Grosse Ile High School BP4 ADD 2 Write-Up.doc
DOC document 2 MB Posted
- Attached to
- High School Renovations
- Solicitation number
- RFP GITS 260000001950 2
- Issued by
- Wayne County, Michigan
About this file
This is an Addendum #2 to Bid Package #4 for the Grosse Ile High School Renovations project issued by Grosse Ile Township Schools in Grosse Ile, Michigan. The addendum modifies the original bidding documents and extends the bid submission deadline from Friday, May 29 to Monday, June 1 at 12:00 p.m. The updated "Invitation to Bid" is available on the Building Connected platform, along with a virtual public bid opening link. All bidding documents and project information are accessible through the Building Connected link: https://app.buildingconnected.com/public/5a1da2a3c624c000145f168b.
The addendum specifies that the work covered under this instruction shall be in accordance with the basic contract documents, with any changes, deletions, and additions to the Plans and Specifications to be incorporated into the final contract. No pricing terms, funding sources, or other financial details are addressed in this addendum document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GITS HS BP4 Newspaper Add.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grosse Ile Township Schools Bid Package #4 – Grosse Ile High School Renovations Grosse Ile, MI
Addendum #2 5/26/26 This addendum forms part of the Contract Documents and modifies the original Bidding Documents.
The documents and information listed below can be found on Building Connected Building Connected Link:
https://app.buildingconnected.com/public/5a1da2a3c624c000145f168b
INDEX
Updated “Invitation to Bid” extending the bid from Friday, 5/29 to Monday, 6/1 at 12:00pm Virtual public bid opening link included in “Invitation to Bid”
INTENT
This instruction is issued prior to awarding the contract, to provide for certain changes, deletions and/or additions to the Plans and Specifications for the above named project as hereinafter specified.
Unless otherwise specified herein, the work covered under this instruction shall be in accordance with the basic contract documents. The work hereinafter specified shall be included in the contract.
End of Document Follow us @DEMARIABUILD BUILDING RELATIONSHIPS www.demariabuild.com Follow us @DEMARIABUILD BUILDING RELATIONSHIPS www.demariabuild.com
File details come from the government source that posted it. Updated .