Attachment 1 to Amendment 0002 to Solicitation GS.doc

DOC document 28 KB Posted

Attached to
RECOVERY: CM Services for LPOE at Maida, ND
Solicitation number
GS-00P-10-CYC-0090
Issued by

About this file

The purpose of this amendment is to make changes to Pages 44 of 79 and 46 of 79 of the RFP document in accordance with Attachment 1 to this amendment. The due date for proposals has been extended to May 11 2010 3 00 P.M. MST.

View the file

Other files

File Type Posted
Maida CM Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 to Amendment 0002 to Solicitation GS-00P-10-CY-C-0090

Maida, ND CM Services The following changes are hereby made to the RFP document:

Page 44 of 79 para b) Individual Experience and Past Performance:

Added: The proposed on-site CM representative must be made available for assignment to this project for a period of 60 days after the date of proposal submission. If, at time of award, the proposed individual is not available to commence work when required, within this timeframe, the government reserves the right to award this work to the next offeror that represents the best value to the Government.

Page 46 of 79 Key Personnel Minimum Qualifications:

General Instructions

Changed: para 1) Experience/Qualifications on Resumes

(a) Educational information must include details of the highest level of education attained, including dates and subjects studied.

(b) Professional and field experience must be specific enough to allow for a clear indication of level of responsibility achieved, i.e. “15 years in Engineering Profession (year – year), 5 years in Commissioning (year – year) “ that the RFP requirements have been met. Indicating specific dates for cited experience is required.

(c) Years of on-site Construction Management/Inspection experience must be cited.

Changed: para 2) Project Construction Manager/Inspector. The Construction Manager/Inspector shall have a minimum of ten (10) years experience in field activities and within this term, a minimum of five (5) years as an on-site Field Superintendent or CM inspector responsible for ensuring delivery of the day-to-day management services during the construction phase. He/she shall demonstrate the necessary technical training and knowledge in engineering, construction management, or related field. All references contacted shall provide a satisfactory or better rating. The Project Construction Manager/Inspector shall work closely with the GSA team and the D/B contractor, which includes the A/E, during all phases of this project and must possess the knowledge, skills, and abilities to perform the following functions:

· Experience in construction management procedures, including the ability to understand different project scheduling software (e.g. Primavera P6).

· Experience in conducting inspections to resolve problems on construction projects and briefing Government personnel.

· Experience in construction practices and techniques, including experience in proper installation methods of construction materials.

· Experience in construction scheduling, budgeting, materials and methods and industry design standards.

· Experience in interpreting engineering and architectural plans and specifications.

· Experience with and an understanding of LEED requirements through qualifications, training or field experience in working on a LEED certified building.