GRPS CA Frost Boiler Replacement Ad to Bid.pdf

PDF 116 KB Posted

Attached to
GRPS C. A. Frost Middle/High - Boiler Replacement
Solicitation number
RFP GRP 260000002090 2
Issued by
Kent County, Grand Rapids City, Michigan

About this file

This is a Request for Proposals issued by Grand Rapids Public Schools for general contracting services to replace an existing cast iron sectional hot water boiler with two new Viessman high efficiency boilers at C.A. Frost Middle High School, located at 1417 Covell Avenue NW, Grand Rapids, Michigan. The scope of work includes demolition, disposal, concrete pad work, piping, pumps, air intakes, flues, associated roofing work, electrical controls, and all related work to ensure a complete functioning system, with the contractor responsible for factory start-up, testing, and balancing. Bid documents became available for electronic download on May 26, 2026 at 2:00 p.m. through the GRPS Bonfire website. A non-mandatory pre-bid meeting was scheduled for May 28, 2026 at 3:30 p.m. on site at C.A. Frost Middle High School. Proposals were due on June 9, 2026 at 1:00 p.m. via the GRPS Bonfire Site. The selection timeline included interviews on June 10, 2026, selection and recommendation on June 12, 2026, finance approval on June 22, 2026, and board approval on July 13, 2026.

The successful bidder will act as the Owner's General Contractor of record under an AIA A105-2017 Standard Short Form Agreement. The project specifications include replacement of an existing Smith cast iron boiler (1,985 MBH output) with new boiler equipment, new system pumps rated at 250 GPM each, a hydraulic separator, pressure relief valves, a condensation neutralization tank, and associated piping and controls. The design incorporates elevated-pressure natural gas piping with two new gas regulators, relocation of existing hot water return piping, revised boiler stacks and combustion air routing, new concrete pad and stainless steel flue stack, and PVC combustion air intake. Mechanical design drawings at scales of 3/8" = 1'-0" and 1/2" = 1'-0" document specifications, with Addendum 1 issued on June 2, 2026 revising mechanical floor plans, boiler piping schematic, roof penetration locations, and the mechanical equipment list. No contract value, term, or specific evaluation criteria were specified in the available source material.

View the file

Other files

File Type Posted
GRPS CA FROST Boiler Replacement Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposals Page No. 1 of 1

C.A. Frost Boiler Replacement

Grand Rapids Public Schools

Request for Proposal

OWNER: Grand Rapids Public Schools

PROJECT: GRPS C.A. Frost Middle High School Boiler Replacement

TO: Potential Bidders

SUBJECT: Request for Bids –

General Contracting Services for GRPS CA Frost Middle High School Boiler Replacement

This project is contracted with the Grand Rapids Public Schools under an AIA A105-2017 Standard

Short Form Agreement whereby the successful bidder will act as the Owner’s General Contractor of record.

SCOPE OF WORK

The object of the project is to replace an existing cast iron sectional hot water boiler with two new Viessman high efficiency boilers at C.A. Frost Middle High School. Selected contractor to be responsible for demolition, disposal, concrete pad work, piping, pumps, air intakes, flues, associated roofing work, electrical, controls and all related work to ensure a complete functioning system. The finished system is to be a complete and fully operation system including factory start-up, tested and balanced.

PROPOSALS ARE DUE

All proposals are due on Tuesday June 9th at 1:00 PM via the GRPS Bonfire Site at:

https://grps.bonfirehub.com/opportunities/237931

PRE-BID MEETING

A non-mandatory pre-bid will take place on site at C.A.Frost Middle High School, located at 1417 Covell Ave

NW, Grand Rapids MI 49504 on Thursday, May 28, 2026 at 3:30PM.

BID DOCUMENT AVAILABILITY

Bid documents will be available for electronic download on Tuesday, May 26, 2026 at 2:00 p.m.

through the GRPS Bonfire website at: https://grps.bonfirehub.com/opportunities/237931.

All addenda will be uploaded to this location as well.

Selection Timeline

RFP issuance: May 26, 2026

Proposals Due: June 9, 2026

Interviews: June 10, 2026

Selection/Recommendation: June 12, 2026

Finance Approval June 22, 2026

Board Approval: July 13, 2026

File details come from the government source that posted it. Updated .