This is a Design-Build Request for Qualifications (RFQ) issued by Pitt Community College for the renovation of its Greenville Center facility to accommodate relocation of the Law Enforcement Training (LET) and Fire/EMS public service programs. The project involves renovation of approximately 27,000 square feet of educational space with updates to finishes in remaining areas, guided by minimum requirements established by NC Law Enforcement, Fire, and EMS Training standards. The mandatory pre-submittal scope briefing is scheduled for June 4, 2026 at 10:00 AM at the PCC-Greenville Center, 3107 S Memorial Road, Greenville, NC 27834. Respondents must submit five hardcopy sets and one electronic copy of qualifications by June 19, 2026 at 3:00 PM to Pitt Community College-Facilities & Construction, P.O. Drawer 7007, Greenville, NC 27836-7200. The selection committee will shortlist and rank the top three candidates by June 26, 2026, conduct interviews July 8, 2026 from 1:00 PM to 5:00 PM, and submit recommendations to the Board of Trustees by July 28, 2026. Construction is expected to commence in Winter 2026/Spring 2027 and be completed by Fall 2027.
The total project budget is $4,500,000 inclusive of owner contingency and reserves, funded through the State of North Carolina SCIF Approved OC-25. The Design-Build entity must possess appropriately qualified personnel holding valid professional and business licenses in good standing under North Carolina law, including general contractor licensing, electrical and plumbing contractor licenses, and appropriate design professional licenses. Pitt Community College encourages minority and women business enterprise (MWBE) participation and supports achieving at least 10% minority participation in accordance with North Carolina General Statutes 143-128.2 and 143-128.4. The RFQ evaluation criteria are weighted with Design-Build team composition and experience at 25%, personnel qualifications at 10%, HUB plan at 10%, methodology to achieve project objectives at 45%, capacity to deliver design-build services at 5%, and professional certifications at 5%. Respondents must provide evidence of surety bonding capacity and demonstrate qualifications based solely on merit without regard to fee, consistent with North Carolina G.S. 143-64.31 qualifications-based selection requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DESIGN-BUILD REQUEST FOR QUALIFICATIONS (RFQ)
May 15, 2026
Department/Agency Pitt Community College Project Title Greenville Center Renovation-Public Services Scope of Work Renovation of approximately 27,000 sq.ft. for educational purposes and updating finishes in remaining areas.
Contact Glenn Sheppard, AVP of Facilities and Construction Telephone (252) 493-7593 Email Glsheppard063@m.pittcc.edu Total Project Budget $4,500,000.00 inclusive of Owners Contingency and Reserves Source of Funds State of NC-SCIF Approved OC-25 # Publish Date May 15, 2026 Closing Date June 19, 2026 @ 3:00pm Submit FIVE (5) copies of By Main:
Pitt Community College-Facilities & Construction qualifications information package P.O. Drawer 7007 to (this is both mailing and delivery Greenville, NC 27836-7200 address): Attn: Glenn Sheppard Submit one electronic copy to Glsheppard063@my.pittcc.edu Hand Delivery*
Pitt Community College-Facilities and Construction 2064 Warren Drive Winterville, NC 28590
*Fedex, UPS, or similar carrier methods may require this address for delivery.
Please verify information with carrier.
The proposing Design-Build entity must be able to perform the requisite Design and Construction services with appropriately qualified personnel having valid professional and business licenses in good standing under the laws of the State of North Carolina. Relevant information can be found the following websites:
CONSTRUCTION:
NC Licensing Board for General Contractors: (https://nclbgc.org) NC State Board of Examiners of Electrical Contractors:
(https://www.ncbeec.org) NC State Board of Examiners of Plumbing, Heating and Fire Sprinkler Contractors: (https://www.nclicensing.org) NC Landscape Contractors’ Licensing Board:
(https://nclclb.com)
DESIGN:
NC Board of Architecture & Interior Designers: (http://www.ncbarch.org) NC Board of Examiners for Engineers and Surveyors:
(http://www.ncbels.org) NC Board of Landscape Architects: (http://www.ncbola.org) mailto:Glsheppard063@my.pittcc.edu https://nclbgc.org/ https://www.ncbeec.org/ https://www.nclicensing.org/ https://nclclb.com/ http://www.ncbarch.org/ http://www.ncbels.org/ http://www.ncbola.org/
I. SCOPE
Pitt CC will be relocating our various Public Service programs to space available at our Greenville Center location. Relocating in this facility empowers the programs to operate in a space specifically tailored for them. The building is approximately 27,105 square feet with existing floorplan (Exhibit A), Study preliminary floorplan (Exhibit B) as well as exterior façade upgrade (Exhibit C). Additional work will include painting and finishes in other areas of the building as identified during design. All design guidelines are to follow minimum requirements identified by NC Law Enforcement, Fire, and EMS Training requirements.
Total project cost is $4,500,000.00 inclusive of 5% Contingency.
The project delivery method will be Design-Build under NC Statute 143-128.1A Design-Build Contracts.
Form of contract can be found at https://www.doa.nc.gov/documents/files/sco-design-build-construction-contract-forms-and-bonds-3-1-2023/open Design-Build General Conditions: https://www.doa.nc.gov/documents/files/sco-design-build-general-conditions-contract/open
II. SCHEDULE
Advertise RFQ Pre-submittal Scope Briefing (Mandatory Attendance) RFQ Submission Deadline Shortlist Preferred Candidates (Rank top three) Interview & Recommend Preferred Finalist Obtain Board of Trustees Approval Execute Pre-Construction Agreement Start Pre-Construction Services Start Construction Services Project Complete
05/12/2026
06/04/2026 - 10:00 AM
06/19/2026 - 3:00 PM
06/26/2026 07/08/2026-1:00pm to 5:00pm 07/28/2026 08/21/2026 Fall 2026 Winter 2026/Spring 2027 Fall 2027 https://www.doa.nc.gov/documents/files/sco-design-build-construction-contract-forms-and-bonds-3-1-2023/open https://www.doa.nc.gov/documents/files/sco-design-build-construction-contract-forms-and-bonds-3-1-2023/open https://www.doa.nc.gov/documents/files/sco-design-build-general-conditions-contract/open https://www.doa.nc.gov/documents/files/sco-design-build-general-conditions-contract/open Glenn Sheppard Highlight
III. SELECTION CRITERIA
PCC will evaluate RFQ respondents according to the provisions of North Carolina G.S. 143-64.31, declaration of public policy regarding qualifications-based selection for Design-Build services. Additionally, and consistent with the University’s goal of achieving at least 10% minority participation for providing products and services in this project, PCC will evaluate respondents’ plans to address the provisions of G.S.
143-128.2 and 143-128.4 for Minority Participation. The criteria for weighted percentage information is provided in the RFQ Information Package Response.
Also note that under G.S.143-128.1A.(c) (8), PCC has the discretion to require either option “a” or “b” to specify procedural criteria by which Design-Builders may select team participants. PCC specifies “option a”.
IV. RFQ INFORMATION PACKAGE RESPONSE
Format:
Provide FIVE (5) copies of the qualification information package. Provide hardcopy in 8 ½ x 11 size, bound by clips or staple, and not exceeding 20 double-sided (or 40 single-sided) pages of copy/illustrations. Do not bind user plastic or wire binders or notebooks. E-mail and Fax submittals will not be accepted; however, a PDF copy via flash-drive or email- attachment is requested in addition to the hardcopy submittal.
Contents:
Provide ONE (1) cover letter for the submittal package acting as an expression of interest and as transmittal.
The contents of the RFQ submittal describe the composition of the Design-Build team; the reason for their inclusion; the personnel and roles; the management approach; and relevant experience pertinent to this and comparable projects. Use the following outline as a guide.
A. The Design-Build Team (25%)
(1) Name of key firms selected by the Design-Build Team dedicated to the project
(2) Describe ownership, thumbnail history, services, location, staff-size of each key firm
(3) Show/describe each firm’s involvement in relevant, successfully completed projects
(4) Indicate extent of history collaborating with selected firms
(5) Disclose any current or impending legal issues associated with collaborating participants
(6) Provide evidence of appropriate certifications (See “F” below)
B. Personnel (10%)
The Design-Build team will identify its roster of key personnel who will be dedicated to this project. Describe why they were selected and the role they will play. Describe how key personnel have demonstrated their qualifications, capacity and relevant successful experience performing the required work. Include appropriate evidence of professional licensure and/or certifications. Note: the successful Design-Builder must obtain advanced written approval from PCC Facilities and Construction assigned Project Manager noted in this RFP prior to any change in personnel listed in their submittal.
C HUB Plan (10%) The Design-Build team will include its plan to obtain participation by HUB firms. Pitt Community College encourages participation by MWBE firms and supports NC SCO and NCCC system’s policy of ensuring and promoting opportunities for minority businesses to meet or exceed the goals set by North Carolina General Statute 143-128.2. Provide evidence of past projects and efforts. Outline specific outreach efforts to engage HUB firms for participation in this project. Indicate the minority participation goal expected to be achieved on the project.
D. Describe Design-Build team’s Methodology to achieve PCC’s project objectives (45%):
(1) Your techniques for collaboration in comparable educational environments
(2) Your plan for determining the true scope of the Work
(3) Your plan for determining the likely cost and maintaining a workable budget
(4) Your plan for determining and managing a workable schedule consistent with the Item II
(5) Your plan for managing personnel who are involved in each step of project execution
(6) Your examples or evidence of applying these techniques on comparable projects of similar scope and complexity
E. Capacity to Deliver Design-Build Services (5%)
Bonding:
Provide a letter, dated within the last 30 days, from Design-Builder’s surety company, signed by their Attorney in Fact, verifying the surety’s willingness to issue sufficient payment and performance bonds for this project, on behalf of design-builder or its agent licensed to do business in North Carolina, and verifying the firm’s capability and capacity based on current value of work. Surety company bond rating shall be rated “A” or better under the A.M. Best Rating system or The Federal Treasury List.
F. Certifications (5%)
Each Design-Builder shall provide the written certifications that that each design professional who is a member of the design build team is licensed and in good standing in the State of North Carolina, including sub-consultants, was selected based upon demonstrated competence and qualifications in the manner provided by G.S. 143-64.31, based solely on qualifications without regard to fee.
V. Pre-submittal Briefing
Interested parties must attend a mandatory pre-submittal briefing on the date shown in Item II. - Schedule above. Attendees will observe the project site or sites to examine existing conditions and receive a briefing by the PCC Project Representative. The meeting will be held at the PCC-Greenville Center, 3107 S Memorial Road, Greenville, NC 27834. There will be no individual meetings or marketing meetings conducted or allowed.
VI. Design-Build Selection
Complete submittals are due at PCC Facilities and Construction on the date and time indicated in Item II –
Schedule.
Pursuant to G.S. 143.64.31, a selection committee of PCC representatives will shortlist and rank-order the top three Design-Build candidates who will be invited to interview. The selection committee will rank order the candidates and submit the ranked candidates to the PCC-Board of Trustees. Pending approval, contract negotiations will commence.
In the event fewer than three respondents provide submittals, the project will be re-advertised and the selection process will continue as described above.
Exhibit A
Existing Floorplan
Exhibit B
Study Plans and Documents
INTREPID ARCHITECTURE, pa
114 East Third Street Greenville, NC 27858 Phone: 252.270.5330
March, 10, 2026
Attn: Mr. Glenn Sheppard, FMP, PEM Pitt Community College Asst. VP of Facilities and Construction glsheppard063@my.pittcc.edu 252-493-7593
RE: Pitt Community College Public Services Study INTREPID Architecture, PA
Dear Mr. Sheppard, It is our understanding that Pitt Community College (PCC) intends to relocate the Law Enforcement Training program to the existing PCC Greenville Center located at 3107 S. Memorial Drive in Greenville, North Carolina. To aid the College is determining the feasibility of this move, INTREPID Architecture was engaged to complete a feasibility study that includes the following tasks:
- Evaluate and create as-builts for the existing Greenville Center Building;
- Develop a program for the Law Enforcement Training and the Fire/EMS programs;
- Develop schematic layouts to explore the feasibility of accommodating the program requirements within the existing buildings;
- Estimated project costs for the various schematic layouts;
- Overall recommendations/conclusions that include feedback from the owner stakeholder group.
Existing Greenville Center Building (See appendix C attached – Sheet A1.01):
The total area under consideration for the relocation of the Law Enforcement Training program is approximately 27,800 square feet within the Greenville Center building, in addition to approximately 2,240 square feet of space currently allocated for mechanical/electrical use. The building is currently unoccupied. While the building provides sufficient square footage to support the proposed program, the existing layout presents challenges related to circulation, classroom size, and functional adjacencies. As a result, several layout options were explored to determine the most effective way to accommodate the program requirements within the existing building footprint while balancing the overall cost of construction. Please see Appendix A for the existing conditions assessment.
mailto:glsheppard063@my.pittcc.edu
March 10, 2026 PCC Public Services Study
Programming requirements (See appendix B attached – Program Document) This study included programming for both the PCC Law Enforcement Training (LET) program as well as the Fire/EMS program. The requirements for the LET program were reported by the user group based on the accreditation requirements for the program and the number of students they would like to serve as well as their existing space. The requirements for the Fire/EMS program were reported by the user as well as by designer evaluation of the existing space. The LET program was determined to be significantly constrained by their current space, and additional space is needed to maintain accreditation. The Fire/EMS program can be accommodated in their current building (the Greenville Center Annex), with the CDL program vacating the building, and sharing some spaces with the LET program in the Greenville Center. The spaces planned to be shared include the conference room, break room, classrooms, computer lab, locker rooms/bathrooms, gym space, and mat training room. Both programs have a significant amount of interior and exterior storage that is currently being accommodated in trailers, sheds, and connexs. During the programming process with the Stakeholders, it was determined that the storage needs for the EMS program are always needed onsite and readily accessible due to the training that occurs in the building. Storage needs for the Fire program are mobile and are used in various training areas both on site and off site. Therefore, storage does not need to be on the premises of the facility but rather could be stored somewhere else on campus and be retrieved when needed. Storage needs for the LET program are a combination of storage required on the premises, and some can be off site and be retrieved when needed.
Proposed Layouts / Approach:
Four layout options were presented at an Owner Stakeholder meeting on February 4, 2026, (the proposed layouts referenced in this study are provided in the appendices for further review). Options A and A-2 focused on more modest renovations with a lower budget while options B and C focused on more extensive renovations including significant exterior façade and site upgrades with an overall higher budget. Ultimately, after owner stakeholder feedback, the preferred option is a compromise between the two options.
Option A & A-2 (Modest) (See Appendix C, sheets A1.02 and A1.03):
Advantages:
- Retains as much as possible of existing
Greenville center interior walls and partitions, thereby lowering overall costs. Most of the area would include finish replacement only.
- Little to no exterior changes, also lowering overall costs.
- Minimize demolition and renovation costs.
- The bathrooms in the space remain as is, resulting in significant savings for the project.
- No changes/updates to the Greenville Center
Annex Building directly behind the Greenville Center where the Fire/EMS program is housed.
However, the shared spaces including the mat training room, gym space, break room, and conference room are situated on the Annex side of the Greenville Center with access into the building from that side as well. The goal is the spaces feel equally shared between the programs.
Considerations:
- Existing circulation patterns remain largely unchanged, which makes the building difficult to navigate, and can be confusing for new visitors.
- In Option A, the removal of two columns for unobstructed mat training space is included to have 5’ of run-off on all sides of the mat and maintain the overall required square footage required in the program. Based on initial feedback from the user, the 5’ runoff area is not required if the walls can be padded. Option A-2 is largely the same aside from the removal of only one (1) column with one of the walls padded due to not having the 5’ runoff on that one side. Option A-2 dramatically reduces project cost and structural complexities.
- Classroom sizes may be more limited compared to other options due to keeping as many existing partitions as possible.
- Relies on existing HVAC and pluming being sufficient. Some of the building systems are at their expected life expectancy, and by leaving them as is, or modifying only what is needed for the limited renovation will result in higher R&R costs long term. Additionally, there is a risk that while modifying the systems to accommodate the renovation, the systems may require replacement anyway, resulting in higher change order costs for the project.
- Fewer opportunities to improve overall spatial organization for the same reason noted above.
Estimated Construction Cost:
- Estimated construction cost is approximately $4.5 million plus soft costs & owner contingency, for an overall budget of approximately $5.1 million (I.e. construction cost, design fee, 5% contingency, and additional funds for testing and other miscellaneous items).
Options B & C (Extensive) (See Appendix C, sheets A1.04 and A1.05):
- Corrects confusing circulation & public/private hierarchy for improved wayfinding and overall flow within the building.
- Allows for greater flexibility in accommodating program requirements and heightens the impact of the investment due to the transformative nature of the renovation.
- Includes significant improvements to the existing façade and the site areas directly adjacent to the building which will improve curb appeal, brand the building as PCC, and create an obvious “front door” to the building.
- These options also do not include changes to PCC Annex Building where the Fire/EMS program is housed; however, it does consider the spaces within the Greenville Center that are shared between programs. These options create more opportunities to ensure the shared spaces between LET and Fire/EMS are truly geared toward both programs from an access/usability perspective.
Access to these spaces from the Annex side of the Greenville Center leads into the primary hallway that connects to the main lobby, which will result in it feeling more like a main entry rather than a “back door”.
- Assumes some HVAC, electrical, and plumbing can remain, but much is upgraded throughout the building.
This will lessen the R&R costs for the building long term, making this renovation more comprehensive, and reduces the likelihood of unexpected change orders during construction due to system failures that occur while work is ongoing.
Consideration:
- Greater level of interior renovation and building system upgrades results in a significantly higher project cost, however, the building would feel more like a full renovation.
- Similar to options A and A-2 above, these options also include major structural modifications to remove a column in the mat training room.
- The primary bathrooms will remain as is in this option as well; however, finish replacement is included to update the look and feel of the spaces.
Estimated Construction Cost:
- Estimated construction cost is approximately $8.5 million plus soft costs & owner contingency, for an overall budget of approximately $9.7 million (I.e. construction cost, design fee, 5% contingency, and additional funds for testing and other miscellaneous items).
Preferred Proposed Layout (See Appendix D, sheet A1.06):
During the Owner Stakeholder meeting on February 4, 2026, the discussion included great feedback related to design priorities as well as budget preferences. The feedback is summarized below:
- Overall budget should be no more than $6 million.
- The priority should be on the interior to make the space as functional as possible; however, the existing classroom spaces and offices work well now and should be adjusted only in a minor way.
- Breakroom, conference room, gym, mat training, and locker rooms and bathroom spaces will be shared between LET and Fire/EMS.
- Preferred option to combine option A and C whereby option A should be maintained on the plan east side of the main north/south corridor, and option C should be maintained on the west side of the main north/south corridor.
- Administrative offices for the LET department are located on the west side of the building, improving functionality and creating a dedicated area for staff operations.
- Classrooms are positioned in the central portion of the building to create a logical separation between instructional and administrative spaces. To increase classroom size and functionality, the existing central corridor was removed, and the circulation area was incorporated into the classroom footprint. This adjustment allows the classrooms to meet the required program size and seating capacity.
- The physical fitness room, mat training room, showers, and locker areas are located on the east side of the building near the rear entrance. Positioning these activity spaces near the rear entrance allows them to function as shared facilities with the adjacent Annex building while minimizing disruption to classroom and office areas. This placement also allows convenient circulation between the two buildings and supports potential after-hours access.
- The final layout represents a balanced solution that incorporates key advantages from the previously studied options while maintaining a reasonable renovation scope. This approach improves spatial efficiency, supports the operational needs of the program, and provides clear organization of administrative, instructional, and shared activity spaces.
- Conference room can be used as either conference room or seminar/small classroom, and an alternate layout is included to show how the space can be rearranged.
Considerations:
- Similar to previous options above, this option also includes major structural modifications to remove a column in the mat training room.
- This option would provide significant facelift to all public spaces in the building; however, it would include modest exterior improvements including sidewalk and parking updates. This option would not include the façade work shown in options B and C above, rather it could be designed as an add alternate to the project to maximize the value for the Owner. In the event the project cannot achieve this cost, the construction documents would be shelf ready should funds become available in the future.
Estimated Construction Cost:
Approximately 60% of the 27,800 SF building will require cosmetic (Level 1 Alteration) type improvements. This portion of the building will likely carry a renovation cost of $1.5 to $2.5 million in renovation costs depending on the extent of MEP improvements required. (i.e. some equipment may be sufficient, but old enough that replacement should be considered.)
Approximately 40% of the building ( 11,120sf) will require extensive renovations (Level 3 Alterations) including heavy plumbing, electrical, HVAC, and structural modifications. This portion of the building is estimated to require between $3m and $3.5m to fully renovate.
The required exterior improvements (ADA and site) are anticipated to cost between $200,000 and $400,000.
Optional exterior facade improvement, which would probably be included as an Alternate, would likely carry a construction cost of $400,000 to $650,000 to improve the west (front), north, and part of the east facades.
Accounting for a 5% construction contingency and escalation would result in a construction cost estimate of $5.25 million on the low end of the spectrum and $7 million on the higher end of the spectrum. An add alternate of an additional $700,000 would cover facade improvements plus related contingencies and escalation. These estimated costs are based on recent regional cost per SF averages, not specific scope take-offs.
Knowing that PCC is attempting to complete the renovations for a $6million dollar construction budget, this seems feasibly within the middle of estimated cost range. It should be noted that this estimate does not include soft costs such as design fees, moving costs, equipment costs, etc. With all these soft costs included, an overall budget of approximately $6.9 million (I.e. construction cost, design fee, 5% contingency, and additional funds for testing and other miscellaneous items).
Fire/EMS Program & The Greenville Center Annex Building (See Appendix C, sheet A1.07):
The Greenville Center Annex building currently houses the Fire/EMS program, and comes somewhat close to meeting their current needs. The primary additional spaces the Fire/EMS program needs to meet the current demand and growth expectations include more classroom space, a larger computer lab, fitness area/gym, a student break space, and additional storage. As noted above, the classrooms, computer lab, fitness area/gym, and student break space are intended to be shared with the LET program in the Greenville Center Building across the parking lot. To address the storage needs for the program, this study concluded it would be feasible to add a mezzanine space above Classroom 2, Electrical Room, and Data Closet on the plan east side of the building. The structural height of the building is fairly tall, and with minor modifications, to the interior partitions, mezzanine could be platform-framed within the structure. This mezzanine could be access via a ships ladder from Storage Room 3.
Estimated Construction Cost:
- Estimated construction cost to add this mezzanine is approximately $250,000 plus soft costs & owner contingency, for an overall budget of approximately $290,000 (I.e. construction cost, design fee, 5% contingency, and additional funds for testing and other miscellaneous items).
Anticipated Project Schedule:
Should the project proceed with the preferred option as described above, the design phase should be expected to take about 10 months, and the bidding and construction to take about a year. The following durations should be anticipated:
• Schematic Design/Design Development – 90 Days
• SCO/AHJ Review – 30 Days
• Construction Documents – 90 days
• SCO/AHJ Review – 60 Days
• Final Documents – 15 days
• SCO/AHJ Review – 15 Days
• Bidding – 45 Days
• Contracting – 30 days
• Construction – 300 days (~10 months)
The findings presented herein are general in nature. Should more greatly detail regarding a facet of this study be required, our team is happy to expound upon any aspects of the information presented herein.
Sincerely, Albrecht McLawhorn, AIA, NCARB
President INTREPID Architecture file:Z:\Intrepid Architecture\01_Projects\2025\25012 - PCC Public Services Study\PROJECT FOLDERS\02 Project Info-Design Minutes\260305_PCC Public Services Study
~10 Months
~1 Year
03/10/26
Appendix A
Existing Conditions Assessment:
Parking and sidewalk: Existing parking lot needs re-striping. Sidewalk that leads to entrance to the building has a ramp, however the slope of the ramp is not ADA complaint, and the cross slope at the bottom is also exceeds the maximum cross slope.
Building Envelope: The exterior wall is a precast concrete panel, which makes exterior modifications challenging.
Cutting in new openings for doors and windows would be a significant undertaking and costly. The existing aluminum storefront and entrances systems are dated, but in good condition. There does not appear to be any active water infiltration through the building envelope visible
ROOFING: The existing roofing system is a modified bituminous roof. The age of the roof system is unknown. The roof is in fair condition, and there does not appear to be any active leaks in the roof. The roof appears to have internal roof drains with overflow scuppers to conductor boxes and downspouts that daylight.
Building Systems: The existing mechanical systems in the building are a mix of new units and older units that are at life expectancy. The units that are at the end of their serviceable life should be planned to be replaced with the next renovation.
Interior walls: There is a mix of traditional stud walls with painted gypsum board and demountable partitions faced with wall covering and fabric throughout the building. The demountable partitions are aged and need to be removed and replaced with a new partition system or traditional partitions.
Building finishes: Evidence of moisture damage is present along interior walls and base trim, including staining, material warping, and separation at joints. The pattern of deterioration suggests that some moisture sources may be internal. The carpet flooring is aged and dated and should be replaced during the next renovation.
Restrooms: The existing restrooms in the building are dated, but functional. It appears as if modifications occurred within the last 15 years to make the gang restrooms ADA compliant, however, the updates are not ada complaint. The sinks exceed the height maximum, and the clear space in the ADA toilet stall does not meet the minimum width. There are two single user restrooms adjacent to the existing restrooms that are ADA compliant, so if viewed as a pod, ADA compliance can be met with the existing restrooms.
Updated: 03/10/2026
Space Current Space Requested Size 10/14/30
Proposed Opt A 02/12/26
Proposed Opt A-2 02/12/26
Proposed Opt B 02/12/26
Proposed Opt C 02/12/26
Proposed Floor Plan-Preferred Option 03/10/26
Current Option Capacity/Notes User Requests/Special Requirements/Notes
Shared Classroom 1 1368 1100 1017 1017 995 995 1017 see plan for number of seats Large Classroom, or two classrooms combined. students to have 20 sf of floor space, not including teacher space, mock court room
Shared Classroom 2 720 1100 1006 1006 993 1969 1006 see plan for number of seats students to have 20 sf of floor space, not including teacher space
Shared Classroom 3 700 1100 987 987 978 862 987 see plan for number of seats students to have 20 sf of floor space, not including teacher space
Shared Classroom 4 880 1100 895 895 863 579 895 see plan for number of seats students to have 20 sf of floor space, not including teacher space
Shared Classroom 5 600 1100 677 677 677 583 677 see plan for number of seats students to have 20 sf of floor space, not including teacher space
Shared Classroom 6 1100 785 785 785 831 785 see plan for number of seats students to have 20 sf of floor space, not including teacher space Shared Computer Lab 1500 1331 1331 1170 1448 1331 see plan for number of seats 50+ computers Shared Classroom 7 831 Library 120 113 225 113 Shared texts, secured Mat Training Room 900 3600 3883 3349 3072 3073 3109 includes first aid station, options where there is no 5' run-off 50x50 mat with 5' run off area between mat and walls Physical Fitness Training Area 1260 2500 2059 2346 3046 2181 2182 50x50, weight equipment First Aid 113 113 Reception Office 200 201 201 113 114 135 2 Work Stations, Sliding transaction window, adj to main entry LET Office 1 120 120 112 119 174 174 119 LET Office 2 143 120 113 124 173 173 124 LET Office 3 240 120 119 129 188 188 129 LET Office 4 120 119 115 188 188 115 LET Office 5 120 137 115 165 165 115 LET Office 6 120 113 138 137 137 165 LET Office 7 120 154 138 138 137 LET Office - Director Office 200 120 154 165 193 239 154 office with meeting area Fire/EMS Offices (See Annex Program) 648 Open Office - cubicle area 300 300 338 338 618 618 338 8 stations Unassigned Office 154 Work Room 120 74 74 77 74
Updated Training Jail Cell 60 70 70 70 70 70 70 7x10, actual jail cell with bed frame, jail mattress, toilet, sink, drinking fountain and security monitor, cinder block walls, metal cell door consistent with those currently in use.
Jail Cell Viewing Area 300 602 602 792 792 602 Firearms Simulator 300 433 433 433 433 433 20x20, Sound dampening walls and ceiling Driving Simulator 300 435 435 435 435 435 20x15, Sound dampening walls and ceiling Armory 99 500 567 567 567 567 220 conditioned space, space for maintenance station and and 3+ gun safes
Conference/Seminar Room 500 500 505 505 505 505 505 Can be used as conference room and seminar/small classroom Small meeting Room 110 138 137 225 138 Small meeting Room 119 119
Student Break Room 600 1200 672 672 672 672 672 40x30, kitchenette with sink, cabinets, refrigerator, and 2+ microwaves, 6+ four seat tables, Staff Break Room 150 193 193 193 Reception Waiting 200 200 73 73 160 160 207 Data / IT Room 584 448 448 584 584 584 Locker Rooms - Men 713 500 407 407 461 461 460 4 showers, 50 full-height lockers (100 half height) existing has 4 showers, sinks, and toilets with 50+ lockers Locker Rooms - Women 713 500 407 407 462 462 464 4 showers, 50 full-height lockers (100 half height) existing has 4 showers, sinks, and toilets with 50+ lockers Restrooms Men 200 214 214 102 102 127 Restrooms Women 200 127 127 127 127 102 Staff Restroom 60 63 63 63 63 63 Janitor Closet 70 70 70 110 110 134 Secured separately from Cleaning Storage, w/ Mop Sink Cleaning Supply Storage 50 52 52 155 155 140 Cleaning supply storage accessed by students General Storage Space 1000 166 166 337 Records/Storage 120 112 109 109 112 3 large file cabinets for instructor files, fireproof Office Storage 46 Storage - Simulator Suite 64 64 64 64 64 General Storage 2 419 Mechanical/Electrical 1452 1452 1452 1452 1013 Picnic Break Area (Outside) 3 picnic tables, covered area, gazebo with a swing Exterior Fitness Space 390
TOTAL PROGRAM SPACE 11290 22230 21926 21679 22368 20655 22310
TOTAL BUILDING SIZE
(INCLUDING HALLS, WALLS, ETC)
15025 30010.5 28339 28339 28339 28339 28339 building efficiency % 75% 65% 77% 76% 79% 73% 79%
PCC Public Services Program - Law Enforcement Training
PCC Greenville Center Building
Dani Hoff Text Box Appendix B
Updated: 03/10/2026 Updated: 3/10/26
Current Space Requested Size 10/14/30
Proposed Opt A 02/12/26 *see note below
Proposed Opt A-2, B, & C 02/12/26
Proposed Preferred Opt 03/10/26
Current Option Capacity/Notes User Requests/Special Requirements/Notes
Classroom 1 793 793 791 791 Classroom 2 643 643 635 635 Fire/EMS Skills Lab 1 155 155 155 155 Labeled as "Breakout Room" on plan Fire/EMS Skills Lab 2 155 155 155 155 Labeled as "Breakout Room" on plan Fire/EMS Skills Lab 3 155 Shared space in Greenville Center Computer Lab 715 715 675 675 Larger Computer Lab shared in Greenville Center Classroom 3 800 Shared space in Greenville Center Conference Room 243 243 250 250 Fire/EMS Office 1 140 140 124 140 140 Fire/EMS Office 2 140 140 129 140 140 Fire/EMS Office 3 - Director 190 190 165 190 190 Fire/EMS Office 4 142 142 115 140 140 Fire/EMS Office 5 141 141 115 135 135 Fire/EMS Office 6 143 143 135 135 Fire/EMS Office 7 148 148 130 130 Fire/EMS Office 8 135 135 130 130 Flex Space/Student Lounge 350 350 340 340 Shared space in Greenville Center Staff Breakroom/ Work Room 166 500 166 166 Reception/Waiting/Lobby 330 330 339 339 Women's Restroom 142 142 142 142 Men's Restroom 142 142 142 142 Janitor Closet 55 55 55 55 Data Closet 105 105 50 50 Electrical Room 105 105 50 50 Storage 1 166 166 165 165 Storage 2 162 162 161 161 Storage 3 162 162
Storage Mezzanine 1000 1029 Upfit current Annex to include mezzanine above classroom on plan east of building.
TOTAL PROGRAM SPACE 5768 8057 648 5411 6440
TOTAL BUILDING SIZE
(INCLUDING HALLS, WALLS, ETC) 8031 9031 8031 9060
Building Efficiency 71.82% 89.21% 67.38% 71.08%
PCC Public Services Program - Fire/EMS PCC Annex Building
* Option A assumed all Fire/EMS program needed to fit into the Greenville Center and be removed from the Annex Building. SF's listed here indicate space in the Greenville Center Building, not the Annex for this option. All other spaces are required are shared within the LET program in the same building.
Dani Hoff
Appendix B
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
NEW RECESSED
ELECTRICAL PANEL
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
EXISTING
TRAINING LAB
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTINGEXISTING MEN'S
TOILET A
EXISTING WOMEN'S
TOILET A
EXISTING WC
WOMEN'S
TOILET C
EXISTING WOMEN'S
TOILET B
EXISTING MEN'S
TOILET B
EXISTING CLASSROOM
EXISTING
CLASSROOM
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
OFFIC
EXISTING
EXISTING
CLASSROOM
EXISTING
CLASSROOM
EXISTING
DATA
EXISTING
CLASSROOM
EXISTING ELEC. / MECH.
EXISTING TRAINING
LAB
EXISTING TRAINING
LAB
EXISTING VEST.
NEW OFFICE
BELOW
COUNTER
EXISTING
TRAINING LAB
EXISTING MECH.EXISTING
CLASSROOM
EXISTING
STORAGE
EXISTING STORAGE
EXISTING MECH.
HGFEDCBA
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
9"
5'-9"
6'-0 5/8" 11'-7" 28'-4" 28'-1" 27'-7" 22'-0" 6'-0 5/8"
32'-4" 24'-7 1/4" 27'-10 9/16"
197'-6"
1' -8
0' 4' 8' 16' 32'
N
1/8" = 1'-0" 1EXISTING FIRST FLOOR
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.01
DJH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R-
PU
BL
IC
S
ER
VI
C
ES
RE
N
O
VA
TIO
N
EXISTING FIRST FLOOR PLAN
PHASE:
STUDY
S . M em or ia l D riv e, G re en vi lle , N
C
# DESC: DATE
Dani Hoff
Appendix C
HGFEDCBA
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
0' 4' 8' 16' 32'
N
2059 SF
FITNESS ROOM
3608 SF
MAT TRAINING
672 SF
STUDENT BREAK
ROOM
505 SF
MEETING ROOM
866 SF
MECH/ELEC
433 SF
FIREARMS
SIMULATOR
435 SF
DRIVING
SIMULATOR
64 SF
STOR
602 SF
SIMULATION
SUITE
1331 SF
COMPUTER LAB
112 SF
LET OFFICE 1
113 SF
LET OFFICE 2
119 SF
LET OFFICE 3
448 SF
DATA/IT
183 SF
WOMEN
LOCKERS
185 SF
MEN LOCKERS
222 SF
SHOWERS
227 SF
SHOWERS
ADA ROLL-IN SHOWER
ADA ROLL-IN SHOWER
586 SF
MECH/ELEC
1017 SF
CLASSROOM 1
1006 SF
CLASSROOM 2
987 SF
CLASSROOM 3
785 SF
CLASSROOM 6
677 SF
CLASSROOM 5
895 SF
CLASSROOM 4119 SF
LET OFFICE 4
124 SF
FIRE/EMS
OFFICE 1
2204 SF
CORRIDOR A
567 SF
ARMORY
129 SF
FIRE/EMS
OFFICE 2
115 SF
FIRE/EMS
OFFICE 3
115 SF
FIRE/EMS
OFFICE 4 81 SF
VESTIBULE
165 SF
EMS/FIRE
DIRECTOR'S
OFFICE
137 SF
LET OFFICE 5
138 SF
SM MEETING
154 SF
LET DIRECTOR'S
OFFICE
193 SF
STAFF BREAK
113 SF
LET OFFICE 6
201 SF
RECEPTION
OFFICE/
RECEIVING
112 SF
GANG
RESTROOM
102 SF
GANG
RESTROOM
127 SF
GANG
RESTROOM
63 SF
STAFF
RESTROOM
2345 SF
CORRIDOR B
SLIDING
WINDOW
40 COMPUTER STATIONS
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
40 SEATS 40 SEATS 40 SEATS
24 SEATS24 SEATS30 SEATS
44'-11"
DEMO EXIST COLUMN
DEMO EXIST COLUMN
TV14 SEATS
TEACHING WALL TEACHING WALL
SECURABLE DOOR FOR AFTER HOURS
SECURABLE DOOR FOR AFTER HOURS
JAIL CELL
SIMULATOR
338 SF
OPEN OFFICE
CUBICLE 3 CUBICLE 4
CUBICLE 5 CUBICLE 6
CUBICLE 7 CUBICLE 8
52 SF
CLEANING STOR
70 SF
JANITOR
CLOSET
COPIER
74 SF
WORK SPACE
CUBICLE 1 CUBICLE 2
166 SF
FILE & TEXT
STORAGE
FIRST AID
FIRST AID
W A
IT
IN
G
A R
EA
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
196'-0" treadmill bench press bench press du al ad ju st ab le pu lle y sy st em treadmill bench press
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
PHASE:
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.02
DH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R
- P
UB
LI
C
S
ER
VI
C
ES
RE
N O
VA
TIO
N
PROPOSED FLOOR PLAN OPTION
A
STUDY
S . M em or ia l D riv e, G re en vi lle , N
C
1/8" = 1'-0" 1PROPOSED FLOOR PLAN OPTION A
# DESC: DATE
Dani Hoff
HGFEDCBA
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
0' 4' 8' 16' 32'
N
2346 SF
FITNESS ROOM
3349 SF
MAT TRAINING
672 SF
STUDENT BREAK
ROOM
505 SF
MEETING ROOM
866 SF
MECH/ELEC
433 SF
FIREARMS
SIMULATOR
435 SF
DRIVING
SIMULATOR
64 SF
STOR
602 SF
SIMULATION
SUITE
1331 SF
COMPUTER LAB
112 SF
FILE STORAGE
113 SF
LIBRARY
119 SF
SM MEETING
448 SF
DATA/IT
183 SF
WOMEN
LOCKERS
185 SF
MEN LOCKERS
222 SF
SHOWERS
227 SF
SHOWERS
ADA ROLL-IN SHOWER
ADA ROLL-IN SHOWER
586 SF
MECH/ELEC
1017 SF
CLASSROOM 1
1006 SF
CLASSROOM 2
987 SF
CLASSROOM 3
785 SF
CLASSROOM 6
677 SF
CLASSROOM 5
895 SF
CLASSROOM 4
119 SF
LET OFFICE 1
124 SF
LET OFFICE 2
2172 SF
CORRIDOR A
567 SF
ARMORY
129 SF
LET OFFICE 3
115 SF
LET OFFICE 4
115 SF
LET OFFICE 5 81 SF
VESTIBULE
165 SF
LET DIRECTOR'S
OFFICE
137 SF
SM MEETING
138 SF
LET OFFICE 6
154 SF
LET OFFICE 7
193 SF
STAFF BREAK
113 SF
FIRST AID
201 SF
RECEPTION
OFFICE/
RECEIVING
112 SF
GANG
RESTROOM
102 SF
GANG
RESTROOM
127 SF
GANG
RESTROOM
63 SF
STAFF
RESTROOM
2337 SF
CORRIDOR B
SLIDING
WINDOW
40 COMPUTER STATIONS
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
40 SEATS 40 SEATS 40 SEATS
24 SEATS24 SEATS30 SEATS
44'-11"
DEMO EXIST COLUMN
TV14 SEATS
TEACHING WALL TEACHING WALL
SECURABLE DOOR FOR AFTER HOURS
SECURABLE DOOR FOR AFTER HOURS
JAIL CELL
SIMULATOR
338 SF
OPEN OFFICE
CUBICLE 3 CUBICLE 4
CUBICLE 5 CUBICLE 6
CUBICLE 7 CUBICLE 8
52 SF
CLEANING STOR
70 SF
JANITOR
CLOSET
COPIER
74 SF
WORK SPACE
CUBICLE 1 CUBICLE 2
166 SF
STORAGE
FIRST AID
PADDED WALL
FI
R
ST
A
ID
W A
IIT
NG
A
R
EA
treadmill bench press bench press st y sy bench press
SLIDING
WINDOW
W A
IT
IN
G
A R
EA
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
196'-0"
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
PHASE:
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.03
DH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R
- P
UB
LI
C
S
ER
VI
C
ES
RE
N O
VA
TIO
N
PROPOSED FLOOR PLAN OPTION
A-2
STUDY
1/8" = 1'-0" 1PROPOSED FLOOR PLAN OPTION A-2
# DESC: DATE
Dani Hoff
HGFEDCBA
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
0' 4' 8' 16' 32'
N
866 SF
MECH/ELEC
433 SF
FIREARMS
SIMULATOR
435 SF
DRIVING
SIMULATOR
64 SF
STOR
792 SF
SIMULATION
SUITE
1170 SF
COMPUTER LAB
584 SF
DATA/IT
586 SF
MECH/ELEC
995 SF
CLASSROOM 1
993 SF
CLASSROOM 2
978 SF
CLASSROOM 3
785 SF
CLASSROOM 6
677 SF
CLASSROOM 5
863 SF
CLASSROOM 4
567 SF
ARMORY
81 SF
VESTIBULE
165 SF
LET OFFICE 5
137 SF
LET OFFICE 6
138 SF
LET OFFICE 7
154 SF
UNASSIGNED
OFFICE
113 SF
RECEPTION
102 SF
GANG
RESTROOM
127 SF
GANG
RESTROOM
63 SF
STAFF
RESTROOM
DMO EXISTS COLUMN
43 COMPUTER STATIONS
TE
A C
HI
NG
W
A
LL
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TEACHING WALL
PODIUM
TE
A C
HI
NG
W
A
LL
PODIUM
46 SEATS 40 SEATS 40 SEATS
24 SEATS24 SEATS30 SEATS
TE
A C
HI
NG
W
A
LL
SECURABLE DOOR FOR AFTER HOURS
SECURABLE DOOR FOR AFTER HOURS
JAIL CELL
SIMULATOR
CUBICLE 5 CUBICLE 6
CUBICLE 7 CUBICLE 8
FIRST AID
FIRST AID
TV
14 SEATS
272 SF
JANITOR &
CLEANING
STORAGE
3072 SF
MAT ROOM
56'-5"
7"
188 SF
LET OFFICE 4
188 SF
LET OFFICE 3
174 SF
LET OFFICE 1
505 SF
CONF. ROOM
TE
A C
HI
NG
W
A
LL
CUBICLE 3 CUBICLE 4
CUBICLE 1 CUBICLE 2
672 SF
BREAK ROOM
173 SF
LET OFFICE 2
225 SF
MEETING ROOM
193 SF
DIRECTOR'S
OFFICE
3046 SF
GYM
sq ua t ra ck s bench press st y sy
ADA ROLL-IN SHOWER
ADA ROLL-IN SHOWER
231 SF
W LOCKER
231 SF
W SHOWERS
232 SF
M SHOWERS
229 SF
M LOCKERS
618 SF
OPEN OFFICE
sq ua t ra ck s treadmill treadmill
MIRROR WALL
bench press
1913 SF
CORRIDOR
SLIDING WINDOW W
A
IT
IN
G
A R
EA
1077 SF
CORRIDOR 1
425 SF
CORRIDOR 2
SE
C
UR
A B
LE
D
O O
R F
O R
A
FT
ER
H
O
UR
S
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
196'-0"
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
PHASE:
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.04
DJH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R
- P
UB
LI
C
S
ER
VI
C
ES
RE
N O
VA
TIO
N
PROPOSED FLOOR PLAN OPTION
B
STUDY
S . M em or ia l D riv e, G re en vi lle , N
C
1/8" = 1'-0" 1PROPOSED FLOOR PLAN OPTION B
# DESC: DATE
Dani Hoff
HGFEDCBA
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
0' 4' 8' 16' 32'
N
866 SF
MECH/ELEC
433 SF
FIREARMS
SIMULATOR
435 SF
DRIVING
SIMULATOR
64 SF
STOR
792 SF
SIMULATION
SUITE
584 SF
DATA/IT
586 SF
MECH/ELEC
995 SF
CLASSROOM 1
1969 SF
CLASSROOM 2
862 SF
CLASSROOM 3
567 SF
ARMORY
81 SF
VESTIBULE
165 SF
LET OFFICE 5
137 SF
LET OFFICE 6
138 SF
LET OFFICE 7
239 SF
DIRECTOR'S
OFFICE
114 SF
RECEPTION
102 SF
GANG
RESTROOM
127 SF
GANG
RESTROOM
63 SF
STAFF
RESTROOM
DEMO EXIST
COLUMN
TE
A C
HI
NG
W
A
LL
PODIUM
TE
A C
HI
NG
W
A
LL
PODIUM
46 SEATS
S
EA
TS
30 SEATS
TE
A C
HI
NG
W
A
LL
SECURABLE DOOR FOR AFTER HOURS
SECURABLE DOOR FOR AFTER HOURS
JAIL CELL
SIMULATOR
CUBICLE 5 CUBICLE 6
CUBICLE 7 CUBICLE 8
FIRST AID
FIRST AID
TV
14 SEATS
135 SF
CLEANING
STORAGE
3073 SF
MAT ROOM
188 SF
LET OFFICE 4
188 SF
LET OFFICE 3
174 SF
LET OFFICE 1
505 SF
CONF. ROOM
TE
A C
HI
NG
W
A
LL
CUBICLE 3 CUBICLE 4
CUBICLE 1 CUBICLE 2
672 SF
BREAK ROOM
173 SF
LET OFFICE 2
225 SF
LIBRARY
2181 SF
GYM
sq ua t ra ck s
ADA ROLL-IN SHOWER
ADA ROLL-IN SHOWER
230 SF
W LOCKER
230 SF
W SHOWERS
232 SF
M SHOWERS
229 SF
M LOCKERS
treadmill bench press
PODIUM
831 SF
CLASSROOM 6
C O
PI
ER
, P R
IN
TE
R , O
FF
IC
E
SU
PP
LI
ES PO
DIUM
TEACHING WALL
st y sy st em
24 SEATS
TEACHING WALL
60 COMPUTER STATIONS
PO
DI
UM
S
EA
TS
TE
A C
HI
NG
W
A
LL
PODIUM
LIBRARY SHELVES
TE
A C
HI
NG
W
A
LL
PO
DIUM
2336 SF
PUBLIC
618 SF
CUBICALS
583 SF
CLASSROOM 5
579 SF
CLASSROOM 4
1448 SF
COMPUTER LAB
MIRROR WALL
bench press
130 SF
JANITOR
bench press bench press
MIRROR
WAITING AREA
1128 SF
CORRIDOR 1
SLIDING WINDOW
SE
C
UR
A B
LE
D
O O
R F
O R
A
FT
ER
H
O
UR
S
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
196'-0"
109 SF
RECORD
STORAGE
PADDED WALLS
50'-0" 5'-0"
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
PHASE:
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.05
DH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R
- P
UB
LI
C
S
ER
VI
C
ES
RE
N O
VA
TIO
N
PROPOSED FLOOR PLAN OPTION
C
STUDY
S . M em or ia l D riv e, G re en vi lle , N
C
1/8" = 1'-0" 1PROPOSED FLOOR PLAN OPTION C
# DESC: DATE
Dani Hoff
HGFEDCBA
EXISTING
CB-T1
EXISTING PANEL
ESWBD
EXISTING
TRANSFORMER
EXISTING
TRANSFORMER
EXISTING
ATS
EXISTING
CB-T2
EXISTING PANEL
ESWBD
EXISTING PANEL
"CD"
0' 4' 8' 16' 32'
N
2182 SF
FITNESS ROOM
419 SF
GENERAL
STORAGE 2
433 SF
FIREARMS
SIMULATOR
435 SF
DRIVING
SIMULATOR
64 SF
STORAGE 1
602 SF
SIMULATION
SUITE
1331 SF
COMPUTER LAB
112 SF
RECORDS
STORAGE
113 SF
LIBRARY
119 SF
SMALL MEETING
584 SF
DATA/IT
230 SF
W LOCKERS
232 SF
M SHOWERS
586 SF
MECH/ELEC
1017 SF
CLASSROOM 1
1006 SF
CLASSROOM 2
987 SF
CLASSROOM 3
785 SF
CLASSROOM 6
677 SF
CLASSROOM 5
895 SF
CLASSROOM 4
119 SF
LET OFFICE 1
124 SF
LET OFFICE 2
1187 SF
CORRIDOR A
220 SF
ARMORY
129 SF
LET OFFICE 3
115 SF
LET OFFICE 4
115 SF
LET OFFICE 5 81 SF
VESTIBULE
165 SF
LET OFFICE 6
137 SF
LET OFFICE 7
138 SF
SMALL MEETING
154 SF
LET DIRECTOR'S
OFFICE 193 SF
STAFF BREAK
113 SF
FIRST AID
135 SF
RECEPTION
OFFICE/
RECEIVING
102 SF
W GANG
RESTROOM
127 SF
M GANG
RESTROOM
63 SF
STAFF
RESTROOM
SLIDING
WINDOW
73 SF
WAITING
55 COMPUTER STATIONS
TE
A C
HI
NG
W
A
LL
PODIUM
48 SEATS
36 SEATS
14 SEATS
TE
A C
HI
NG
W
A
LL
TE
A C
HI
NG
W
A
LL
SECURABLE DOOR FOR AFTER HOURS
SECURABLE DOOR FOR AFTER HOURS
JAIL CELL
SIMULATOR
338 SF
OPEN OFFICE
CUBICLE 3 CUBICLE 4
CUBICLE 5 CUBICLE 6
CUBICLE 7 CUBICLE 8
COPIER
74 SF
WORK SPACE
CUBICLE 1 CUBICLE 2
FIRST AID
672 SF
STUDENT BREAK
ROOM
134 SF
JANITOR
CLOSET
140 SF
CLEANING
SUPPLY
STORAGE
3109 SF
MAT ROOM
831 SF
CLASSROOM 7
ADA ROLL-IN SHOWER
treadmill sq ua t ra ck s st y sy st em bench press bench press bench press bench press
234 SF
W SHOWERS
228 SF
M LOCKERS
FIRST AID MIRROR WALL
506 SF
CONF./SEMINAR
ROOM
1838 SF
CORRIDOR B
45 SEATS
TEACHING WALL
PODIUM
TE
A C
HI
NG
W
A
LL
PODIUM
48 SEATS
TE
A C
HI
NG
W
A
LL
PODIUM
48 SEATS
TE
A C
HI
NG
W
A
LL
PODIUM
TE
A C
HI
NG
W
A
LL
PO
D
IUM
36 SEATS
PODIUM
45 SEATS
TE
A C
HI
NG
W
A
LL
134 SF
RECEPTION &
LOBBY
SE
C
UR
A B
LE
D
O O
R
337 SF
GENERAL
STORAGE
DEMO EXIST
COLUMN
PADDED WALLS
28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0" 28'-0"
196'-0"
ALTERNATE FURNITURE
LAYOUT FOR SEMINAR
STYLE SPACE
/8
50'-0" 5'-0"
SECURABLE DOOR
46 SF
OFFICE
STORAGE
427 SF
MECH ROOM
TV
18 SEATS
TE
A C
HI
NG
W
A
LL
PO
DI
UM
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD STREET; GREENVILLE, NC 27858
p:1.252.270.5330 www.INTREPIDarchitecture.com
PHASE:
THESE DRAWINGS AND THE ACCOMPANYING SPECIFICATIONS ARE INSTRUMENTS OF
SERVICE AND AS SUCH SHALL REMAIN THE PROPERTY OF THE ARCHITECT. THEY HAVE BEEN
PREPARED FOR A SPECIFIC PROJECT AND SHALL NOT BE USED IN CONJUNCTION WITH
ANY OTHER PROJECTS WITHOUT PRIOR WRITTEN PERMISSION OF THE ARCHITECT.
© INTREPID Architecture, PA 2026
A1.06
DH/RB
03/10/2026
25012
PI
TT
C O
M M
UN
ITY
C O
LL
EG
E
G
RE
EN
VI
LL
E
C
EN
TE
R-
PU
BL
IC
S
ER
VI
C
ES
RE
N
O
VA
TIO
N
PROPOSED FLOOR
PLAN-PREFERRED OPTION
STUDY
S . M em or ia l D riv e, G re en vi lle , N
C
1/8" = 1'-0" 1PROPOSED FLOOR PLAN-PREFERRED OPTION
# DESC: DATE
Dani Hoff
0' 4' 8' 16' 32'
N
190 SF
OFFICE 3
142 SF
OFFICE 4
141 SF
OFFICE 5
143 SF
OFFICE 6
155 SF
BREAKOUT 1
155 SF
BREAKOUT 2
154 105 SF
ELECTRICAL
105 SF
DATA CLOSET
643 SF
CLASSROOM 2
162 SF
STORAGE 3
793 SF
CLASSROOM 1
715 SF
COMPUTER LAB
243 SF
CONF. ROOM
108 SF
STORAGE 2
140 SF
OFFFICE 1
166 SF
BREAK ROOM
165 SF
STORAGE 1
140 SF
OFFICE 2
135 SF
OFFICE 8
148 SF
OFFICE 7
350 SF
FLEX SPACE
110 SF
RECEPTION
69 SF
WAITING
142 SF
M
173142 SF
W
55 SF
JANITOR
261 SF
LOBBY
C O
PI
ER
M
A
IL
B O
XE
S
WB
W B
WB
V
EN
D
IN
G
PR
IN
TI
NG
S
TA
TI
O
N
964 SF
CORRIDOR 2
543 SF
CORRIDOR 1
OPEN TO BELOW
1029 SF
STORAGE
MEZZANINE
PROPOSED STORAGE MEZZANINE
OVER CLASSROOM 157
SHIPS LADDER
SHIPS LADDER
DN
UP
SHEET NAME & NUMBER
ISSUE DATE:
DRAWN BY:
REVISIONS:
PROJECT #:
114 E. 3RD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .