ADDENDUM TO THE STANDARD FORM 1442

Revision 0001 dated 28 August 2020

Palm Beach Harbor Maintenance Dredging, 33-Foot Project Entrance Channel and Settling Basin, Palm Beach County, Florida

NOTICE OF INTENT TO ORDER: THIS OPPORTUNITY IS AVAILABLE ONLY TO

THE FOLLOWING CONTRACTORS AWARDED A CONTRACT UNDER

SOLICITATION NUMBER W912EP18R0029, GROUP 1 - UNRESTRICTED:

Callan Marine, Ltd. (W912EP19D0023); Cashman Dredging & Marine Contracting Co., LLC (W912EP19D0024); Cavache Inc. (W912EPD0025); Continental Heavy Civil Corp (CHC) (W912EP19D0026); Cottrell Contracting Corporation (W912EP19D0027); Great Lakes Dredge & Dock Company, LLC (W912EP19D0028); J.T. Cleary Inc. (W912EP19D0029);

Manson Construction Co. (W912EP19D0030); Marinex Construction, Inc.

(W912EP19D0031); Norfolk Dredging Company (W912EP19D0032); Orion Marine Construction, Inc. (W912EP19D0033); Southern Dredging Co., Inc. (W912EP19D0034);

The Dutra Group (W912EP19D0035); Waterfront Property Services, LLC dba Gator Dredging (W912EP19D0036); Weeks Marine, Inc. (W912EP19D0037).

PROPOSALS WILL NOT BE CONSIDERED FROM ANY ENTITY OTHER THAN THE

PREVIOUSLY LISTED FIRMS INCLUDED IN THE GROUP 1 - UNRESTRICTED

DREDGING MATOC POOL.

EVALUATION: The award of the task order will be made on the basis of Lowest Price, Technical Acceptable (LPTA) evaluation method. To be considered technically acceptable, an offeror’s proposal must be rated “Acceptable under all non-price factors.

The factors for evaluation will be as follows:

FACTOR 1 - Availability of technically acceptable dredge(s)

FACTOR 2 - Past performance

FACTOR 3 - Price

SUBMISSION REQUIREMENTS: Contractors are required to submit the following:

FACTOR 1 - Availability of technically acceptable dredge(s).

The contractor shall provide a letter on company letterhead identifying the dredge(s) the contractor proposes to do the work and the current location of dredge(s).

Evaluation Method:

The Government will evaluate all identified dredge(s) submitted to determine whether the identified dredge(s) have been found technically acceptable by the Contracting Officer prior to the proposal due date. The Government will also determine whether the dredge(s) are available to meet the required period of performance as stated in the

GROUP1-18-R-J020 1 Revision 0001

GROUP1-18-R-J020 2

Notice of Intent.

To be determined Acceptable for Factor 1, the identified dredge(s) must have been found technically acceptable prior to the proposal due date and available to meet the required period of performance.

FACTOR 2 - Past performance.

NO SUBMISSION REQUIREMENT. Past Performance information submitted in response to the Dredging MATOC (Solicitation No. W912EP18R0029) will be used to determine the offeror’s record of complying with contractual requirements and meeting acceptable levels of performance risk.

Evaluation Method:

Past Performance was evaluated for all contractors under the Dredging MATOC. An "Acceptable" rating was earned under Past Performance for all offerors that received an award in accordance with the solicitation evaluation criteria for the Dredging MATOC (Solicitation No. W912EP18R0029). Therefore, for this task order all offerors will receive the Past Performance rating of "Acceptable".

Note: The Government reserves the right to use recent and relevant project data independently obtained from other Government or commercial sources or from any other sources available to include, but not limited to: (1) the Past Performance Information Retrieval System (PPIRS), (2) Federal Awardee Performance and Integrity Information System (FAPIIS) or Electronic Subcontract Reporting System (eSRS), or other data bases; (3) interviews with Program/Project Managers and Contracting Officers or rely upon personal business experience with the offeror; and (4) consider any information the offeror submits which explains any problems encountered on the identified contract and the offeror's corrective actions. The Government reserves the rights to obtain and evaluate past performance information from any source it deems appropriate. Information related to the contractor’s (or contractor’s team) performance in Quality, Schedule, Management, Regulatory Compliance, and Safety/Security will be reviewed from the aforementioned additional sources to determine the offeror “Acceptable” or “Unacceptable.

FACTOR 3 – Price.

The Offeror’s submission for this factor shall be fully completed. Offeror completeness addresses the extent to which the elements of the price proposal are consistent with the requirements of the RFP.

Offerors are required to submit the following:

(1) Completed Bid Schedule (see Section 00010A).

(2) Bid Guarantee per Section 00700, Clause 52.228-1 and Section00100A, Attachment 8, Paragraph 2.4.3, of the MATOC.

Revision 0001

GROUP1-18-R-J020 3

(3) Completed “Addendum to the Standard Form 1442 with the latest revision”.

THE FOLLOWING INFORMATION IS APPLICABLE ONLY TO THIS TASK ORDER:

Block 7. ISSUED BY: USA ENGINEER DISTRICT, JACKSONVILLE

CONTRACTING DIVISION 701 SAN MARCO BLVD JACKSONVILLE FL

32207-8175

Block 9 -- For additional information contact:

A. NAME: Frederick L. Cooper

EMAIL ADDRESS: Frederick.L.Cooper@usace.army.mil

B. TELEPHONE NO.: 904-232-1186

Block 10 – THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK

DESCRIBED IN THESE DOCUMENTS:

DESCRIPTON OF WORK: Refer to Section 01 11 00 for complete description.

MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000.

THIS SOLICITATION IS FOR GROUP 1 - UNRESTRICTED

YOU MUST BE REGISTERED IN SAM IN ORDER TO RECEIVE AN

AWARD FROM THIS NOTICE OF INTENT. THE SAM WEBSITE IS LOCATED

AT WWW.SAM.GOV.

THE NAICS CODE FOR THIS NOTICE OF INTENT IS 237990 AND THE

SMALL BUSINESS SIZE STANDARD IS $30.0 MILLION.

Block 11 – The performance period is mandatory. (See FAR Clause 52.211-10 in

Section 00700).

Block 12A. The Contractor must furnish any required performance and payment bonds: Yes

Block 12B. PAYMENT BONDS DUE WITHIN 10 CALENDAR DAYS AFTER AWARD.

Revision 0001 mailto:Brian.J.Kilpatrick@usace.army.mil http://www.sam.gov/

GROUP1-18-R-J020 4

Block 13 ADDITIONAL SOLICITATION REQUIREMENTS:

A. Offer to perform the work required are due electronically at the following email address(s) by 2:00 PM, local time 14 September 2020 15 September 2020 to frederick.l.cooper@usace.army.mil and carbon copy (cc) tedra.n.thompson@usace.army.mi and griselle.gonzalez@usace.army.mil

B. An offer guarantee is required. Electronic copy of the bid guarantee shall be submitted with the offer and Original must be received within two calendar days of the date due for submittal of offer

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the Notice Intent in full text or by reference.

D. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NOTICE TO OFFERORS: Offerors are to complete Blocks 14, 15, 16, 17, 19, and 20A- 20D below:

Block 14. NAME AND ADDRESS OF OFFEROR (including Zip Code)

DUNS: CAGE:

Block 15. TELEPHONE NO. (Include area code):

Block 16. REMITTANCE ADDRESS: (Include only if different than Item 14)

Block 17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this Notice of Intent, if this offer is accepted by the government in writing within 60 calendar days after the date the offers are due.

Block 18. The offeror agrees to furnish any required performance and payment bonds.

Revision 0001 mailto:joseph.d.sherwood@usace.army.mil mailto:frederick.l.cooper@usace.army.mil mailto:frederick.l.cooper@usace.army.mil mailto:griselle.gonzalez@usace.army.mil mailto:griselle.gonzalez@usace.army.mil mailto:griselle.gonzalez@usace.army.mil k3ctcflc Cross-Out

GROUP1-18-R-J020 5

Block 19. ACKNOWLEDGMENT OF REVISIONS

(The offeror acknowledges receipt of revisions to the notice of intent -- give number and date of each)

REVISION

NO.

DATE

Block 20A. NAME AND

TITLE OF PERSON

AUTHORIZED TO SIGN

OFFER (Type or print)

Block 20B.

EMAIL ADDRESS

Block 20C.

SIGNATURE

Block 20D.

OFFER DATE

Block 26 --This Task Order will be administered by: West Palm Beach Resident Office

Block 27 -- Payment will be made by:

USACE Finance Center

5722 Integrity Drive

ATTN: CEFC-AO-P

Millington, TN 38054-5005

Revision 0001

SF 30 CONTINUATION SHEET

Palm Beach Harbor Maintenance Dredging, 33-Foot Project, Entrance Channel and

Settling Basin, Palm Beach County, Florida

GROUP1-18-R-J020 2 Revision 0001

SUMMARY OF CHANGES

1. SPECIFICATIONS:

Text changes have been updated with additions noted by underlined text (green in PDF) and deletions noted by line/cross-outs (red in PDF). These text changes pertain only to changes made by this amendment

DELETE the Addendum SF1442 and REPLACE with the attached revised Addendum SF1442.

DELETE Section 00700 and REPLACE with the attached revised Section 00700.

DELETE unsigned Design Authentication and REPLACE with the attached signed Design

Authentication.

2. DRAWINGS: No Change to drawings.

(End of Summary of Changes)

ADDENDUM TO SECTION 00700, CONTRACT CLAUSES

THE REQUIRED FILL-INS FOR FOLLOWING CLAUSES OF SECTION 00700 ARE

HEREBY PROVIDED:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR

1984)

The Contractor shall be required to (a) commence work under this contract within 30 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 70 the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.

The total completion time of 70 calendar days includes the following:

Base Bid 60 calendar days (includes 30 calendar days mob/demob) Option A 10 calendar days

(End of clause)

52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $1,976.00 for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(End of clause)

52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM

(MAR 1989)

The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor Prior to 15 December 2020. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of clause)

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

GROUP1-18-R-J020 Revision 0001

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general—

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

Title File Drawing No.

Palm Beach Harbor Plans G-01 Maintenance Dredging, 33-Foot Project, Entrance Channel and Settling Basin, Palm Beach County, Florida

(End of Clause)

Palm Beach Harbor Maintenance Dredging, 33-Foot Project GROUP1-18-R-J020 Entrance Channel and Settling Basin, Palm Beach County, FL

DESIGN AUTHENTICATION

This project was designed by the Jacksonville District, U.S. Army Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152.

WILLIAM L. REILLY, P.E.

CHIEF, WATERWAYS SECTION,

DESIGN BRANCH ENGINEERING DIVISION

DENNIS J. ZEVENEY, P.E.

CHIEF, GEOSYSTEMS BRANCH

ENGINEERING DIVISION

DAVID DUDLEY, P.E.

CHIEF, DESIGN BRANCH

ENGINEERING DIVISION

LAUREEN A. BOROCHANER, P.E.

CHIEF, ENGINEERING DIVISION

NEVES.MICHAE

L.P.1392765405

Digitally signed by

NEVES.MICHAEL.P.139276

Date: 2020.08.13 07:36:29 -04'00'

DUDLEY.DAVID

.F.1399388569

Digitally signed by

DUDLEY.DAVID.F.1399388569

Date: 2020.08.17 12:36:36 -04'00'

HOLEM.GARRY.W

AYNE.1230436076

Digitally signed by

HOLEM.GARRY.WAYNE.12304360

Date: 2020.08.18 10:36:01 -04'00'

WIGNER.WILLIAM.

KEITH.1230084617

Digitally signed by

WIGNER.WILLIAM.KEITH.1230084

Date: 2020.08.18 13:56:04 -04'00'

File details come from the government source that posted it. Updated .