GRPS Security Projects.pdf

PDF 2 MB Posted

Attached to
2020001 2020 Entrance Security Improvements
Solicitation number
RFP GRP 200000001705 1
Issued by
Kent County, Grand Rapids City, Michigan

About this file

Summary of GRPS Security Projects Bidding Documents

This is a project manual and bidding package issued by Grand Rapids Public Schools (GRPS) for 2020 entrance security improvements at five school locations: Kent Hills Elementary School, Sibley Elementary School, Alger Middle School, Ken-O-Sha Elementary School, and Southwest Community Campus. The project involves modifications to school entrance areas to create vestibules that route visitor flow through offices before gaining access to the main building. Work includes installation of doors, aluminum and hollow metal framing, and associated hardware. Sealed bids were due on May 22, 2020, at 10:00 AM at the GRPS Service Building, 900 Union Avenue NE, Grand Rapids, Michigan. The contractor must achieve 100% completion on or before July 31, 2020, subject to final inspection approval, completion of punchlist items, manufacturer inspection and warranties, and issuance of a Certificate of Occupancy. The design professional is Long Nguyen, reachable at nguyenl@grps.org or (616) 819-3010. Bidders were required to visit project sites by appointment to familiarize themselves with existing conditions before submitting bids.

Bidders must submit sealed bids with bid security equal to 5% of the base bid amount. Payment and performance bonds at 100% of the award amount are required if the contract exceeds $50,000, and bidders must include bond costs in their bid prices. GRPS Policy 3670 provides bid discounts to local vendors certified as Michigan-based businesses with primary operations in Grand Rapids, up to a maximum 5% discount or $25,000, whichever is lower. Non-local vendors may qualify for discounts by subcontracting with certified local businesses on a tiered percentage basis. All bids must include completed DTMB demographic and Michigan business certification forms, sworn statements of familial relationships, Iran Business Relationship Affidavits, and Debarment and Suspension Certifications. The project will be executed using the ConsensusDocs Form 205 Standard Short Form Agreement between Owner and Constructor. Prevailing wage requirements do not apply to this project. The contractor must maintain occupancy conditions during construction, provide temporary enclosures complying with Michigan Fire Code, and maintain a safe working environment with no smoking allowed on school property.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRAND RAPIDS PUBLIC SCHOOLS

2020 Entrance Security Improvements Kent Hills Elementary School

Sibley Elementary School Alger Middle School

Ken -O-Sha Elementary School Southwest Community Campus

May 4,2020

GRPS Facilities & Operations 900 Union Avenue NE

Grand Rapids, MI 49503

Telephone (616) 819-3010

PROJECT MANUAL

TABLE OF CONTENTS

Instructions to Bidders

Bid Form

GRPS 3670 – Local Construction Contracting

GRPS 3670R – Local Construction Contracting Regulations

DTMB Demographics, Statistics and Certification

DTMB Certification of a Michigan-Based Business

Sworn Statement of Familial Relationship

Iran Business Relationship Affidavit

Debarment and Suspension Certification

Pre-bid Inquiry Form

Attachment A: Section 01000, General Requirements

Attachment B: Work Description, Drawings, Sketches, Specifications

GRPS Instructions to Bidders 3 May 4,2020

INSTRUCTIONS TO BIDDERS

PROJECT: 2020 Entrance Security Improvements

PROJECT

LOCATIONS:

Kent Hills Elementary School Sibley Elementary School Alger Middle School Ken-O-Sha Elementary School

OWNER:

Grand Rapids Public Schools

DESIGN

PROFESSIONAL:

Long Nguyen 900 Union Ave NE 616.819.3010 nguyenl@grps.org

DATE BIDS ARE DUE:

May 22,2020 with a ZOOM public opening.

TIME BIDS ARE DUE: 10:00 AM

LOCATION FOR RECEIVING BIDS: Grand Rapids Public Schools Service Building 900 Union Avenue NE Grand Rapids, MI 49503

SUMMARY OF WORK

Modifications to school entrance areas creating a vestibule to route visitor flow through offices before gaining access to the . Includes doors, aluminum and hollow metal framing, and minor demolition work.

OBTAINING BID DOCUMENTS

Contact Long Nguyen at NguyenL@grps.org to obtain documents. Documents may also be obtained on the SIGMA Vendor Self Service website (https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService).

EXAMINATION

Builders’ Exchange 678 Front Avenue NW Suite 330 Grand Rapids, MI 49504 (616) 949-8650 e-mail: projects@grbx.com mailto:nguyenl@grps.org mailto:NguyenL@grps.org mailto:NguyenL@grps.org https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:projects@grbx.com mailto:projects@grbx.com

GRPS Instructions to Bidders 4 May 4,2020

CONTRACT DOCUMENTS

The Contract Documents, alone, detail the requirements of the project, and bids shall be based only on information presented there. Information obtained from others shall not affect the risks or obligations assumed by the bidder or relieve a Constructor from fulfilling any part of the contract.

SUBSTITUTIONS DURING THE BIDDING PERIOD

Unless otherwise noted, manufacturers and products not named in the specifications will be given consideration during the bidding period. Written approval from the Design Professional shall be obtained before a bidder uses substitute materials or manufacturers in its bid estimate. Bidders who base their bids on substitute materials or manufacturers without the Design Professional’s written approval do so at their own risk.

Requests for substitutions during the bidding period must be received at least ten calendar days prior to bid date and may be emailed to the Design Professional at the email address noted above. The burden of showing the requested product is an adequate substitution for the specified product rests with the Bidder.

