G2J002Specs_RTA.pdf
PDF 3 MB Posted
- Attached to
- NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING 44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
- Solicitation number
- GROUP2-18-R-J002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sub_Base_FY20_plans_20191021.pdf | ||
| GDR_KBIC_FY20 - Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GROUP2-18-R-J002
Jacksonville District
Naval Submarine Base Kings Bay Maintenance Dredging 44, 45, and 47-Foot Project
Camden County, Georgia
Construction Solicitation and Specifications Task Order
15 NOVEMBER 2019
GROUP2-18-R-J002 SF1442-A1
ADDENDUM TO THE STANDARD FORM 1442
NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING
44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE
ONLY TO THE FOLLOWING CONTRACTORS AWARDED A CONTRACT
UNDER SOLICITATION NUMBER W912EP18R0029, GROUP 2 – SMALL
BUSINESS SET ASIDE:
Cavache, Inc. (W912EP19D0038); CJW Construction (W912EP19D0039);
Coastal Dredging Company, Inc. (W912EP19D0040); Cottrell Contracting Corporation (W912EP19D0041); Florida Dredge and Dock, LLC (W912EP19D0042); Southern Dredging Co., Inc. (W912EP19D0043);
Southwind Construction Corp (W912EP19D0044); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0045);
PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER
THAN THE PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 2 –
SMALL BUSINESS SET ASIDE DREDGING MATOC POOL.
EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors. The factors for evaluation will be as follows:
FACTOR 1 - Availability of technically acceptable dredge(s).
FACTOR 2 - Past performance.
FACTOR 3 – Price.
SUBMISSION REQUIREMENTS: Contractors are required to submit the following:
FACTOR 1 - Availability of technically acceptable dredge(s).
The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).
Evaluation Method:
The Government will evaluate all identified dredge(s) submitted to determine
GROUP2-18-R-J002 SF1442-A2
whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the Notice of Intent.
To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date andavailable to meet the required period of performance.
FACTOR 2 - Past performance.
NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.
Evaluation Method:
Past Performance was recently evaluated for all contractors under the Dredging MATOC.
An "Acceptable" rating was earned under Past Performance for all offeros that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offeros will receive the Past Performance rating of "Acceptable".
Note: For future task orders, the Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain andevaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.
FACTOR 3 – Price.
The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.
Offerors are required to submit the following:
GROUP2-18-R-J002 SF1442-A3
(1) Completed Bid Schedule (see Section 00010A).
(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section 00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.
(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.
THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS
TASK ORDER:
Block 7. ISSUED BY:
USA ENGINEER DISTRICT, JACKSONVILLE
CONTRACTING DIVISION
701 SAN MARCO BLVD
JACKSONVILLE FL 32207-8175
Block 9 -- For additional information contact:
A. NAME: Timothy Humphrey
EMAIL ADDRESS: Timothy.G.Humphrey@usace.army.mil
B. TELEPHONE NO.: 904-232-1072
Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS: The project work consists of maintenance dredging of shoal material at the Naval Submarine Base Kings Bay. Work is divided into a Base and two options as indicated below. For the base and the two dredging options, this contract incorporates two feet of allowable overdepth throughout. Work also includes Bird Monitoring and Standby Time.
Base: Work consists of maintenance dredging the locations to required depths indicated in the table below and shown on the drawings. The placement of the dredged material will be at Crab Island Dredge Material Placement Facility (DMPF) (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Additional Base work also includes bird monitoring and standby time.
LOCATION REQUIRED DEPTH
Station 31+800 to Station 48+175
44-foot, 45-foot and 47-foot mailto:Timothy.G.Humphrey@usace.army.mil
GROUP2-18-R-J002 SF1442-A4
Upper Turning Basin 45-foot Site Six North 39-foot
LOCATION REQUIRED DEPTH
Magnetic Silencing Facility (MSF) North
44-foot
Explosive Handling Basin 44-foot and 47-foot
Site Six Operating Area South and Medium Auxiliary Repair Dock (ARDM) Yoke Area
45-foot
Explosive Handling Wharves (EHW)
47-foot
Refit Wharves 47-foot
Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility
46-foot
Small Boat Basin 24-foot
Option A: Work consists of supplying additional field cut weir riser boards as requested by the Contracting Officer.
Option B: Work consists of secondary maintenance dredging. The locations and required depths are indicated in the table below and shown on the drawings. The placement of the dredged material will be at Crab Island Dredge Material Placement Facility (DMPF) (D/A-C) as shown on the drawings and as directed by the Contracting Officer. Option B work also includes mobilization and demobilization, bird monitoring and standby time.
LOCATION REQUIRED DEPTH
Site Six Operating Area South and Medium Auxiliary Repair Dock (ARDM) Yoke Area
45-foot
Explosive Handling Wharves (EHW)
47-foot
Refit Wharves 47-foot
GROUP2-18-R-J002 SF1442-A5
Dry Dock Caisson Gate Sill and Dry Dock Caisson Gate Mooring Facility
46-foot
DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.
MAGNITUDE OF CONSTRUCTION: Between $5,000,000 and $10,000,000.
THIS SOLICITATION IS FOR GROUP 2 - SMALL BUSINESS SET ASIDE
YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN AWARD FROM
THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED AT WWW.SAM.GOV.
THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE SMALL
BUSINESS SIZE STANDARD IS $27.5 MILLION.
Block 11 -- The performance period is mandatory. (See FAR Clause
52.210.11 in Section 00700).
Block 12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED
PERFORMANCE AND PAYMENT BONDS: YES
Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER
AWARD.
Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Block 7 by 2:00 PM, local time 19 December 2019.
B. An offer guarantee is required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.
D. Offers providing less than 120 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
http://www.sam.gov/
GROUP2-18-R-J002 SF1442-A6
NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A-20D below:
Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)
DUNS: CAGE:
Block 15. TELEPHONE NO. (Include areacode):
Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)
Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D).
Block 18. The offeror agrees to furnish any required performance and payment bonds.
Block 19. ACKNOWLEDGMENT OF REVISIONS (The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)
GROUP2-18-R-J002 SF1442-A7
REVISION
NO.
DATE
Block 20A. NAME AND
TITLE OF PERSON
AUTHORIZED TO SIGN
OFFER (Type or print to include email address)
Block 20B. EMAIL
ADDRESS
Block 20C. SIGNATURE Block 20D.
OFFER DATE
Block 26 --This Task Order will be administered by:
NORTH FLORIDA AREA OFFICE
SUITE 201
4070 BOULEVARD CENTER DRIVE,
JACKSONVILLE, FL 32206-3474
PH: (904) 232-3086
Block 27 -- Payment will be made by:
USACE Finance Center 5722 Integrity Drive
ATTN: CEFC-AO-P
Millington, TN 38054-5005
SECTION 00010A
LINE ITEMS AND PRICING SCHEDULE
NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING
44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
GROUP2-18-R-J002 00010A-1
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
BASE
0001 MOBILIZATION AND DEMOBILIZATION 1 JOB $_______________
0002 EXCAVATION, UNCLASSIFIED;
STATION 43+300 TO STATION 48+175
AND UPPER TURNING BASIN
(ESTIMATED QUANTITY - SEE NOTE 2) 300,000 CUBIC YARD $___________ $_______________
0003 EXCAVATION, UNCLASSIFIED;
STATION 39+141 TO STATION 43+300
AND EXPLOSIVE HANDLING BASIN
(ESTIMATED QUANTITY - SEE NOTE 2) 600,000 CUBIC YARD $___________ $_______________
0004 EXCAVATION, UNCLASSIFIED;
STATION 31+800 TO STATION 39+141 AND
MAGNETIC SILENCING FACILITY (MSF) NORTH
(ESTIMATED QUANTITY - SEE NOTE 2) 230,000 CUBIC YARD $___________ $_______________
0005 EXCAVATION, UNCLASSIFIED; SITE SIX NORTH
STATION 36+850 TO STATION 38+800
(ESTIMATED QUANTITY - SEE NOTE 2) 90,000 CUBIC YARD $___________ $_______________
0006 EXCAVATION, UNCLASSIFIED; SITE SIX SOUTH
AND ARDM YOKE;
STATION 34+233.1 TO STATION 36+548;
(ESTIMATED QUANTITY - SEE NOTE 2) 40,000 CUBIC YARD $___________ $_______________
0007 EXCAVATION, UNCLASSIFIED;
EXPLOSIVE HANDLING WHARVES (EHW)
STATION 41+420 TO STATION 43+320
(ESTIMATED QUANTITY - SEE NOTE 2) 25,000 CUBIC YARD $___________ $_______________
0008 EXCAVATION, UNCLASSIFIED;
REFIT WHARVES
STATION 45+850.4 TO STATION 48+175
(ESTIMATED QUANTITY - SEE NOTE 2) 15,000 CUBIC YARD $___________ $_______________
0009 EXCAVATION, UNCLASSIFIED;
DRY DOCK CAISSON GATE SILL AND
DRY DOCK CAISSON GATE MOORING FACILITY 1 JOB $___________ $_______________
0010 EXCAVATION, UNCLASSIFIED;
PORT OPERATIONS SMALL BOAT BASIN
STATION 43+497.45 TO STATION 44+461
(ESTIMATED QUANTITY - SEE NOTE 2) 20,000 CUBIC YARD $___________ $_______________
0011 STANDBY TIME (SEE NOTE 5)
(ESTIMATED QUANTITY) 120 HOUR $___________ $_______________
0012 BIRD MONITORING (SEE NOTE 7) 1 JOB $_______________
0013 PARTNERING REGROUP 1 EACH $___________ $_______________
TOTAL BASE (LINE ITEMS 0001 THROUGH 0013) $_______________
NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING
44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
GROUP2-18-R-J002 00010A-2
LINE ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL
OPTION A
0014 FIELD-CUT WEIR RISER BOARDS
(ESTIMATED QUANTITY) 200 EACH $___________ $_______________
TOTAL OPTION A (LINE ITEM 0014) $_______________
TOTAL BASE PLUS OPTION A (LINE ITEMS 0001 THROUGH 0014) $_______________
OPTION B
SECONDARY MAINTENANCE DREDGING
0015 MOBILIZATION AND DEMOBILIZATION 1 JOB $_______________
0016 EXCAVATION, UNCLASSIFIED;
SITE SIX SOUTH AND ARDM YOKE
(ESTIMATED QUANTITY - SEE NOTE 2) 25,000 CUBIC YARD $___________ $_______________
0017 EXCAVATION, UNCLASSIFIED;
EXPLOSIVE HANDLING WHARVES (EHW)
(ESTIMATED QUANTITY - SEE NOTE 2) 35,000 CUBIC YARD $___________ $_______________
0018 EXCAVATION, UNCLASSIFIED;
REFIT WHARVES
(ESTIMATED QUANTITY - SEE NOTE 2) 20,000 CUBIC YARD $___________ $_______________
0019 EXCAVATION, UNCLASSIFIED;
DRY DOCK CAISSON GATE SILL AND
DRY DOCK CAISSON GATE MOORING FACILITY 1 JOB $___________ $_______________
0020 BIRD MONITORING (SEE NOTE 7) 1 JOB $_______________
0021 STANDBY TIME (SEE NOTE 5) 24 HOUR $___________ $_______________
TOTAL OPTION B (LINE ITEMS 0015 THROUGH 0021) $_______________
TOTAL BID (LINE ITEMS 0001 THROUGH 0021) $_______________
NOTES: (1) OFFEROR MUST PRICE ALL LINE ITEMS.
(2) QUANTITY INCLUDES REQUIRED DEPTH, ALLOWABLE OVERDEPTH AND SHOALING ESTIMATED TO OCCUR
BETWEEN DATES OF SURVEYS SHOWN ON DRAWINGS AND ACTUAL DREDGING.
(3) FAILURE TO COMPLETE AND RETURN ALL REQUIRED SUBMISSIONS (SF 1442, SECTION 00010A, SECTION 00101, AND BID GUARANTEE) COULD RENDER YOUR BID NON-RESPONSIVE.
SEE NEXT PAGE FOR NOTES 4 THROUGH 8.
NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING
44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
GROUP2-18-R-J002 00010A-3
(4) THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE OPTIONAL ITEMS IN ACCORDANCE WITH FAR CLAUSES 52.211-10 AND 52.217-7 (SECTION 00700). THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER, IN WRITING, A MINIMUM OF 7 DAYS PRIOR TO THE ANTICIPATED DATE OF THE DEMOBILIZATION OF A DREDGE PLANT.
(5) STANDBY TIME IS DEFINED AS WHEN THE DREDGE PLANT IS NOT IN OPERATION AT THE DIRECTION OF THE CONTRACTING OFFICER OR ADMINISTRATIVE CONTRACTING OFFICER. STANDBY TIME SHALL BE UTILIZED ONLY DUE TO THE PRESENCE OF ENDANGERED SPECIES IN THE IMMEDIATE AREA OF THE DREDGING OPERATIONS, DIFFERING SITE CONDITIONS, SECURITY OPERATIONS OR OTHER CONDITIONS AS DETERMINED BY THE CONTRACTING OFFICER. STANDBY TIME IS NOT AFFORDED FOR DELAYS CAUSED BY ADVERSE WEATHER CONDITIONS. PAYMENT WILL ONLY BE MADE FOR ACTUAL STANDBY TIME REQUIRED BY THE CONTRACTING OFFICER. SEE SECTION 01 22 00 MEASUREMENT AND PAYMENT AND SECTION 01 57 20
ENVIRONMENTAL PROTECTION.
(6) FOR THE SECURITY REQUIREMENTS, SEE PARAGRAPH "NAVAL SUBMARINE BASE KINGS BAY STATION ACCESS/
REGULATIONS" AND APPENDICES OF SECTION 01 11 00 SUMMARY OF WORK.
(7) PAYMENT WILL BE MADE FOR BIRD MONITORING IN ACCORDANCE WITH SECTION 01 57 20.
(8) FOR BIDDING PURPOSES, PROSPECTIVE BIDDERS SHOULD ASSUME A FULL MOBILIZATION AND DEMOBILIZATION.
UNDER THE BASE AND OPTION B.
SECTION 00010A, Attachment A
INSTRUCTIONS FOR TECHNICAL INQUIRIES AND QUESTIONS
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) December 10, 2019, Close of Business. To submit and review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email, followed by an answer to the comment/question after it has been processed by our technical team.
All timely questions and approved answers will be made available through ProjNet.
The Solicitation Number is: GROUP2-18-R-J002
The Bidder Inquiry Key is: VIP5H9-7FKE34
Specific Instructions for ProjNet Bid Inquiry Access from ProjNet home page:
1. Identify the Agency. This should be marked as USACE.
2. Email. Enter the email address you would like to use for communication.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access from ProjNet home page:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. Identify the Agency. This should be marked as USACE.
3. Email. Enter the email address you used to register previously in ProjNet.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
6. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
THE FOLLOWING PAGES CONTAIN ADDENDUMS
TO SPECIFIC SECTIONS OF THE ORIGINAL SOLICITATION
NUMBER W12EP18R0029
THESE ADDENDUMS ARE ONLY APPLICABLE TO
THIS SPECIFIC TASK ORDER
REQUEST FOR PROPOSAL NUMBER: GROUP2-18-R-J002
TASK ORDER PROJECT TITLE:
NAVAL SUBMARINE BASE KINGS BAY, MAINTENANCE DREDGING
44, 45, AND 47-FOOT PROJECT, CAMDEN COUNTY, GEORGIA
NOTICE TO OFFERORS: The information on the following pages is provided for the various clauses and/or paragraphs which require information to be filled in (when applicable) on each Request for Proposal for Task Orders issued under the awarded contracts. All applicable clauses, terms and conditions contained in the original solicitation and subsequently awarded contracts become part of each Task Order.
GROUP2-18-R-J002 Clause Addendum-1
GROUP2-18-R-J002 00100-A1
ADDENDUM TO SECTION 00100, INSTRUCTIONS TO OFFERORS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00100
ARE HEREBY PROVIDED:
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO
ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION
(FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Camden County, GA.
22.2%
6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the
GROUP2-18-R-J002 00100-A2
(d) Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(e) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(f) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Camden County, Georgia.
(End of provision)
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) (ALTERNATE I) (FEB
1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for 3 December 2019 @ 10:00 AM Local Time.
(c) Participants will meet at -- (Location will be provided by the contract administration office via telephone. See (d) below.)
(d) In order to attend the site visit, Participants must email the completed attached form SECNAC5512 NLT 22 November 2019 to James Vechitto at james.vecchitto@usace.amry.mil. If you have any question call James Vechitto at 904-232-3818.
(e) Core borings are available. (If available, follow the instructions in the Physical Data paragraph in Section 01 11 00 of individual request for proposals issued for task orders under this contract to make arrangements to inspect the borings. Failure to follow the instructions may result in a delay
GROUP2-18-R-J002 00100-A3
ranging in duration from one hour to 4 days.)
(f) After the site visit, a memorandum summarizing the visit may be posted to the appropriate website under the solicitation number. This posting will be strictly for informational purposes only. The memorandum will not become a part of the solicitation. If the solicitation needs to be changed as a result of information obtained during the site visit, a written amendment will be made available to all registered vendors. Questions regarding any information given in the memorandum must be directed to the person whose name appears in item 9 of the Addendum to the Standard Form 1442.
(End of provision)
GROUP2-18-R-J002 00700-A4
ADDENDUM TO SECTION 00700, CONTRACT CLAUSES
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700
ARE HEREBY PROVIDED:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK
(APR 1984)
The Contractor shall be required to (a) commence work under this contract within 60 calendar days after receipt of NTP, and complete work within 354 calendar days after receipt of NTP. Performance period consists of the Base (285 calendar days, including 60 calendar days commencement), Option A (7 calendar days) concurrent with base work and Option B (69 calendar days) including 30 calendar days commencement.
NOTE: The anticipated Notice to Proceed date is March 27, 2020. No more than 5 calendar days after receipt of Notice to Proceed, the Designated Contractor Security Administrator shall submit a Contractor Intake Form with all contractor employees requiring access to SUBASE Kings Bay Security Manager at Building 1063 Fluckey Hall, and submit a Contractor Intake Form - Submission Notification to the Contracting Officer (see Section 01 11 00 for additional details).
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $2,070.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
GROUP2-18-R-J002 00700-A5
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE
ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise Option A before demobilization.
The Contracting Officer may exercise Option B by written notice to the contractor on or before September 15, 2020. The option will be exercised by a unilateral modification to the contract; the contractor shall commence work under Option B within 120calendar days after Option B is exercised or as directed by the Contracting Officer. If exercised, Option B work is to be performed between December 2020 and February 2021. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general—
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
GROUP2-18-R-J002 00700-A6
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Naval Submarine Base Kings Bay GROUP18-R-J002 G-02 Maintenance Dredging, 44, 45 and 47-Foot Project, Camden County, Georgia
GROUP2-18-R-J002 00800-A1
ADDENDUM TO SECTION 00800, SPECIAL REQUIREMENTS
THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00800 ARE
HEREBY PROVIDED:
LIMITATIONS ON SUBSTITUTIONS FOR CERTAIN POSITIONS AND/OR
SUBCONTRACTORS
The award decision for this contract was based, in part, on an evaluation of the personnel and/or subcontractors the Contractor included in its proposal for the positions and/or items of subcontracted work identified at the end of this paragraph. The Contractor agrees these personnel and/or subcontractors will be employed as described in its proposal and no substitutes will be employed without prior written approval of the Contracting Officer or Administrative Contracting Officer. The Contractor further agrees that any proposed substitutes shall meet or exceed the qualifications of the original personnel and/or subcontractors. If the Contractor’s proposal did not name a subcontractor for an identified item of work, the Contractor will not be allowed to subcontract that item of work without prior approval of the Contracting Officer or Administrative Contracting Officer. The limitations described herein shall apply to the following: plant and equipment.
Section 00800A - WAGE DETERMINATIONS & OTHER ATTACHMENTS
52.200-1 LIST OF CONSTRUCTION CONTRACT ATTACHMENTS
NO. TITLE DATE NO. OF PAGES
1 NOTE 1
2 General Decision Number GA20190004 10/04/2019 7 3 General Decision Number GA20190060 09/27/2019 8
GROUP2-18-R-J002 00800A-i
00800A-ii
NOTE NOTE NOTE
THIS PROJECT INCORPORATES STATEWIDE HEAVY DREDGING AND THE HEAVY
CONSTRUCTION WAGE DECISIONS FOR CAMDEN COUNTY, GA
THE HEAVY CONSTRUCTION WAGE DECISION MAY ONLY BE APPLIED TO
OPERATIONS OCCURRING ON LAND
EXECUTIVE ORDER (EO) 13658 ESTABLISHES AN HOURLY MINIMUM WAGE
OF $10.60 FOR 2019 THAT APPLIES TO ALL CONTRACTS SUBJECT TO THE
DAVIS- BACON ACT FOR ALL HOURS PERFORMED ON THE CONTRACT IN
CALENDAR YEAR 2019.
IF YOU HAVE ANY QUESTIONS CONCERNING THE APPLICATION OF THE WAGE
DECISIONS FURNISHED FOR THIS PROJECT, PLEASE CONTACT:
FRAN RUSSELL, OFFICE OF COUNSEL, JACKSONVILLE DISTRICT, U.S. ARMY
CORPS OF ENGINEERS AT fran.g.russell@usace.army.mil
"General Decision Number: GA20190004 10/04/2019
Superseded General Decision Number: GA20180016
State: Georgia
Construction Type: Heavy Dredging
DREDGING
Counties: Georgia Statewide.
STATEWIDE
DREDGING CONSTRUCTION PROJECTS GEORGIA {East of the Aucilla and Ocmulgee Rivers within the Jacksonville & Savannah
Districts of the Corps of Engineers).
Note: Under Executive Order {EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5{a)(l)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
1/7
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.l(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number
Publication Date
01/04/2019
05/10/2019
10/04/2019
* ENGI0025-002 10/01/2019
Dredging : (Hydraulic Dredges
Over 20'"')
Rates
CLASS Al. •...•............•. $ 40.31
CLASS A2 .•...•........•...•. $ 35.92
CLASS Bl. •...•....•...•...•. $ 34.86
CLASS B2 .•...•........•...•. $ 32.82
CLASS Cl. •............•...•. $ 31. 92
CLASS C2 .•........•.......•. $ 30.89
CLASS D ..•...•...••...•...•. $ 25.66
Hydraulic Dredges Under 20""
Cook ..•..•...•........•...•. $ 8.11
Deckhand .•...•....•...•...•. $ 7.77
Engineer .•.......••...•...•. $ 9.59
Launchman •.......•........•. $ 8.19
Leverman .•...•............•. $ 10.03
Mate ..•..•...•...••...•...•. $ 8.82
Mess Cook •................•. $ 7. 71
Messman & Janitor .•...•...•. $ 7.53
Oiler & Fireman ...•...•...•. $ 8.11
Shoreman .•...•....•...•...•. $ 7. 82
Spider Barge Operator .•...•. $ 8.68
Spill Barge Operator ..•...•. $ 8.68
Welder ...•........•......... $ 9. 79
CLASSIFICATIONS:
Fringes
17.71+a
17.71+a
17.71+a
17.71+a
17.6l+a
17.61+a
17.51+a
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
1. 73+b
2/7
CLASS Al: Deck Captain, Leverman, Mechanical Dredge Operator.
Licensed Tug Operator over 1000 HP
CLASS A2: Crane Operator (360 swing)
CLASS Bl: Derrick Operator (180 swing), Spider/Spill Barge
Operator, Timber Fork Operator, Dozer Operator, Engineer, Blaster/Driller, Fill Placer, Electrician, Licensed Boat
Operator, Licensed Crew Boat Operator.
CLASS B2: Certified Welder.
CLASS Cl: Mate, Drag Barge Operator, Welder, Assistant Fill
Placer, Steward.
CLASS C2: Boat Operator.
CLASS D: Shoreman, Deckhand, Rodman, Scowman, Cook, Messman, Oiler, Janitor, Drill Oiler
PREMIUMS: Additional 20% for hazardous material work
FOOTNOTE APPLICABLE TO ABOVE CRAFTS:
a. New Year's Day, Good Friday, Memorial Day, Independence
Day, Labor Day, Thanksgiving Day and Christmas Day.
Vacation Contribution of 8% of straight time rate multiplied by the total hours worked.
b. New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day, Christmas Day. Plus Vacation contribution of 8% of straight time pay for all hours worked.
INCENTIVE PAY : (Add to Hourly Rate)
Operator (NCCCO License/Certification) $1.80; Licensed Tug
Operator over 1000 HP (Assigned as Master) USCG licensed
Master of Towing Vessels (MOTV) $1.80; Licensed Boat
Operator (assigned as lead boat captain) USCG licensed boat operator $1.30; Engineer (QMED and Tankerman endorsement or licensed engineer (USCG) $1.80; Oiler QMED and Tankerman endorsement (USCG) $1.80; All classifications Tankerman endorsement only (USCG) $1.55; Deckhand or Mater AB w/Lifeboatman only (USCG) $1.80; Welder (ABS certification)
$1.55
3/7
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
4/7
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the '"'SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
5/7
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
6/7
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
7/7
"General Decision Number: GA20190060 09/27/2019
Superseded General Decision Number: GA20180072
State: Georgia
Construction Type: Heavy
Heavy Construction, Includes Water and Sewer Lines, and Heavy
Construction on Treatment Plant Sites and Industrial Sites
(Refineries, Power Plants, Chemical and Manufacturing Plants, Paper Mills, Etc.)
Counties: Appling, Atkinson, Bacon, Ben Hill, Berrien, Calhoun, Camden, Charlton, Clay, Clinch, Coffee, Colquitt, Cook, Decatur, Grady, Irwin, Jeff Davis, Miller, Mitchell, Pierce, Quitman, Randolph, Seminole, Telfair, Thomas, Tift, Turner, Ware and Wayne Counties in Georgia.
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January
1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year
2019. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(l)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate
1/8 will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the
Davis-Bacon Related Acts, including those set forth at 29 CFR
5.l(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/04/2019
1 03/22/2019
2 04/05/2019
3 06/28/2019
4 09/27/2019
ELEC0177-003 12/30/2018
CHARLTON COUNTY
Rates Fringes
ELECTRICIAN •..•...•...••...•...•. $ 28.21 12.44
ELEC0508-010 09/01/2018
APPLING, ATKINSON, BACON, CAMDEN, CLINCH, COFFEE, PIERCE, WARE,
& WAYNE COUNTIES
Rates Fringes
ELECTRICIAN •..•...•....•.......•. $ 26.00 4.75%9.70
* ELEC0613-019 09/02/2019
CLAY & QUITMAN COUNTIES
Rates Fringes
2/8
ELECTRICIAN •..•.................. $ 32.35 32%
ELEC1205-008 06/04/2018
BERRIEN, COOK, DECATUR, GRADY, SEMINOLE, & THOMAS COUNTIES
Rates Fringes
ELECTRICIAN •..•...•...••.......•. $ 25 .17 14%+7.30
ELEC1316-015 09/01/2018
JEFF DAVIS & TELFAIR COUNTIES
Rates Fringes
ELECTRICIAN •..•...•...••.......•. $ 25. 79 12.81
ELEC1531-008 01/01/2019
BEN HILL, CALHOUN, COLQUITT, IRWIN, MILLER, MITCHELL, RANDOLPH,
TIFT, & TURNER COUNTIES
Rates
ELECTRICIAN •..•...•....•.......•. $ 23. 35
SUGA2012-090 08/11/2012
Rates
CARPENTER (Form Work Only) .....•. $ 15.21
CEMENT MASON/CONCRETE FINISHER .•. $ 14.11
LABORER: Common or General •...•. $ 11.00
LABORER: Pipelayer ....•...•...•. $ 12.00
OPERATOR:
Fringes
4%+12.55
Fringes
0.00
1.78
0.00
0.00
3/8
Backhoe/Excavator/Trackhoe ....... $ 17.23
OPERATOR: Grader/Blade .......... $ 18.88
OPERATOR: Loader ................ $ 15.92
TRUCK DRIVER: Dump Truck ........ $ 12.00
0.00
1.32
0.00
2.14
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
4/8
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or
'"'UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which
5/8 these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests
6/8 for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
7/8
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
8/8
Naval Submarine Base Kings Bay, Maintenance Dredging 44, 45, and 47-Foot Project, Camden County, Georgia
PROJECT TABLE OF CONTENTS
DI VI SI ON 00 - PROCUREMENT AND CONTRACTI NG REQUI REMENTS
00 31 21 CONTROL MONUMENT DESCRIPTIONS
00 33 50 WEATHER, WATER STAGE AND TIDE DATA
DI VI SI ON 01 -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .