locations – Floor Plans and Drawings
Asbestos Survey
56 Main St.
St. Albans, Vermont
ACM Brown Pipe
Federal Building and U.S. Post Office St. Albans, VT.
Brown Pipe Insulation Basement
Mechanical Room
Women’s Restroom
GSA Storage
Janitor Closet
Men’s Restroom
Stairs Up
RM B28A
RM B26
RM B24
RM B22
RM B14
RM B1 RM B2
ELEV.
Mechanical Room
B11
RM B15A
Ramp Down
MECH.RM
Garage
RM B44 RM B19
RM
B41
MECH.
RM
RM B45
RM B42
RM B21
RM B23
RM B35 RM B33
RM B36
RM B21A 88
RM B12
3 Pipes
RM B28
RM B28B
RM B20
RM B18
56 Main St.
St. Albans, Vermont
Federal Building and U.S. Post Office St. Albans, VT.
Basement Hard Mud Joints
Mechanical Room
Women’s Restroom
GSA Storage
Janitor Closet
Men’s Restroom
Stairs Up
RM B28 RM B28A
RM B28B
RM B26
RM B24
RM B22
RM B20
RM B18
RM B14
RM B1 RM B2
ELEV.
Mechanical Room
B11
RM B15A
Ramp Down
MECH.RM
Garage
RM B44 RM B19
RM
B41
MECH.
RM
RM B45
RM B42
RM B21
RM B23
RM B35 RM B33
RM B36
RM B21A 88
RM B12
X 2
X 2
X 27
X 7 X 48
X 14
X 10
X 10
X 62
X = Total Number of Hard Mud Joints in Area
56 Main St.
St. Albans, Vermont
ACM White Pipe
St. Albans, VT.
White Pipe Insulation and Hard Mud Joints
Basement
Mechanical Room
Women’s Restroom
GSA Storage
Janitor Closet
Men’s Restroom
Stairs Up
RM B28 RM B28A
RM B26
RM B24
RM B22
RM B20
RM B18
RM B14
RM B1 RM B2
ELEV.
Mechanical Room
B11
RM B15A
Ramp Down
MECH.RM
Garage
RM
B41
MECH.
RM
RM B45
RM B42
RM B21
RM B23
RM B33
RM B36
RM B21A 88
RM B12
RM B28B
RM B35
RM B44 RM B19
X2
X2
X27
X7
X48
X14
X4
X10 X10
X10
X62
56 Main St.
St. Albans, Vermont
ACM Locations
Non ACM Locations
ACM 9" X 9" White Floor Tile
Federal Building and U.S. Post Office St. Albans, VT.
Basement
Boiler Room
Women’s Restroom
GSA Storage
Janitor Closet
Men’s Restroom
Stairs Up
RM B28 RM B28A
RM B28B
RM B26
RM B24
RM B22
RM B20
RM B18
RM B14
RM B1 RM B2
ELEV.
Mechanical Room
B11
RM B15A
Ramp Down
MECH.RM
Garage
RM B44 RM B19
RM
B41
MECH.
RM
RM B45
RM B42
RM B21
RM B23
RM B35 RM B33
RM B36
55 56
65 66 67 68 69 70
747576
RM B21A
80 81
RM B12
93 94
959697
101 102
Chase
Break Room
56 Main St.
St. Albans, Vermont
Federal Building and U.S. Post Office St. Albans, VT.
1st Floor Hard Mud Joints
Ramp Down
Men’s Restroom
Women’s Restroom
Elev.
STAIRS
Men’s Restroom
Women’s Restroom
STAIRS
STAIRS
RM 106A RM 107A
RM 109A
RM 113ARM 114A
RM 115A
RM 116ARM 117ARM 118A
RM 120A
RM 121ARM 122A
RM 103C
RM 103D
LOBBY
RM 127A
RM 128A
RM 129A
RM
131A
RM
132A
RM 133A
Break Room
RM 134A
RM 135A
RM 136A RM 131C
Restroom RM 102A RM 104A
RM 131
RM 123A
RM 124A
RM 125A RM 144A RM 143A
RM 142A
RM 146ARM 153A
RM 148A
RM 140A
X 1X 1
X 1 X 1
56 Main St.
St. Albans, Vermont
Sample Locations
U.S. Post Office St. Albans, VT.
1st Floor
Ramp Down
Men’s Restroom
Women’s Restroom
Elev.
STAIRS
36 37
Men’s Restroom
Women’s Restroom
STAIRS
STAIRS
RM 106A RM 107A
RM 109A
RM 113ARM 114A
RM 115A
RM 116ARM 117ARM 118A
RM 120A
RM 121ARM 122A
RM 103C
RM 103D
LOBBY
RM 127A
RM 128A
RM 129A
RM
131A
RM
132A
RM 133A
Break Room
RM 134A
RM 135A
RM 136A RM 131C
Restroom RM 102A RM 104A
RM 131
RM 123A
RM 124A
RM 125A RM 144A RM 143A
RM 142A
RM 146ARM 153A
RM 148A
RM 140A
Chase
Chase
Chase
Chase
Chase
Chase
Chase
Chase
Chase
56 Main St.
St. Albans, Vermont
U.S. Post Office St. Albans, VT.
1st Floor Mezanine
RM 156A
Mechanical Room
RM 157A
RM 158A
Stairs Down
UPUPDown
56 Main St.
St. Albans, Vermont
ACM 9" X 9" White Floor Tile
St. Albans, VT.
2nd Floor White Floor Tile
RM 204
RM 205
RM 203
RM 206
RM 202A
Men’s RR Women’s RR
RM 218
RM 217
RM 216
RM 216ARm 209
RM 209A RM 215
RM 214
RM 210
RM 213
RM 212
RM 211A
RM 211
RM 221
RM 222
Stairs Down
Men’s RR
Women’s
RR
STAIRS
STAIRSVAULT
RM 219
RM 220
RM 223
RM 224
RM 225
56 Main St.
St. Albans, Vermont
U.S. Post Office St. Albans, VT.
2nd Floor
09 12
28 29 30
RM 204
RM 205
RM 203
RM 206
RM 202A
Men’s RR Women’s RR
RM 218
RM 217
RM 216
RM 216ARm 209
RM 209A RM 215
RM 214
RM 210
RM 213
RM 212
RM 211A
RM 211
RM 219
RM 220
RM 225
RM 224
RM 221
RM 222
RM 223
Stairs Down
Men’s RR
Women’s
RR
STAIRS
STAIRSVAULT
56 Main St.
St. Albans, Vermont
Federal Building and U.S. Post Office St. Albans, VT.
Attic Hard Mud Joints
Stairs Down
4 Hard Mud Joints
ACM Hard Mud Joints
Stacked Windows
56 Main St.
St. Albans, Vermont
U.S. Post Office St. Albans, VT.
Attic
01 02
Stairs Down
4 Hard Mud Joints
Stored Stacks of Windows
Appendix – D
Inspector Licenses and Company Certifications
| Attic Drawing.pdf |
| Attic Drawing.vsd |
| Page-1 |
| Attic Drawing Hard Mud Joints.pdf |
| Attic Drawing Hard Mud Joints.vsd |
| Page-1 |
| 2nd Floor Drawing.pdf |
| 2nd Floor Drawing.vsd |
| Page-1 |
| 2nd Floor Drawing White Floor Tile (Revised 8-17-12).pdf |
| 2nd Floor Drawing White Floor Tile (Revised 8-17-12).vsd |
| Page-1 |
| 1st Floor Mezanine Drawing.pdf |
| 1st Floor Mezanine Drawing.vsd |
| Page-1 |
| 1st Floor Drawing.pdf |
| 1st Floor Drawing.vsd |
| Page-1 |
| 1st Floor Drawing Hard Mud Joints.pdf |
| 1st Floor Drawing Hard Mud Joints.vsd |
| Page-1 |
| Basement Drawing.pdf |
| Basement Drawing.vsd |
| Page-1 |
| Basement Drawing White Pipe Insulation and Hard Mud Joints (Revised 8-17-12).pdf |
| Basement Drawing White Pipe Insulation and Hard Mud Joints (Revised 8-17-12).vsd |
| Page-1 |
| Basement Drawing Hard Mud Joints-rfh.pdf |
| Basement Drawing Hard Mud Joints-rfh.vsd |
| Page-1 |
| Basement Drawing Brown Pipe Insulation (Revised 8-17-12).pdf |
| Basement Drawing Brown Pipe Insulation (Revised 8-17-12).vsd |
| Page-1 |