GS-01-P-15-NL-P-7005_Generated_PDF_with_TOC.pdf
PDF 3 MB Posted
- Attached to
- Install CCTV - SSA, Worcester, MA Federal contract opportunity
- Solicitation number
- GS-01-P-15-NL-P-7005
About this file
Not Listed
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_Amendment_GS-01-P-15-NL-P-7005_0001.pdf | ||
| Solicitation_Package_(GS-01-P-15-NL-P-7005).zip | ZIP file | |
| GS-01-P-15-NL-P-7005_Combined_Synopsis_Solicitation_07_31_2015_12-53-26_PDF.pdf | ||
| solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table Of Contents
Section Description Page Number Section A Standard Form 1 Section B Supplies or Services and Prices or Costs 82 Section L Instructions, conditions, and notices to offerors or respondents 83
GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
NEW ENGLAND REGION
REQUEST FOR QUOTE
THIS PROCUREMENT IS SET ASIDE 100% SMALL BUSINESS
Solicitation No: GS-01P-15-NLP-7005
Project: Installation of CCTV Social Security Administration Madison PL 51 Myrtle Street, Worcester, MA
Quote Due Date: August 31, 2015
Time: 2:OO PM (LOCAL TIME)
Submit proposal to:
General Services Administration 2 Exchange Terrace, Room 102 Providence, RI 02903 Attention: Gary Smith gary.smith@gsa.gov 401-528-4128
THE INFORMATION COLLECTION REQUIREMENTS CONTAINED IN THIS SOLICITATION/CONTRACT THAT ARE
NOT REQUIRED BY REGULATION HAVE BEEN APPROVED BY THE OFFICE OF MANAGEMENT AND BUDGET
PURSUANT TO THE PAPERWORK REDUCTION ACT AND ASSIGNED OMB CONTROL NO. 3990-0163
Section A Page 1 mailto:gary.smith@gsa.gov
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NO.
5. REQUISITION/PURCHASE REQUEST NO.
CODE
6. PROJECT NO.
8. ADDRESS OFFER TO
4. CONTRACT NO.
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)
11. The contractor shall begin performance
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
07/31/2015GS-01-P-15-NL-P-7005
1PSLP
EQ1PSLP-15-5033
Betty Tejada 401-528-5459
08/31/2015
:00
Section A Page 1Section A Page 2
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE.
AWARD (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 4-85) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
27. PAYMENT WILL BE MADE BY
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
20b. SIGNATURE 20c. OFFER DATE
Please see attached
1PSLP
$0.00
P.O. BOX 17181
FORT WORTH, TX 76102-0181
P , RI 02903
Gary Smith
Section A Page 2Section A Page 3
SF1442 List of Accounting Strings
Accounting String
1PSLP-15-5033.2015.192X.01.P0125300.PG80.PGA51.K01..MA5809ZZ..1300987.1
Section A Page 3Section A Page 4
PAGE
GENERAL SERVICES ADMINISTRATION
OF
ITEM NO., FORM OR
STOCK NUMBER
DESCRIPTION OF ARTICLES OR SERVICES
QUAN-
TITY
UNIT
OF
ISSUE
UNIT
PRICE
AMOUNT
Worcester, MA
Install IP-based Video
LS
Surveillance Systems for SSA, Install Video Surveillance Systems
Section B Page 4Section A Page 5
New England Region
U.S. General Services Administration
J.O. Pastore Federal Building
2 Exchange Terrace – Room 102
Providence, RI 02903 http://www.gsa.gov
General Services Administration
2 Exchange Terrace Providence, RI, 02903
(401) 528-5125
(401) 528-5114 FAX
SCOPE OF WORK
Closed Circuit TV
General
The following Statement of Work (SOW) provides the requirements and specifications for the purchase and installation of closed circuit TV (CCTV) in the SSA Office in Worcester Ma.
All requirements contained in this SOW must be met and must meet minimum industry standards. If the requirements within this SOW are not able to be met the contractor will notify the project manager.
Product substitutions are not permitted without the express written approval of the Contracting officer.
The contractor must document all proposed changes in writing and receive approval from the Contracting officer prior to implementation. If a substitution is made without written permission, the contractor may have to replace the parts in question without delay and at no cost to the government. Additional fees or expenses for items not specifically addressed by the SOW or Contracting Officer will not be approved.
The contractor must have at least three years experience designing and installing security systems. An experienced alarm equipment installation company is preferred. This is defined as a company that specializes in installing electronic security equipment and that has an association with, or follows the installation standards of, the National Burglar Fire Alarm Association.
The contractor, in conjunction with the building manager, and SSA will prepare a schedule for the completion of the installation of the CCTV system. Any variance from the schedule, once set, must be communicated immediately to all parties.
The contractor will install the system in accordance with the manufacturer’s written instructions in addition to all codes and standards set forth by, but not limited to, the National Electrical Code, the National Building Code, Underwriters Laboratories, and the local Authority Having Jurisdiction.
The contractor will furnish and install all equipment, cables, wires, outlets, circuits, connectors, wall or ceiling mounting brackets, labor, supervision and all other equipment necessary for the installation of the security systems contained within this SOW. All work pertaining to the installation of the security equipment as covered by the SOW is the responsibility of the contractor.
The contractor shall not splice or utilize T-taps, etc., except inside of the control panel, spare enclosure, cabinets, or auxiliary power supply.
The contractor may not use the existing isolated ground outlets (orange) to power any of the security system equipment.
The contractor must label each wire, cable, etc. as it enters its termination location on the head end for long term troubleshooting purposes. If wire numbers are used, a true wire legend must remain on site with a full description of each device, its destination point, and termination point. Periodic labels must be
Section A Page 6 placed on the wire to indicate type of wire; for example “CCTV”. All other items, including detectors, sensors, junction boxes, control panels, transformers, phone jacks, etc. must be labeled to show the device and/or zone number on the front cover of the specific device.
All necessary patching, painting, or repairs as a result of this installation must be performed by the contractor at no cost to the government.
After installation of the security system, the contractor will inspect and test the system. The contractor will provide operator training to the employees selected by the Facilities Analyst, and will distribute associated User Guides to the local user.
The contractor is responsible for the installed equipment for one year, including all parts, labor, wiring, service travel hours, parking, etc, beginning from the point of acceptance by the Facilities Analyst. No additional costs for service due to system or component malfunction during the one year warranty period will be paid by the government.
All equipment remains the property of the United States government. The contractor retains no liens, titles, or ownership against any equipment, installed or uninstalled. All surplus equipment should be given to the SSA representative.
OVERVIEW
Social Security Administration has a requirement for a new Internet Protocol (IP) based security solution for video surveillance systems (VSS), consisting of equipment and installation. The contractor will install, configure, test, and provide training for an IP-based video surveillance system (VSS).
ONSSI - IP Video Surveillance Solution or equivalent Razberi Technologies - Server/Switch/NVR Solution or equivalent Axis Communications - Network Cameras or equivalent Contractor will coordinate and install the below referenced equipment as required.
SITE INSTALLATION: Furnish and install the following or and equivalent item
One new electrical circuit located in the data room 24 port Razberi NVR with ONSSI IS VSS or equivalent ONSSI IP camera licenses or equivalent ONSSI IS VSS licenses or equivalent One KVM in rack space or equivalent One rack mounted UPS Wall Mounted Rack Exterior IP Axis cameras or equivalent Interior IP Axis cameras or equivalent All-in-One workstations Wall mounted interior monitor for employee entrance Plenum rate CAT 6 wiring, 5 network outlets to communicate with Razberi NVR or the equivalent.
Miscellaneous hardware necessary to connect the newly installed cameras, workstations and interior employee entrance monitor to the new video management system within the ADP room.
Once installed and commissioned provide all documentation and one session consisting of training for the local administrator(s) responsible for the monitoring of the new VSS.
Section A Page 7
Equipment
IP Cameras
24 Interior - AXIS M3006-V or equivalent 9 Exterior - AXIS P3367-VE or equivalent
Monitor and Mount
1 26” (Minimum) 1080P Color LCD Monitor
a. Monitor shall be connected via HDMI cable from the HDMI output of the Razberi or equivalent
1 PE-PMCLWM VESA WALL MOUNT FOR LCD MONITR ADI or equivalent
Workstation
5 HP 19-2014 All-in-One Desktop PC or equivalent (all workstations must have VSS client software installed so that user may access VSS)
Cable Unshielded Plenum Rated Cat6 Purple
Equipment to be located in the ADP Room:
2. Keyboard/Video/Mouse
a. 1 NO-RMKBLCD1 1SP KB W/ 17 LCD, 8 PORT KVM ADI or equivalent
3. Uninterruptable Power Supply
a. 1 TC-SMRT3002U 3000 VA RACK MOUNT UPS ADI or equivalent
4. Equipment Rack
a. 1 Swing Out Wall Mount Rack (Middle Atlantic Product DWR Series or equivalent)
b. Contractor shall verify Rack Mount size to hold all equipment that is shown in SOW.
5. Server/Switch/NVR
a. 2 RAZ-MPRO24-I5-12T Professional Server Switch, 24 PoE ports (270 W), Intel Core i7-
3770s 3.7 GHz, 12 TB, RAID 0/1/5/10, 2 X 1Gbps or equivalent
b. Video storage calculation: Camera type, 15fps, 1080p, 30 days of storage, recording 7 days a week.
6. Video Surveillance System
a. 1 OC-IS Ocularis IS Video Centric Physical Security Information ONSSI
Management Base Server Software with license or equivalent
b. 50 OC-IS-1C One (1) Camera/Channel License for Ocularis OC-IS ONSSI or equivalent
Section A Page 8
ADDITIONAL SOW INCLUSIONS/EXCLUSIONS:
1. Remove and Replace existing interior and exterior cameras and fill holes or blemishes cause by old camera
2. Coordinate with agency personnel for the locations of cameras and workstations.
3. Program each workstation to operate cameras as required by the agency.
4. Coordinate with the agency representative at time of install to verify required operation of the system.
5. Program all systems to operate as the agency intends.
6. Configure / program all camera inputs and operational parameters to include but not limited to Privacy screens where cameras are place to view staff interaction with customers, but should not show employee performing daily duties.
7. Configure all camera presets and operational parameters.
8. Contractor shall verify video storage calculations based on the following:
a. Contractor will provide recording storage based on calculations of the following: Cameras type, H.264, 15fps, 30 days storage, recording 7 days a week.
9. Follow applicable standards, including:
a. UL1076 Proprietary Burglar Alarm Units and Systems
b. UL 681 Standard for Installation and Classification of Burglar and Holdup Alarm Systems
c. UL 634 Connectors and Switches for Use with Burglar-Alarm Systems
d. National Electrical Code
e. Local codes
10. The Contractor shall label all wiring with information that allows for easy identification from either terminating location. Except for patch cables, all cable installations will include cable labeling in accordance with the BICSI Standard and ANSI/TIA/EIA-606-A Standard. The Contractor shall install Plenum-rated cable.
11. Execute all work in accordance with the best practices of the trade.
12. Upon completion of each day's work clean, remove and dispose of any dirt and debris
13. Remedy project activities that require cutting, drilling, or other damaging effects (intentional or unintentional) on building finishes and clean all debris
14. Repair all holes and wall damage, refinish, repaint, and clean all debris when removing existing equipment
15. Match the surface in repair to existing surfaces and finish the surface in repair as flush with the existing surfaces
16. Coordinate activities with the Facility Manager; if any proposed work is deemed disruptive to the operation or occupants, the Contractor will need to schedule work outside of normal hours at no additional cost to the Government
Section A Page 9
17. Remove all unused legacy system cables upon completion of the new system
18. The Contractor shall conceal CCTV wiring in the wall, floor, or ceiling to prevent safety hazards.
The Contractor shall conceal wiring in a conduit to provide a professional finish when wiring outside the walls or ceiling. The agency shall accept a combination of concealed and conduit wiring for a site. The Contractor shall conceal wiring, if required, on exterior walls and roofing with approval from the customer. The Contractor shall meet all safety standards and building codes. The Contractor shall include all additional wiring work, such as firewall penetration.
19. The Contractor shall install all components securely and in accordance with the manufacturer instructions at the indicated locations on the drawing. The Contractor shall verify all components of any existing system as functional when incorporating equipment with new systems.
20. After job completion and agency acceptance, any materials furnished by the contractor become the sole property of the Government.
21. Store, secure, or remove properly any unused material from the work site at the end of each work shift; uninstalled or removed (decommissioned) equipment will remain the property of the agency and the Contractor will return the property to the agency
22. The Contractor will provide all tools and items to complete the services and activities required under this contract.
23. Install and configure all components required for the fully integrated CCTV solution
24. The Contractor shall provide as-built documents to the agency for the complete installation of CCTV equipment.
25. The Contractor shall provide 12 months on-site warranty, including equipment and associated workmanship, commencing from the date of acceptance for the complete system at individual field offices.
26. The Contractor shall restore normal operational conditions of reported problems within two (2) business days of the service request. The customer may request the service via telephone, email, or verbal request.
27. The Contractor shall provide user and original equipment manufacturer (OEM) training for the provided systems upon completion of the installation. Training on the equipment will include the operation of any software associated with the system to end-user key personnel. Specific areas of training may include operational technologies and techniques, minor and routine system testing, and troubleshooting tips. The Contractor shall demonstrate full functionality to the on-site end user.
28. Space shall be cleaned to a professional level when work is complete
Section A Page 10
Contracting Officer:
General Services Administration 2 Exchange Terrace Providence, R. I. 02903 Attn: Gary Smith, (401) 528-4128
Contracting Officer’s Technical Representative (COTR) For questions regarding the drawings, specifications and scope of work contact:
General Services Administration U.S. Courthouse 300 State Street Springfield, MA Attn: Mark Howard, (860) 305-2576
Section A Page 11
360' Dual Tech Motion Detector
Door Contact
Fixed Camera
CCTV Monitor
CCTV Workstation
NVR
IDS Control Panel
Section A Page 12
General Decision Number: MA150002 07/17/2015 MA2
Superseded General Decision Number: MA20140002
State: Massachusetts
Construction Types: Building and Heavy (Heavy and Dredging)
BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS;
AND MARINE CONSTRUCTION PROJECTS
County: Worcester County in Massachusetts.
BUILDING CONSTRUCTION PROJECTS (Does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS;
AND MARINE CONSTRUCTION PROJECTS
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 01/09/2015
2 01/30/2015
3 02/13/2015
4 03/06/2015
5 03/20/2015
6 04/17/2015
7 05/08/2015
8 07/03/2015
9 07/17/2015
ASBE0006-005 09/01/2014
Rates Fringes
Insulator/asbestos worker
Includes the application of all insulating materials, protective coverings, coating, and finishes to all types of mechanical systems..........$ 38.98 24.15
BOIL0029-001 10/01/2009
7/31/2015http://www.wdol.gov/wdol/scafiles/davisbacon/MA2.dvb?v=9
Section A Page 13
Rates Fringes
BOILERMAKER......................$ 38.25 17.04
BRMA0001-002 09/01/2013
SPRINGFIELD/PITTSFIELD CHAPTER WORCESTER (Warren County)
Rates Fringes
Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 36.56 27.87
BRMA0001-014 09/01/2013
WORCESTER CHAPTER
WORCESTER (Auburn Barre, Blackstone, Berlin, Bolton, Boylston, the Brookfields, Charlton, Clinton, Douglas, Dudley, Grafton, Hardwick, Holden, Leicester, Mendon, Millbury, Milville, New
Braintree, Northboro, Northbridge, Oakham, Oxford, Paxton, Rutland, Shrewbury, Southbridge, Spencer, Sturbridge, Sutton, Upton, Uxbridge, Webster, Westboro, West Boylston, Worcester)
Rates Fringes
Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 45.96 29.74
BRMA0001-015 09/01/2013
LOWELL CHAPTER
WORCESTER (Hopedale, Milford, Southboro)
Rates Fringes
Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 45.96 29.74
BRMA0001-023 09/01/2013
LOWELL CHAPTER
WORCESTER (Ashburhanm, Athol, Fitchburg, Gardner, Harvard, Hubbardston, Lancaster, Leominster, Lunenburg, Petersham, Phillipston, Princeton, Royalston, Sterling, Templeton, Westminster, Winchendon)
Rates Fringes
Bricklayer, Cement Mason, Plasterer & Stonemason...........$ 45.96 29.74
BRMA0003-001 08/01/2014
Rates Fringes
Marble & Tile Finisher...........$ 37.37 27.20
Marble, Tile & Terrazzo
Section A Page 14
Workers..........................$ 49.00 28.72
TERRAZZO FINISHER................$ 47.90 28.55
* CARP0056-004 08/01/2014
Rates Fringes
DIVER TENDER.....................$ 41.05 29.17
DIVER............................$ 57.47 29.17
* CARP0056-008 08/01/2014
Rates Fringes
PILEDRIVERMAN....................$ 41.05 29.17
CARP0107-002 03/01/2015
WORCESTER (Except Gilbertville, Harwick, Warren, West
Brookfield)
Rates Fringes
Carpenter/Lather.................$ 35.75 26.88
CARP0108-001 03/02/2015
WORCESTER (Gilbertville, Hardwick, Warren, West Brookfield)
Rates Fringes
Carpenter/Lather.................$ 32.09 22.93
CARP1121-001 04/01/2015
Rates Fringes
MILLWRIGHT.......................$ 36.64 27.88
* CARP2168-002 03/01/2015
Rates Fringes
FLOOR LAYER: Carpet.............$ 38.80 27.68
ELEC0007-001 12/29/2014
WORCESTER (Warren)
Rates Fringes
ELECTRICIAN......................$ 37.71 19.08
* ELEC0096-002 06/01/2015
WORCESTER (Except Warren)
Rates Fringes
Section A Page 15
ELECTRICIAN......................$ 38.87 14%+16.83
Teledata System Installer........$ 26.25 3%+19.87
ELEC0104-001 08/31/2014
Rates Fringes
Line Construction:
Cableman....................$ 43.51 21.64+A
Equipment Operator..........$ 36.98 18.93+A
Groundman...................$ 23.93 12.26+A
Lineman.....................$ 43.51 21.64+A
A. PAID HOLIDAYS: New Year's Day; Memorial Day;
Independence Day; Labor Day; Thanksgiving Day; Christmas
Day and Columbus Day, provided the employee has been employed 5 working days prior to any one of the listed holidays.
ELEV0041-002 01/01/2015
Rates Fringes
ELEVATOR MECHANIC................$ 47.73 28.385+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0004-003 06/01/2015
WORCESTER (Except Athol, Barre, Brookfield, East Brookfield, Hardwick, New Braintree, North Brookfield, Oakham, Petersham, Phillipston, Royalston, Strutbridge, Templeton, Warren, West
Brookfield, Winchendon)
Rates Fringes
Power equipment operators:
BUILDING, HEAVY & MARINE
GROUP 1....................$ 42.83 25.45+A
GROUP 2....................$ 42.42 25.45+A
GROUP 3....................$ 29.61 25.45+A
GROUP 4....................$ 35.64 25.45+A
GROUP 5....................$ 21.97 25.45+A
GROUP 6....................$ 25.68 25.45+A
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day, Christmas Day
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Section A Page 16
Over 150 ft. +2.12
Over 185 ft. +3.72
Over 210 ft. +5.23
Over 250 ft. +7.92
Over 295 ft. +10.97
Over 350 ft. +12.76
POWER EQUIPMENT OPERATORS CLASSIFICATIONS BUILDING AND HEAVY
CONSTRUCTION
GROUP 1: Power shovel; crane; truck crane; derrick; pile driver; trenching machine; mechanical hoist pavement breaker; cement concrete paver; dragline; hoisting engine;
three drum machine; pumpcrete machine; loaders; shovel dozer; front end loader; mucking machine; shaft hoist;
steam engine; backhoe; gradall; cable way; fork lift;
cherry picker; boring machine; rotary drill; post hole hammer; port hole digger; asphalt plant on job site;
concrete batching and/or mixing plant on job site; crusher plant on job site; paving concrete mixer; timber jack
GROUP 2: Sonic or vibratory hammer; grader; scraper; tandem scraper; bulldozer; tractor; mechanic - maintenance; York rake; mulching machine; paving screed machine;stationary steam boiler; paving concrete finishing machine; grout pump; portable steam boiler; portable steam generator;
roller; spreader; asphalt paver; locomotives or machines used in place thereof; tamper (self propelled or tractor-draw); cal tracks; ballast regulator;rail anchor machine; switch tamper; tire truck
GROUP 3: Pumps (1-3 grouped); compressor; welding machines
(1-3 grouped); generator; sighting plant; heaters (power driven, 1- 5); syphon-pulsometer; concrete mixer; valves controlling permanent plant air steam, conveyor, wellpoint system (operating)
GROUP 4: Assitant engineer (fireman)
GROUP 5: Oiler (other than truck cranes and gradalls)
GROUP 6: Oiler (on truck cranes and gradalls)
POWER EQUIPMENT OPERATORS CLASSIFICATIONS MARINE CONSTRUCTION
GROUP 1: Shovel; crane; truck crane; cherry picker; derrick;
pile driver; two or more drum machines; lighters; derrick boats; trenching machines; mechanic hoist pavement breakers; cement concrete pavers; draglines; hoisting engines; pumpcrete machines; elevating graders; shovel dozer; front end loader; backhoe; gradall; cable ways;
boring machine; rotary drill; post hole hammer; post hole digger; fork lift; timber jack; asphalt plant (on site);
concrete batching and/or mixing plant (on site); crusher plant (on site); paving concrete mixer
GROUP 2: Portable steam boiler; portable steam generator;
sonic or vibratory hammer; grader; scraper; tandem scraper;
concrete pump; bulldozer; tractor; York rake; mulching machine; roller; spreader; tamper (self-propelled or tractor-drawn); asphalt paver; concrete mixer with side loader; mechanic - maintenance; cal tracks; ballast regulator; switch tamper; rail anchor machine; tire truck
GROUP 3: Pumps (1-3 grouped); comressor; welding machines
(1-3 grouped); generator; lighting plant; heaters (power driven 1-5); syphon-pulsometer; concrete mixer; valves controlling permanent plant air or steam; conveyor; well
Section A Page 17 point systems; auger (powered by independent engines and attached to pile drivers); hydraulic saws
GROUP 4: Fireman
GROUP 5: Assistant engineer (other than truck crane and gradall)
GROUP 6: Assistant engineer (on truck crane and gradall)
ENGI0004-007 06/01/2015
WORCESTER (Area East of a line formed by the Eastern boundaries of the following townships: Barre, Brookfield, East Brookfield, North Brookfield, Oakham, Sturbridge, Templeton, and Winchendon)
Rates Fringes
Power equipment operators:
(BUILDING)
GROUP 1.....................$ 42.83 25.45+A
GROUP 2.....................$ 42.42 25.45+A
GROUP 3.....................$ 29.61 25.45+A
HOURLY PREMIUM FOR BOOM LENGTHS (Including Jib):
Over 150 ft. +2.12
Over 185 ft. +3.72
Over 210 ft. +5.23
Over 250 ft. +7.92
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Backhoe, Front End Loader, Crane
GROUP 2: Bulldozer
GROUP 3: Pumps
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas
Day
ENGI0098-005 06/01/2014
Rates Fringes
Power equipment operators:
(HEAVY CONSTRUCTION)
Group 1....................$ 31.17 21.43+A
Group 2....................$ 30.86 21.43+A
Group 3....................$ 30.64 21.43+A
Group 4....................$ 30.03 21.43+A
Group 5....................$ 27.41 21.43+A
Group 6....................$ 26.29 21.43+A
Group 7....................$ 24.35 21.43+A
Group 8....................$ 285.87 21.43+A
Section A Page 18
Group 9....................$ 210.61 21.43+A
Group 10....................$ 32.66 21.43+A
Group 11....................$ 35.67 21.43+A
Group 12....................$ 37.17 21.43+A
Group 13....................$ 38.17 21.43+A
Group 14....................$ 39.17 21.43+A
Group 15....................$ 40.67 21.43+A
HAZARDOUS WASTE PREMIUM $2.00
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. Paid Holidays: New year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day and Christmas Day
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
Group 1: Shovels; crawlers and truck cranes including all tower; self-propelled hydraulic cranes 10 tons and over;
draglines; clam shells; cableways; shaft hoists; mucking machines derricks; backhoes; bulldozers; gradalls;
elevating graders; pile drivers; concrete pavers; trenching machines; front end loaders- 5 1/2 cu yds and over; dual drum paver; automatic grader-excavator(C.M.I. or equal);
scrapers towing pan or wagon; tandem dozers or push cats(2 units in tandem); shotcrete machine; tunnel boring machine;
combination backhoe/loader 3/4 cu yd hoe or over; jet engine dryer; tree shredder; post hole digger; post hole hammer; post extractor; truck mounted concrete pump with boom; roto-mill; Grader; Horizontal Drilling Machine; John
Henry Rock Drill and similar equipment.
Group 2: Rotary drill with mounted compressor; compressor house (3 to 6 compressors); rock and earth boring machines
(excluding McCarthy and similar drills); front end loaders
4 cu yds to 5 1/2 cu yds); forklifts-7 ft lift and over 3 ton capacity; scraper 21 yds and over (struck load); sonic hammer console; reclaimers road planer/milling machine; cal tracks; ballast regulators; rail anchor machines; switch tampers, asphalt pavers; mechanic; welder and transfer machine.
Group 3: Combination backhoe/loader up to 3/4 cu yd;
scrapers up to 21 cu yd (struck load, self propelled or tractor drawn); tireman; front end loaders up to 4 yds;
well drillers; engineer or fireman on high pressure boiler;
self-loading batch plant; well point operators electric pumps used in well point system; pumps, 16 inches and over
(total discharge); compressor, one or two 900 cu ft and over; powered grease truck; tunnel locomotives and dingys;
grout pumps; hydraulic jacks; boom truck; hydraulic cranes-up to 10 ton.
Group 4: Asphalt rollers; self-powered rollers and compactors; tractor without blade drawing sheepsfoot roller; rubber tire roller; vibratory roller or other type of compactors including machines for pulverizing and aerating soil; york rake.
Group 5: Hoists; conveyors; power pavement breakers;
self-powered concrete pavement finishing machines; two bag mixers with skip; McCarthy and similar drills; batch plants
(not self loading); bulk cement plants; self-propelled material spreaders; three or more 10 KW light plants; 30
KW or more generators; power broom.
Section A Page 19
Group 6: Compressor (one or two) 315 cu ft to 900 cu ft;
pumps 4 inches to 16 inches (total discharge).
Group 7: Compressors up to 315 cu ft; small mixers with skip; pumps up to 4 inches; power heaters; oiler; A-frame trucks; forklifts-up to 7 ft. lift and up to 3 ton capacity; hydro broom; stud welder.
Group 8: Truck crane crews
Group 9: Oiler
Group 10: Master Mechanic
Group 11: Boom lengths over 150 feet including jib
Group 12: Boom lengths over 200 feet including jib
Group 13: Boom lengths over 250 feet including jib
Group 14: Boom lengths over 300 feet including jib
Group 15: Boom lengths over 350 feet including jib
ENGI0098-006 06/01/2014
WORCESTER (Area west of a line formed by the Eastern boundaries of the following Townships: Barre, Brookfield, East Brookfield, North Brookfield, Oakham, Sturbridge, Templeton, and Winchendon)
Rates Fringes
Power equipment operators:
(BUILDING)
GROUP 1.....................$ 31.17 21.43+A
GROUP 2.....................$ 30.86 21.43+A
GROUP 3.....................$ 30.64 21.43+A
GROUP 4.....................$ 30.03 21.43+A
FOOTNOTE FOR POWER EQUIPMENT OPERATORS:
A. Paid Holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day and Christmas Day
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Backhoe; Bulldozer; Front End Loader, 5 1/2 cu yd and over; Crane
GROUP 2: Front End Loader, 4 cu yd to 5 1/2 cu yd
GROUP 3: Front End Loader up to 4 cu yd
GROUP 4: Roller, all types
IRON0007-012 03/16/2015
Rates Fringes
IRONWORKER.......................$ 41.81 28.67
LABO0022-001 12/01/2012
Rates Fringes
Laborers: (HEAVY CONSTRUCTION)
GROUP 1.....................$ 29.60 19.50
GROUP 2.....................$ 29.85 19.50
GROUP 3.....................$ 30.35 19.50
GROUP 4.....................$ 30.60 19.50
Section A Page 20
GROUP 5.....................$ 20.50 19.50
GROUP 6.....................$ 31.60 19.50
LABORERS CLASSIFICATIONS
GROUP 1: Laborers; carpenter tenders; cement finisher tenders, plasterer tenders
GROUP 2: Asphalt raker; fence and guard rail erector; laser beam operator; mason tender; pipelayer; pneumatic drill operator; pneumatic tool operator; wagon drill operator, jack hammer operator, pavement breaker, carbide core drilling machine, chain saw operator, barco type jumping tampers, concrete pump, motorized mortar mixer, ride-on-motorized buggy
GROUP 3: Air track operator; block paver; rammer; curb setter, hydraulic and similar self powered drills
GROUP 4: Blaster; powderman
GROUP 5: Flagger
GROUP 6: Asbestos Abatement; Toxic and Hazardous Waste
Laborers
LABO0022-013 12/01/2012
Rates Fringes
Laborers:
(FREE AIR OPERATION):
SHIELD DRIVEN AND LINER
PLATE IN FREE AIR)
GROUP 1....................$ 32.90 20.30+A
GROUP 2....................$ 32.90 20.30+A
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
TEST BORING & WELL DRILLING
Driller....................$ 33.70 19.85+A
Laborer....................$ 32.30 19.85+A
(OPEN AIR CASSONS,
UNDERPINNING AND TEST
BORING INDUSTRIES):
OPEN AIR CASSON,
UNDERPINNING WORK & BORING
CREW
Bottom man.................$ 33.45 19.85+A
Laborers; Top man..........$ 32.30 19.85+A
(TUNNELS, CAISSON &
CYLINDER WORK IN
COMPRESSED AIR)
Section A Page 21
GROUP 1....................$ 30.35 20.30+A
GROUP 2....................$ 40.83 20.30+A
GROUP 3....................$ 40.83 20.30+A
GROUP 4....................$ 40.83 20.30+A
GROUP 5....................$ 40.83 20.30+A
GROUP 6....................$ 42.83 20.30+A
CLEANING CONCRETE AND
CAULKING TUNNEL (Both New
& Existing)
GROUP 1....................$ 32.90 20.30+A
GROUP 2....................$ 32.90 20.30+A
ROCK SHAFT, CONCRETE
LINING OF SAME AND TUNNEL
IN FREE AIR
GROUP 1....................$ 30.35 20.30+A
GROUP 2....................$ 32.90 20.30+A
GROUP 3....................$ 32.90 20.30+A
GROUP 4....................$ 32.90 20.30+A
GROUP 5....................$ 34.90 20.30+A
LABORERS CLASSIFICATIONS for TUNNELS, CAISSON & CYLINDER WORK
IN COMPRESSED AIR
GROUP 1: Powder watchman; Top man on iron bolt; change house attendant
GROUP 2: Brakeman; trackman; groutman; tunnel laborer;
outside lock tender; lock tender; guage tender
GROUP 3: Motorman, miner
GROUP 4: Blaster
GROUP 5: Mucking machine operator
GROUP 6: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic wage rate.
LABORERS CLASSIFICATIONS for (FREE AIR OPERATION): SHIELD
DRIVEN AND LINER PLATE IN FREE AIR
GROUP 1: Miner; miner welder; conveyor operator; motorman;
mucking machine operator; nozzle man; grout man-; pumps, shaft and tunnel steel and rodman; shield and erector arm operators, mole nipper, outside motorman, burner, TBM operator, safety miner; laborer topside; heading motormen;
erecting operators; top signal men
GROUP 2: Brakeman; trackman
LABORERS CLASSIFICATIONS FOR CLEANING CONCRETE AND CAULKING
TUNNEL (Both New & Existing)
GROUP 1: Concrete workers; strippers and form movers (wood & steel), cement finisher
GROUP 2: Form erector (wood & steel and all accessories)
Section A Page 22
LABORERS CLASSIFICATIONS for ROCK SHAFT, CONCRETE LINING OF
SAME AND TUNNE IN FREE AIR
GROUP 1: Change house attendants
GROUP 2: Laborers, topside, bottom men (when heading is 50
ft. from shaft) and all other laborers
GROUP 3: Brakeman; trackman; tunnel laborers; shaft laborers
GROUP 4: Miner; cage tender; bellman
GROUP 5: Hazardous Waste work within the "HOT" zone. (A premium of two dollars $2.00 per hour over the basic wage rate)
FOOTNOTE FOR LABORERS:
A. PAID HOLIDAYS: New Year's Day, Washington's Birthday, Patriot's Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veteran's Day, Thanksgiving Day, and
Christmas Day
LABO1421-003 06/01/2014
Rates Fringes
Laborers:
Group 1.....................$ 34.25 20.85
Group 2.....................$ 35.00 20.85
Group 3.....................$ 35.25 20.85
Group 4.....................$ 30.25 20.85
Group 5.....................$ 33.35 20.85
Group 6.....................$ 34.25 20.85
Group 1: Adzeman, Wrecking Laborer.
Group 2: Burners, Jackhammers.
Group 3: Small Backhoes, Loaders on tracks, Bobcat Type
Loaders, Hydraulic "Brock" Type Hammer Operators, Concrete
Cutting Saws.
Group 4: Yardman (Salvage Yard Only).
Group 5: Yardman, Burners, Sawyers.
Group 6: Asbestos, Lead Paint, Toxic and Hazardous Waste.
PAIN0035-006 01/01/2015
Rates Fringes
Painters:
NEW CONSTRUCTION:
Bridge.....................$ 46.76 25.95
Brush, Taper...............$ 36.26 25.95
Spray, Sandblast...........$ 37.66 25.95
Section A Page 23
REPAINT
Bridge.....................$ 46.76 25.95
Brush, Taper...............$ 34.32 25.95
Spray, Sandblast...........$ 35.72 25.95
PAIN0035-021 01/01/2015
Rates Fringes
GLAZIER..........................$ 36.26 25.95
PLUM0004-002 09/01/2014
WORCESTER (Except Hopedale and Southboro)
Rates Fringes
Plumbers and Pipefitters.........$ 41.11 24.71
PLUM0012-002 09/01/2013
WORCESTER (Hopedale and Southboro)
Rates Fringes
PLUMBER..........................$ 49.06 24.56
ROOF0033-001 08/01/2014
Rates Fringes
Roofers:
All Tear-off and/or removal of any types of roofing and all spudding, sweeping, vacuuming and/or cleanup of any and all areas of any type where a roof is to be relaid........$ 39.21 22.92
SFMA0669-002 01/01/2014
Rates Fringes
SPRINKLER FITTER.................$ 39.40 21.05
SHEE0017-004 02/01/2012
WORCESTER (Harvard, Lancaster)
Rates Fringes
Sheet metal worker...............$ 40.79 28.83
SHEE0063-002 07/01/2012
WORCESTER (Except Harvard & Lancaster)
Rates Fringes
Section A Page 24
Sheet metal worker...............$ 31.23 23.69
TEAM0379-003 08/01/2013
Rates Fringes
Truck drivers: (EXCEPT
BUILDING CONSTRUCTION)
Group 1.....................$ 30.78 18.37+A+B
Group 2.....................$ 30.95 18.37+A+B
Group 3.....................$ 31.02 18.37+A+B
Group 4.....................$ 31.14 18.37+A+B
Group 5.....................$ 31.24 18.37+A+B
Group 6.....................$ 31.53 18.37+A+B
Group 7.....................$ 31.82 18.37+A+B
TRUCK DRIVERS CLASSIFICATIONS
Group 1: Station wagons; panel trucks; and pickup trucks
Group 2: Two axle equipment; & forklift operator
Group 3: Three axle equipment and tireman
Group 4: Four and Five Axle equipment
Group 5: Specialized earth moving equipment under 35 tons other than conventional type trucks; low bed; vachual;
mechanics, paving restoration equipment
Group 6: Specialized earth moving equipment over 35 tons
Group 7: Trailers for earth moving equipment (double hookup)
POWER TRUCKS $.25 DIFFERENTIAL BY AXLE TUNNEL WORK
(UNDERGROUND ONLY) $.40 DIFFERENTIAN BY AXLE HAZARDOUS
MATERIALS (In Hot Zone Only) $2.00 premium
FOOTNOTES: A. PAID HOLIDAYS: New Year's Day, Washington's
Birthday, Memorial Day, Independence Day, Labor Day, Patriot's Day, Columbus Day, Veteran's Day, Thanksgiving
Day, & Christmas Day
B. PAID VACATION: Employees with 4 months to 1 year of service receive 1/2 day's pay per month; 1 week vacation for 1 - 5 years of service; 2 weeks vacation for 5 - 10 years of service; and 3 weeks vacation for more than 10 years of service
SUMA1989-001 05/01/1989
BUILDING CONSTRUCTION ONLY:
Rates Fringes
Laborers:
Landscape...................$ 8.28
Unskilled...................$ 12.71 3.60
Section A Page 25
Truck drivers:
2-AXLE......................$ 11.77
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates
Section A Page 26 the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an
Section A Page 27 interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Section A Page 28
Section A Page 29
Section A Page 30
Section A Page 31
Section A Page 32
Section A Page 33
Section A Page 34
Section A Page 35
Section A Page 36
GSA Solicitation No. GS-01P-15-NL-P-7005
Document: C201-SAT-LPTA / APR 2015 (The Solicitation) Pages 1 of 13
Simplified Acquisition Construction Contract for Installation of CCTV, SSA, Madison PL, 51 Myrtle Street, Worcester, MA
The Solicitation
Notice to Offerors of Total Small Business Set-Aside The General Services Administration (GSA) is setting aside the contract under the following clause found in the Agreement:
52.219-6, Notice of Total Small Business Set-Aside
Table of Contents
I. General Information A. The Solicitation and Contract B. List of Solicitation Documents C. Authorized Representatives D. Estimated Price Range E. FAR 52.236-27 Site Visit - Construction
F. Receipt of Offers
II. Proposals A. Proposal Contents B. Proposal Format C. Price Proposal D. Technical Proposal E. Other Information to Submit with Proposal
III. General Provisions
A. Availability of Funds B. Requests for Clarification or Interpretation C. Notice to Small Business Firms D. Information Concerning the Disclosure of Solicitation Results E. Affirmative Procurement Program F. Notice Concerning Preparation of Proposals G. Bond/Payment Protection Requirements H. Contractor Performance Information I. Safeguarding Documents Designated as Sensitive But Unclassified
IV. FAR/GSAR Solicitation Provisions
A. FAR 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction
B. FAR 52.225-10 Notice of Buy American Requirement-Construction Materials C. Buy American Exceptions D. FAR 52.252-1 Solicitation Provisions Incorporated by Reference
V. Additional Solicitation Provisions and Instructions
Section A Page 37
(The Solicitation) Pages 2 of 13
VI. Method of Award A. Evaluation of Offers – Lowest Price Technically Acceptable B. Lowest Price Technically Acceptable Evaluation Process C. Price Reasonablenes D. Unbalanced Prices
Section A Page 38
(The Solicitation) Pages 3 of 13
I. General Information
I.A. The Solicitation and Contract
(1) This Solicitation is set-aside for Small Businesses], in accordance with FAR 19. This Solicitation sets forth requirements for proposals for a Contract to construct the Project described in the Solicitation Documents. Proposals conforming to the Solicitation requirements will be evaluated in accordance with the Method of Award set forth herein. The Government will award the Contract to the selected Offeror, subject to the conditions set forth herein.
(2) Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein by the Contracting Officer.
(3) The Offeror's proposal submitted in response to this Solicitation shall constitute a firm offer.
No contract shall be formed unless and until the Contracting Officer has countersigned the SF 1442 submitted by an Offeror, and delivered to the Contractor a copy of the SF 1442 with original signatures together with the Agreement reflecting the Offeror's proposed prices.
I.B List of Solicitation Documents
The Solicitation Documents are comprised of:
(1) The Solicitation
(2) Offeror Representations and Certifications Form
(3) Other Forms Required For Submission with Proposals
(4) Standard Form (SF) 1442 – Solicitation Offer and Award
(5) The Agreement and Attachments to the Agreement
I.C . Authorized Representatives
The following individuals are designated as the authorized GSA representatives under this Solicitation:
(1) Contracting Officer
Name: Gary Smith Address: GSA, 2 Exchange Terrace, Providence, RI 02903
Telephone: 401-528-4128 Email: gary.smith@gsa.gov