GRPS Nutrition Center Roof Project Manuel & Specifications 10-19-2026 - Sigma.pdf

PDF 4 MB Posted

Attached to
GRPS Nutrition Center Roof Replacement
Solicitation number
RFP GRP 270000000144 1
Issued by
Kent County, Michigan

About this file

GRPS Nutrition Center Roof Replacement Project Manual and Specifications

This is a project manual and specifications document prepared by Jeffrey Parker Architects, LLC for Grand Rapids Public Schools (GRPS) for a complete roof replacement project at the Nutrition Center located at 1100 Race Street NE in Grand Rapids, Michigan. The project scope includes removal of the existing roofing system and installation of a new roof system with insulation, roofing membrane, and all related flashing at roof penetrations and roof edges. Bids are due by 2:00 p.m. on November 3, 2026, with a mandatory pre-bid conference scheduled for October 23, 2026 at 11:00 a.m. at the project site. Work is scheduled to commence in March 2027 (weather permitting) with a completion date of June 1, 2027. Bid documents are available after 1:00 p.m. on October 19, 2026 through the GRPS website. Three sealed bid originals must be submitted to Marc Bennett, Director of Facilities & Operations at the GRPS Service Building, 900 Union Avenue NE, Grand Rapids, Michigan 49503. An asbestos testing report dated September 8, 2026 identified chrysotile asbestos in roof edge flashing material (approximately 5,550 square feet) and in roof flashing sealant tar (approximately 132 square feet), requiring proper abatement or encapsulation during work.

Bid security of 5% of the base bid amount must accompany all proposals in the form of a certified check, cashier's check, money order, or bid bond. The owner reserves the right to reject all bids and applies a local vendor preference discount of up to 5% to bidders meeting Michigan business certification and City of Grand Rapids location criteria; non-local bidders may qualify for discounts based on local subcontractor participation. Payment and performance bonds equal to 100% of the contract sum are required if the award amount exceeds $50,000. The contract will be awarded to the bidder offering the most advantageous proposal following Board of Education approval, with payment terms providing for 10% retainage on all progress payments. Prevailing wages do not apply to this project. Contractors must obtain all required building permits and governmental fees, maintain appropriate insurance coverage naming GRPS as an additional insured, comply with asbestos-free product installation requirements, and provide daily full-time on-site supervision throughout the construction phase.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GRAND RAPIDS PUBLIC SCHOOLS

Nutrition Center Reroof Project

1100 Race St NE

10/19/2026

GRPS Facilities & Operations 900 Union Avenue NE

Grand Rapids, MI 49503

Telephone (616) 819-3010

PROJECT MANUAL

TABLE OF CONTENTS

Instructions to Bidders

Bid Form

GRPS 3670 – Local Construction Contracting

GRPS 3670R – Local Construction Contracting Regulations

DTMB Demographics, Statistics and Certification

DTMB Certification of a Michigan-Based Business

Sworn Statement of Familial Relationship

Iran Business Relationship Affidavit

Debarment and Suspension Certification

RFI Form

General Requirements

Guidelines for Contractors & Subcontractors

Sample AIA Contract A105-2017 RFB

Asbestos Testing Report dated 09/08/2026

Attachment A: Work Description

GRPS Instructions to Bidders 1 October 2026

INSTRUCTIONS TO BIDDERS

PROJECT: Nutrition Center Reroof

OWNER: Grand Rapids Public Schools

DESIGN

PROFESSIONAL:

Jeffrey Parker Architects, LLC 855 28th St. SE Grand Rapids MI 49508 Wayne Bickel- Project Architect 616-241-0090 wayneb@jp-architects.com

BID DATE: 11/3/2026

BID TIME: 2:00 pm

LOCATION FOR RECEIVING BIDS: Grand Rapids Public Schools Service Building 900 Union Avenue NE Grand Rapids, MI 49503

SUMMARY OF WORK

Scope of Work: Complete removal of existing roofing of the Nutrition Center @ 110 Race St Grand Rapids MI a building of the Grand Rapids Public Schools. After deck inspections a new roof systems will be installed that include insulation & roofing membrane & all related flashing at roof penetrations & roof edge. This work will commence in March 2027 (weather permitting) with a completion date of June 1, 2027

OBTAINING BID DOCUMENTS

Bid Documents may be obtained after 1:00 p.m. on 10/19/2026 on the GRPS website at https://www.grps.org/request-for-proposals.

EXAMINATION

Plans may be examined at the Plan Room noted.

Builders Exchange 678 Front Avenue NW Suite 330 Grand Rapids, MI 49546

(616) 949-8650 e-mail: projects@grbx.com mailto:projects@grbx.com

GRPS Instructions to Bidders 2 October 2026

PRE-BID CONFERENCE

A pre-bid conference will be held at:

ADDRESS: 1100 Race Street NE Gand Rapids MI

DATE: 10/23/2026

TIME: 11:00 am

Attendance at the pre-bid conference is ☐ MANDATORY ☒ NOT MANDATORY (but encouraged) for those firms wishing to be considered for contract award.

CONTRACT DOCUMENTS

The Contract Documents, alone, detail the requirements of the project, and bids shall be based only on information presented there. Information obtained from others shall not affect the risks or obligations assumed the Constructor or relieve the Constructor from fulfilling any part of the contract.

SUBSTITUTIONS DURING THE BIDDING PERIOD

Unless otherwise noted, manufacturers and products not named in the specifications will be given consideration during the bidding period. Written approval from the Design Professional shall be obtained before a bidder uses substitute materials or manufacturers in its bid estimate. Bidders who base their bids on substitute materials or manufacturers without the Design Professional’s written approval do so at their own risk.

Requests for substitutions during the bidding period must be received at least ten calendar days prior to bid date and may be emailed to the Design Professional at the email address noted above. The burden of showing the requested product is an adequate substitution for the specified product rests with the Bidder.

Substitution requests shall be reviewed by the Design Professional for quality and function, only. The Design Professional’s approval of a substitution shall be communicated to all plan holders in an addendum. Bidders shall be responsible for any unforeseen costs that result from using an approved substitution.

TIME FOR COMPLETION

The Constructor shall be 100% complete with the work on or before 6/1/2027

Conditions precedent to establishing final completion include:

GRPS Instructions to Bidders 3 October 2026

A. Final inspection and approval by all relevant agencies.

B. All punchlist items having been completed and accepted by Owner.

C. Manufacturer inspection, approval, and warranties.

RESPONSIBILITY OF BIDDERS

Bidders shall study the bid documents and visit the site to satisfy themselves of all conditions before submitting a bid. It is incumbent upon bidders to reconcile any ambiguities, errors or omissions in the documents discovered during the bidding period.

It is the responsibility of each bidder to take those steps necessary to satisfy itself of the physical conditions under which the Work will be performed and the condition of the existing facilities, including those which may not be a part of the Work but could be affected by the performance of the Work, and (b) account for all general, local and prevailing conditions at or near the site that may in any manner affect the cost, schedule, progress or performance of the Work.

Questions about the bid documents, the intent of the design, or errors or omissions discovered in the documents shall be formally submitted to the Design Professional by email at the address given above not less than 10 calendar days prior to the date set for receipt of bids.

INSPECTION OF PREMISES

Call Ronnie Sluiter at Facilities & Operations at (616) 819-3010, prior to visiting site to arrange for entry into building if not the day of pre-bid conference.

COST CONSIDERATIONS

Unless specifically noted otherwise, bids shall include the following costs:

1. Permits, fees, notices, etc. for any federal, state or local government agency having jurisdiction over the project.

2. Inspections by building authorities and other government agencies.

3. Maintaining an environment in compliance with all rules, statutes, regulations and codes as applicable by law.

4. All equipment required to fully and safely complete the work. No equipment shall be furnished by or borrowed from Owner.

5. Prevailing Wages ☐ DO, ☒ DO NOT apply to this Project.

GRPS Instructions to Bidders 4 October 2026

BID SECURITY

Bid security shall be made payable to "Grand Rapids Public Schools" in the form of a certified or cashier's check or money order drawn upon a bank insured by an agency of the Federal government, or an executed Bid Bond on Consensus Docs form 262, AIA form A310, or a substantially similar form in the amount of 5% of the bid. A bid bond shall be executed with a surety authorized to do business in the State. A certified or cashier’s check or money order submitted as bid security shall be held by the Owner until a contract has been executed.

BIDDING PROCEDURES

1. Bids shall be submitted on the Bid Form included with this document. All blank spaces shall be printed in ink or typewritten. The Bid Form must be fully completed, signed and sealed. In the event of a discrepancy between the words and figures entered on the Bid Form, the written word shall take precedence over the numerical figures.

2. Three originals of the bid shall be submitted in a sealed, opaque envelope bearing the following information clearly marked on the outside:

Grand Rapids Public Schools Attn: Mr. Marc Bennett, Director of Facilities & Operations 900 Union Avenue NE Grand Rapids, MI 49503

Sealed bid for: Nutrition Center Reroof

The envelope shall also bear, on the outside, the name of the bidding firm, its address and telephone number.

3. Include bid security in the amount identified above.

4. Include a completed and signed Statement of Familial Relationship or the bid may be disqualified.

5. Include a completed and signed Iran Business Relationship Affidavit or the bid may be disqualified.

6. Include completed DTMB documents: Demographics, Statistics and Certification and Certification of a Michigan-based business. These forms are collected for statistical purposes and will not affect award of the contract.

7. Include a completed and signed Debarment and Suspension Certification.

8. Bids will be received until the time and date noted above at the location noted above, unless modified by Addendum, at which time all bids will be opened and read aloud.

9. Bids received after the date and time set for receipt of bids will not be considered or accepted.

GRPS Instructions to Bidders 5 October 2026

10. Bids transmitted by fax, telephone, or electronic mail will not be accepted.

EVALUATION AND AWARD

1. The Owner may waive informalities or minor defects in a bid, may reject any and all bids, or may award to any bidder, regardless of bid amount, when the Owner deems it is in its best interest.

2. Any bid that is incomplete, obscure, or irregular may be rejected. Bids having erasures or corrections may be rejected. Bids that omit a price on any item in the Bid Form may be rejected. A bid for which unit prices are omitted or for which unit prices are, in the sole opinion of GRPS, unbalanced may be rejected.

Any bid accompanied by insufficient or unacceptable bid surety may be rejected.

A conditional or qualified bid may be rejected.

3. The Owner reserves the right to reject all bids if all bids exceed its budget for contract award.

4. In accordance with GRPS Policy 3670, a bid discount will be applied to bids from bidders who qualify as a local vendor. Non-local bidders can obtain a bid discount based on the percentage of the bid price that will be awarded to local subcontractors. Certification of the amount to be subcontracted will be required prior to award. GRPS Policy 3670 is attached to the Bid Form.

5. Upon approval of contract award by the GRPS Board of Education, the Owner will issue a Notice of Award to that bidder making Grand Rapids Public Schools the most advantageous offer. Payment and performance bonds will be required if the award amount is $50,000 or more. Once Notice of Award has been issued, the prospective contractor shall obtain and submit payment and performance bonds, if necessary, insurance in accordance with the terms of the construction contract and any additional documentation requested by the Owner.

6. Upon receipt of acceptable payment and performance bonds, if necessary, an insurance certificate showing coverages and limits in accordance with the contract, and any additional documentation requested by the Owner, a contract will be forwarded for signature.

INSTRUCTIONS SUBSEQUENT TO AWARD

1. After executing a contract, the Owner will issue a Notice to Proceed identifying the agreed upon start date. No work shall be performed prior to the start date in the Notice to Proceed.

2. If requested, the Constructor will be furnished, free of charge, up to 3 copies of drawings and specifications, with Amendments current at time of award.

Additional copies will be furnished, at cost, payable to the Owner.

GRPS Bid Form 1 June 2017

BID FORM

Grand Rapids Public Schools

Nutrition Center 1100 Race St NE Grand Rapids MI 49503

DATE: ___________________________ (Bidder to enter date)

SUBMITTED BY: (Bidder to enter name and address)

Bidder’s Full Name: ___________________________________________________

Address: ____________________________________________________________

City, State, Zip: _______________________________________________________

Telephone: _______________________ Fax: ___________________________

E-Mail: ______________________________________________________________

OFFER

A. Having examined the place of the Work and all matters referred to in the Instructions to Bidders and the Contract Documents prepared by the Owner for the Project, we, the undersigned, hereby offer to enter into a Contract to perform the Work for the lump sum price of:

Total Project Base Bid: ________________________________________________

___________________________ dollars ($______________), in lawful money of the

United States of America.

B. We have included bid security in the amount of 5% of the base bid as required by the Instructions to Bidders.

C. The cost of the 100% Payment and Performance Bonds included in the base bid is

D. The base bid price includes all applicable taxes.

GRPS Bid Form 2 June 2017

ACCEPTANCE

A. This offer shall be open to acceptance and is irrevocable for sixty days from the date on which bids were opened.

B. If this bid is accepted by the Owner within the time period stated above, we will:

1. Furnish the required bonds and insurance certificates within ten days of receipt of Notice of Award.

2. Execute the Agreement immediately upon receipt from the Owner.

3. Commence work within ten days after written Notice to Proceed.

C. If this bid is accepted within the time stated, and we fail to commence the Work or we fail to provide the required bonds and insurance certificates, the bid security shall be forfeited as damages to Grand Rapids Public Schools by reason of our failure, limited in amount to the lesser of the face value of the bid security or the difference between this bid and the bid upon which a Contract is signed.

D. In the event our bid is not accepted within the time stated above, the bid security shall be returned to the undersigned, in accordance with the provisions of the Instructions to Bidders, unless a mutually satisfactory arrangement is made for its retention and validity for an extended period of time.

CONTRACT TIME

A. If this Bid is accepted, we will complete all work on or before Completion Date. We understand that conditions precedent to achieving Final Completion include:

1. Final inspection and approval by all relevant agencies.

2. All punchlist items having been completed and accepted by Owner.

3. Manufacturer inspection, approval, and warranties.

4. Issuance of a Certificate of Occupancy, if necessary.

ADDENDA

A. We acknowledge receipt of the following Addenda. These addenda have been evaluated and their effect on the cost of the Work has been incorporated into the base bid entered above.

Addendum # Dated Addendum # Dated

Addendum # Dated Addendum # Dated

GRPS Bid Form 3 June 2017

BID FORM SUPPLEMENTS

A. As requested by the Owner, the following additional information is included:

1. Schedule of Unit Prices: Complete the Schedule of Unit Prices attached to the Bid Form.

B. We agree to submit the following Supplements to Bid Forms within 48 hours after receipt of a Notice of Award:

1. Subcontractors: Include the names of all Subcontractors and the portions of the Work they will perform.

ACKNOWLEDGEMENTS

The Bidder acknowledges:

a. That this bid was developed without any collusion, undertaking, or agreement, either directly or indirectly, with any other bidder or bidders to maintain the prices of indicated Work or prevent any other bidder or bidders from bidding the Work.

b. That this bid shall not be withdrawn for a period of 60 calendar days after the date on which bids were opened.

c. That all work will be complete on or before the Final Completion date(s) identified in the bid documents.

d. That the following documents, identified in Instructions to Bidders, have been completed and are attached to this Bid Form:

1. Bid Security in the amount of 10% of the base bid

2. DTMB Demographics, Statistics and Certification

3. DTMB Certification of a Michigan-Based Business

4. Sworn Statement of Familial Relationship

5. Iran Business Relationship Affidavit

6. Debarment and Suspension Certification

Voluntary Alternate No. 1

SCHEDULE OF UNIT PRICES

Provide unit prices for the following line items which will be used to price changes to the Work after award:

Item Description Unit Price

Unit

Roof Deck Replacement $/sf cost allowance to be used for both damaged deck & existing openings to be closed off

SF

2 Top of wall Treated Blocking replacement LF

3 Solar panel CMU blocks Per block

GRPS Bid Form 4 June 2017

SIGNATURE(S)

The Corporate Seal of ______________________________________ was hereunto affixed (Print the full name of your firm) In the presence of:

Signature

(Seal)

Printed Name and Title

Date

If the Bid is a joint venture or partnership, add additional forms of execution for each member of the joint venture as above.

AUTHORIZED CORPORATE OFFICER

Signature

Printed Name

Title

Date

GRPS Policy 3670 – Local Construction Contracting

The District provides a preference (bid discount) in construction contracts from local vendors, providing the quality and service are commensurate with the requirements set forth by the District as to satisfy the demands of the bid or proposal. Bids, or proposals when bids are not required, shall be accepted from non-local vendors in order to maintain a fair market price.

In determining the qualification for a Local Purchasing Preference for purposes of this policy, vendors must have obtained the Certification of a Michigan Based Business as determined by the Michigan Department of Technology, Management and Budget as well as meet one of the following criteria:

a. For at least the last six months had its primary business operations located within the municipality boundaries of the City of Grand Rapids, Michigan (Grand Rapids).

b. Be certified by the City of Grand Rapids, as a Micro-Local Business Enterprise and have its primary business operations within the municipality boundaries of the City of Grand Rapids.

A successful recipient of a contract and/or purchase order which has received a Local Purchasing

Preference may be required to present proof of its status as a Michigan Based Business and documentation of its location within the City of Grand Rapids at any time upon request from an authorized District official. Failure to provide the requested information or failure to maintain business operations with the city of Grand Rapids for the duration of the contract will make the contract voidable at the District’s discretion, and will result in disqualification from future consideration of a Local Purchasing Preference for a period of five years unless excused by the Superintendent or Designee.

Preference will be provided on the following basis:

a. Constructor Participation: Grand Rapids Public Schools will provide up to a 5% bid discount to prime contractors and/or construction managers who satisfy the criteria set forth for consideration as a Local Vendor.

b. Subcontractor Participation: Construction bids for non-local vendors may be discounted when a bidder on a Grand Rapids Public Schools’ project voluntarily subcontracts with businesses meeting

Local Vendor Criteria. Prime contractors and/or construction managers must submit affidavit(s) verifying Local Vendor subcontractor participation.

Prime contractors and/or construction managers must require Local Vendor certification documentation to be submitted by each subcontract bidder with their sealed bid. The District at its discretion can request additional documentation for verification of the qualification of any Local

Vendor subcontractor participating in a construction project.

c. The following is a schedule of discounted percentages based upon Local Vendor subcontractor participation achieved by the prime Constructor:

LV Subcontractor Participation Discount Percentage

i. 1.00% – 2.5% 1.0%

ii. 2.51% – 5.0% 1.5%

iii. 5.01% – 7.5% 2.0%

iv. 7.51% – 10.0% 2.5%

v. 10.01% – 15.0% 3.0%

vi. 15.01% – 18.0% 4.0%

vii. 18.01% + 5.0%

d. Prime contractors and/or construction managers may not terminate an approved Local Vendor subcontractor working on a Grand Rapids Public Schools construction project, and then perform the work on the terminated subcontract with its own forces or those of another subcontractor, without prior written consent by the Grand Rapids Public Schools Executive Director of Facilities Planning and Management. If a Local Vendor subcontractor fails to complete its work on the contract for any reason, a prime Constructor/construction manager must notify the Grand Rapids Public Schools

Executive Director of Facilities Planning and Management and make good faith efforts to find another approved Local Vendor subcontractor to substitute for the original Local Vendor subcontractor. Utilizing good faith efforts, and to the extent reasonable, the prime

Constructor/construction manager shall substitute an approved Local Vendor subcontractor to perform the same amount of work under the contract as the Local Vendor subcontractor that was terminated.

e. Joint Venture Bidding: As an incentive to contractors engaging in activities that stimulate the growth and development of local, small emerging businesses as partners bidding as a joint venture, Grand Rapids Public School will apply up to a 5% bid discount for partnering with a qualified

Local Vendor.

f. The Bid Discounts outlined above may not exceed 5% or $25,000 per bid, whichever is lower.

Project bids from prime contractors and/or construction managers are considered a single bid for purposes of the Bid Discount consideration.

Grand Rapids Public Schools, Board of Education Members and employees are prohibited from having any financial interest or personal beneficial interest either directly or indirectly, in the award of any construction contracts, sub-contracts, or the recommendation/selection of any professional design service or construction manager, unless previously disclosed in writing to the Superintendent and approved in writing by the

Superintendent.