Substitution requests shall be reviewed by the Design Professional for quality and function, only. The Design Professional’s approval of a substitution shall be communicated to all plan holders in an addendum. Bidders shall be responsible for any unforeseen costs that result from using an approved substitution.

TIME FOR COMPLETION

The Constructor shall be 100% complete with the work on or before July 31,2020.

Conditions precedent to establishing final completion include:

A. Final inspection and approval by all relevant agencies.

B. All punchlist items having been completed and accepted by Owner.

C. Manufacturer inspection, approval, and warranties.

D. Issuance of a Certificate of Occupancy, if necessary.

RESPONSIBILITY OF BIDDERS

Bidders shall study the bid documents and visit the site to satisfy themselves of all conditions before submitting a bid. It is incumbent upon bidders to reconcile any ambiguities, errors or omissions in the documents discovered during the bidding period.

It is the responsibility of each bidder to take those steps necessary to satisfy itself of the physical conditions under which the Work will be performed and the condition of the existing facilities, including those which may not be a part of the Work but could be affected by the performance of the Work, and (b) account for all general, local and prevailing conditions at or near the site that may in any manner affect the cost, schedule, progress or performance of the Work.

Questions about the bid documents, the intent of the design, or errors or omissions discovered in the documents shall be formally submitted to the Design Professional by email at the address given above not less than 10 calendar days prior to the date set for receipt of bids.

GRPS Instructions to Bidders 5 May 4,2020

INSPECTION OF PREMISES

Most GRPS buildings are occupied Monday through Friday from 7:30 AM until 4:00 PM.

Bidders may visit by appointment.

Contact Long Nguyen at NguyenL@grps.org, prior to visiting a secured site, to arrange for entry and to receive custodial assistance.

In order to maintain a safe and orderly environment, visitors shall proceed directly to the main office when entering a Grand Rapids Public School building. Identify yourself and state your business. When you have completed your business, please check out at the office.

COST CONSIDERATIONS

GRPS will execute with the successful bidder ConsensusDocs Form 205 STANDARD SHORT FORM AGREEMENT BETWEEN OWNER AND CONSTRUCTOR (Lump Sum Price), as modified.

No negotiation of contract terms will be allowed. Bidders shall account for all terms and conditions of this contract in their bid prices.

Unless specifically noted otherwise, bids shall include the following costs:

1. Permits, fees, notices, etc. for any federal, state or local government agency having jurisdiction over the project.

2. Insurance coverages, limits and deductibles required by the draft contract.

3. Inspections by building authorities and other government agencies

4. Maintaining an environment in compliance with all rules, statutes, regulations and codes covering an occupied school facility.

5. All equipment required to fully and safely complete the work. No equipment shall be furnished by or borrowed from Owner.

6. Unless otherwise noted, during Constructor’s performance of the Work, Owner will continue to occupy the building. The Constructor shall provide labor, materials and equipment to construct, maintain and remove all temporary enclosures needed to comply with State of Michigan Fire Code and/or to prevent dust, noise, odors and debris in a construction area from entering the remainder of the building.

7. During the school day, construction operations shall be limited to those methods and procedures that do not adversely affect the environment of Owner’s occupied space, including noise, odors, dust, lighting hazards and other undesirable effects and conditions.

8. Prevailing Wages ☐ DO / ☒ DO NOT apply to this Project.

GRPS Instructions to Bidders 6 May 4,2020

BID SECURITY

Bid security shall be made payable to "Grand Rapids Public Schools" in the form of a certified or cashier's check drawn upon a bank insured by an agency of the Federal government, or an executed Bid Bond on ConsensusDocs form 262, AIA form A310, or a substantially similar form in the amount of 5% of the bid. A bid bond shall be executed with a surety authorized to do business in the State. A certified or cashier’s check submitted as bid security shall be held by the Owner until a contract has been executed.

PAYMENT AND PEFORMANCE BONDS

Payment and performance bonds, in the amount of 100% of the award amount, are required if the award amount is $50,000 or more. All bids shall include the cost of payment and performance bonds. Bidders shall show the cost of bonds in the appropriate spot on the Bid Form. For contract awards less than $50,000, GRPS reserves the right to not require bonds and take a credit for the cost of bonds shown on the Bid Form. Bonds shall be executed with a surety authorized to do business in the State and use ConsensusDocs forms 260/261, AIA form A312, or a substantially similar form.

BIDDING PROCEDURES

1. Bids shall be submitted on the Bid Form included with this document. All blank spaces shall be printed in ink or typewritten. The Bid Form must be fully completed, signed and sealed. In the event of a discrepancy between the words and figures entered on the Bid Form, the written word shall take precedence over the numerical figures.

2. Three originals of the bid shall be submitted in a sealed, opaque envelope bearing the following information clearly marked on the outside:

Grand Rapids Public Schools Attn: Mr. Long Nguyen 900 Union Avenue NE Grand Rapids, MI 49503 Sealed bid for: 2020 Entrance Security Improvements

The envelope shall also bear, on the outside, the name of the bidding firm, its address and telephone number.

3. Include bid security in the amount identified above.

4. Include a completed and signed Statement of Familial Relationship or the bid may be disqualified.

5. Include a completed and signed Iran Business Relationship Affidavit or the bid may be disqualified.

6. Include a completed and signed Debarment and Suspension Certification.

7. Include completed DTMB documents: Demographics, Statistics and Certification and Certification of a Michigan-based business. These forms are collected for statistical purposes and will not affect award of the contract.

8. Bids will be received until the time and date noted above at the location noted above, unless modified by Addendum, at which time all bids will be opened and read aloud.

GRPS Instructions to Bidders 7 May 4,2020

9. Bids received after the date and time set for receipt of bids will not be considered or accepted.

10. Bids transmitted by fax, telephone, or electronic mail will not be accepted.

EVALUATION AND AWARD

1. The Owner may waive informalities or minor defects in a bid, may reject any and all bids, and may award to a bidder who is not the lowest bidder when the Owner deems it is in its best interest to do so.

2. Any bid that is incomplete, obscure, or irregular may be rejected. Bids that omit a price on any item in the Bid Form may be rejected. A bid for which unit prices are omitted or for which unit prices are, in the sole opinion of GRPS, unbalanced maybe rejected. Any bid accompanied by insufficient or unacceptable bid surety may be rejected. A conditional or qualified bid may be rejected.

3. The Owner reserves the right to reject all bids.

4. In accordance with GRPS Policy 3670, a bid discount will be applied to bids from bidders who qualify as a local vendor. Non-local bidders can obtain a bid discount based on the percentage of the bid price that will be awarded to local subcontractors.

Certification of the amount to be subcontracted will be required prior to award. GRPS Policy 3670 is attached to the Bid Form.

5. Upon approval of contract award by the GRPS Board of Education, the Owner will issue a Notice of Award to that bidder making Grand Rapids Public Schools the most advantageous offer. Once Notice of Award has been issued, the prospective Constructor shall obtain and submit payment and performance bonds, if directed, insurance in accordance with the terms of the construction contract and any additional documentation requested by the Owner.

6. Upon receipt of acceptable payment and performance bonds, if necessary, an insurance certificate showing coverages and limits in accordance with the contract, and any additional documentation requested by the Owner, a contract will be forwarded for signature.

INSTRUCTIONS SUBSEQUENT TO AWARD

1. After executing a contract, the Owner will issue a Notice to Proceed identifying the agreed upon start date. No work shall be performed prior to the start date in the Notice to Proceed.

2. If requested, the Constructor will be furnished, free of charge, up to 3 copies of drawings and specifications, with Amendments current at time of award. Additional copies will be furnished, at cost, payable to the Owner.

GRPS Bid Form 1 May 4,2020

BID FORM

2020 Entrance Security Improvements Kent Hills Elementary School

Sibley Elementary School Alger Middle School

Ken-O-Sha Elementary School

DATE:

(Bidder to enter date of bid opening)

SUBMITTED BY: (Bidder to complete)

Bidder’s Full Name:

Address:

City, State, Zip:

Telephone: Fax:

E-Mail:

OFFER

A. Having examined the place of the Work and all matters referred to in the Instructions to

Bidders and the Contract Documents prepared by the Owner for the Project, we, the undersigned, hereby offer to enter into a Contract on the Owner’s Contract Form to perform the Work for the lump sum price of:

Project Base Bid for Kent Hills Elementary School:

dollars ($ ), in lawful money of the United States of America.

Project Base Bid for Sibley Elementary School:

GRPS Bid Form 2 May 4,2020

Project Base Bid for Alger Middle School:

Project Base Bid for Ken-O-Sha Elementary School:

Project Base Bid for Southwest Community Campus:

B. The cost of payment and performance bonds included in the base bid amount is

C. We have included bid security in the amount of 5% of the base bid.

D. The base bid price includes all applicable taxes.

GRPS Bid Form 3 May 4,2020

ACCEPTANCE

A. This offer shall be open to acceptance and is irrevocable for sixty days from the date on which bids were opened.

B. If this bid is accepted by the Owner within the time period stated above, we will:

1. Furnish all required bonds and insurance certificates within ten days of receipt of a Notice of Award.

2. Commence work within ten days after written Notice to Proceed.

C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required bonds and insurance certificates, the bid security shall be forfeited as damages to Grand Rapids Public Schools by reason of our failure.

D. In the event our bid is not accepted within the time stated above, the bid security shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders, unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.

CONTRACT TIME

A. If this Bid is accepted, we will complete all work on or before July 31, 2020. We understand that conditions precedent to achieving Final Completion include:

1. Final inspection and approval by all relevant agencies.

2. All punchlist items having been completed and accepted by Owner.

3. Manufacturer inspection, approval, and warranties.

4. Issuance of a Certificate of Occupancy, when necessary.

ADDENDA

A. We acknowledge receipt of the following Addenda. These addenda have been evaluated and their effect on the cost of the Work has been incorporated into the base bid entered above.

Addendum # Dated Addendum # Dated

GRPS Bid Form 4 May 4,2020

BID FORM SUPPLEMENTS

A. If requested on the Bid Form, submit with your bid, a Schedule of Unit Prices to be used, upon the Owner’s acceptance, to price changes.

B. If requested in the Notice of Award, within 48 hours after receipt of the Notice of Award, provide a list of Subcontractors, Subcontract prices and the scope of Work each Subcontractor will perform.

ACKNOWLEDGEMENTS

The Bidder acknowledges:

a. That this bid was developed without any collusion, undertaking, or agreement, either directly or indirectly, with any other bidder or bidders to maintain the prices of indicated Work or prevent any other bidder or bidders from bidding the Work.

b. That this bid shall not be withdrawn for a period of 60 calendar days after the date on which bids were opened.

c. That all work will be complete on or before the Final Completion date(s) identified in the bid documents.

d. That the following documents, identified in Instructions to Bidders, have been completed and are attached to this Bid Form:

1. Bid Security in the amount of 5% of the base bid

2. DTMB Demographics, Statistics and Certification

3. DTMB Certification of a Michigan-Based Business

4. Sworn Statement of Familial Relationship

5. Iran Business Relationship Affidavit

6. Debarment and Suspension Certification

GRPS Bid Form 5 May 4,2020

SCHEDULE OF UNIT PRICES

Provide unit prices for the following line items which will be used, at the Owner’s discretion, to price changes to the Work after award:

Item Description Unit Price Unit

GRPS Bid Form 6 May 4,2020

SIGNATURE(S)

AUTHORIZED CORPORATE OFFICER

Signature

Printed Name

Title

Date

If the Bid is submitted by a joint venture or partnership, add additional executed signature pages for each member of the joint venture or partnership.

GRPS Policy 3670 – Local Construction Contracting

The District provides a preference (bid discount) in construction contracts from local vendors, providing the quality and service are commensurate with the requirements set forth by the District as to satisfy the demands of the bid or proposal. Bids, or proposals when bids are not required, shall be accepted from non-local vendors in order to maintain a fair market price.

In determining the qualification for a Local Purchasing Preference for purposes of this policy, vendors must have obtained the Certification of a Michigan Based Business as determined by the Michigan Department of Technology, Management and Budget as well as meet one of the following criteria:

a. For at least the last six months had its primary business operations located within the municipality boundaries of the City of Grand Rapids, Michigan (Grand Rapids).

b. Be certified by the City of Grand Rapids, as a Micro-Local Business Enterprise and have its primary business operations within the municipality boundaries of the City of Grand Rapids.

A successful recipient of a contract and/or purchase order which has received a Local Purchasing Preference may be required to present proof of its status as a Michigan Based Business and documentation of its location within the City of Grand Rapids at any time upon request from an authorized District official.

Failure to provide the requested information or failure to maintain business operations with the city of Grand Rapids for the duration of the contract will make the contract voidable at the District’s discretion, and will result in disqualification from future consideration of a Local Purchasing Preference for a period of five years unless excused by the Superintendent or Designee.

Preference will be provided on the following basis:

a. Constructor Participation: Grand Rapids Public Schools will provide up to a 5% bid discount to prime contractors and/or construction managers who satisfy the criteria set forth for consideration as a Local Vendor.

b. Subcontractor Participation: Construction bids for non-local vendors may be discounted when a bidder on a Grand Rapids Public Schools’ project voluntarily subcontracts with businesses meeting Local Vendor Criteria. Prime contractors and/or construction managers must submit affidavit(s) verifying Local Vendor subcontractor participation.

Prime contractors and/or construction managers must require Local Vendor certification documentation to be submitted by each subcontract bidder with their sealed bid. The District at its discretion can request additional documentation for verification of the qualification of any Local Vendor subcontractor participating in a construction project.

c. The following is a schedule of discounted percentages based upon Local Vendor subcontractor participation achieved by the prime Constructor:

LV Subcontractor Participation Discount Percentage

i. 1.00% – 2.5% 1.0%

ii. 2.51% – 5.0% 1.5%

iii. 5.01% – 7.5% 2.0%

iv. 7.51% – 10.0% 2.5%

v. 10.01% – 15.0% 3.0%

vi. 15.01% – 18.0% 4.0%

vii. 18.01% + 5.0%

d. Prime contractors and/or construction managers may not terminate an approved Local Vendor subcontractor working on a Grand Rapids Public Schools construction project, and then perform the work on the terminated subcontract with its own forces or those of another subcontractor, without prior written consent by the Grand Rapids Public Schools Executive Director of Facilities Planning and Management. If a Local Vendor subcontractor fails to complete its work on the contract for any reason, a prime Constructor/construction manager must notify the Grand

Rapids Public Schools Executive Director of Facilities Planning and Management and make good faith efforts to find another approved Local Vendor subcontractor to substitute for the original Local Vendor subcontractor. Utilizing good faith efforts, and to the extent reasonable, the prime Constructor/construction manager shall substitute an approved Local Vendor subcontractor to perform the same amount of work under the contract as the Local Vendor subcontractor that was terminated.

e. Joint Venture Bidding: As an incentive to contractors engaging in activities that stimulate the growth and development of local, small emerging businesses as partners bidding as a joint venture, Grand Rapids Public School will apply up to a 5% bid discount for partnering with a qualified Local Vendor.

f. The Bid Discounts outlined above may not exceed 5% or $25,000 per bid, whichever is lower.

Project bids from prime contractors and/or construction managers are considered a single bid for purposes of the Bid Discount consideration.

Grand Rapids Public Schools, Board of Education Members and employees are prohibited from having any financial interest or personal beneficial interest either directly or indirectly, in the award of any construction contracts, sub-contracts, or the recommendation/selection of any professional design service or construction manager, unless previously disclosed in writing to the Superintendent and approved in writing by the Superintendent.

This policy shall not apply to the extent that it would conflict with any provision of Michigan or federal law, regulation or constitution. The local preference shall not be applied to purchases of goods and services made with federal funds.

Policy Adopted: March 19, 2012

LEGAL Ref: MCL 380.1267; 380.1274 POLICY Ref: 3660 Bids and Quotation

Requirements 3690 Local Purchasing 1900 Contracts and Board Member Disclosure Obligations

GRPS Policy Rules 3670R – Local Construction Contracting Regulations

Qualification for Local Construction Contracting Preference On an annual basis beginning with July 1st of each fiscal year, a vendor desiring to receive a bid discount for local construction contracting may submit appropriate documentation to the Executive Director of Facilities and Operations. Appropriate documentation shall include the following:

a. Proof of completed submittal of Certification of a Michigan Based Business as determined by the Michigan Department of Technology, Management, and Budget and

b. Proof it has its primary business operations located within the municipality of the City of Grand Rapids, Michigan for the past six months (on company letterhead) or

Proof it has been certified as a Micro-Local Business Enterprise by the City of Grand Rapids and has its primary business operations within the municipality boundaries of the City of Grand Rapids (on company letterhead)

A firm may submit the same documentation with its sealed bid or proposal in order to qualify for the bid discount.

Non-Local Vendors

A non-local vendor may qualify for a bid discount if it voluntarily subcontracts with businesses that meet the above documentation requirements. Proof of subcontractors meeting these requirements must be submitted with the sealed bid or proposal in order to qualify for the discount.

Local subcontractor participation will be based on the value of the local subcontracts as compared to the total bid or proposal

Joint Venture Bidding

Contractors that engage in joint venture bidding with a local, small emerging business partner will need to submit documentation of participation level with the sealed bid or proposal. The local bid discount will be based on the value of the local, small emerging business partner as compared to the total bid or proposal.

Eligibility/Verification

The District may request documentation at the conclusion of a project for which a bid discount was received verifying eligibility with local bid discount criteria. If it is determined that a vendor did not actually meet the terms of local preference, disqualification from future consideration of a local purchasing preference may occur for a period of five years unless excused by the Superintendent or Designee.

Dated: March 12, 2012

LEGAL REF: MCL 380.1267; 380.1274

3660- Bids and Quotation Requirements 3690- Local Purchasing 1900- Contracts and Board Member Disclosure Obligations

R 2/11

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

Facilities and Business Services Administration

Design & Construction Division

DEMOGRAPHICS, STATISTICS AND CERTIFICATION

1. Company Name:

2. Company Address:

3. Principal Place of Business:

4. Year of Establishment:

Woman-, Minority-, or Veteran-Owned Small Business Representation (For Statistical Use Only)

DEFINITIONS:

“Woman-owned business” means a small business that is at least 51% owned by a woman or women who are US citizens and who control and operate the business.

The vendor represents that it ☐ IS, ☐ IS NOT a woman-owned small business.

“Minority-owned business” means a small business that is at least 51% owned by a minority or minorities who are US citizens and who control and operate the business.

The vendor represents that it ☐ IS, ☐ IS NOT a minority-owned small business.

☐ African-American ☐ Arab-American ☐ Asian-American ☐ Hispanic

☐ American Indian ☐Eskimo

“Qualified Disabled Veteran” means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.

“Qualified Disabled” means a business entity that is 51% or more owned by one or more with a service-connected disability.

The vendor represents that it ☐ IS, ☐IS NOT qualified disabled.

“Veteran -owned business” means a small business that is at least 51% owned by a veteran or veterans who are U.S. citizens and who control and operate the business.

The vendor represents that it ☐ IS, ☐ IS NOT a veteran-owned small business.

The Constructor represents and warrants that the company meets the above (when checked) and can provide supportive documentation upon request.

Authorized Agent Name (print or type)

Authorized Agent Signature

Fraudulent Certification as a Qualified Disabled Veteran is subject to debarment under MCL 18.1264.

R 2/11

Certification of a Michigan-Based Business (Information Required Prior to Contract Award for Application of State Preference/Reciprocity Provisions)

DEFINITION: To qualify as a Michigan business, vendor must have, during the 12 months immediately preceding this bid deadline, or if the business is newly established, for the period the business has been in existence, it has (check all that apply):

Bidder shall also indicate one of the following:

☐ Bidder qualifies as a Michigan business (provide zip code):

☐ Filed a Michigan single business tax return showing a portion or all of the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL ˜208.1 – 208.145; or, ☐ Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan;

or, ☐ Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the Department of Treasury; or

I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.

I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.

☐ Bidder does not qualify as a Michigan business (provide name of State):

☐ Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code):

Authorized Agent Name (print or type)

Authorized Agent Signature

Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 §268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A

FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.1264

SWORN STATEMENT OF FAMILIAL RELATIONSHIP

As required by Section 1267 of the Revised School Code – MCL 380.1267

STATE OF MICHIGAN COUNTY

OF

, being duly sworn, deposes and says:

(Printed name of deponent)

That (The “Bidder”) has bid on the following

(Printed name of bidding firm) project located in Kent County, Michigan, which is owned by Grand Rapids Public Schools:

Project Name:

That the following is a statement of disclosure of any familial relationship that exists between the owner or any employee of the bidder and any member of the Grand Rapids Public Schools Board of Education or Superintendent, as required pursuant to Section 1267 of the Revised School Code, as amended.

1. ☐ That there are no such familial relationships existing at this time.

OR

2. ☐ That a familial relationship exists between , (Name of employee of bidder) an ☐ owner ☐ employee of the Bidder who is the (Relationship) of , who is ☐ a member of the Board, (Name of GRPS relative)

☐ the Superintendent.

Deponent (Signature of deponent)

Subscribed and sworn to before me this day of , 20

Acting in:

My commission expires:

IRAN BUSINESS RELATIONSHIP AFFIDAVIT

Effective April 1, 2013 all bids, proposals, and/or qualification statements received in the State of Michigan must comply with the “Iran Economic Sanctions Act”. The following certification is to be signed and included at time of submittal.

Certification

Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business” as the term is defined in the Act.

Signature Title

Company Date

DEBARMENT AND SUSPENSION CERTIFICATION

The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

• Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;

• Has not been suspended, debarred, voluntarily excluded or determined ineligible by any

Federal agency within the past 3 years;

• Does not have a proposed debarment pending; and,

• Is not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space:

Exceptions will not necessarily result in denial or award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

Notes: Providing false information may result in criminal prosecution or administrative sanctions.

The above certification is part of the Bid. Signing this document on the signature portion thereof shall also constitute signature of this Certification.

Signature Title

Company Date

PRE-BID INQUIRY

PROJECT:

COMPANY:

NAME:

PHONE:

E-MAIL:

DATE:

QUESTION:

(Type or print in box, or attach additional typed pages with this cover page.)

EMAIL TO: Long Nguyen E-Mail: nguyenl@grps.org

ATTACHMENT A

SECTION 01000, GENERAL REQUIREMENTS

Grand Rapids Public Schools General Requirements 01000-1

June 2017

SECTION 01000 GENERAL REQUIREMENTS

PART 1 – GENERAL

1.1 FIELD CONDITIONS AND DIMENSIONS

A. Prior to doing any work, verify all dimensions, details, quantities, and conditions which may affect the work. No allowance for additional compensation will be considered for discrepancies between dimensions indicated on the drawings and actual field dimensions.

1.2 SUBSTITUTIONS AFTER CONTRACT AWARD

A. The Owner will consider substitution requests only if the proposed substitute offers the Owner cost or schedule advantages. A request for a substitution shall include a proposal for adjustments to the contract price and/or time if the substitution is approved. The Constructor shall bear the burden of providing the Design Professional any technical, cost or schedule data needed to evaluate the proposed substitution.

B. The Design Professional shall review the substitution proposal for quality and function, only.

The Constructor shall be responsible for any unforeseen costs associated with using an approved substitution.

1.3 CONTRACT DOCUMENTS

A. The Contract Documents, alone, detail the requirements of the project. Information obtained from an officer, agent, consultant or employee of the Owner or any other person shall not affect the risks or obligations assumed or relieve the Constructor from fulfilling any part of the contract.

1.4 ASBESTOS

A. All material to be used in the work shall be certified by the manufacturer to be free of any amount of asbestos. No material will be permitted on the site without such certification.

B. The Constructor should review the Owner’s material management plan for their information regarding asbestos. The Constructor must provide an affidavit stating that no asbestos was used in the project. Any asbestos containing material installed under this Contract by the Constructor shall be removed and replaced with like asbestos-free materials, all at the cost of the Constructor.

1.5 LEAD PAINT

A. Lead Paint: This renovation project may involve activities that disturb lead-based paint. It is the responsibility of the Constructor to determine if the building to be renovated is a Child- Occupied Facility as defined under the EPA regulation Renovation, Repair, and Painting Final Rule (RRP Rule). All covered renovations to a Child-Occupied Facility must be performed by Certified Firms, using Certified Renovators and other trained workers.

1.6 PROGRESS MEETINGS

A. The Owner may schedule progress meetings to be held on the jobsite whenever needed to supply information necessary to complete the work without interruptions.

Grand Rapids Public Schools General Requirements 01000-2

B. The Constructor shall be represented at each progress meeting by persons with full authority to act for the Constructor in regard to all portions of the work.

1.7 WORKMANSHIP

A. Except when the Contract Documents note otherwise, the Constructor shall be fully responsible for all construction means, methods, techniques, sequences, and procedures and for coordinating all portions of the work under the Contract with the Owner.

B. The Constructor shall provide an authorized representative at the site – at all times during working hours – to receive and execute orders by the Owner. All such orders given to the Constructor’s representative shall be deemed as given to and received by the Constructor.

C. The Constructor shall maintain a copy of the Contract Documents at the project site at all times.

1.8 CODE AND REGULATION COMPLIANCE

A. Comply with all applicable federal, state, and local codes and regulations relating to buildings, employment, the preservation of public health and safety, use of streets, and the performance of the work under this Contract. It shall be the responsibility of the Constructor to fully understand all such requirements and to ensure that the subject requirements are fully and faithfully enforced.

B. Any work performed that the Constructor knew or should have known was contrary to existing laws, rules and regulations, and for which the Constructor failed to give notice of such fact to the Owner, shall be the responsibility of the Constructor to correct. The Constructor shall bear all costs arising therefrom and hold the Owner harmless for any such violation.

C. Upon completion of the Work, the Constructor shall submit to the Owner a certificate of inspection by the governmental authority having jurisdiction, showing that all work subject to inspection has been properly inspected and approved to meet current code requirements.

D. Covid-19 Safety Update. In light of the Coronavirus Disease 2019 (COVID-19), GRPS is requiring special health and safety measures for everyone. All contractors must meet Federal, State, CDC and OSHA guidelines as it relates to Covid-19. Specifically, a safety plan that is in Compliance with OSHA 3990-3 2020 must be in place prior to work in any GRPS facilities.

1.9 PROJECT SAFETY

SAFETY IS OF ABSOLUTE IMPORTANCE. The Constructor shall be solely responsible for initiating, maintaining, and supervising all safety precautions and programs associated with the Work. Under no circumstances shall the Constructor’s activities jeopardize the safety of a building’s occupants, construction workers or the general public.

A. All Work must be executed in accordance with applicable standards of the Construction Safety and Health Division of the State of Michigan Department of Licensing and Regulatory Affairs.

B. The requirements indicated in this section are to be considered the minimum. Where the requirements of any of the listed authorities having jurisdiction conflict with the requirements of this section, the maximum condition shall prevail.

Grand Rapids Public Schools General Requirements 01000-3

C. The Constructor shall furnish, install and maintain as long as necessary and remove when no longer required, adequate barriers, warning signs and lights or other necessary or prudent safety measures at all dangerous locations during work operations for the protection of Constructor personnel, building occupants, and the general public. Provide and erect all such safety precautions in accordance with federal, state and local codes and other legal requirements.

D. Whenever lifting materials or equipment over or near existing or occupied buildings, provide advance notice of such activities and arrange to have any potentially endangered spaces vacated.

E. During work operations, provide temporary partitions, barriers, curtains, and guards as necessary to confine materials, dust and debris to the immediate work areas. Do not allow dust or debris to enter the building interior. Coordinate the location of temporary barriers or partitions with the Owner.

F. Remove all temporary protection when work is completed and restore disturbed areas to their original condition.

G. The Constructor shall hold the Owner harmless from damage or claims arising out of any injury or damage that may be sustained by any person or persons as a result of the work under the Contract.

1.10 PROTECTION OF PROPERTY

A. During Constructor’s performance of the Work, Owner will continue to occupy the existing building. The Constructor shall provide labor and materials to construct, maintain and remove necessary temporary enclosures as necessary to comply with State of Michigan Fire Code and prevent dust or debris in the construction area(s) from entering the remainder of the building. If the Owner must provide custodial services because of the Constructor’s failure to provide and maintain effective temporary enclosure(s), a fee of $20.00 per custodian, per hour, plus expenses will be deducted from monies due the Constructor.

Interruption of Owner’s access to the building will not be permitted without prior approval by the Owner. Interruption or blocking-off required means of access to or from the building will not be permitted.

During the school day, limit construction operations to those methods and procedures which will not adversely and unduly affect the environment of Owner’s occupied space, including noise, dust, lighting hazards and other undesirable effects and conditions.

B. Coordinate all Work with the Owner so that adequate interior protection, as necessary, is provided and disruption to normal building operations is minimized. Repair all property damage caused by lack of such protection to the satisfaction of the Owner.

C. Confine equipment, storage of materials, debris, and the operation and movements of workmen within the physical limits and time limits directed by the Owner. Such activities are to be governed by applicable local building codes and the traffic regulation and safety and fire regulation of local authorities.

D. Document existing damage prior to the start of work to avoid responsibility for preexisting conditions. During work operations, provide protection for existing building, finishes, walks, drives, and landscaping in and adjacent to the work areas. Repair or replace building components or site property damaged during the work to match its condition before the damage. If the Constructor fails to repair or replace such damage, the Owner will have the work done by others and the costs of such work will be charged to the Constructor.

Grand Rapids Public Schools General Requirements 01000-4

E. Do not store materials, tools, or equipment on any existing roof area adjacent to the work site unless proper protection of the existing roof is provided and the materials are spread out and located at column locations.

F. The Constructor shall hold the Owner harmless against all claims of damage or alleged damage to any such structure arising out of the work under this Contract.

1.11 FIRE SAFETY

A. No open fire is permitted on the building site at any time (except for torches to apply modified roof membrane).

B. Take all precautions to eliminate possible fire hazards at the site, including but not limited to the following:

1. Remove all combustible debris from the roof and storage areas on a daily basis.

2. Store highly flammable materials in well-ventilated areas; mixing and preparation of such materials is also restricted to such areas. Handle all such materials in accordance with safe practices and the requirements of authorities having jurisdiction.

3. The Constructor shall not store large quantities of flammable materials at the site.

1.12 VANDALISM

A. The cost for any damage by vandalism to material or equipment or that which occurs to items finished or installed under this contract, is to be borne by the Constructor. The Constructor is responsible for such vandalism from the date of the Notice to Proceed until Final Completion.

1.13 TEMPORARY UTILITIES AND FACILITIES

A. Water and electricity may be available in the area where work will be performed. If so, the Constructor will not be charged for reasonable use of these services for construction operations. The Constructor shall pay costs for installation and removal of any temporary connections including necessary safety devices and controls.

1.14 MISCELLANEOUS FACILITIES AND CONTROLS

A. New materials delivered to and stored outdoors on the jobsite shall be fully protected from weather by placement on raised platforms and shall have secure waterproof plastic coverings or tarpaulins. The waterproof plastic coverings or tarpaulins shall not extend all the way to the ground surface. They shall terminate a few inches above the ground surface.

Factory-provided plastic wrap is not an acceptable waterproof covering.

B. Contractors and their employees or suppliers will not use or interfere with existing public access, drives, roads or parking lots, except as specifically indicated by prior arrangement with the Owner.

C. Constructor’s employee parking, delivery trucks and other construction vehicle parking will only be allowed in areas designated by the Owner.

D. The Constructor shall provide and regularly maintain portable sanitary facilities at the site.

The contractors’ employees shall not utilize the restrooms in the school buildings.

1.15 NO SMOKING POLICY

A. The use of tobacco products on school property is a misdemeanor under MCL 750.473. No

Grand Rapids Public Schools General Requirements 01000-5 tobacco products will be allowed anywhere on school property at any time.

1.16 REMOVAL OF DEBRIS

A. Remove all rubbish and debris from the site daily or more often if directed by the Owner. The premises shall be maintained as clean as practical, consistent with the neatness required for the Owner’s normal operations.

B. No storage of removed items or debris will be permitted on the site unless so directed by the Owner.

C. The location of the trash containers is subject to the Owner’s approval.

D. During non-construction hours, cover and seal trash containers to prevent wind- blown debris and access into trash containers.

1.17 SECURITY

A. Constructor shall observe the following procedures when working in a school building, unless otherwise instructed: 1. Proceed to the office, identify yourself, state reason for being in the building, and receive visitor’s pass. 2. Complete work, then revisit office to check out prior to leaving the building/premises.

1.18 ENVIRONMENTAL SAFETY/RESPONSIBILITY

A. It shall be the responsibility of the Constructor to pay any and all costs incurred from the clean-up related to any environmental hazard created by means of release, spill, leak or any other means of contamination caused by accident or neglect of the Constructor or sub- Constructor. It shall be the responsibility of the Constructor to dispose of any product(s) and/or material following EPA, DNR, and local applicable laws and regulations. It shall be the responsibility of the Constructor, if required, to purchase the proper permits and notify the proper authorities prior to commencing said project or, should a “release” take place, to notify proper authorities of any such release. It shall be the responsibility of the Constructor to maintain, on site, a blood- borne pathogen plan and all necessary safety supplies associated with any spill or clean up that may occur.

1.19 INSULATION AND PROTECTION FROM MOISTURE

A. Insulation shall be applied on clean, dry surfaces and only after tests and approvals required by the specifications have been completed. All pipe insulation on piping operating below ambient temperature shall be continuous through wall and ceiling openings and sleeves.

Insulation on all cold surfaces must be applied with a continuous, unbroken vapor seal.

Hangers, supports, anchors, etc. that are secured directly to cold surfaces shall be adequately insulated and vapor sealed to prevent condensation. Specified adhesives, mastics, and coatings shall be applied at the manufacturer’s recommended minimum coverage per gallon. Edges of vapor barrier insulation at valve stems, instrument wells, unions, and other raw edges shall be sealed adequately to prevent moisture from penetrating the insulation.

END OF SECTION

ATTACHMENT B

WORK DESCRIPTION

DRAWINGS, SKETCHES, SPECIFICATIONS

2020 Security Projects

Grand Rapids, MI

Owner: Grand Rapids Public Schools

Design Professional: Long Nguyen 900 Union Ave NE Grand Rapids, MI 49503 Phone: 616-819-3010 Fax: 616-819-3014

PROJECT MANUAL

SPECIFICATIONS

Grand Rapids Public

Schools 2020 Security

Projects

Bidding May 4,2020

TABLE OF CONTENTS

ARCHITECTURAL SPECIFICATIONS

081113 – Hollow Metal Doors and Frames

081116 – Monumental Aluminum Stile and Rail Doors

081416 – Flush Wood Doors

084113 – Aluminum-Framed Entrances and Storefronts

087100 – Door Hardware

088000 – Glazing

2020 Security Projects METAL DOORS AND FRAMES 08 1113-1

SECTION 08 1113

HOLLOW METAL DOORS AND FRAMES

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

1. Hollow steel doors and frames.

B. Related Sections:

1. Division 01: Administrative, procedural, and temporary work requirements.

2. Section 08 7100 - Door Hardware.

3. Section 08 8000 - Glazing.

1.2 REFERENCES

A. American National Standards Institute (ANSI)/Steel Door Institute (SDI):

1. A250.3 - Test Procedure and Acceptance Criteria for Factory Applied Finished Painted Steel for Steel Doors and Frames.

2. A250.4 - Test Procedure and Acceptance Criteria for Physical Endurance for Steel Doors, Frames, Frame Anchors and Hardware Reinforcings.

3. A250.8 - Recommended Specifications for Standard Steel Doors and Frames.

4. A250.10 - Test Procedure and Acceptance Criteria for Prime Painted Steel Surfaces for Steel

Doors and Frames.

5. A250.11 - Recommended Erection Instructions for Steel Frames.

B. ASTM International (ASTM):

1. A1008/A1008M - Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy and High-Strength Low-Alloy with Improved Formability.

C. National Fire Protection Association (NFPA) 80 - Standard for Fire Doors and Fire Windows.

D. Steel Door Institute (SDI) 117 - Manufacturing Tolerances for Standard Steel Doors and Frames.

E. Underwriters Laboratories (UL):

1. 10B - Standard for Fire Tests of Door Assemblies.

2. 10C - Standard for Positive Pressure Fire Tests of Door Assemblies.

1.3 SUBMITTALS

A. Submittals for Review:

1. Shop Drawings: Show locations, elevations, dimensions, model designations, fire ratings, preparation for hardware, and anchoring details.

2. Product Data: Show elevations, dimensions, gages of metal, hardware reinforcing gages and locations, and anchor types.

B. Quality Control Submittals:

1. Certificates of Compliance: Certification that products furnished comply with ANSI/SDI A250.3, ANSI/SDI 250.4, and ANSI/SDI A250.10.

http://www.steeldoor.org/ http://www.steeldoor.org/ http://www.astm.org/ http://www.astm.org/ http://www.ul.com/ http://www.ul.com/

2020 Security Projects METAL DOORS AND FRAMES 08 1113-2

1.4 QUALITY ASSURANCE

A. Doors: ANSI/SDI A250.8.

1. Grade: III - Extra Heavy Duty.

2. Model: 3 - Stile and Rail - Flush Panel.

B. Frames: ANSI/SDI A250.8, Grade III - Extra Heavy Duty.

C. Fire Door and Frame Construction: Conform to UL 10B.

D. Installed Fire Rated Door and Frame Assemblies: Conform to NFPA 80.

1.5 DELIVERY, STORAGE AND HANDLING

A. Ship door frames with removable angle…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .