B.07 Pre-Proposal Conference_GROUP1-26-R-J006_Everglades Harbor.pdf
PDF 1 MB Posted
- Solicitation number
- GROUP1-26-R-J006
About this file
This document is a pre-proposal conference presentation for a federal dredging contract solicitation.
Solicitation GROUP1-26-R-J006 seeks maintenance dredging services at Everglades Harbor in Collier County, Florida. The work consists of dredging identified areas to an 8-foot MLLW required depth plus 1-foot allowable overdepth, placing dredged material within a designated in-water placement area at a target elevation of -3.1ft NAVD88 with +0.5ft tolerance, environmental and water quality monitoring, and optional removal of sunken vessels. The base scope includes five primary dredging cuts, while Option A encompasses additional cut areas, and Option B covers vessel removal activities running concurrently with base work. The estimated contract magnitude is $1,000,000 to $7,000,000 under a Total Small Business Set-Aside using FAR Part 15 competitive procedures. The contract type is Firm-Fixed Price with a bid guarantee of 20% of bid price or $3,000,000, whichever is less. Performance and Payment Bonds are required within 10 calendar days of award. The period of performance includes 150 calendar days for base work (inclusive of 60 days mobilization/demobilization), 30 days for Option A if exercised, with contractor start required within 60 days of notice to proceed and final completion within 180 calendar days. Liquidated damages are assessed at $2,606 per calendar day of delay. The contracting officer may exercise options by October 21, 2026. Award will be made to the lowest-priced technically acceptable proposal meeting FAR 9.104-1 responsibility standards. Proposals must be submitted electronically via PIEE by August 21, 2026, at 2:00 PM EDT and include three volumes: Technical Merit (25 pages maximum), Past Performance (25 pages maximum), and Price (no page limit). The NAICS code is 237990 with a $37 million small business size standard. Technical questions must be submitted via ProjNet by August 5, 2026, at 5:00 PM EDT using Solicitation Number GROUP1-26-R-J006 and Bidder Inquiry Key UM8G5Y-V8DPFC. Significant environmental compliance requirements include pre-construction turbidimeter calibration, erosion control measures, manatee protection protocols, protected species observers, weekly turbidity monitoring, and construction shutdown requirements if turbidity exceeds 29 NTU above background or 0 NTU in Outstanding Florida Waters. Bidders must be registered in SAM and previously awarded under MATOC W912EP-25-R-0010 for maintenance dredging to be eligible.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Working Today to Build a Better Tomorrow
Pre-Proposal Conference
Presented by:
Jacksonville District
August 04, 2026
SOLICITATION NO. GROUP1-26-R-J006
EVERGLADES HARBOR, MAINTENANCE DREDGING,
COLLIER COUNTY, FLORIDA.
Thank you for joining, we will begin shortly.
Please mute your microphone.
PRE-PROPOSAL CONFERENCE: AGENDA
• INTRODUCTION
• PROJECT OVERVIEW
• TECHNICAL OVERVIEW
• ENVIRONMENTAL REQUIREMENTS
• CONTRACTING OVERVIEW
• OTHER ADMINISTRATIVE ITEMS
• RESOURCES
• CLOSING REMARKS
PROJECT OVERVIEW
PRE-PROPOSAL CONFERENCE: PROJECT OVERVIEW
SOLICITATION NUMBER: GROUP1-26-R-J006
PROJECT TITLE: Everglades Harbor, Maintenance Dredging, Collier County, Florida.
DESCRIPTION OF WORK: Project work consists of maintenance dredging the Everglades Harbor at identified dredging areas indicated on the drawings. Dredge areas will incorporate 1 foot of allowable overdepth. Place dredged material within the In-water Placement Area. Additional work includes environmental and water quality monitoring and removal of sunken vessels.
PROJECT LOCATION: The project is located Everglades Harbor, Collier County, Florida.
TECHNICAL OVERVIEW
PRE-PROPOSAL CONFERENCE: TECHNICAL OVERVIEW
Scope of Work:
All dredging is to be 8-foot MLLW Required Depth plus 1-foot Allowable Overdepth
• Base: Cut-4 Sta. 37+00 to Sta. 37+88.10, Cut-5, Cut-6 Sta. 0+00 to 2+00, Cut-7 Sta.
12+00 to 27+00, Cut-8 Sta. 19+00 to 87+20.17, and Cuts 14 through 16.
• Option A: Cut-3 Sta. 1+00 to Sta. 10+00, Cut-4 Sta. 14+50 to 26+00, Cut-6 Sta.
13+00 to 18+00, Cut-7 Sta. 7+00 to 10+00, Cut-8 Sta. 3+00 to 7+50, Cuts 9 through 13, and Cuts 17 through 22.
Additional Work:
• Environmental and Water Quality Monitoring
• Option B: Removal of Sunken Vessels
Placement:
• All dredged material is to be placed within the designated In-Water Placement Area. Target Elevation -3.1ft NAVD88 with +0.5ft tolerance
PRE-PROPOSAL CONFERENCE: TECHNICAL OVERVIEW
ENVIRONMENTAL REQUIREMENTS
PRE-CONSTRUCTION PHASE
• Delineation of Spoil Area: The boundaries of the spoil disposition area must be clearly and visibly marked before any spoil is placed. Specific Condition 3
• Erosion Control Implementation: Best Management Practices (BMPs) for erosion control, such as turbidity curtains, must be installed before construction begins to prevent siltation and turbid discharges. Specific Conditions 4, 7
• Designate Point of Contact (POC): The permittee must designate a specific POC responsible for overseeing construction compliance. The POC's contact information must be submitted to the FDEP for review before construction starts. Specific Condition 5
• Manatee Signage: Temporary signs concerning manatee presence, "Idle Speed/No Wake" zones, and shutdown requirements must be prominently posted before and during all in-water activities. Specific Conditions 38
• Protected Species Observer (PSO) Plan: Ensure dedicated observers for protected species are designated and provided a copy of the permit and its special conditions before construction begins. Specific Conditions 40, 41
• Turbidimeter Calibration: Turbidimeters must be calibrated within one month prior to the commencement of construction.
Specific Condition 25.a
CONSTRUCTION PHASE
• General Operations:
• Watercraft must maintain a minimum clearance of 1 foot from the seabed to prevent bottom scouring or prop dredging. Specific Condition 6
• No dredging, filling, or anchoring is permitted over seagrass or oyster beds without prior Department approval.
Specific Condition 9
• Dredging must not exceed the areas and depths indicated on the permit drawings. Specific Condition 10
• Turbidity and Water Quality Monitoring:
• Turbidity curtains, if used, must be maintained throughout construction to ensure turbidity levels do not exceed ambient background levels. Specific Condition 8
• Weekly reports, including turbidity logs and a description of any environmental concerns, must be submitted to the FDEP. Specific Condition 22
• Turbidity levels must be monitored every four hours during daylight operations. Specific Condition 23
• If turbidity monitoring shows an exceedance of state water quality standards (29 NTU’s above background or 0 in an OFW), all work contributing to the violation must cease immediately. Specific Conditions 7, 21, 28.a
CONSTRUCTION PHASE CON’T
• Protected Species Protection:
• All construction personnel must be instructed on the presence of manatees and the penalties for harming them.
Specific Condition 33
• All project-associated vessels must operate at "Idle Speed/No Wake" at all times while in the immediate project area.
Specific Condition 34
• If a marine turtle or manatee comes within 50 feet of in-water operations, all activities must immediately shut down until the animal has moved beyond the 50-foot radius of its own volition. Specific Condition 36
• No nighttime mechanical dredging is allowed within a specific restricted area of Chokoloskee Bay without prior written approval. Specific Condition 39
• Collision and Injury Reporting:
• Any collision with or injury to a manatee or marine turtle must be reported immediately to the FWC Hotline (888-404-
3922) and the FWC Imperiled Species email. Specific Condition 37
• If an injured or dead marine mammal or turtle is discovered, all work must cease, and the incident must be reported immediately by phone to the FWC Wildlife Alert Hotline. Specific Condition 42.a
• Hopper Dredge Operations:
• If a hopper dredge is used, specific operational procedures must be followed to minimize impingement or entrainment of marine turtles, including the use of a rigid deflector draghead. Specific Conditions 44.a, 44.c
POST-CONSTRUCTION PHASE
• Removal of Control Devices: All turbidity and erosion control devices must be removed within 14 days after the area has stabilized and turbidity levels have returned to background. Specific Condition 7
• Removal of Signage: All temporary manatee and operational signs must be removed upon project completion. Specific Condition 38
CONTRACTING OVERVIEW
Ruth C. Rodriguez, Contracting Officer
Email: Ruth.C.Rodriguez@usace.army.mil
Nicole M. Batista-Cruz, Contract Specialist Email: Nicole.M.Batista-Cruz@usace.army.mil mailto:Ruth.C.Rodriguez@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil mailto:Nicole.M.Batista-Cruz@usace.army.mil
15PRE-PROPOSAL CONFERENCE: ACQUISITION
APPROACH
Solicitation No. GROUP1-26-R-J006
This opportunity is available only to contractors awarded a Contract under Solicitation
W912EP-25-R-0010, SAD, REGIONAL SB MATOC TASK ORDER FOR MAINTENANCE
DREDGING.
• Contracting Method: FAR Part 15 Contracting by Negotiation - Request for Proposals (RFP), Total Small Business Set-Aside.
• Type of Contract: Firm-Fixed Price (FFP). (FAR clause 52.216-1)
• Bid Guarantee: Electronic copy of the bid guarantee shall be submitted with the proposal. The bid guarantee shall be 20% of bid price or $3,000,000.00, whichever is less. (FAR clause 52.228-1)
• Payment and Performance Bonds: The offeror must furnish any required Performance and Payment Bonds within 10 calendar days after Award.
16PRE-PROPOSAL CONFERENCE: ACQUISITION
APPROACH
• Estimated Magnitude of Construction: $1,000,000.00 - $7,000,000.00.
• Applicable North American Industry Classification System (NAICS): 237990 (Exception), Dredging and Surface Cleanup Activities. The Small Business Size Standard for dredging is $37.0 million.
• Estimated Period of Performance: The Contractor shall be required to (a) commence work under this contract within sixty (60) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than one hundred eighty (180) calendar days after the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.
- Base: 150 calendar days (inclusive of 60 calendar days for mob/demob)
- Option A: 30 calendar days
- Option B: concurrent with the base
• Liquidated Damages: $2,606.00 for each calendar day of delay until the work is completed or accepted. (FAR clause 52.211-12)
• The Contracting Officer may exercise the option by written notice to the contractor on or before October 21, 2026.
(FAR clause 52.217-7)
17PRE-PROPOSAL CONFERENCE: PROPOSAL SUBMISSION
REQUIREMENT
• Site Visit: Held on Thursday, July 30, 2026, at 9:00 AM EDT.
•Proposal Submission: Each file should begin with the solicitation number, followed by the word ‘‘RESPONSE’’, followed by your firm’s names, and finally the Volume Number / Document title.
Example: “GROUP1-26-R-J006_Response_[Firm name]_Volume 1.pdf”
• Transmission Method: Electronically via Procurement Integrated Enterprise Environment (PIEE).
Proposals must be received by the Government no later than Friday, August 21, 2026, at 2:00 PM (EDT).
Please see paragraph 9 of the RFP Letter, Electronic Proposals, for more details.
• ALL REVISIONS MUST BE ACKNOWLEDGED (IF ANY):
- Revision 0001: Forthcoming.
• You must be registered in the System for Award Management (SAM) in order to receive an award from this RFP.
PRE-PROPOSAL CONFERENCE: BASIS FOR THE AWARD
Lowest Price Technically Acceptable (LPTA)
• Subject to the provisions contained herein, award will be made to one offeror who is deemed responsible in accordance with FAR 9.104-1; whose proposal conforms to the solicitation requirements; provides the lowest evaluated price; and whose proposal, judged by an overall assessment of the evaluation criteria and other considerations specified in this solicitation, meets the technically acceptable standard for the non-price factors. Prices will be evaluated to determine fair and reasonableness in accordance with FAR 15.404-1.
19PRE-PROPOSAL CONFERENCE: PROPOSAL
REQUIREMENTS
• Your proposal shall include the following items. Failure to provide any of these requirements may result in your offer being rejected.
TECHNICAL INQUIRIES AND QUESTIONS:
• ProjNet closes on Wednesday, August 05, 2026, at 5:00 PM, EDT.
• All Inquiries must be submitted via ProjNet for an official answer.
PRE-PROPOSAL CONFERENCE: OTHER ADMINISTRATIVE
ITEMS
PRE-PROPOSAL CONFERENCE: RESOURCES
System for Award Management (SAM):
www.sam.gov
Procurement Integrated Enterprise Environment (PIEE):
https://piee.eb.mil/
ProjNet:
www.projnet.org http://www.sam.gov/ https://piee.eb.mil/ http://www.projnet.org/
PRE-PROPOSAL CONFERENCE: QUESTIONS
Please submit any questions via ProjNet.
ProjNet closes on Wednesday, August 05, 2026, by 5:00 PM EDT.
Solicitation Number is: GROUP1-26-R-J006
Bidder Inquiry Key is: UM8G5Y-V8DPFC
PRE-PROPOSAL CONFERENCE: CLOSING REMARKS
Thank you!
| ����Solicitation No. GROUP1-26-R-J006��EVERGLADES HARBOR, MAINTENANCE DREDGING, COLLIER COUNTY, FLORIDA.���� |
| PRE-PROPOSAL CONFERENCE: AGENDA |
| Slide Number 3 |
| ��PRE-PROPOSAL CONFERENCE: PROJECT OVERVIEW�� |
| Slide Number 5 |
| ��PRE-PROPOSAL CONFERENCE: Technical overview�� |
| ��PRE-PROPOSAL CONFERENCE: Technical overview�� |
| Slide Number 8 |
| Slide Number 9 |
| Slide Number 10 |
| Slide Number 11 |
| Slide Number 12 |
| Slide Number 13 |
| Slide Number 14 |
| PRE-PROPOSAL CONFERENCE: Acquisition APPROACH |
| PRE-PROPOSAL CONFERENCE: Acquisition APPROACH |
| PRE-PROPOSAL CONFERENCE: PROPOSAL SUBMISSION REQUIREMENT |
| PRE-PROPOSAL CONFERENCE: BASIS FOR THE AWARD |
| PRE-PROPOSAL CONFERENCE: PROPOSAL REQUIREMENTS |
| ��PRE-PROPOSAL CONFERENCE: OTHER ADMINISTRATIVE ITEMS�� |
| ��PRE-PROPOSAL CONFERENCE: resources�� |
| PRE-PROPOSAL CONFERENCE: Questions |
| �PRE-PROPOSAL CONFERENCE: CLOSING REMARKS� |
File details come from the government source that posted it. Updated .