This policy shall not apply to the extent that it would conflict with any provision of Michigan or federal law, regulation or constitution. The local preference shall not be applied to purchases of goods and services made with federal funds.

Policy Adopted: March 19, 2012

LEGAL Ref: MCL 380.1267; 380.1274

POLICY Ref: 3660 Bids and Quotation Requirements

3690 Local Purchasing

1900 Contracts and Board Member Disclosure Obligations

GRPS Policy Rules 3670R – Local Construction Contracting Regulations

Qualification for Local Construction Contracting Preference

On an annual basis beginning with July 1st of each fiscal year, a vendor desiring to receive a bid discount for local construction contracting may submit appropriate documentation to the Executive Director of Facilities and Operations. Appropriate documentation shall include the following:

a. Proof of completed submittal of Certification of a Michigan Based Business as determined by the Michigan Department of Technology, Management, and Budget and

b. Proof it has its primary business operations located within the municipality of the City of

Grand Rapids, Michigan for the past six months (on company letterhead) or

Proof it has been certified as a Micro-Local Business Enterprise by the City of Grand Rapids and has its primary business operations within the municipality boundaries of the City of Grand

Rapids (on company letterhead)

A firm may submit the same documentation with its sealed bid or proposal in order to qualify for the bid discount.

Non-Local Vendors

A non-local vendor may qualify for a bid discount if it voluntarily subcontracts with businesses that meet the above documentation requirements. Proof of subcontractors meeting these requirements must be submitted with the sealed bid or proposal in order to qualify for the discount.

Local subcontractor participation will be based on the value of the local subcontracts as compared to the total bid or proposal

Joint Venture Bidding

Contractors that engage in joint venture bidding with a local, small emerging business partner will need to submit documentation of participation level with the sealed bid or proposal. The local bid discount will be based on the value of the local, small emerging business partner as compared to the total bid or proposal.

Eligibility/Verification

The District may request documentation at the conclusion of a project for which a bid discount was received verifying eligibility with local bid discount criteria. If it is determined that a vendor did not actually meet the terms of local preference, disqualification from future consideration of a local purchasing preference may occur for a period of five years unless excused by the Superintendent or

Designee.

Dated: March 12, 2012

LEGAL REF: MCL 380.1267; 380.1274

3660- Bids and Quotation Requirements

3690- Local Purchasing

1900- Contracts and Board Member Disclosure Obligations

R 2/11

DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET

Facilities and Business Services Administration

Design & Construction Division

DEMOGRAPHICS, STATISTICS AND CERTIFICATION

1. Company Name:

2. Company Address:

3. Principal Place of Business:

4. Year of Establishment:

Woman-, Minority-, or Veteran-Owned Small Business Representation (For Statistical Use Only)

DEFINITIONS:

“Woman-owned business” means a small business that is at least 51% owned by a woman or women who are US citizens and who control and operate the business.

The vendor represents that it IS IS NOT a woman-owned small business.

“Minority-owned business” means a small business that is at least 51% owned by a minority or minorities who are US citizens and who control and operate the business.

The vendor represents that it IS IS NOT a minority-owned small business.

African-American Arab-American Asian-American Hispanic

American Indian Eskimo

“Qualified Disabled Veteran” means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.

“Qualified Disabled” means a business entity that is 51% or more owned by one or more with a service-connected disability.

The vendor represents that it IS IS NOT qualified disabled.

“Veteran -owned business” means a small business that is at least 51% owned by a veteran or veterans who are U.S. citizens and who control and operate the business.

The vendor represents that it IS IS NOT a veteran-owned small business.

The Constructor represents and warrants that the company meets the above (when checked) and can provide supportive documentation upon request.

Authorized Agent Name (print or type) ______________________________________

Authorized Agent Signature ______________________________________

Fraudulent Certification as a Qualified Disabled Veteran is subject to debarment under MCL 18.1264.

R 2/11

Certification of a Michigan-Based Business (Information Required Prior to Contract Award for Application of State Preference/Reciprocity Provisions)

DEFINITION: To qualify as a Michigan business, vendor must have, during the 12 months immediately preceding this bid deadline, or if the business is newly established, for the period the business has been in existence, it has (check all that apply):

Bidder shall also indicate one of the following:

Bidder qualifies as a Michigan business (provide zip code): ___________

Filed a Michigan single business tax return showing a portion or all of the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax

Act, 1975 PA 228, MCL ˜208.1 – 208.145; or, Filed a Michigan income tax return showing income generated in or attributed to the State of

Michigan; or, Withheld Michigan income tax form compensation paid to the bidder’s owners and remitted the tax to the Department of Treasury; or

I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.

I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.

Bidder does not qualify as a Michigan business (provide name of State):

Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code):

Authorized Agent Name (print or type) ________________________________________

Authorized Agent Signature ________________________________________

Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 §268. A BUSINESS THAT

PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN

BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF

BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.1264

SWORN STATEMENT OF FAMILIAL RELATIONSHIP

As required by Section 1267 of the Revised School Code – MCL 380.1267

STATE OF MICHIGAN COUNTY

OF

, being duly sworn, deposes and says:

That (The “Bidder”) has bid for an improvement to the following described project located in Kent County, Michigan, which is owned by the Grand Rapids Public Schools:

Project Name:

That the following is a statement of disclosure of any familial relationship that exists between the owner or any employee of the Bidder and any member of the Grand Rapids Public Schools Board of Education or Superintendent, as required pursuant to Section 1267 of the Revised School Code, as amended.

1. That there are no such familial relationships existing at this time.

OR

2. That a familial relationship exists between an owner employee of the Bidder who is the _________________________ relationship of _____________________________________ , who is a member of the Board, the Superintendent.

Deponent _________________________________________

Subscribed and sworn to before me this _____ day of _________________, 20_____

Acting in:

My commission expires: ________________

IRAN BUSINESS RELATIONSHIP AFFIDAVIT

Effective April 1, 2013 all bids, proposals, and/or qualification statements received in the State of Michigan must comply with the “Iran Economic Sanctions Act”. The following certification is to be signed and included at time of submittal.

Certification

Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response, Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business” as the term is defined in the Act.

Signature Title

Company Date

DEBARMENT AND SUSPENSION CERTIFICATION

The bidder, under penalty of perjury, certifies that, except as noted below, he/she or any other person associated therewith in the capacity of owner, partner, director, officer, manager:

• Is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any Federal agency;

• Has not been suspended, debarred, voluntarily excluded or determined ineligible by any Federal agency within the past 3 years;

• Does not have a proposed debarment pending; and,

• Is not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or Local) in any matter involving fraud or official misconduct within the past 3 years.

If there are any exceptions to this certification, insert the exceptions in the following space:

Exceptions will not necessarily result in denial or award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action.

Notes: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Bid. Signing this document on the signature portion thereof shall also constitute signature of this Certification.

Signature Title

Company Date

REQUEST FOR INFORMATION

PROJECT:

COMPANY:

NAME:

PHONE:

E-MAIL:

DATE:

QUESTION:

(Type or print in box, or attach additional typed pages with this cover page.)

SEND TO: Marc Bennett Grand Rapids Public Schools E-Mail: Bennettm@grps.org mailto:Bennettm@grps.org

ATTACHMENT A

WORK DESCRIPTION

DRAWINGS, SKETCHES, SPECIFICATIONS

*REFER TO Jeffrey Parker Architects Drawings & Specification Documents

AIA

Document A105® – 2017 Standard Short Form of Agreement Between Owner and Contractor

AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

User Notes: (1701793620)

ADDITIONS AND DELETIONS: The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form. An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed.

This document has important legal consequences.

Consultation with an attorney is encouraged with respect to its completion or modification.

ELECTRONIC COPYING of any portion of this AIA® Document to another electronic file is prohibited and constitutes a violation of copyright laws as set forth in the footer of this document.

AGREEMENT made as of the «________________» day of «____________» in the year «Two Thousand Twenty Six.» (In words, indicate day, month and year.)

BETWEEN the Owner:

(Name, legal status, address and other information)

Grand Rapids Public School District 1331 Martin Luther King Jr. St SE

Grand Rapids, Michigan 49506 and the Contractor:

(Name, legal status, address and other information) for the following Project:

(Name, location and detailed description)

«Grand Rapids Public School District 2023 Bond Program Construction and Improvements related to Roofing Design and Consultant Services at the following District Properties:

Nutrition Services facility located at 1130 Race Street NE in the City of Grand Rapids, Kent County, Michigan, in accordance with Owner-approved plans and specifications, all applicable laws, the Owner’s fixed budget, and as otherwise approved by the Owner. » General Contractor Services including: ________________________________________

The Architect:

(Name, legal status, address and other information)

« Jeffrey Parker Architects, Inc.

855 28th Street SE Grand Rapids, Michigan 49508

(616) 241-0090 The Owner and Contractor agree as follows.

AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

TABLE OF ARTICLES

1 THE CONTRACT DOCUMENTS

2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION

3 CONTRACT SUM

4 PAYMENTS

5 INSURANCE

6 GENERAL PROVISIONS

7 OWNER

8 CONTRACTOR

9 ARCHITECT

10 CHANGES IN THE WORK

11 TIME

12 PAYMENTS AND COMPLETION

13 PROTECTION OF PERSONS AND PROPERTY

14 CORRECTION OF WORK

15 MISCELLANEOUS PROVISIONS

16 TERMINATION OF THE CONTRACT

17 OTHER TERMS AND CONDITIONS

ARTICLE 1 THE CONTRACT DOCUMENTS

The Contractor shall complete the Work described in the Contract Documents for the Project. The Contract Documents consist of§ 1.1 The Contractor shall faithfully and competently complete the Work described in the Contract Documents, or as reasonably inferable, necessary, or incidental to produce the results intended by the Contract Documents for the Project. The Contract Documents consist of

.1 this Agreement signed by the Owner and Contractor;Contractor, as modified;

.2 the all drawings and specifications prepared by the Architect, dated , and enumerated as follows:Architect for construction of the Project, incorporated herein by this reference, and including but not necessarily limited to the following:

Drawings:

Number Title Date

Specifications:

Section Title Pages

.3 addenda prepared by the Architect as follows:

AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

Number Date Pages

.4 written orders for changes in the Work, pursuant to Article 10, issued after execution of this

Agreement; and

.5 other documents, if any, identified as follows:

«Project Manual Exhibit A – Architect’s Bid Documents dated _________, including any Addenda, incorporated herein by this reference;

Exhibit B – Contractor’s Bid Form, dated __________, including to the extent there is not a conflict with the RFP or this Agreement; any such conflicting terms shall be deemed ineffective;

Exhibit C – Owner’s Insurance Requirements and Additional Insured Form CG 20 10 07 04 Exhibit D – Major Subcontractors or Suppliers, if any, shall be provided for Owner review and approval at a later date.

Exhibit E – Not Used Exhibit F – Contractor’s Certificate(s) of Insurance and Bonds

If there should be conflict or ambiguity within, between, or among any Contract Document(s), the conflict shall be resolved by complying with the provision that is most beneficial to the Owner, as determined in the Owner’s sole discretion. »

ARTICLE 2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION

§ 2.1 The Contract Time is the number of calendar days available to the Contractor to substantially complete the Work.

§ 2.2 Date of Commencement:

Unless otherwise set forth below, the date of commencement shall be the date of this Agreement.

(Insert the date of commencement if other than the date of this Agreement.)

§ 2.3 Substantial Completion:

Subject to adjustments of the Contract Time as provided in the Contract Documents, the Contractor shall achieve Substantial Completion, as defined in Section 12.5, of the entire Work:

(Check the appropriate box and complete the necessary information.)

[ « » ] Not later than « » ( « » ) calendar days from the date of commencement.

[ « X » ] By the following date: « _________________, 20___»

ARTICLE 3 CONTRACT SUM

§ 3.1 The Contract Sum shall include all items and services necessary for the proper execution and completion of the Work. Subject to additions and deductions in accordance with Article 10, the Contract Sum is:

($ )« A lump sum amount of ____________________________________________, inclusive of all costs, taxes, fees, reimbursable expenses, and/or any other expenses.

§ 3.2 For purposes of payment, the Contract Sum includes the following values related to portions of the Work:

(Itemize the Contract Sum among the major portions of the Work.)

Portion of the Work Value

§ 3.3 The Contract Sum is based upon upon, and includes, the following alternates, if any, which are described in the Contract Documents and hereby accepted by the Owner:

AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

(Identify the accepted alternates. If the bidding or proposal documents permit the Owner to accept other alternates subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires.)

§ 3.4 Allowances, if any, included in the Contract Sum are as follows:

(Identify each allowance.)

Item Price

§ 3.5 Unit prices, if any, are as follows:

(Identify the item and state the unit price and quantity limitations, if any, to which the unit price will be applicable.)

Item Units and Limitations Price per Unit ($0.00)

ARTICLE 4 PAYMENTS

§ 4.1 Based on Contractor’s Applications for Payment certified by the Architect, the Owner shall pay the Contractor, in accordance with Article 12, as follows:

(Insert below timing for payments and provisions for withholding retainage, if any.)

« Applications for Payment shall be submitted to the Architect, certified, and thereafter forwarded to the Owner. If a certified Application for Payment is received by the Owner by the 15th day of the month, the Owner will pay the certified amount to the Contractor by the last day of the next month, unless and to the extent the Owner reasonably disputes same in good faith. A 10% retention shall be withheld on all payments. »

§ 4.2 Payments due and unpaid under the Contract Documents shall bear interest from the date payment is due at the rate below, or in the absence thereof, at the legal rate prevailing at the place of the Project.

(Insert rate of interest agreed upon, if any.)

% «Five percent (5%). See MCL 438.31. »

ARTICLE 5 INSURANCE

§ 5.1 The Contractor shall maintain the following types and limits of insurance as detailed in Exhibit C until the expiration of the period for correction of Work as set forth in Section 14.2, subject to the terms and conditions set forth in this Section 5.1:

§ 5.1.1 Commercial General Liability insurance for the Project, written on an occurrence form, with policy limits of not less than ($ ) each occurrence, ($ ) general aggregate, and ($ ) aggregate for products-completed operations hazard.–

5.1.5 – see Exhibit C for Owner’s Insurance Requirements.

§ 5.1.2 Automobile Liability covering vehicles owned, and non-owned vehicles used, by the Contractor, with policy limits of not less than ($ ) per accident, for bodily injury, death of any person, and property damage arising out of the ownership, maintenance, and use of those motor vehicles along with any other statutorily required automobile coverage.

§ 5.1.3 The Contractor may achieve the required limits and coverage for Commercial General Liability and Automobile Liability through a combination of primary and excess or umbrella liability insurance, provided that such primary and excess or umbrella insurance policies result in the same or greater coverage as those required under Section 5.1.1 and 5.1.2, and in no event shall any excess or umbrella liability insurance provide narrower coverage than the primary policy. The excess policy shall not require exhaustion of the underlying limits only through the actual payment by the underlying insurers.

§ 5.1.4 Workers’ Compensation at statutory limits.

AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

§ 5.1.5 Employers’ Liability with policy limits not less than ($ ) each accident, ($ ) each employee, and ($ ) policy limit.

§ 5.1.6 The Contractor shall provide builder’s risk insurance to cover the total value of the entire Project on a replacement cost basis.

§ 5.1.7 Other Insurance Provided by the Contractor (List below any other insurance coverage to be provided by the Contractor and any applicable limits.)

Coverage Limits Bid Bond

Performance Bond

Payment Bond

5% of Bid Amount

100% of Contract Sum

100% of Contract Sum

Insurance coverages, shall be either: (a) written on an occurrence basis, and shall be maintained without interruption from the date of commencement of the Work until one (1) year after the date of final payment, or (b) written on a claims-made basis, and shall be maintained without interruption from the date of commencement of the Work until seven (7) years after the date of final payment.

Insurance coverage and surety bond required under the Agreement shall be written with insurance and surety carriers authorized to do business in the State of Michigan. Insurance coverage and surety bonds shall be in a form and provided by an insurer acceptable to the Owner with an A.M. Best rating of A, XII or better and shall name the Owner, Owner’s Representative, and Architect as "additional insureds" on all applicable policies. The additional insured coverage shall be primary and non-contributory to any of the Owner’s insurance policies and shall apply to both ongoing and completed operations, using the 2013 version of ISO forms CG 2010 07 04 or its equivalent, attached hereto as Exhibit C.

The Contractor shall deliver the required performance/payment bonds to the Owner and Architect at least three (3) days before the commencement of any Work at the Project site.

The Contractor shall provide any other type or amount of insurance reasonably required by the Owner in good faith.

The Contractor’s insurance shall not be eliminated, reduced or non-renewed without at least thirty (30) days’ prior written notice to the Owner.

§ 5.2 The Owner shall be responsible for purchasing and maintaining the Owner’s usual liability insurance and shall provide property insurance to cover the value of the Owner’s property.The Contractor is entitled to receive an increase in the Contract Sum equal to the insurance proceeds related to a loss for damage to the Work covered by the Owner’s property insurance.

§ 5.3 The Contractor shall obtain an endorsement to its Commercial General Liability insurance policy to provide coverage for the Contractor’s obligations under Section 8.12.

§ 5.4 Prior to commencement of the Work, each party the Contractor shall provide certificates of insurance showing their respective coverages.coverages and stating that insurance coverages and limits shall not be reduced or eliminated without at least thirty (30) days prior written notice to the Owner. The Owner may require additional proof of coverage in the form of a true and accurate copy of the policies of insurance themselves. The maintenance of insurance in strict compliance with the requirements of this Agreement shall be a condition precedent to the Owner’s obligation to make any payments to Contractor.

§ 5.5 Unless specifically precluded by the Owner’s property insurance policy, the Owner and Contractor waive all rights against (1) each other and any of their subcontractors, suppliers, agents, and employees, each of the other; and

(2) the Architect, Architect’s consultants, and any of their agents and employees, for damages caused by fire or other causes of loss to the extent those losses are covered by property insurance or other insurance applicable to the Project, AIA Document A105 – 2017. Copyright © 1993, 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,” “AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 12:04:07 ET on 07/02/2026 under Order No.3104239075 which expires on 12/31/2026, is not for resale, is licensed for one-time use only, and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com .

except such rights as they have to the proceeds of such insurance.Superior to any other term in this Agreement, any reference in this document to waivers of subrogation shall be deemed to be deleted and of no effect.

ARTICLE 6 GENERAL PROVISIONS

§ 6.1 The Contract The Contract represents the entire and integrated agreement between the parties and supersedes prior negotiations, representations or agreements, either written or oral. The Contract may be amended or modified only by a written modification in accordance with Article 10.

§ 6.2 The Work The term "Work" means the construction and services required by the Contract Documents, and includes all other labor, materials, tools, transportation, equipment, and services provided, or to be provided, by the Contractor to fulfill the Contractor’s obligations.the Contractor’s obligations: (i) to be incorporated into the Project (or the Contractor’s portion of the Project if the Contractor is not responsible for the entire Project), (ii) required of the Contractor under the Contract Documents, or (iii) necessary or appropriate to fully construct, operate and maintain the Project (or the Contractor’s portion of the Project if the Contractor is not responsible for the entire Project). The Work shall be performed in accordance with the Contract Documents. Contractor agrees that it (and any individuals it assigns to perform the Work) shall adhere to professional standards and will perform all Work in a manner consistent with generally accepted proficiency and competency for the type and nature of work rendered. Contractor shall at all times comply with all applicable federal, state and local laws and regulations, including the Owner’s policies.

The Contractor acknowledges that there may be items of the Work, which the Contractor is responsible to provide under the Agreement that are not drawn or specified, but are necessary for the proper execution and completion of the Work and are consistent with and reasonably inferable from the Drawings and Specifications. All such items shall be provided as part of the Work without delay in its progress and without any increase in the Contract Sum.

§ 6.3 Intent The intent of the Contract Documents is to include all items necessary for the proper execution and completion of the Work by the Contractor. The Contract Documents are complementary, and what is required by one shall be as binding as if required by all.

§ 6.4 Ownership and Use of Architect’s Drawings, Specifications and Other Documents Documents prepared by the Architect are instruments of the Architect’s service for use solely with respect to this Project.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .