Greenwood.pdf
PDF 65 KB Posted
- Solicitation number
- iDS Project No. 25-111 | KVE Project No. C25D2252-1
- Issued by
- Jackson County, Missouri
About this file
This is a construction bid invitation document issued by Lee's Summit R-7 School District in partnership with Kaw Valley Engineering Inc. for the Greenwood Elementary School Public Improvements Project. The project involves construction of public road improvements on S Allendale Lake Road and within the Rolling Ridge Subdivision in Greenwood, Missouri to support a new elementary school currently under construction. The project is being offered as a Stipulated Sum contract. A pre-bid meeting is scheduled for October 27, 2026 at 2:00 PM at Lee's Summit R-7 Schools, 502 SE Transport Drive, Lee's Summit, MO 64081 in the Large Breakroom. Sealed bids must be submitted no later than 2:00 PM local standard time on Tuesday, November 10, 2026, with bids to be opened and read aloud at that time. Bids received after the deadline will not be accepted.
Bid documents for qualified general contractors may be obtained from the Drexeltech.com Plan Room, while other parties may view the documents at the same location. The engineer of record is Kaw Valley Engineering Inc., located at 14700 W. 114th Terrace, Lenexa, KS 66215, with primary contact David Wood at 913-894-5150 or wood@kveng.com. The project is listed with iDS Project No. 25-111 and KVE Project No. C25D2252-1. No information regarding pricing terms, funding sources, or contract term is provided in the bid invitation document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Greenwood Elementary School Public Improvements Project iDS Project No. 25-111 | KVE Project No. C25D2252-1
Status Accepting Bids
10/27/26 2:00pm 11/10/26 2:00pm
Company & Contacts Kaw Valley Engineering Inc.
David Wood 913-894-5150 wood@kveng.com
Location Greenwood, MO
FROM:
1.01 THE OWNER (HEREINAFTER REFERRED TO AS OWNER:
A. Lee's Summit R-7 School District
B. Address:
301 NE Tudor Road
Lee's Summit, Missouri, 64086
1.02 AND THE ENGINEER (HEREINAFTER REFERRED TO AS ENGINEER:
A. Kaw Valley Engineering, Inc.
B. Address:
14700 W. 114th Terrace
Lenexa, KS 66215
1.03 DATE: OCTOBER 19, 2026
1.04 TO: QUALIFIED BIDDERS
A. Contractors are invited to submit an offer under seal to Owner for construction of Public road improvements on S Allendale Lake Road and within the Rolling Ridge Subdivision in Greenwood, Missouri to support the new Elementary School currently under construction.
Before 2:00pm local standard time on Tuesday, November 10th, 2026.
Prebid Date Bid Date mailto:wood@kveng.com
Bid will be opened and read aloud at this time.
Bids received after this time will not be accepted.
A Pre-Bid Meeting will be held on October 27th, 2026 at 2:00PM. At the Lee’s Summit Facility’s Building
Lee's Summit R-7 Schools
502 SE Transport Drive
Lee's Summit, MO 64081
Large Breakroom
B. Project: Greenwood Elementary School Public Improvement Project
C. Bid Documents for a Stipulated Sum contract may be obtained from Drexeltech.com Plan Room.
D. Documents may be obtained only by general contract Bidders. Others may view the Bid Documents at the Drexeltech.com Plan Room.
http://drexeltech.com/ http://drexeltech.com/
File details come from the government source that posted it. Updated .