GS-01P-10-BZ-C- 0017
PRE-PROPOSAL MEETING MINUTES
RFP GS-01P-10-BZ-C- 0017
Design Build of Energy Conservation Measures (ECM’s) to Upgrade Lighting Systems and BAS/EMS at the Cleveland/Rudman Federal Buildings, Concord, NH.
The pre-proposal meeting was held at 10:00 AM EST on Thursday, February 11, 2010.
Contractors reported to the WB Rudman FB for escort service to the conference room.
The Pre-Proposal Conference for the Design Build of Energy Conservation Measures (ECM’s) to Upgrade Lighting Systems and BAS/EMS at the Cleveland/Rudman Federal Buildings, Concord, NH, began on time. The RFP number for this project is GS-01P-10- BZ-C-0017. It is anticipated this contract will be awarded on or around May 26, 2010 with substantial completion on January 19, 2011 for a total duration of 238 days. This procurement is open to large and small business participation.
My name is John Sarnoski. I am a Contract Specialist, for the General Services Administration, North Service Center, in Boston, Massachusetts. The other GSA personnel here today are:
Donna Maffeo, Contracting Officer for this solicitation;
Patrick Ross, Project Manager for this project;
Charlie Dockham, Property Manager for Cleveland/Rudman buildings;
Brian Wong, Engineering Manager Jeff Schetrompf, Lead Electrical Engineer
A list of prospective offerors that attended the pre-proposal conference/site visit is attached.
The purpose of this meeting is to discuss key provisions of the solicitation and to give you the opportunity to ask clarifying questions regarding the requirements. A copy of these meeting minutes will be issued along with any forthcoming amendment(s).
Any discussions held today do not change the Solicitation. Any questions and answers are provided as information only and do not authorize changes to the solicitation. Only changes made by the issuance of an amendment are to be considered in preparing your proposals.
There will be an amendment forthcoming that, among other things, will revise the format of the proposal to standardize Design/Build RFP format. This format change will not change the substance of the RFP currently released.
SITE VISIT:
All offerors are strongly encouraged to visit each site. An initial site tour was conducted immediately prior to this meeting.
Additional, site visits can be arranged by contacting Patrick Ross, Project Manager, at
(603) 225-1615.
FEDBIZOPPS:
This solicitation and any related documents have been posted on the FedBizOpps website. Paper copies will not be issued. All future documents regarding this solicitation will also be posted on this website. Nothing said today will modify the terms of the solicitation. The solicitation can only be modified by amendment, and all amendments will be posted at FBO. The Internet address is: http://www.fbo.gov.
DOCUMENT SECURITY:
Current Document security requirements authorizes the issuance of this solicitation to be posted on the Internet. The Technical Specifications contain sensitive but unclassified (SBU) information and are subject to the safeguards presented in the RFP.
The contractor will be required to follow the procedures when disseminating any SBU building information during the term of the contract.
DESCRIPTION OF WORK:
This is an unrestricted procurement open to large and small business under the Small Business Competitiveness Demonstration Program. If award is made to a large business, the provisions of GSAR 552.219-71 –“Notice to Offerors of Subcontracting Plan Requirements” (JUN 05) will apply. The full text of this provision is contained on the cover sheet of Volume 1 of the solicitation.
Contractor will be responsible for the Design/Build of Energy Conservation Measures to upgrade the Lighting Systems and BAS/EMS Systems at the J.C. Cleveland and W.B.
Rudman Federal buildings in Concord, NH. The work will include but not be limited to:
- Performance of a complete lighting fixture replacement with energy efficient T-8 units.
- Installation and integration of master and occupancy lighting controls with BAS/EMS.
- Replacement of exterior HID wall packs with LED lighting.
- Installation of auto-dimming ballasts for stairwells.
- Installation of flow measuring devices and modulating motor air dampers to regulate ventilating air and installation of occupancy sensing controls for AHU’s.
- Installation of two speed EMS control and VFD’s on cooling tower fans.
- Consolidation of legacy BAS under a single, secure BAS for the entire Cleveland/Rudman complex.
- Installation of carbon dioxide sensors into return air ductwork of AHUs.
- Integration of chiller controls with EMS.
The contractor shall perform all professional services as necessary to provide GSA with a complete design package including, but not limited by, the requirements outlined in the Statement of Work. The design package shall include specifications, calculations and drawings which will be turned over to GSA. After approval by GSA of the final design package, the contractor shall provide all necessary construction services to successfully execute the project.
CONTRACT PROVISIONS
There will be significant revisions to the format of the RFP forthcoming. These revisions will not substantially change the requirements. All references to solicitation locations that I give today will refer to the unrevised solicitation that you have now.
The Contract (Vol1, p.3) The Contract consists of the SF 1442, the Agreement, the Statement of Work, Specifications, Drawings, Exhibits, and other Attachments identified herein (collectively, the Contract Documents). The Contract contains the entire agreement of the Parties, and no prior written or oral agreement, express or implied, shall be admissible to contradict or modify any part of the Contract.
Period of Performance (Vol1,p.4) The Contractor shall achieve Substantial Completion of the Work, as that term is defined in this solicitation (Vol.1, I.B.8), no later than 225 calendar days from issuance of Notice to Proceed (NTP). The Contractor shall achieve Contract Completion within thirty
(30) calendar days of Substantial Completion.
Work Conditions/Site Requirements (Vol1, p.4) This provision details Contractor’s responsibilities with respect to modification, replacement removal and protection of existing conditions. All work performed under this contract will conform to existing conditions. No deviations will be allowed unless expressly approved by the Contracting Officer.
GENERAL TERMS AND CONDITIONS
Contractor Responsibilities (Vol1, p.5) The Contractor shall be responsible for providing professional design services unless this responsibility is expressly excluded from the Contract.
In addition, the Contractor shall be responsible for construction of the approved design and for coordinating all activities of subcontractors.
The Contractor shall perform at least ten percent (10%) of the Work
Contractor Management and Personnel (Vol1, p.6) In addition to the requirements of FAR 52.236-6, Superintendence by Contractor, the following requirements are added:
1) The Contractor shall employ sufficient management and contract administration resources to ensure the proper execution and timely completion of the Work. This requirement extends to subcontractors. Also, the Contractor shall designate a principal of the firm or other senior management official to provide executive oversight and problem resolution resources to the Project for the life of the Contract.
CPM Project Schedule (Vol1, p.7)
The Contractor shall use a Critical Path Method ("CPM") Project Schedule to plan, coordinate, and perform the Work. The preparation and proper management of the Project Schedule is a material component of the Work, and the Contract price should include all costs of compliance with Project Schedule requirements.
After award of the Contract, the Contractor will be required to submit a revised Project Schedule which will become the basis for measuring progress.
If at any time the Contracting Officer finds that the Project Schedule does not comply with any Contract requirement, the Contractor shall, upon written notice, revise the Project Schedule, adjust activity progress, or provide sufficient information demonstrating compliance..
Submittals (Vol1, p.9)
The Contractor shall prepare and submit to the Contracting Officer design documents, shop drawings, samples, calculations, product information, mockups, and other submittals (collectively, "submittals") as specified in the Contract Documents. GSA shall review submittals for the limited purpose of verifying that the documents conform to the design criteria expressed in the Contract Documents.
The Contractor shall not proceed with work or procure products or materials described or shown in submittals until the Contracting Officer has indicated approval of the submittal
Substantial Completion and Contract Completion (Vol1,p.9)
For the purposes of FAR 52.211-10, Commencement, the Work shall be deemed complete when it is “Substantially Complete.” The Work shall be deemed "Substantially Complete" if and only if the Contractor has completed the Work and related Contract obligations in accordance with the Contract Documents, such that the Government may enjoy the intended access, occupancy, possession, and use of the entire Work without impairment due to incomplete or deficient work, and without interference from the Contractor's completion of remaining work or correction of deficiencies in completed work.
The Contract Completion occurs when the Contractor has completed all Work and related Contract obligations, corrected all deficiencies, and complied with all conditions for final payment. The Contractor will not receive final payment nor release of any retainage held by the Government until after Contract Completion.
Insurance Requirements (Vol1, p.11)
In addition to customary insurance requirements which have been raised significantly from previous levels, the Contractor shall require that the licensed design professionals it retains for the Project acquire and maintain professional liability insurance in the amount of $5,000,000 per claim and shall provide proof to the Contracting Officer.
Administrative Matters (Vol1, p.12)
Project Meetings. The Contractor shall attend a preconstruction conference and shall participate in regularly scheduled Project meetings.
Schedule of Values. After award, the Contractor shall prepare and submit for approval a detailed cost breakdown of the Contract price, to be referred to as the Schedule of Values, assigning values to each component of the Work. Values must include all direct and indirect costs. The Schedule of Values must contain sufficient detail to enable the Contracting Officer to evaluate applications for payment.
Payments.
This Contract is funded by the American Recovery and Reinvestment Act of 2009 (ARRA). All invoices must cite the appropriate CLIN to enable GSA to meet its reporting obligations under ARRA.
Security Clearances. Contractor shall comply with all requirements pertaining for security clearances which are contained in the solicitation. This requirement also applies to all subcontractors used on the Contract. You should carefully review Section 01593 “Security Regulations” of the Division 1 specification for detailed instructions. All requests for clearances will be submitted through the Boston office to expedite processing. Bidders should also be aware of the possibility for employees to obtain a limited NAC clearance if they will not be onsite for more than 180 days.
Information concerning these requirements can be found at:
http://www.gsa.gov/Portal/gsa/ep/contentView.do?contentType=GSA_BASIC&contentId =25562&noc=T
Sensitive But Unclassified (SBU) Building Information. Certain technical information provided is considered “Sensitive but Unclassified” information. The Contractor is required to comply with all restrictions on dissemination, reproduction and electronic transmission of SBU as detailed in the Contract. Your attention is invited to the portion of the RFP entitled “Sensitive but Unclassified (SBU) Building Information” on page 14 of Volume 1 of the RFP for detailed requirements. Among other requirements, this clause requires the prime contractor to maintain records of release of SBU information to subcontractors as well as return of all SBU information from subcontractors. This accounting of releases and returns will be furnished to the Government at the completion of the contract.
Central Contractor Registration (CCR). The Contractor must be registered in the CCR database and is responsible during performance and through final payment of this contract for the accuracy and completeness of the data within the CCR database.
Failure to comply with this provision may result in suspension of payments.
ADDITIONAL TERMS AND CONDITIONS
Contractor Personnel (Vol1, p.17). The Contractor is solely responsible for the management planning, supervision and contract coordination, design professional services and construction and must staff appropriately to meet all requirements.
Additionally, the Contractor shall provide required design and consultant services to include any specialty design or consulting services.
Licensing (Vol1, p18). All Contractor and subcontractor personnel engaged in the activities specified by this contract shall possess certificates of training, licenses, permits and bonding as required by the state, county, city, other local jurisdictions and as specified in the contract for each activity they will be directly engaged in or supervise.
All HVAC mechanics are required to possess a universal certificate of completion as required by 40 CFR Part 82, Subpart F. EPA technician certification is required under the regulation implementing Section 608 of the Clean Air Act Amendments.
Electricians must be licensed by the State of New Hampshire.
DESIGN BUILD CONTRACT CLAUSES (Vol1, pgs 19-31) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. These clauses should be reviewed and understood. The full text of a clause may also be accessed electronically at this address:
http://www.acquisition.gov/comp/far/index.html
AUTHORIZED REPRESENTATIVES (Vol1, p.31).
The following individuals are designated as the authorized GSA representatives under this Contract:
(a) Contracting Officer
Name: Donna Maffeo Address: North Service Center Branch, 1PSK
Telephone: 617-565-6012 Email: donna.maffeo@gsa.gov
(b) Contracting Officer's Representative
Name: Patrick Ross Address: Project Management Services Branch, 1PCM
Telephone: 603-410-1615 Email: patrick.ross@gsa.gov
SOLICITATION AND CONTRACT (Vol3, p3.)
This Solicitation sets forth requirements for proposals for a Contract to design and construct the Project described in the Solicitation Documents. The Offeror's proposal will be submitted on the SF1442 and will constitute a firm offer. Neither the Solicitation nor any part of an Offeror's proposal shall be part of the Contract except to the extent expressly incorporated therein.
Budget Amount. (Vol3,p.4)
The Design/Build budget amount for this project is $ 3,300,000.00.
Bid Guarantee. (Vol3, p.4) The bidder shall furnish a bid guarantee no later than the date and time set for bid opening in the amount of 20 percent of the bid price or $3,000,000, whichever is less.
Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
Site Visit-Construction. (Vol3, p.5) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, Offerors are urged and expected to inspect the site where the work will be performed.
Site visits will be conducted by appointment only at the times and dates specified by the point of contact shown below. To arrange for a site visit, contact:
Name: Patrick Ross Address: WB Rudman FB, Concord, NH
Telephone: 603-225-1615 Email: Patrick.ross@gsa.gov
Receipt of Offers. (Vol3, p.5) In order to be considered for award, offers conforming to the requirements of the Solicitation must be received at the following office no later than 12:00 pm EST on the following date and at the following address:
Date: 04 March 2010 Address: 10 Causeway Street
Attn: John Sarnoski 1PSK, 11th Floor Boston, MA 02222
Telegraphic, facsimile, and telephone offers will not be accepted.
SOLICITATION PROVISIONS (Vol3, p.13)
Requests for Clarification or Interpretation (Vol3, p.13)
The Government will attempt to answer all requests for clarifications or interpretations of the Solicitation Documents prior to the date set for receipt of offers, but will not warrant that answers will be provided to questions received less than 15 days prior to the due date for proposals.
Information Concerning the Disclosure of Solicitation Results (Vol3, p.13)
After receipt of proposals, no information regarding the identity of those submitting offers, the number of offers received, or the information contained in such offers will made available until after award.
Bond Requirements (Vol3, p14)
After award of this contract, the successful Offeror will be required to provide Performance and Payment bonds within 15 days after award.
FAR 52.215-1 Instruction to Offerors-Competitive Acquisition (JAN 04) (Vol3, p.15)
Proposal Contents (Vol3, p.6) Proposals shall consist of the following documents, completed and executed in accordance with this Solicitation:
1. Price Proposal
2. Technical Proposal
3. Representations and Certifications
4. Bid Guarantee, using Standard Form 24
5. Contractor Qualifications and Financial Information (GSA Form 527)
6. Small Business Subcontracting Plan (Large Businesses only)
7. Past Performance References
Proposal Arrangement (Vol3, p.12) Each proposal shall identify name of offeror, date of submission and solicitation number.
Each proposal shall consist of two physically separate volumes, individually titled and numbered as stated below. Each volume shall contain one original and four copies.
Volume Number 1 (Technical Proposal):
All information addressing the offeror's technical capabilities in each technical factor.
Volume Number 2 (Price Proposal):
- Standard Form 1442 with pricing page.
- Representations and Certifications
- Standard Form 24 Bid Guarantee
- GSA Form 527 Contractor Qualifications and Financial Information or audited balance sheet
- Small Business Subcontracting Plan (Large Businesses only)
- Past Performance References
Price Proposal (Vol3, p.6)
The Price Proposal shall consist of the SF 1442 and the Agreement, with prices and/or rates indicated for each element shown on the pricing form. Indicate the Base Contract Price in Block 17 of the SF 1442, which must be fully executed and signed by the Offeror.
Indicate in Block 13 of the SF 1442 any offered prompt payment discount. Offerors are cautioned against indicating terms requiring payment of proposed prices sooner than the time required in the Contract, as such terms shall be deemed exceptions to the requirements of the Contract.
If the Offeror communicates in its proposal any qualifications, exclusions, or conditions, the Contracting Officer may reject the proposal and exclude the Offeror from further discussions.
Technical Proposal (Vol3, p.6) The technical proposal consists of 3 parts:
1) Past Performance
2) Experience
3) Technical and Management Approach Unless otherwise stated, the information required applies to prime contractors as well as all key subcontractors being proposed.
Past Performance (Vol3, p.7) This factor considers the past performance of the Offeror and proposed subcontractors for key trades. The Offeror shall submit at least 3 references (a person or persons who may be contacted regarding the quality of the Offeror’s past performance) for comparable projects substantially completed within the last five (5) years. The Offeror must provide the name, title, company name, current address, current phone number, and current fax number for each reference, as well as a brief description of the work performed. The Government will contact references to verify information provided in relation to the Offeror’s past performance.
Experience. (Vol3, p.7) This factor considers the extent of the Offeror’s past experience as a firm in providing similar services. The Offeror must demonstrate successful experience as a Design Build (DB) Contractor responsible for the construction of similar projects. The projects presented should demonstrate skill in managing a Design Build effort and should be selected carefully to represent work performed that most closely resembles the scope of this project. The similarity to this project is more important than the quantity of projects presented. The information to be provided to support each project is listed in the solicitation.
Technical and Management Approach (Vol3, p.8)
This factor is concerned with the Offeror’s understanding of the project requirements and the management approach. The Offeror shall submit a written plan addressing the following:
Offerors shall describe their approach to managing and delivering a project of the magnitude and complexity of THIS project under budgetary and time constraints.
Offerors shall identify what they believe are the most significant risks associated with this project.
Offerors shall provide an organization chart for their team for this project showing organizational positions – only key personnel names are required.
Offerors shall provide a Design and Construction Quality Control Plan (QCP) tailored to THIS Project.
Offerors shall provide a Management Plan for the Project that explains how the various team members will work together and the methodology and processes for managing this entire Project.
Offeror shall provide a project schedule narrative and a project schedule in CPM network format. The proposed schedule will run from the contract award date (assume 26 May 2010) through the required date for substantial completion of construction (19 January 2011) and all punch list items.
Design Development (Vol3, p.10)
Design development considers how the offeror intends to meet the requirements by demonstrating design and construction capabilities in the design and installation of high efficiency lighting systems and design and installation of various energy conservation measures to include an upgrade of EMS systems in an occupied building.
As part of this presentation, the Offeror should provide evidence of the lead designer’s ability to be innovative and creative in solving design issues for similar projects. Also, evidence should be provided which demonstrates the constructor’s ability to deliver similar projects on time and within budget constraints.
For this factor, you should also demonstrate that the proposed TEAM has the relevant key individual professional qualifications including professional registrations and experience necessary for this project
Small Business Utilization (Vol3, p11)
This information is provided as information only for offerors that are large business for preparation of the subcontracting plan.
While the proposed extent of small business utilization by Offerors that are large businesses is not a ratable factor for award of this contract, it will be considered as a matter of policy. FAR 52.219-8, Utilization of Small Business Concerns states in part; “The Contractor hereby agrees to carry out this policy in the awarding of subcontracts to the fullest extent consistent with efficient contract performance.” Therefore, large business Offerors shall provide a subcontracting plan in accordance with the requirements of FAR
19.704. If the Offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance.
Submission and Content of Proposals (Vol3, p.12) In addition to documents previously cited, the following submission requirements apply:
Representations and Certifications (Vol3, p12)
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal a completed set of Representations and Certifications on the form C221 attached to this Solicitation. The Offeror shall complete electronic annual representations and certifications at http://orca.bpn.gov in conjunction with required registration in the Central Contractor Registration (CCR) database.
Qualifications of Offerors (Vol3, p.12)
Offerors submitting a proposal in response to this Solicitation shall submit with their proposal evidence of their financial responsibility and capacity to perform the Contract.
Offerors shall submit this information on GSA Form 527 – Contractor’s Qualifications and Financial Information. Where applicable, point of contact, including names and telephone numbers, are required for all contracts listed.
Requirements for Joint Venture Offerors (Vol3, p.12)
All offers submitted by joint ventures must include a copy of an executed joint venture agreement (with original signatures) which fully discloses the legal identity of each member of the joint venture, the relationship between the members, the form of ownership of each member, and any limitations on liability or authority for each member.
Representations and certifications, financial information, and past performance information must be submitted for each member of the joint venture.
EVALUATION OF OFFERS (Vol, p.23)
The Government will award a contract resulting from this Solicitation to the responsible Offeror whose offer conforming to the Solicitation will be most advantageous to the Government, Total Evaluated Price and other factors considered.
In addition to Total Evaluated Price, the following non-price factors shall be used to evaluate offers:
1. Past Performance
2. Experience
3. Technical and Management Approach
4. Specialized experience and technical competence
Determination of Responsibility (Vol3, p.23)
In order to be considered responsible, an Offeror must demonstrate that it meets the requirements of FAR 9.104-1 which speaks to capacity and credit. The Offeror must demonstrate that it meets the following definitive responsibility criteria:
(a) Experience Criterion
(b) Financial Capacity Criterion
(c) Past Performance Criterion
Price Realism (Vol3, p.24)
All offers must include realistic prices. In order to be considered realistic, an Offeror may not propose prices that appear so low as to indicate the Offeror's failure to comprehend the scope and complexity of the Work, or the willingness of the Offeror to assume commercial risk to a degree that endangers successful completion of the Project.
Total Evaluated Price (Vol3, p.24)
Total Evaluated Price shall be calculated using the prices indicated in the Price Proposal, using the following formula:
The Total Evaluated Price of the Offer will be the total evaluated price of the Base Line Items and all the Option Line Items. ( Line Items 0001 – 0008)
Non-Price Factors
Past Performance and Technical Experience (Vol3, p.24)
Past performance will be evaluated as a predictor of the Offeror’s compliance with contract requirements and overall quality of performance.
This factor will be evaluated based upon the written responses to the RFP by the Offeror and by the evaluation of responses of references recommended by the Offeror. The Government also reserves the right to use other government data available in its assessment of the offeror.
Experience (Vol3, p. 25)
Experience will be evaluated as an indicator of the Offeror's capacity to perform.
Experience will be evaluated on the basis of information submitted by the Offeror indicating completion of projects of similar size, complexity, and scope.
Technical and Management Approach (Vol3, p.25)
Technical and Management Approach will be evaluated as an indicator of the Offeror's understanding of the project requirements.
Technical and Management Approach will be evaluated on the basis of the information submitted by the Offeror indicating understanding of the schedule, performance criteria including LEEDS certification and budget constraints. The Offeror’s understanding of the risks associated with this type of project including availability of resources to perform the work.
Design Development (Vol3, p. 25)
This factor will be evaluated based on the Offerors presentation of a comprehensive plan to integrate design and construction elements of this project to meet all technical requirements of the solicitation.
QUESTIONS
Q. A question was asked regarding the status of all of the lighting tasks (CLINs 0001, 0002, and 0003. Specifically it was asked if all lighting tasks should be considered, and bid, as options.
A. All of the lighting tasks listed in the RFP (CLINs 0001, 0002, and 0003) should be considered options and bid accordingly. This will be clearly reflected in a forthcoming amendment to the RFP. Also there will be an additional mechanical option added by amendment, i.e. “OPTION: Design/Build services for partial upgrade of Cleveland & Rudman HVAC-1 Building Controls.
(SOW 3.1.1.4) “
Q. Will after hours work be permitted?
A. Hours of operation in the facilities are 6:00 AM – 6:00 PM, M-F, excluding Federal Holidays. Any requests for after/off hours must be coordinated with the facility manager on a case by case basis.
Q. The requirement for $5,000,000.00 of professional liability insurance for licensed design professionals seems high. Is this correct and can it be adjusted to a more reasonable level?
A. This is a new requirement imposed by GSA Central Office. We are currently obtaining guidance on acceptable limits and will publish results in a forthcoming amendment.
Q. What is the latest that the Government will accept questions/requests for clarification regarding the solicitation?
A. The Government will accept questions up to the closing time of the RFP.
Every attempt will be made to answer all questions but you should be cautioned that we can not guarantee that answers will be provided for questions received less than 5 business days prior to RFP closing .
Q. Will the list of attendees to the preproposal conference be provided to prospective offerors?
A. The list of attendees is attached.
Q. Technical Spec page 70 of 470 refers to the Roof Project--- I am assuming that this is an oversight and that we are not responsible for any of that work.
A. You are correct, it is an oversight and you are not responsible for any of that work.
Q. Technical Specs page 3 of 470 references "attached concept drawings" which are not included---- Where can these be found?
A. These drawings will be uploaded to FBO with the forthcoming amendment.
ATTACHMENT
PREPROPOSAL CONFERENCE
GS-01P-10-BZ-C-0017
Design Build of Energy Conservation Measures (ECM’s) to Upgrade Lighting Systems and
BAS/EMS at the Cleveland/Rudman Federal Buildings, Concord, NH
February 11, 2010
NAME COMPANY PHONE EMAIL
Steve Bussell Bussco Inc. 339-224-5625 steve@busscoinc.com
Anthony Brock Longchamps Electric
603-2314947 tony@longchampselectric.com
Jonathan Halle Warren Street 603-225-0640 jh@warrenstreet.coop
Bob Maccini DEW Construction
603-286-0490 bmaccini@dewcorp.com
Rick Lilly Philips 603-219-2848 Rick.lilly@philips.com
Kenneth Lafferty Cornerstone 781-944-3045 klafferty@cornerstone-serv.com
Butch Thorton JMR Construction
603-565-0136 bthornton@jmrcc.com
Leeds Bouchard LED Conversions
508-561-9920 leeds@ledconversionsinc.com
Peter Schwarz Columbia Construction
978-664-9500 pschwarz@columbiacc.com
Richard Fay IB Controls 603-343-7765 dfay@ibcontrols.com
Stevyn Dodd Dodd Electric 603-774-2400 doddelectric@gsinet.net
Paul Kuhlman Adura Technologies
678-907-6815 pkuhlman@aduratech.com