REQUEST FOR PROPOSAL NUMBER: GROUP4-10-R-JO40
GROUP4-10-R-JO40 REVISION 0002
Revision 0002
Shore Protection Project, Brevard County, Florida, Beach Renourishment 2017, North Reach and South Reach
SUMMARY OF CHANGES
The text changes have been updated with additions noted by red text and deletions noted by strikethrough, and pertain only to changes made by this revision. The entire section is replaced if there is any change.
1. DELETE the following in their entirety and REPLACE with attached revised sections:
ADDENDUM TO THE STANDARD FORM 1442
GROUP4-10-R-J040 SF 1442-A1 Revision 0002
ADDENDUM TO THE STANDARD FORM 1442
Shore Protection Project, Brevard County, Florida, Beach Renourishment 2017, North Reach and South Reach
SPECIAL NOTIFICATION: THIS OPPORTUNITY IS AVAILABLE ONLY TO THE FOLLOWING
CONTRACTORS AWARDED A CONTRACT UNDER SOLICITATION NUMBER
W912EP-10-R-0026: Orion Marine Construction (W912EP-13-D-0003); Cavache, Inc.
(W912EP-13-D-0004); Cashman Dredging & Marine Contracting (W912EP-13-D-0005);
Cottrell Contracting Corporation (W912EP-13-D-0006); Great Lakes Dredge & Dock Company, LLC (W912EP-13-D-0007); Dutra Dredging Company (W912EP-13-D-0008);
Marinex Construction, Inc. (W912EP-13-D-0009); Norfolk Dredging Company (W912EP-13- D-0010); Mike Hooks, Inc. (W912EP-13-D-0011); Weeks Marine, Inc. (W912EP-13-D-0012);
Southern Dredging Co., Inc. (W912EP-13-D-0013); Manson Construction Company (W912EP-13-D-0014); C. F. Bean LLC (W912EP-13-D-0015) PROPOSALS WILL NOT BE
CONSIDERED FROM ANY ENTITY OTHER THAN THE PREVIOUSLY LISTED FIRMS
INCLUDED IN THE Group 4 Dredging MATOC Pool.
TECHNICAL EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the technical evaluation factors are:
(1) Availability of technically acceptable dredge(s) as stated in section 00100B (c) within the base MATOC.
(2) Past performance, to include the Contractor Performance Assessment Reporting System (CPARS) and MATOC (The government reserves the right to obtain copies of all Construction Contract Administration Support System (CCASS) records contained in the US Army Corps of Engineers CCASS database for the Prime Contractor (Offeror) and all Major Sub-Contractors).
PRICE EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA); the price evaluation factor is:
(1) Price will be evaluated as total base (Line Items 0001 through 0024).
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
(1) A letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the location of dredge(s). The identified dredge(s) must also have been found technically acceptable by the Contracting Officer prior to the proposal due date.
(2) Completed Bid Schedule (see Section 00010A)
(3) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Paragraph 2.4(c) of the MATOC
(4) Completed “Addendum to the Standard Form 1442 with the latest revision”.
(5) Revisions – Offers must acknowledge receipt of this Revision by completing “Notice to Offerors--Blocks 14, 15 and 20” of each revision.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:
Block 9 -- For additional information contact:
John Vohlken 904-232-1884
GROUP4-10-R-J040 SF 1442-A2 Revision 0002 john.d.vohlken@usace.army.mil.
Block 10 -- Magnitude of Construction is between $10,000,000.00 and $20,000,000.00.
Block 11 -- The Contractor shall begin performance within 45 calendar days and complete it within 150 calendar days after receiving notice to proceed. This performance period is mandatory. NOTE: If there are optional line items, refer to FAR 52.211-10 for breakdown of period of performance.
Block 12 -- The contractor must furnish any required performance and payment bonds within 10 calendar days after award of the task order.
Block 13 -- Sealed offers to perform the work required shall be delivered to the following address not later than October 25, 2017, at 2:00 P.M. Local Time
U.S. Army Corps of Engineers Jacksonville Regional Contracting Center (CESAJ-CT-C) Prudential Office Building 701 San Marco Blvd.
Jacksonville, Florida 32207-8175
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, and 20 below:
Block 14 -- Name and Address of Offeror (including Zip Code):
DUNS: ___________________ CAGE: _______________
Block 15 -- Telephone No. (include area code): _____________________
Block 20 -- Name and Title of Person Authorized to Sign Offer (type or print):
Type/Print ________________________________________________
Signature: ________________________________________________ e-Mail: ________________________________________________
Offer Date: _______________________________________________
Block 26 -- This Task Order will be administered by:
TAMPA PROJECT OFFICE
U.S. ARMY CORPS OF ENGINEERS (CESAJ-CD-GT)
4211 WEST BOY SCOUT BLVD., SUITE 170
TAMPA, FL 33607-5767
PHONE: (813) 348-0690
IIS/MELBOURNE RESIDENT OFFICE
U.S. ARMY CORPS OF ENGINEERS (CESAJ-CD-NM)
1020 WEST EAU GALLIE BLVD, SUITE A
MELBOURNE, FL 32935
PHONE: (321) 253-2390
GROUP4-10-R-J040 SF 1442-A3 Revision 0002
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
| GROUP4-10-R-JO40 Revision 0002 Front Page |
| Addendum for SF 1442 - Revision 0002 |