JA1-Holloman-EL-v06-23Aug13.pdf
PDF 1 MB Posted
- Attached to
- Privatization of the electric distribution system at Holloman Air Force Base, New Mexico
- Solicitation number
- GS-00P-13-BSC-0937
About this file
JA1-Holloman
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF_30SolMod1_121113.pdf | ||
| QA_Holloman_-_10Dec13r2.docx | DOCX document | |
| JA39_Hol_Past_Performance.doc | DOC document | |
| SiteVisitForm11062013.doc | DOC document | |
| JE1__Subcontracting_Plan.pdf | ||
| JR1_AF_Sample_Bill_of_Sale.pdf | ||
| JA40_Example_Completion_of_Schedules_for_FP-EPA_Type_Contracts_(1)_(1).pdf | ||
| JR2_Tech_Eval_Categories.pdf | ||
| Hol_UP_RFP_Nov_2013.docx | DOCX document | |
| JA43-1_-_Holloman_-_Electrical_Training_Requirements_ver02-_22_Oct_10_(1).pdf | ||
| JA41_Hol_Wage_Determination_Jun_13.pdf | ||
| JA42_Holloman__AFB_Schedules_and_Price_Data_Sheets_5_and_6.xlsx | XLSX spreadsheet |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GS-00P-13-BSC-0937 UTILITY SYSTEM PRIVATIZATION
Holloman AFB, NM
(Attachment JA1 Electric Distribution System Template –30 JAN 13) User Edited: rev:06 23Aug13
JA1-1
ATTACHMENT JA1
Holloman AFB Electric Distribution System
Table of Contents
JA1.1 HOLLOMAN AFB OVERVIEW ............................................................................................. JA1-2 JA1.2 ELECTRIC DISTRIBUTION SYSTEM DESCRIPTION ............................................................... JA1-2
JA1.2.1 Electric Distribution System Fixed Equipment Inventory ....................................... JA1-2 JA1.2.2 Electric Distribution System Non-Fixed Equipment and Specialized Tools .......... JA1-31 JA1.2.3 Electric Distribution System Manuals, Drawings, and Records ........................... JA1-32
JA1.3 SPECIFIC SERVICE REQUIREMENTS ................................................................................... JA1-33 JA1.4 CURRENT SERVICE ARRANGEMENT ................................................................................. JA1-35 JA1.5 METERING ......................................................................................................................... JA1-35
JA1.5.1 Existing Meters ....................................................................................................... JA1-35 JA1.5.2 Required New Meters ............................................................................................. JA1-36
JA1.6 MONTHLY SUBMITTALS .................................................................................................... JA1-36 JA1.7 ENERGY-SAVINGS PROJECTS ............................................................................................ JA1-36 JA1.8 SERVICE AREA ................................................................................................................... JA1-37 JA1.9 OFF-INSTALLATION SITES ................................................................................................. JA1-37 JA1.10 SPECIFIC TRANSITION REQUIREMENTS .......................................................................... JA1-37 JA1.11 INITIAL SYSTEM DEFICIENCY CORRECTIONS (ISDC) .................................................... JA1-37 JA1.12 RIGHT OF ACCESS TO THE UTILITY SYSTEM ................................................................... JA1-37
JA1.12.1 Map of the Utility System ..................................................................................... JA1-37 JA1.12.2 Lateral Extent of the Right-of-Access, and Points of Demarcation ...................... JA1-38 JA1.12.3 Environmental Baseline Survey ............................................................................ JA1-41
LIST OF TABLES
TABLE 1 - Fixed Inventory ......................................................................................................... JA1-4 TABLE 2 - Spare Parts ............................................................................................................... JA1-32 TABLE 3 - Specialized Vehicles and Tools ............................................................................. JA1-32 TABLE 4 - Manuals, Drawings, and Records ........................................................................ JA1-32 TABLE 5 - Existing Meters ....................................................................................................... JA1-35 TABLE 6 - Required New Meters ............................................................................................ JA1-36 TABLE 7 - Energy-Savings Projects ........................................................................................ JA1-36 TABLE 8 - Service Connections and Disconnections ............................................................ JA1-37 TABLE 9 - Initial System Deficiency Corrections ................................................................. JA1-37 TABLE 10 - Standard Points of Demarcation ........................................................................ JA1-38 TABLE 11 - Unique Points of Demarcation ........................................................................... JA1-41
JA1-2
JA1 Holloman AFB Electric Distribution System
JA1.1 Holloman AFB Overview
Holloman AFB (“Base” or “Installation”) is located southeastern New Mexico, approximately six miles west of Alamogordo. The contiguous boundary of the Base contains 52,411 acres. In addition, the Installation has an additional 7,332 acres on non-contiguous land in the Boles Wells Water System Annex and Bonito Lake. The cantonment area comprises approximately 8,000 acres in the southern portion of the Base. However, the electrical distribution system contained in this solicitation has facilities located throughout the Installation, (except Bonito Lake).
What was to become Holloman AFB was established in 1941 as the Alamogordo Army Air Field with a bombing and gunnery training mission. On 16 July 1945, the first atomic bomb was detonated at Trinity Site. In 1946, more land became available and the Installation became a missile development facility. In addition to missile development, Holloman AFB has been in the forefront of high-speed sled tests, high-altitude balloon projects, aeromedical research, and inertial guidance testing. The Primate Research Facility trained the first chimpanzee (Ham) to make a sub-orbital flight and the first chimpanzee (Enos) to orbit the earth.
In addition to continuing research and development efforts, Holloman AFB is currently home to the 49th Fighter Wing flying the F-22A Raptor. In addition to maintaining worldwide deployment capabilities, the 49th Fighter Wing provides training for German Air Force aircrews.
There are approximately 3,700 active-duty personnel assigned to Holloman AFB.
Approximately 600 German Air Force personnel are also located on the Installation.
JA1.2 Electric Distribution System Description
JA1.2.1 Electric Distribution System Fixed Equipment Inventory
The Holloman AFB electric distribution system consists of all appurtenances physically connected to the distribution system from the point of demarcation defined by the Right of Access. The distribution system consists of the items listed in Table 1 “Fixed Inventory
Electric Distribution System” in Section JA1.2.1.2 Inventory. The actual inventory of items sold will be in the bill of sale at the time the system is transferred. The following description and inventory is included to provide the Offeror with a general understanding of the size and configuration of the distribution system. The Government makes no representation that the inventory is accurate. The Offeror shall base its Schedule B and Price Schedule Data Sheets on the Table 1 inventory below. However, the Offeror should use the following sources of information for developing other aspects of its proposal: site inspections, information in the technical library, and other pertinent information.
Specifically excluded from the electric distribution system privatization are:
JA1-3
All meters
Airfield lighting
Parking lot lights serviced by secondary feed from a building
Emergency generators that exist for the purpose of emergency back-up for AF facilities
Privatized Military Family Housing (MFH) area (no connection to the Holloman AFB electric distribution system)
Building 647 (located within Privatized Housing area, no connection to Holloman AFB electric distribution system)
Building 650 (located within Privatized Housing area, no connection to Holloman AFB electric distribution system)
Golf Course Lift Station (located within Privatized Housing area, no connection to Holloman AFB electric distribution system)
FamCamp (located within Privatized Housing area, no connection to Holloman AFB electric distribution system)
Space Command Compound
Building 1020 area
Bonito Lake
JA1.2.1.1 Description
The Holloman AFB electric distribution system is supplied power by El Paso Electric (EPEC) at 115 kV, 3 phase, 3 wire, delta connection. The Holloman AFB circuit breaker, located in the EPEC Switch Station, is the metered delivery point for the base. A 115 kV pole mounted switch, located on the second pole structure outside the EPEC substation, is the point where the Government takes ownership of the 115 kV power line. This 115 kV power line feeds three substation located on the base, the Main Substation, the North Substation, and the Atlas Substation. The West Switching Station is fed 13.2 kV power from the Main Substation and the North Substation through dedicated “express” feeders. The West Switching Station powers 8 circuit breakers.
The Main Substation has two padmount transformers, each rated at 115kV primary and 13.2 kV secondary and 22.5 MVA. One transformer feeds power to 8 circuit breakers, and the second transformer feeds power to two circuit breakers. One of the eight circuit breakers powers an overhead power line that is dedicated to power the offsite well fields. The North Substation has one transformer that feeds 8 circuit breakers. This transformer is rated 115 kV primary, 13.2 kV secondary, and 22.5 MVA. The Atlas Substation has one transformer that feeds 4 circuit breakers. This transformer is rated 115 kV primary, 13.2 kV secondary, and
22.5 MVA. There is a 13.2 kV “express feeder” that runs between one of the Atlas Substation circuit breakers and one of the North Substation circuit breakers.
JA1-4
The majority of the distribution system associated with the Base is installed overhead on wood poles. There are two areas on the base where there are joint use poles used by both the MFH contractor and the Base. The Government owns the poles and the wiring for the circuit associated with the Base power and the MFH contractor owns the wires associated with the housing circuit. The SO shall prepare a written MOU with the MFH contractor for the joint use of these poles. There is one pole, P195, near the Main Gate, that has joint use. There are several joint use poles on Yucca Ave starting at the intersection of Yucca Ave and Santa Fe Ave heading north (poles P162-166) and then turning East on Arizona Ave (poles P150-160) and extending to Creosote Ave.
As shown on Table 1, the inventory for the base has been divided into four areas:
Main Base – East Side is the area east of the North South runway and South of Douglas Road.
Main Base – West Side is the area west of the North-South runway and South of Douglas Road.
Main Base – North Side is the area north of Douglas Rd.
Boles Wells Water System Annex is the power line and equipment from the Main Base Substation through the well field.
JA1.2.1.2 Inventory
Table 1 provides a general list of the major electric distribution system fixed assets for the Holloman AFB electric distribution system included in the sale. The design life column indicated in Table 1 is used by the Government in the development of the Government Should Cost Estimate. The design life is not mandated in the Offeror’s proposal. However, the proposal must clearly explain the use of any system component design life that significantly differs from the published Government design life.
TABLE 1
Fixed Inventory Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Main Base – East Side
Main Substation
115 kV Bus Structure Small 1 Ea 1970 50
Circuit Breaker 115 kV 1 Ea 1980 35
15 kV Bus Structure Large 1 Ea 2000 50
Transformer 115 kV – 13.2 kV 22.5 MVA 2 Ea 1970 35
Voltage Regulators 15 kv 3 Ea 1980 35
JA1-5
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Circuit Breaker 15 kV 5 Ea 1980 35
Circuit Breaker 15 kV 2 Ea 2012 35
Lightning arrestors 115 kv 3 Ea 1980 30
Lightning arrestors 15 kv 3 Ea 1980 30
Current transformer 115 kV 12 Ea 2000 35
Current transformer 15 kV 3 Ea 2000 35
Fence, chain link 8’ 200 LF 1980 50
North Substation
115 kV Bus Structure Small 1 Ea 1992 50
Circuit Breaker 115 kV 1 Ea 1992 35
15 kV Bus Structure Small 1 Ea 1992 50
Transformer 115 kV – 13.2 kV 22.5 MVA 1 Ea 1992 35
Voltage Regulators 15 kV 3 Ea 1992 35
Circuit Breaker 15 kV 5 Ea 1992 35
Circuit Breaker 15 kV 3 Ea 2012 35
Lightning arrestors 115 kV 3 Ea 1992 30
Lightning arrestors 15 kV 3 Ea 1992 30
Current transformer 115 kV 12 Ea 1992 35
Current transformer 15 kV 3 Ea 1992 35
Fence, chain link 8’ 150 LF 1992 50
Wood Pole, single cross arm 35’ 5 Ea 1960 35
Wood Pole, single cross arm 35’ 5 Ea 1970 35
Wood Pole, single cross arm 35’ 4 Ea 1980 35
Wood Pole, two single cross arms 35’ 5 Ea 1960 35
Wood Pole, two single cross arms 35’ 5 Ea 1970 35
Wood Pole, two single cross arms 35’ 4 Ea 1980 35
Wood Pole, double cross arm 35’ 7 Ea 1960 35
Wood Pole, double cross arm 35’ 6 Ea 1970 35
JA1-6
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, double cross arm 35’ 6 Ea 1980 35
Wood Pole, two double cross arms 35’ 4 Ea 1960 35
Wood Pole, two double cross arms 35’ 3 Ea 1970 35
Wood Pole, two double cross arms 35’ 3 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
35’ 5 Ea 1960
Wood Pole, 1 single, 1 double cross arms
35’ 5 Ea 1970
Wood Pole, 1 single, 1 double cross arms
35’ 4 Ea 1980
Wood Pole, three double cross arms
35’ 2 Ea 1960
Wood Pole, three double cross arms
35’ 2 Ea 1970
Wood Pole, three double cross arms
35’ 1 Ea 1980
Wood Pole, 3 standoff insulators 35’ 5 Ea 1960 35
Wood Pole, 3 standoff insulators 35’ 5 Ea 1970 35
Wood Pole, 3 standoff insulators 35’ 4 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 2 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 2 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 1 Ea 1980 35
Wood Pole, single cross arm 40’ 17 Ea 1960 35
Wood Pole, single cross arm 40’ 17 Ea 1970 35
Wood Pole, single cross arm 40’ 16 Ea 1980 35
Wood Pole, two single cross arms 40’ 17 Ea 1960 35
Wood Pole, two single cross arms 40’ 17 Ea 1970 35
Wood Pole, two single cross arms 40’ 16 Ea 1980 35
Wood Pole, double cross arm 40’ 23 Ea 1960 35
Wood Pole, double cross arm 40’ 22 Ea 1970 35
Wood Pole, double cross arm 40’ 22 Ea 1980 35
JA1-7
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, two double cross arms 40’ 12 Ea 1960 35
Wood Pole, two double cross arms 40’ 11 Ea 1970 35
Wood Pole, two double cross arms 40’ 11 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
40’ 17 Ea 1960
Wood Pole, 1 single, 1 double cross arms
40’ 17 Ea 1970
Wood Pole, 1 single, 1 double cross arms
40’ 16 Ea 1980
Wood Pole, three double cross arms
40’ 6 Ea 1960
Wood Pole, three double cross arms
40’ 6 Ea 1970
Wood Pole, three double cross arms
40’ 5 Ea 1980
Wood Pole, 3 standoff insulators 40’ 17 Ea 1960 35
Wood Pole, 3 standoff insulators 40’ 17 Ea 1970 35
Wood Pole, 3 standoff insulators 40’ 16 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 6 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 6 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 5 Ea 1980 35
Wood Pole, single cross arm 45’ 24 Ea 1960 35
Wood Pole, single cross arm 45’ 23 Ea 1970 35
Wood Pole, single cross arm 45’ 23 Ea 1980 35
Wood Pole, two single cross arms 45’ 24 Ea 1960 35
Wood Pole, two single cross arms 45’ 23 Ea 1970 35
Wood Pole, two single cross arms 45’ 23 Ea 1980 35
Wood Pole, double cross arm 45’ 31 Ea 1960 35
Wood Pole, double cross arm 45’ 31 Ea 1970 35
Wood Pole, double cross arm 45’ 31 Ea 1980 35
Wood Pole, two double cross arms 45’ 16 Ea 1960 35
JA1-8
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, two double cross arms 45’ 16 Ea 1970 35
Wood Pole, two double cross arms 45’ 15 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
45’ 24 Ea 1960
Wood Pole, 1 single, 1 double cross arms
45’ 23 Ea 1970
Wood Pole, 1 single, 1 double cross arms
45’ 23 Ea 1980
Wood Pole, three double cross arms
45’ 8 Ea 1960
Wood Pole, three double cross arms
45’ 8 Ea 1970
Wood Pole, three double cross arms
45’ 7 Ea 1980
Wood Pole, 3 standoff insulators 45’ 24 Ea 1960 35
Wood Pole, 3 standoff insulators 45’ 23 Ea 1970 35
Wood Pole, 3 standoff insulators 45’ 23 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 8 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 8 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 7 Ea 1980 35
Wood Pole, single cross arm 50’ 12 Ea 1960 35
Wood Pole, single cross arm 50’ 12 Ea 1970 35
Wood Pole, single cross arm 50’ 11 Ea 1980 35
Wood Pole, two single cross arms 50’ 12 Ea 1960 35
Wood Pole, two single cross arms 50’ 12 Ea 1970 35
Wood Pole, two single cross arms 50’ 11 Ea 1980 35
Wood Pole, double cross arm 50’ 16 Ea 1960 35
Wood Pole, double cross arm 50’ 15 Ea 1970 35
Wood Pole, double cross arm 50’ 15 Ea 1980 35
Wood Pole, two double cross arms 50’ 8 Ea 1960 35
JA1-9
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, two double cross arms 50’ 8 Ea 1970 35
Wood Pole, two double cross arms 50’ 7 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
50’ 12 Ea 1960
Wood Pole, 1 single, 1 double cross arms
50’ 12 Ea 1970
Wood Pole, 1 single, 1 double cross arms
50’ 11 Ea 1980
Wood Pole, three double cross arms
50’ 4 Ea 1960
Wood Pole, three double cross arms
50’ 4 Ea 1970
Wood Pole, three double cross arms
50’ 4 Ea 1980
Wood Pole, 3 standoff insulators 50’ 12 Ea 1960 35
Wood Pole, 3 standoff insulators 50’ 12 Ea 1970 35
Wood Pole, 3 standoff insulators 50’ 11 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 50’ 4 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 50’ 4 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 50’ 4 Ea 1980 35
Wood Pole, two double cross arms 55’ 3 Ea 1960 35
Wood Pole, two double cross arms 55’ 3 Ea 1970 35
Wood Pole, two double cross arms 55’ 3 Ea 1980 35
Wood Pole, two double cross arms 60’ 19 Ea 1960 35
Wood Pole, two double cross arms 60’ 18 Ea 1970 35
Wood Pole, two double cross arms 60’ 18 Ea 1980 35
Wood Pole, two double cross arms 65’ 7 Ea 1960 35
Wood Pole, two double cross arms 65’ 7 Ea 1970 35
Wood Pole, two double cross arms 65’ 6 Ea 1980 35
Wood Pole, two double cross arms 70’ 4 Ea 1960 35
Wood Pole, two double cross arms 70’ 4 Ea 1970 35
JA1-10
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, two double cross arms 70’ 4 Ea 1980 35
Wood Pole, two double cross arms 75’ 2 Ea 1960 35
Wood Pole, two double cross arms 75’ 1 Ea 1970 35
Wood Pole, two double cross arms 75’ 1 Ea 1980 35
Guy and Anchor 8’ 137 Ea 1960 35
Guy and Anchor 8’ 136 Ea 1970 35
Guy and Anchor 8’ 136 Ea 1980 35
Wire, 15 kV bare copper #8 AWG 2,081 SCLF 1960 50
Wire, 15 kV bare copper #8 AWG 2,081 SCLF 1970 50
Wire, 15 kV bare copper #8 AWG 2,081 SCLF 1980 50
Wire, 15 kV bare copper #6 AWG 8,883 SCLF 1960 50
Wire, 15 kV bare copper #6 AWG 8,883 SCLF 1970 50
Wire, 15 kV bare copper #6 AWG 8,883 SCLF 1980 50
Wire, 15 kV bare copper #4 AWG 4,549 SCLF 1960 50
Wire, 15 kV bare copper #4 AWG 4,549 SCLF 1970 50
Wire, 15 kV bare copper #4 AWG 4,549 SCLF 1980 50
Wire, 15 kV bare copper #2 AWG 10,134 SCLF 1960 50
Wire, 15 kV bare copper #2 AWG 10,134 SCLF 1970 50
Wire, 15 kV bare copper #2 AWG 10,134 SCLF 1980 50
Wire, 15 kV bare copper #1/0 AWG 480 SCLF 1960 50
Wire, 15 kV bare copper #1/0 AWG 480 SCLF 1970 50
Wire, 15 kV bare copper #1/0 AWG 480 SCLF 1980 50
Wire, 15 kV bare copper #2/0 AWG 154 SCLF 1960 50
Wire, 15 kV bare copper #2/0 AWG 154 SCLF 1970 50
Wire, 15 kV bare copper #2/0 AWG 154 SCLF 1980 50
Wire, 15 kV ACSR #4 AWG 80,582 SCLF 1960 50
Wire, 15 kV ACSR #4 AWG 80,582 SCLF 1970 50
Wire, 15 kV ACSR #4 AWG 80,582 SCLF 1980 50
JA1-11
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wire, 15 kV ACSR #2 AWG 1,310 SCLF 1960 50
Wire, 15 kV ACSR #2 AWG 1,310 SCLF 1970 50
Wire, 15 kV ACSR #2 AWG 1,310 SCLF 1980 50
Wire, 15 kV ACSR #1/0 AWG 860 SCLF 1960 50
Wire, 15 kV ACSR #1/0 AWG 860 SCLF 1970 50
Wire, 15 kV ACSR #1/0 AWG 860 SCLF 1980 50
Wire, 15 kV ACSR #2/0 AWG 4,875 SCLF 1960 50
Wire, 15 kV ACSR #2/0 AWG 4,875 SCLF 1970 50
Wire, 15 kV ACSR #2/0 AWG 4,875 SCLF 1980 50
Wire, 15 kV ACSR #3/0 AWG 634 SCLF 1960 50
Wire, 15 kV ACSR #3/0 AWG 634 SCLF 1970 50
Wire, 15 kV ACSR #3/0 AWG 634 SCLF 1980 50
Wire, 15 kV ACSR #4/0 AWG 8,965 SCLF 1960 50
Wire, 15 kV ACSR #4/0 AWG 8,965 SCLF 1970 50
Wire, 15 kV ACSR #4/0 AWG 8,965 SCLF 1980 50
Wire, 15 kV ACSR 336 kcmil 40,960 SCLF 1960 50
Wire, 15 kV ACSR 336 kcmil 40,960 SCLF 1970 50
Wire, 15 kV ACSR 336 kcmil 40,960 SCLF 1980 50
Wire, 115 kV ACSR 336 kcmil 68,703 SCLF 1970 50
Shielded Cable, 15 kV #6 AWG 421 SCLF 1985 20
Shielded Cable, 15 kV #6 AWG 421 SCLF 1995 45
Shielded Cable, 15 kV #6 AWG 421 SCLF 2005 45
Shielded Cable, 15 kV #3 AWG 48,420 SCLF 1985 20
Shielded Cable, 15 kV #3 AWG 48,420 SCLF 1995 45
Shielded Cable, 15 kV #3 AWG 48,420 SCLF 2005 45
Shielded Cable, 15 kV #2 AWG 51,112 SCLF 1985 20
Shielded Cable, 15 kV #2 AWG 51,112 SCLF 1995 45
Shielded Cable, 15 kV #2 AWG 51,112 SCLF 2005 45
JA1-12
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Shielded Cable, 15 kV #1 AWG 4,680 SCLF 1985 20
Shielded Cable, 15 kV #1 AWG 4,680 SCLF 1995 45
Shielded Cable, 15 kV #1 AWG 4,680 SCLF 2005 45
Shielded Cable, 15 kV #1/0 AWG 2,767 SCLF 1985 20
Shielded Cable, 15 kV #1/0 AWG 2,767 SCLF 1995 45
Shielded Cable, 15 kV #1/0 AWG 2,767 SCLF 2005 45
Shielded Cable, 15 kV #2/0 AWG 1,422 SCLF 1985 20
Shielded Cable, 15 kV #2/0 AWG 1,422 SCLF 1995 45
Shielded Cable, 15 kV #2/0 AWG 1,422 SCLF 2005 45
Shielded Cable, 15 kV #4/0 AWG 275 SCLF 1985 20
Shielded Cable, 15 kV #4/0 AWG 275 SCLF 1995 45
Shielded Cable, 15 kV #4/0 AWG 275 SCLF 2005 45
Shielded Cable, 15 kV 350 kcmil 16,040 SCLF 1985 20
Shielded Cable, 15 kV 350 kcmil 16,040 SCLF 1995 45
Shielded Cable, 15 kV 350 kcmil 16,040 SCLF 2005 45
Shielded Cable, 15 kV 400 kcmil 9,796 SCLF 1985 20
Shielded Cable, 15 kV 400 kcmil 9,796 SCLF 1995 45
Shielded Cable, 15 kV 400 kcmil 9,796 SCLF 2005 45
Duct Bank, 2x2 PVC 4” 35,249 LF 1985 100
Duct Bank, 2x2 PVC 4” 35,249 LF 1995 100
Duct Bank, 2x2 PVC 4” 35,249 LF 2005 100
Secondary wiring
Wire, 600V #1/0 AWG 42,275 SCLF 1960 50
Wire, 600V #1/0 AWG 42,275 SCLF 1970 50
Wire, 600V #1/0 AWG 42,275 SCLF 1980 50
Wire, 600V #1/0 AWG 40,250 SCLF 1985 50
Wire, 600V #1/0 AWG 40,250 SCLF 1995 50
Wire, 600V #1/0 AWG 40,250 SCLF 2005 50
JA1-13
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Duct bank, 1x2 PVC 2” 10,062 LF 1985 100
Duct bank, 1x2 PVC 2” 10,062 LF 1995 100
Duct bank, 1x2 PVC 2” 10,062 LF 2005 100
Cobrahead Light with 6’ arm 250 watt 195 Ea 1985 20
Light pole 6’ arm and fixture 30’ 288 Ea 2005 35
Switch, GOAB, manual operation 15 kV 14 Ea 1960 35
Switch, GOAB, manual operation 15 kV 14 Ea 1970 35
Switch, GOAB, manual operation 15 kV 14 Ea 1980 35
Switch, Fused Cutouts, pole mtd 15 kV 77 Ea 1960 30
Switch, Fused Cutouts, pole mtd 15 kV 77 Ea 1970 30
Switch, Fused Cutouts, pole mtd 15 kV 77 Ea 1980 30
Sectionalizing Switch, Pad mounted, 4-way
15 kV 7 Ea 1985 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 7 Ea 1995 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 7 Ea 2005 35
Circuit Breaker, pad mounted 15 kV 2 Ea 1985 35
Circuit Breaker, pad mounted 15 kV 2 Ea 1995 35
Circuit Breaker, pad mounted 15 kV 1 Ea 2005 35
Manhole 6’x10’x6’ 97 Ea 1985 60
Manhole 6’x10’x6’ 96 Ea 1995 60
Manhole 6’x10’x6’ 96 Ea 2005 60
Junction Cabinet, pad mounted 15 kV 21 Ea 1985 35
Junction Cabinet, pad mounted 15 kV 21 Ea 1995 35
Junction Cabinet, pad mounted 15 kV 21 Ea 2005 35
Capacitor, 15 kV 1 MVAR 1.2 Ea 1960 35
Capacitor, 15 kV 1 MVAR 1.2 Ea 1970 35
Capacitor, 15 kV 1 MVAR 1.2 Ea 1980 35
Transformer, pole mount, 1 ph 5 kVA 1 Ea 1970 35
JA1-14
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Transformer, pole mount, 1 ph 15 kVA 127 Ea 1960 35
Transformer, pole mount, 1 ph 15 kVA 127 Ea 1970 35
Transformer, pole mount, 1 ph 15 kVA 127 Ea 1980 35
Transformer, pole mount, 1 ph 25 kVA 51 Ea 1960 35
Transformer, pole mount, 1 ph 25 kVA 51 Ea 1970 35
Transformer, pole mount, 1 ph 25 kVA 51 Ea 1980 35
Transformer, pole mount, 1 ph 37.5 kVA 39 Ea 1960 35
Transformer, pole mount, 1 ph 37.5 kVA 39 Ea 1970 35
Transformer, pole mount, 1 ph 37.5 kVA 39 Ea 1980 35
Transformer, pole mount, 1 ph 50 kVA 41 Ea 1960 35
Transformer, pole mount, 1 ph 50 kVA 41 Ea 1970 35
Transformer, pole mount, 1 ph 50 kVA 41 Ea 1980 35
Transformer, pole mount, 1 ph 75 kVA 1 Ea 1970 35
Transformer, pad mounted, 1 ph 15 kVA 1 Ea 1985 35
Transformer, pad mounted, 1 ph 25 kVA 24 Ea 1985 35
Transformer, pad mounted, 1 ph 25 kVA 24 Ea 1995 35
Transformer, pad mounted, 1 ph 25 kVA 24 Ea 2005 35
Transformer, pad mounted, 1 ph 37.5 kVA 17 Ea 1985 35
Transformer, pad mounted, 1 ph 37.5 kVA 17 Ea 1995 35
Transformer, pad mounted, 1 ph 37.5 kVA 17 Ea 2005 35
Transformer, pad mounted, 1 ph 50 kVA 19 Ea 1985 35
Transformer, pad mounted, 1 ph 50 kVA 19 Ea 1995 35
Transformer, pad mounted, 1 ph 50 kVA 19 Ea 2005 35
Transformer, pad mounted, 3 ph 75 kVA 21 Ea 1985 35
Transformer, pad mounted, 3 ph 75 kVA 21 Ea 1995 35
Transformer, pad mounted, 3 ph 75 kVA 21 Ea 2005 35
Transformer, pad mounted, 3 ph 100 kVA 13 Ea 1985 35
Transformer, pad mounted, 3 ph 100 kVA 12 Ea 1995 35
JA1-15
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Transformer, pad mounted, 3 ph 100 kVA 12 Ea 2005 35
Transformer, pad mounted, 3 ph 112.5 kVA 12 Ea 1985 35
Transformer, pad mounted, 3 ph 112.5 kVA 12 Ea 1995 35
Transformer, pad mounted, 3 ph 112.5 kVA 12 Ea 2005 35
Transformer, pad mounted, 3 ph 150 kVA 8 Ea 1985 35
Transformer, pad-mounted, 3 ph 150 kVA 7 Ea 1995 35
Transformer, pad mounted, 3 ph 150 kVA 7 Ea 2005 35
Transformer, pad mounted, 3 ph 225 kVA 8 Ea 1985 35
Transformer, pad mounted, 3 ph 225 kVA 8 Ea 1995 35
Transformer, pad mounted, 3 ph 225 kVA 8 Ea 2005 35
Transformer, pad mounted, 3 ph 300 kVA 9 Ea 1985 35
Transformer, pad mounted, 3 ph 300 kVA 8 Ea 1995 35
Transformer, pad mounted, 3 ph 300 kVA 8 Ea 2005 35
Transformer, pad mounted, 3 ph 500 kVA 5 Ea 1985 35
Transformer, pad mounted, 3 ph 500 kVA 5 Ea 1995 35
Transformer, pad mounted, 3 ph 500 kVA 4 Ea 2005 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 1985 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 1500 kVA 2 Ea 1985 35
Transformer, pad mounted, 3 ph 1500 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 1500 kVA 1 Ea 2005 35
Main Base – West Side
Switching Station
15 kV Bus Structure Small 1 Ea 1975 50
Circuit Breaker 15 kV 8 Ea 1975 35
Lightning arrestors 15 kV 3 Ea 1975 30
Current transformer 15 kV 12 Ea 1975 35
JA1-16
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Fence, chain link 8’ 150 LF 1975 50
Wood Pole, single cross arm 30’ 1 Ea 1960 35
Wood Pole, single cross arm 30’ 1 Ea 1970 35
Wood Pole, two single cross arms 30’ 1 Ea 1960 35
Wood Pole, two single cross arms 30’ 1 Ea 1970 35
Wood Pole, double cross arm 30’ 1 Ea 1960 35
Wood Pole, double cross arm 30’ 1 Ea 1970 35
Wood Pole, double cross arm 30’ 1 Ea 1980 35
Wood Pole, two double cross arms 30’ 1 Ea 1960 35
Wood Pole, 1 single, 1 double cross arms
30’ 1 Ea 1960
Wood Pole, 1 single, 1 double cross arms
30’ 1 Ea 1970
Wood Pole, three double cross arms
30’ 1 Ea 1960
Wood Pole, 3 standoff insulators 30’ 1 Ea 1960 35
Wood Pole, 3 standoff insulators 30’ 1 Ea 1970 35
Wood Pole, single cross arm 35’ 3 Ea 1960 35
Wood Pole, single cross arm 35’ 3 Ea 1970 35
Wood Pole, single cross arm 35’ 2 Ea 1980 35
Wood Pole, two single cross arms 35’ 3 Ea 1960 35
Wood Pole, two single cross arms 35’ 3 Ea 1970 35
Wood Pole, two single cross arms 35’ 2 Ea 1980 35
Wood Pole, double cross arm 35’ 4 Ea 1960 35
Wood Pole, double cross arm 35’ 3 Ea 1970 35
Wood Pole, double cross arm 35’ 3 Ea 1980 35
Wood Pole, two double cross arms 35’ 2 Ea 1960 35
Wood Pole, two double cross arms 35’ 2 Ea 1970 35
Wood Pole, two double cross arms 35’ 1 Ea 1980 35
JA1-17
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, 1 single, 1 double cross arms
35’ 3 Ea 1960
Wood Pole, 1 single, 1 double cross arms
35’ 3 Ea 1970
Wood Pole, 1 single, 1 double cross arms
35’ 2 Ea 1980
Wood Pole, three double cross arms
35’ 1 Ea 1960
Wood Pole, three double cross arms
35’ 1 Ea 1970
Wood Pole, three double cross arms
35’ 1 Ea 1980
Wood Pole, 3 standoff insulators 35’ 3 Ea 1960 35
Wood Pole, 3 standoff insulators 35’ 3 Ea 1970 35
Wood Pole, 3 standoff insulators 35’ 2 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 1 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 1 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 35’ 1 Ea 1980 35
Wood Pole, single cross arm 40’ 7 Ea 1960 35
Wood Pole, single cross arm 40’ 6 Ea 1970 35
Wood Pole, single cross arm 40’ 6 Ea 1980 35
Wood Pole, two single cross arms 40’ 7 Ea 1960 35
Wood Pole, two single cross arms 40’ 6 Ea 1970 35
Wood Pole, two single cross arms 40’ 6 Ea 1980 35
Wood Pole, double cross arm 40’ 9 Ea 1960 35
Wood Pole, double cross arm 40’ 9 Ea 1970 35
Wood Pole, double cross arm 40’ 8 Ea 1980 35
Wood Pole, two double cross arms 40’ 5 Ea 1960 35
Wood Pole, two double cross arms 40’ 4 Ea 1970 35
Wood Pole, two double cross arms 40’ 4 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
40’ 7 Ea 1960
JA1-18
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, 1 single, 1 double cross arms
40’ 6 Ea 1970
Wood Pole, 1 single, 1 double cross arms
40’ 6 Ea 1980
Wood Pole, three double cross arms
40’ 2 Ea 1960
Wood Pole, three double cross arms
40’ 2 Ea 1970
Wood Pole, three double cross arms
40’ 2 Ea 1980
Wood Pole, 3 standoff insulators 40’ 7 Ea 1960 35
Wood Pole, 3 standoff insulators 40’ 6 Ea 1970 35
Wood Pole, 3 standoff insulators 40’ 6 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 2 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 2 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 40’ 2 Ea 1980 35
Wood Pole, single cross arm 45’ 15 Ea 1960 35
Wood Pole, single cross arm 45’ 14 Ea 1970 35
Wood Pole, single cross arm 45’ 14 Ea 1980 35
Wood Pole, two single cross arms 45’ 15 Ea 1960 35
Wood Pole, two single cross arms 45’ 14 Ea 1970 35
Wood Pole, two single cross arms 45’ 14 Ea 1980 35
Wood Pole, double cross arm 45’ 19 Ea 1960 35
Wood Pole, double cross arm 45’ 19 Ea 1970 35
Wood Pole, double cross arm 45’ 19 Ea 1980 35
Wood Pole, two double cross arms 45’ 10 Ea 1960 35
Wood Pole, two double cross arms 45’ 10 Ea 1970 35
Wood Pole, two double cross arms 45’ 9 Ea 1980 35
Wood Pole, 1 single, 1 double cross arms
45’ 15 Ea 1960
Wood Pole, 1 single, 1 double cross arms
45’ 14 Ea 1970
JA1-19
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, 1 single, 1 double cross arms
45’ 14 Ea 1980
Wood Pole, three double cross arms
45’ 5 Ea 1960
Wood Pole, three double cross arms
45’ 5 Ea 1970
Wood Pole, three double cross arms
45’ 4 Ea 1980
Wood Pole, 3 standoff insulators 45’ 15 Ea 1960 35
Wood Pole, 3 standoff insulators 45’ 14 Ea 1970 35
Wood Pole, 3 standoff insulators 45’ 14 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 5 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 5 Ea 1970 35
Wood Pole, 3 standoff, 1 dbl x-arm 45’ 4 Ea 1980 35
Wood Pole, single cross arm 50’ 2 Ea 1960 35
Wood Pole, single cross arm 50’ 2 Ea 1970 35
Wood Pole, single cross arm 50’ 2 Ea 1980 35
Wood Pole, two single cross arms 50’ 2 Ea 1960 35
Wood Pole, two single cross arms 50’ 2 Ea 1970 35
Wood Pole, two single cross arms 50’ 2 Ea 1980 35
Wood Pole, double cross arm 50’ 3 Ea 1960 35
Wood Pole, double cross arm 50’ 3 Ea 1970 35
Wood Pole, double cross arm 50’ 2 Ea 1980 35
Wood Pole, two double cross arms 50’ 2 Ea 1960 35
Wood Pole, two double cross arms 50’ 2 Ea 1970 35
Wood Pole, 1 single, 1 double cross arms
50’ 2 Ea 1960
Wood Pole, 1 single, 1 double cross arms
50’ 2 Ea 1970
Wood Pole, 1 single, 1 double cross arms
50’ 2 Ea 1980
JA1-20
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, three double cross arms
50’ 1 Ea 1960
Wood Pole, three double cross arms
50’ 1 Ea 1970
Wood Pole, 3 standoff insulators 50’ 2 Ea 1960 35
Wood Pole, 3 standoff insulators 50’ 2 Ea 1970 35
Wood Pole, 3 standoff insulators 50’ 2 Ea 1980 35
Wood Pole, 3 standoff, 1 dbl x-arm 50’ 1 Ea 1960 35
Wood Pole, 3 standoff, 1 dbl x-arm 50’ 1 Ea 1970 35
Wood Pole, two double cross arms 55’ 1 Ea 1970 35
Guy and Anchor 8’ 49 Ea 1960 35
Guy and Anchor 8’ 49 Ea 1970 35
Guy and Anchor 8’ 49 Ea 1980 35
Wire, 15 kV bare copper #6 AWG 680 SCLF 1960 50
Wire, 15 kV bare copper #6 AWG 680 SCLF 1970 50
Wire, 15 kV bare copper #6 AWG 680 SCLF 1980 50
Wire, 15 kV bare copper #4 AWG 9,648 SCLF 1960 50
Wire, 15 kV bare copper #4 AWG 9,648 SCLF 1970 50
Wire, 15 kV bare copper #4 AWG 9,648 SCLF 1980 50
Wire, 15 kV bare copper #2/0 AWG 2,657 SCLF 1960 50
Wire, 15 kV bare copper #2/0 AWG 2,657 SCLF 1970 50
Wire, 15 kV bare copper #2/0 AWG 2,657 SCLF 1980 50
Wire, 15 kV bare copper #4/0 AWG 605 SCLF 1960 50
Wire, 15 kV bare copper #4/0 AWG 605 SCLF 1970 50
Wire, 15 kV bare copper #4/0 AWG 605 SCLF 1980 50
Wire, 15 kV ACSR #4 AWG 24,996 SCLF 1960 50
Wire, 15 kV ACSR #4 AWG 24,996 SCLF 1970 50
Wire, 15 kV ACSR #4 AWG 24,996 SCLF 1980 50
Wire, 15 kV ACSR #2 AWG 17,912 SCLF 1960 50
JA1-21
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wire, 15 kV ACSR #2 AWG 17,912 SCLF 1970 50
Wire, 15 kV ACSR #2 AWG 17,912 SCLF 1980 50
Wire, 15 kV ACSR #2/0 AWG 2,765 SCLF 1960 50
Wire, 15 kV ACSR #2/0 AWG 2,765 SCLF 1970 50
Wire, 15 kV ACSR #2/0 AWG 2,765 SCLF 1980 50
Wire, 15 kV ACSR #4/0 AWG 12,919 SCLF 1960 50
Wire, 15 kV ACSR #4/0 AWG 12,919 SCLF 1970 50
Wire, 15 kV ACSR #4/0 AWG 12,919 SCLF 1980 50
Wire, 15 kV ACSR 336 kcmil 11,666 SCLF 1960 50
Wire, 15 kV ACSR 336 kcmil 11,666 SCLF 1970 50
Wire, 15 kV ACSR 336 kcmil 11,666 SCLF 1980 50
Wire, 115 kV ACSR 336 kcmil 24,486 SCLF 1970 50
Shielded Cable, 15 kV #6 AWG 5,095 SCLF 1985 20
Shielded Cable, 15 kV #6 AWG 5,095 SCLF 1995 45
Shielded Cable, 15 kV #6 AWG 5,095 SCLF 2005 45
Shielded Cable, 15 kV #2 AWG 25,765 SCLF 1985 20
Shielded Cable, 15 kV #2 AWG 25,765 SCLF 1995 45
Shielded Cable, 15 kV #2 AWG 25,765 SCLF 2005 45
Shielded Cable, 15 kV #1 AWG 231 SCLF 1985 20
Shielded Cable, 15 kV #1 AWG 231 SCLF 1995 45
Shielded Cable, 15 kV #1 AWG 231 SCLF 2005 45
Shielded Cable, 15 kV #1/0 AWG 11,261 SCLF 1985 20
Shielded Cable, 15 kV #1/0 AWG 11,261 SCLF 1995 45
Shielded Cable, 15 kV #1/0 AWG 11,261 SCLF 2005 45
Shielded Cable, 15 kV #2/0 AWG 2,005 SCLF 1985 20
Shielded Cable, 15 kV #2/0 AWG 2,005 SCLF 1995 45
Shielded Cable, 15 kV #2/0 AWG 2,005 SCLF 2005 45
Shielded Cable, 15 kV #4/0 AWG 11,430 SCLF 1985 20
JA1-22
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Shielded Cable, 15 kV #4/0 AWG 11,430 SCLF 1995 45
Shielded Cable, 15 kV #4/0 AWG 11,430 SCLF 2005 45
Shielded Cable, 15 kV 350 kcmil 7,843 SCLF 1985 20
Shielded Cable, 15 kV 350 kcmil 7,843 SCLF 1995 45
Shielded Cable, 15 kV 350 kcmil 7,843 SCLF 2005 45
Duct Bank, 2x2 PVC 4” 16,015 LF 1985 100
Duct Bank, 2x2 PVC 4” 16,015 LF 1995 100
Duct Bank, 2x2 PVC 4” 16,015 LF 2005 100
Light pole 6’ arm and fixture 30’ 48 Ea 2005 35
Light pole , fixture, windmill & PV 15’ 8 Ea 2010 35
Switch, GOAB, manual operation 15 kV 3 Ea 1960 35
Switch, GOAB, manual operation 15 kV 3 Ea 1970 35
Switch, GOAB, manual operation 15 kV 3 Ea 1980 35
Switch, Fused Cutouts, pole mtd 15 kV 28 Ea 1960 30
Switch, Fused Cutouts, pole mtd 15 kV 28 Ea 1970 30
Switch, Fused Cutouts, pole mtd 15 kV 28 Ea 1980 30
Sectionalizing Switch, Pad mounted, 4-way
15 kV 6 Ea 1985 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 6 Ea 1995 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 7 Ea 2005 35
Manhole 6’x10’x6’ 18 Ea 1985 60
Manhole 6’x10’x6’ 18 Ea 1995 60
Manhole 6’x10’x6’ 18 Ea 2005 60
Junction Cabinet, pad mounted 15 kV 17 Ea 1985 35
Junction Cabinet, pad mounted 15 kV 17 Ea 1995 35
Junction Cabinet, pad mounted 15 kV 17 Ea 2005 35
Handhole 4’6”x3’2”x2’ 1 Ea 1995 60
Capacitor, 15 kV 1 MVAR 0.6 Ea 1960 35
JA1-23
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Capacitor, 15 kV 1 MVAR 0.6 Ea 1970 35
Capacitor, 15 kV 1 MVAR 0.6 Ea 1980 35
Transformer, pole mount, 1 ph 10 kVA 1 Ea 1970 35
Transformer, pole mount, 1 ph 15 kVA 53 Ea 1960 35
Transformer, pole mount, 1 ph 15 kVA 53 Ea 1970 35
Transformer, pole mount, 1 ph 15 kVA 53 Ea 1980 35
Transformer, pole mount, 1 ph 25 kVA 23 Ea 1960 35
Transformer, pole mount, 1 ph 25 kVA 23 Ea 1970 35
Transformer, pole mount, 1 ph 25 kVA 23 Ea 1980 35
Transformer, pole mount, 1 ph 37.5 kVA 18 Ea 1960 35
Transformer, pole mount, 1 ph 37.5 kVA 18 Ea 1970 35
Transformer, pole mount, 1 ph 37.5 kVA 18 Ea 1980 35
Transformer, pole mount, 1 ph 50 kVA 16 Ea 1960 35
Transformer, pole mount, 1 ph 50 kVA 16 Ea 1970 35
Transformer, pole mount, 1 ph 50 kVA 16 Ea 1980 35
Transformer, pad mounted, 1 ph 25 kVA 1 Ea 1985 35
Transformer, pad mounted, 1 ph 37.5 kVA 4 Ea 1985 35
Transformer, pad mounted, 1 ph 37.5 kVA 4 Ea 1995 35
Transformer, pad mounted, 1 ph 37.5 kVA 3 Ea 2005 35
Transformer, pad mounted, 1 ph 50 kVA 4 Ea 1985 35
Transformer, pad mounted, 1 ph 50 kVA 4 Ea 1995 35
Transformer, pad mounted, 1 ph 50 kVA 4 Ea 2005 35
Transformer, pad mounted, 3 ph 75 kVA 6 Ea 1985 35
Transformer, pad mounted, 3 ph 75 kVA 5 Ea 1995 35
Transformer, pad mounted, 3 ph 75 kVA 5 Ea 2005 35
Transformer, pad mounted, 3 ph 100 kVA 3 Ea 1985 35
Transformer, pad mounted, 3 ph 100 kVA 3 Ea 1995 35
Transformer, pad mounted, 3 ph 100 kVA 3 Ea 2005 35
JA1-24
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Transformer, pad mounted, 3 ph 112.5 kVA 3 Ea 1985 35
Transformer, pad mounted, 3 ph 112.5 kVA 3 Ea 1995 35
Transformer, pad mounted, 3 ph 112.5 kVA 2 Ea 2005 35
Transformer, pad mounted, 3 ph 150 kVA 3 Ea 1985 35
Transformer, pad mounted, 3 ph 150 kVA 3 Ea 1995 35
Transformer, pad mounted, 3 ph 150 kVA 2 Ea 2005 35
Transformer, pad mounted, 3 ph 225 kVA 4 Ea 1985 35
Transformer, pad mounted, 3 ph 225 kVA 4 Ea 1995 35
Transformer, pad mounted, 3 ph 225 kVA 3 Ea 2005 35
Transformer, pad mounted, 3 ph 300 kVA 5 Ea 1985 35
Transformer, pad mounted, 3 ph 300 kVA 4 Ea 1995 35
Transformer, pad mounted, 3 ph 300 kVA 4 Ea 2005 35
Transformer, pad mounted, 3 ph 500 kVA 2 Ea 1985 35
Transformer, pad mounted, 3 ph 500 kVA 2 Ea 1995 35
Transformer, pad mounted, 3 ph 500 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 1985 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 1000 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 1500 kVA 1 Ea 1995 35
High Mast light pole and base 150’ 23 Ea 1971 35
High mast light fixture 1000 watt 368 Ea 1995 20
Main Base - North Side
Atlas Substation
115 kV Bus Structure Small 1 Ea 1980 50
Circuit Breaker 115 kV 1 Ea 1980 35
15 kV Bus Structure Medium 1 Ea 1980 50
Transformer 115 kV – 13.2 kV 22.5 MVA 1 Ea 2009 35
Circuit Breaker 15 kV 4 Ea 2010 35
JA1-25
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Lightning arrestors 115 kV 3 Ea 1980 30
Lightning arrestors 15 kV 3 Ea 1980 30
Current transformer 115 kV 12 Ea 1980 35
Current transformer 15 kV 3 Ea 1980 35
Fence, chain link 8’ 200 LF 1980 50
Wood Pole, single cross arm 30’ 2 Ea 1960 35
Wood Pole, single cross arm 30’ 3 Ea 1970 35
Wood Pole, single cross arm 30’ 3 Ea 1980 35
Wood Pole, single cross arm 35’ 35 Ea 1960 35
Wood Pole, single cross arm 35’ 36 Ea 1970 35
Wood Pole, single cross arm 35’ 36 Ea 1980 35
Wood Pole, single cross arm 40’ 184 Ea 1960 35
Wood Pole, single cross arm 40’ 184 Ea 1970 35
Wood Pole, single cross arm 40’ 184 Ea 1980 35
Wood Pole, 3 standoff insulators 45’ 171 Ea 1960 35
Wood Pole, 3 standoff insulators 45’ 171 Ea 1970 35
Wood Pole, 3 standoff insulators 45’ 171 Ea 1980 35
Wood Pole, 3 standoff insulators 50’ 21 Ea 1960 35
Wood Pole, 3 standoff insulators 50’ 20 Ea 1970 35
Wood Pole, 3 standoff insulators 50’ 20 Ea 1980 35
Wood Pole, 3 standoff insulators 55’ 11 Ea 1960 35
Wood Pole, 3 standoff insulators 55’ 10 Ea 1970 35
Wood Pole, 3 standoff insulators 55’ 10 Ea 1980 35
Wood Pole, 2 single cross arms 60’ 12 Ea 1960 35
Wood Pole, 2 single cross arms 60’ 11 Ea 1970 35
Wood Pole, 2 single cross arms 60’ 11 Ea 1980 35
Wood Pole, 2 single cross arms 65’ 7 Ea 1960 35
Wood Pole, 2 single cross arms 65’ 7 Ea 1970 35
JA1-26
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wood Pole, 2 single cross arms 65’ 6 Ea 1980 35
Wood Pole, 2 single cross arms 70’ 2 Ea 1960 35
Guy and Anchor 8’ 110 Ea 1960 35
Guy and Anchor 8’ 110 Ea 1970 35
Guy and Anchor 8’ 110 Ea 1980 35
Wire, 15 kV bare copper #6 AWG 22,450 SCLF 1960 50
Wire, 15 kV bare copper #6 AWG 22,450 SCLF 1970 50
Wire, 15 kV bare copper #6 AWG 22,450 SCLF 1980 50
Wire, 15 kV bare copper #4 AWG 9,034 SCLF 1960 50
Wire, 15 kV bare copper #4 AWG 9,034 SCLF 1970 50
Wire, 15 kV bare copper #4 AWG 9,034 SCLF 1980 50
Wire, 15 kV bare copper #4/0 AWG 13,242 SCLF 1960 50
Wire, 15 kV bare copper #4/0 AWG 13,242 SCLF 1970 50
Wire, 15 kV bare copper #4/0 AWG 13,242 SCLF 1980 50
Wire, 15 kV ACSR #6 AWG 1,544 SCLF 1960 50
Wire, 15 kV ACSR #6 AWG 1,544 SCLF 1970 50
Wire, 15 kV ACSR #6 AWG 1,544 SCLF 1980 50
Wire, 15 kV ACSR #4 AWG 48,066 SCLF 1960 50
Wire, 15 kV ACSR #4 AWG 48,066 SCLF 1970 50
Wire, 15 kV ACSR #4 AWG 48,066 SCLF 1980 50
Wire, 15 kV ACSR #2 AWG 103,008 SCLF 1960 50
Wire, 15 kV ACSR #2 AWG 103,008 SCLF 1970 50
Wire, 15 kV ACSR #2 AWG 103,008 SCLF 1980 50
Wire, 15 kV ACSR #1/0 AWG 4,134 SCLF 1960 50
Wire, 15 kV ACSR #1/0 AWG 4,134 SCLF 1970 50
Wire, 15 kV ACSR #1/0 AWG 4,134 SCLF 1980 50
Wire, 15 kV ACSR #2/0 AWG 88,964 SCLF 1960 50
Wire, 15 kV ACSR #2/0 AWG 88,964 SCLF 1970 50
JA1-27
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Wire, 15 kV ACSR #2/0 AWG 88,964 SCLF 1980 50
Wire, 15 kV ACSR #4/0 AWG 134,836 SCLF 1960 50
Wire, 15 kV ACSR #4/0 AWG 134,836 SCLF 1970 50
Wire, 15 kV ACSR #4/0 AWG 134,836 SCLF 1980 50
Wire, 15 kV ACSR 336 kcmil 31,155 SCLF 1960 50
Wire, 15 kV ACSR 336 kcmil 31,155 SCLF 1970 50
Wire, 15 kV ACSR 336 kcmil 31,155 SCLF 1980 50
Wire, 115 kV ACSR 336 kcmil 51,693 SCLF 1970 50
Shielded Cable, 15 kV #4 AWG 456 SCLF 1985 45
Shielded Cable, 15 kV #4 AWG 456 SCLF 1995 45
Shielded Cable, 15 kV #4 AWG 456 SCLF 2005 45
Shielded Cable, 15 kV #2 AWG 22,755 SCLF 1985 45
Shielded Cable, 15 kV #2 AWG 22,755 SCLF 1995 45
Shielded Cable, 15 kV #2 AWG 22,755 SCLF 2005 45
Shielded Cable, 15 kV #1/0 AWG 15,560 SCLF 1985 45
Shielded Cable, 15 kV #1/0 AWG 15,560 SCLF 1995 45
Shielded Cable, 15 kV #1/0 AWG 15,560 SCLF 2005 45
Shielded Cable, 15 kV #4/0 AWG 43,933 SCLF 1985 45
Shielded Cable, 15 kV #4/0 AWG 43,933 SCLF 1995 45
Shielded Cable, 15 kV #4/0 AWG 43,933 SCLF 2005 45
Duct Bank, 2x2 PVC 4” 20,714 LF 1985 100
Duct Bank, 2x2 PVC 4” 20,714 LF 1995 100
Duct Bank, 2x2 PVC 4” 20,714 LF 2005 100
Cobrahead Light with 6’ arm 250 watt 32 Ea 1985 20
Switch, Ground operated air break 15 kV 7 Ea 1960 35
Switch, Ground operated air break 15 kV 7 Ea 1970 35
Switch, Ground operated air break 15 kV 6 Ea 1980 35
Switch, Fused Cutouts, pole mtd 15 kV 50 Ea 1960 30
JA1-28
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Switch, Fused Cutouts, pole mtd 15 kV 50 Ea 1970 30
Switch, Fused Cutouts, pole mtd 15 kV 51 Ea 1980 30
Sectionalizing Switch, Pad mounted, 4-way
15 kV 3 Ea 1985 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 3 Ea 1995 35
Sectionalizing Switch, Pad mounted, 4-way
15 kV 2 Ea 2005 35
Manhole 6’x10’x6’ 37 Ea 1985 60
Manhole 6’x10’x6’ 37 Ea 1995 60
Manhole 6’x10’x6’ 36 Ea 2005 60
Junction Cabinet, pad mounted 15 kV 4 Ea 1985 35
Junction Cabinet, pad mounted 15 kV 4 Ea 1995 35
Junction Cabinet, pad mounted 15 kV 4 Ea 2005 35
Capacitor, 15 kV 1 MVAR 0.6 Ea 1960 35
Capacitor, 15 kV 1 MVAR 0.6 Ea 1970 35
Transformer, pole mount, 1 ph 5 kVA 1 Ea 1960 35
Transformer, pole mount, 1 ph 5 kVA 1 Ea 1970 35
Transformer, pole mount, 1 ph 5 kVA 1 Ea 1980 35
Transformer, pole mount, 1 ph 10 kVA 1 Ea 1960 35
Transformer, pole mount, 1 ph 15 kVA 38 Ea 1960 35
Transformer, pole mount, 1 ph 15 kVA 38 Ea 1970 35
Transformer, pole mount, 1 ph 15 kVA 38 Ea 1980 35
Transformer, pole mount, 1 ph 25 kVA 17 Ea 1960 35
Transformer, pole mount, 1 ph 25 kVA 17 Ea 1970 35
Transformer, pole mount, 1 ph 25 kVA 16 Ea 1980 35
Transformer, pole mount, 1 ph 37.5 kVA 11 Ea 1960 35
Transformer, pole mount, 1 ph 37.5 kVA 11 Ea 1970 35
Transformer, pole mount, 1 ph 37.5 kVA 10 Ea 1980 35
Transformer, pole mount, 1 ph 50 kVA 8 Ea 1960 35
JA1-29
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Transformer, pole mount, 1 ph 50 kVA 8 Ea 1970 35
Transformer, pole mount, 1 ph 50 kVA 7 Ea 1980 35
Transformer, pad mounted, 1 ph 25 kVA 1 Ea 1985 35
Transformer, pad mounted, 1 ph 25 kVA 1 Ea 1995 35
Transformer, pad mounted, 1 ph 25 kVA 1 Ea 2005 35
Transformer, pad mounted, 1 ph 37.5 kVA 1 Ea 1985 35
Transformer, pad mounted, 1 ph 37.5 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 45 kVA 1 Ea 1985 35
Transformer, pad mounted, 3 ph 45 kVA 1 Ea 1995 35
Transformer, pad mounted, 3 ph 45 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 75 kVA 4 Ea 1985 35
Transformer, pad mounted, 3 ph 75 kVA 3 Ea 1995 35
Transformer, pad mounted, 3 ph 75 kVA 3 Ea 2005 35
Transformer, pad mounted, 3 ph 112.5 kVA 7 Ea 1985 35
Transformer, pad mounted, 3 ph 112.5 kVA 6 Ea 1995 35
Transformer, pad mounted, 3 ph 112.5 kVA 6 Ea 2005 35
Transformer, pad mounted, 3 ph 150 kVA 2 Ea 1985 35
Transformer, pad mounted, 3 ph 150 kVA 2 Ea 1995 35
Transformer, pad mounted, 3 ph 150 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 225 kVA 3 Ea 1985 35
Transformer, pad mounted, 3 ph 225 kVA 3 Ea 1995 35
Transformer, pad mounted, 3 ph 225 kVA 2 Ea 2005 35
Transformer, pad mounted, 3 ph 300 kVA 2 Ea 1985 35
Transformer, pad mounted, 3 ph 300 kVA 2 Ea 1995 35
Transformer, pad mounted, 3 ph 300 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 500 kVA 4 Ea 1985 35
Transformer, pad mounted, 3 ph 500 kVA 4 Ea 1995 35
Transformer, pad mounted, 3 ph 500 kVA 4 Ea 2005 35
JA1-30
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
Transformer, pad mounted, 3 ph 750 kVA 2 Ea 1985 35
Transformer, pad mounted, 3 ph 750 kVA 2 Ea 1995 35
Transformer, pad mounted, 3 ph 750 kVA 1 Ea 2005 35
Transformer, pad mounted, 3 ph 1000 kVA 1 Ea 1985 35
Transformer, pad mounted, 3 ph 1500 kVA 1 Ea 1985 35
Boles Wells Water System Annex and Transmission Line from Holloman AFB
Wood Pole, single cross arm 40’ 110 Ea 1970 35
Wood Pole, two single cross arms 40’ 14 Ea 1970 35
Wood Pole, double cross arm 40’ 14 Ea 1970 35
Wood Pole, single cross arm 45’ 210 Ea 1970 35
Wood Pole, two single cross arms 45’ 26 Ea 1970 35
Wood Pole, double cross arm 45’ 26 Ea 1970 35
Guy and Anchor 8’ 98 Ea 1970 35
Wire, 15 kV bare copper #4 AWG 3,884 SCLF 1970 50
Wire, 15 kV bare copper #2 AWG 45,935 SCLF 1970 50
Wire, 15 kV ACSR #4 AWG 37,739 SCLF 1970 50
Wire, 15 kV ACSR #2 AWG 106,853 SCLF 1970 50
Wire, 15 kV ACSR #1/0 AWG 200,665 SCLF 1970 50
Wire, 15 kV ACSR #2/0 AWG 4,642 SCLF 1970 50
Switch, Ground operated air break 15 kV 8 Ea 1970 35
Switch, Fused Cutouts, pole mtd 15 kV 26 Ea 1970 30
Transformer, pole mount, 1 ph 15 kVA 52 Ea 1970 35
Transformer, pole mount, 1 ph 25 kVA 21 Ea 1970 35
Transformer, pole mount, 1 ph 37.5 kVA 16 Ea 1970 35
Transformer, pole mount, 1 ph 50 kVA 16 Ea 1970 35
Transformer, pad mounted, 3 ph 150 kVA 1 Ea 1970 35
Transformer, pad mounted, 3 ph 300 kVA 1 Ea 1970 35
JA1-31
Electric Distribution System
Item Size Quantity Unit Approximate Year of
Construction
Design Life (Years)
ISDC Additions
Junction Cabinets 15 kV 12 EA 2013 45
Manholes with Junctions 15 kV 18 EA 2013 100
Cable Terminations 15 kV 198 EA 2013 35
Shielded Cable, 15 kV #4/0 AWG 46,000 SCLF 2013 50
Duct Bank, 2x2 PVC 4” 5,000 LF 2013 100
Note 1 -: Underground feeder conductor installed pre-1990 is assumed to have a design life of 20 years and 45 years.
if installed in 1990 or later.
Note 2 – In numerous instances it is know that electric inventory was installed during the period of approximately 1960 through 1980 but exact dates are unknown. In these cases, to approximate the “average” install date, the inventory in Table 1 is evenly spread with install dates of 1960, 1970 and 1990. For some items in Table 1 this also occurs for years1985, 1995, and 2005.
Notes A = Ampere
ACSR = aluminum-conducting-steel-reinforced
AH = amp hour AL = Aluminum
ATS = automatic transfer switch
AWG = American Wire Gauge EA = each lf = linear feet Nom kVA = nominal kilovolt-amperes PH = phase SCLF = single conductor linear feet V = volts KV = kilovolt W = wire ID = inner diameter Kcmil = thousand circular mils
OH = Overhead UG = Underground kVA = kilovolt ampere MVA = megavolt-amperes Cu = copper Dia = diameter PVC = polyvinyl chloride Est = Estimated Ft = ‘ = foot In = “ = inch cy = cubic yards RTU = remote terminal unit sf = square foot GOAB = gang operated air brake kW = kilowatt
JA1.2.2 Electric Distribution System Non-Fixed Equipment and Specialized Tools
Table 2 lists other ancillary equipment (spare parts) and Table 3 lists specialized vehicles and tools included in the purchase. Offeror shall field verify all equipment, vehicles, and tools prior to submitting a proposal. Offeror shall make its own determination of the adequacy of all equipment, vehicles, and tools.
JA1-32
TABLE 2
Spare Parts Electric Distribution System
Item Make/Model Description Quantity Remarks
None
Note: Spare parts may be available at the time of transfer. For any spare parts available, the Government and the System Owner (SO) will negotiate the value and include in the bill of sale at the time of transfer.
TABLE 3
Specialized Vehicles and Tools Electric Distribution System
Item Make/Model Description Quantity Remarks
None
Note: Specialized Vehicles and Tools may be available at the time of transfer. For any Specialized Vehicles and Tools available, the Government and the System Owner (SO) will negotiate the value and include in the bill of sale at the time of transfer.
JA1.2.3 Electric Distribution System Manuals, Drawings, and Records
Table 4 lists the manuals, drawings, and records that will be transferred with the system.
TABLE 4
Manuals, Drawings, and Records Electric Distribution System
Item Description Quantity Remarks
GoeBase System Drawings
Drawings of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .