About this file
Summary of Gravity Sewer Line Rehabilitation/Inflow and Infiltration Correction IFB
This Invitation for Bid (IFB2026-3) is issued by the City of Cooper City, Florida, for a Federally funded Gravity Sewer Line Rehabilitation and Inflow and Infiltration (I&I) Correction project. The project encompasses comprehensive sewer system services including gravity sewer main cleaning, pre- and post-cleaning closed-circuit television (CCTV) inspections, sewer lining and rehabilitation for I&I correction, sidewalk and curb removal and replacement, asphalt and concrete work, traffic sign and signal installation, water and reclaimed water main installation, fire hydrant installation or relocation, utility services removal and replacement, wet taps, main abandonments, manhole installation, sewer service installation or relocation, utility testing, point repairs, sectional liners, and all appurtenant miscellaneous work required for project completion. The bid release date is November 4, 2026, with a response deadline of December 4, 2026, at 3:00 p.m. A virtual pre-bid conference is scheduled for Wednesday, November 18, 2026, at 9:30 a.m. via Zoom. The contract is anticipated to commence the first calendar day of the month following City Commission approval. Substantial completion is required within 180 calendar days and final completion within 240 calendar days after the Notice to Proceed issuance. Award shall be made to the lowest responsive and responsible bidder based on evaluated unit prices, with the City Commission making the final award determination.
Bidders must hold a valid Florida Underground Utility and Excavation Contractor License and/or Florida General Contractor License and demonstrate a minimum of five years' experience in gravity sewer line construction with three references from customers and five years' government experience with manufacturer-certified specialty technicians. Pricing must remain fixed and firm for the contract term and firm for 120 days from the bid due date. A 5% bid bond is required, with performance and payment bonds each at 100% of the contract price required within ten days of award notification. Insurance requirements include $1,000,000 per occurrence/$2,000,000 aggregate Commercial General Liability, $1,000,000 combined single limit Business Auto Liability, and Workers' Compensation per Florida Statutes. The project is funded in whole or in part with Federal funds, requiring compliance with 2 CFR Part 200, Davis-Bacon prevailing wage rates (FL20260107 Modification Number 1), Build America Buy America requirements for American-produced iron, steel, and manufactured products, and American Iron and Steel requirements. Liquidated damages are assessed at $500 per calendar day for non-excusable delays. Records must be retained for a minimum of five years following final payment or grant closeout.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/coopercity
CITY OF COOPER CITY
INVITATION FOR BID
GRAVITY SEWER LINE REHABILITATION/INFLOW
AND INFILTRATION CORRECTION (CG - 06D01626 -
0)
IFB2026-3
For information, contact the Purchasing Division:
The Purchasing Division
954-434-4300 Ext. # 268
Purchasing@CooperCity.gov
RELEASE DATE: November 4, 2026
RESPONSE DEADLINE: December 4, 2026, 3:00 pm
Please refer to the project timeline in this document for all important deadlines.
mailto:Purchasing@CooperCity.gov
Invitation For Bid #IFB2026-3 Title: Gravity Sewer Line Rehabilitation/Inflow and Infiltration Correction (CG - 06D01626 - 0)
Table Of Contents
1. GENERAL TERMS AND CONDITIONS
1.1. GENERAL TERMS AND CONDITIONS
2. ADDITIONAL/SPECIAL TERMS AND CONDITIONS
2.1. PURPOSE
2.2. CONTRACT TIME/TERM OF CONTRACT
2.3. PRE-BID CONFERENCE
2.4. MINIMUM REQUIREMENTS
2.5. METHOD OF AWARD
2.6. INDEMNIFICATION
2.7. INSURANCE
2.8. INSURANCE - SPECIAL COVERAGES
2.9. PRICING
2.10. METHOD OF PAYMENT
2.11. BID BOND
2.12. PAYMENT AND PERFORMANCE BOND
2.13. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
2.14. LIQUIDATED DAMAGES
2.15. NOTIFICATION TO BEGIN WORK
2.16. WEATHER
2.17. USE OF CONTRACT BY OTHER GOVERNMENTAL AGENCIES
2.18. MATHEMATICAL ERRORS
2.19. ARCHITECT/ENGINEER/FIELD REPRESENTATIVE
2.20. REJECTION OF BIDS
2.21. ADDENDA - CHANGES WHILE BIDDING
2.22. EMPLOYEES AND CONTRACTOR(S)
2.23. SECURITY BACKGROUND CHECKS FOR ALL PERSONNEL
2.24. DAVIS BACON WAGES: HEAVY CONSTRUCTION
2.25. ADD. CONSTRUCTION TERMS AND CONDITIONS
2.26. FEDERAL PROCUREMENT REQUIREMENTS
3. SCOPE OF WORK/TECHNICAL SPECIFICATIONS
3.1. SCOPE OF WORK
4. SUBMITTAL REQUIREMENTS
4.1. SUBMITTAL FORM
4.2. PRICE SHEET INSTRUCTIONS
4.3. PRICE SHEET
Attachments:
A - General Terms & Conditions - Construction Contracts (new)
B - Required Forms and Affidavits (with bonds)
C - LS Basin 1 Map - Project Area_Phase 1
D - FL20260107 Modification Number 1
1. GENERAL TERMS AND CONDITIONS
2. ADDITIONAL/SPECIAL TERMS AND CONDITIONS
2.1. PURPOSE
The City of Cooper City “City”) is seeking bids from qualified firms for its Federally funded Gravity Sewer Line Rehabilitation/Inflow and
Infiltration Correction Project (“Project”). The Successful Bidder shall provide all labor, superintendence, equipment, accessories, materials, tools, transportation, services, incidentals, etc., including all applicable taxes and fees.
2.2. CONTRACT TIME/TERM OF CONTRACT
The effective date of the resultant Contract shall commence on the first calendar day of the month succeeding approval of the Contract by the City Commission, or designee, unless otherwise stipulated in the Purchase Order issued by the City, and shall remain in effect until final completion or two hundred forty (240) calendar days after the date of the Notice to Proceed issued by the City.
Time is a very important factor in the performance of this work. The time for final completion and readiness for final payment are set forth within this Solicitation and shall become part of the Contract Documents. Substantial completion shall be within one hundred eighty (180) calendar days after the date of the Notice to Proceed is issued by the City to the Awarded Bidder. Final completion shall be within two hundred forty (240) calendar days after the date of the Notice to Proceed issued by the City to the Awarded Bidder.
The time for final completion will be taken into consideration by the City during the evaluation of bids, and it will be necessary for the apparent successful contractor to satisfy the City that it will be able to achieve substantial completion and be ready for final payment within the times designated in the submission. All work must be completed within the time set forth in the proposal unless an extension is granted in writing by the City through a Change Order, Amendment and/or Modification. Violations may void the resultant Contract, and/or preclude the Awarded Bidder from bidding additional projects for the City, until such time that the work has been satisfactorily completed and inspected.
2.3. PRE-BID CONFERENCE
The Pre-Bid Conference and will be held virtually Wednesday, November 18, 2026, at 9:30 am (Eastern Standard Time) via Zoom ( https://coopercityfl-org.zoom.us/j/88694328600).
Participants will have an opportunity to ask questions and obtain clarification during the pre-bid meeting. Bidder(s) are requested to have a copy of the solicitation available for review and reference during the meeting. This meeting is exempt from the ‘Cone of Silence’, allowing City staff to address questions.
It is highly recommended that Bidders participate in the Pre-Bid Meeting to become familiar with any conditions which may in any manner affect the work to be done or affect the equipment, materials and labor required prior to submitting an offer. No additional allowances will be made because of lack of knowledge of these conditions. City staff will go over the specifications and what is expected for this Project.
Should you need an ADA accommodation to participate in this meeting (i.e., materials in alternate format, sign language interpreter, etc.) or any o ther meeting, please contact the City Clerk at least seventy-two (72) hours prior to the scheduled meeting. The City Clerk, Tedra Allen, may be reached by phone at (954) 434-4300 x 291 or via email at: tallen@coopercity.gov. TTY users may reach the
Clerk's Office by calling the Florida Relay Service at 711.
Zoom Link: https://coopercityfl-org.zoom.us/j/88694328600
Webinar ID: 886 9432 8600
Phone one-tap: +13052241968,,88694328600# US
+13017158592,,88694328600# US (Washington DC) https://coopercityfl-org.zoom.us/j/88694328600 mailto:tallen@coopercity.gov https://coopercityfl-org.zoom.us/j/88694328600
Join via audio:
+1 305 224 1968 US
+1 301 715 8592 US (Washington DC)
+1 312 626 6799 US (Chicago)
+1 929 205 6099 US (New York)
+1 346 248 7799 US (Houston)
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
International numbers available: https://coopercityfl-org.zoom.us/u/kqc6teBTl
2.4. MINIMUM REQUIREMENTS
Bidder must meet the following requirements to be considered for award:
A. Bidders shall hold one of the following active and valid licenses: a State of Florida Underground Utility and Excavation
Contractor License and/or a State of Florida General Contractor License. All licenses shall be valid and active at the time of bid submittal and remain valid and active throughout the solicitation process and resultant contract term. Bidders shall submit a copy their license(s) with their bid.
B. Bidders shall have a minimum of five (5) years' experience in the business of gravity sewer line construction to be considered for award. Bidders shall demonstrate their experience by providing three (3) references from customers whom the Bidder and/or Bidder’s Subcontractor has provided or is currently providing goods and/or services as described throughout this
Solicitation. In lieu of the references from the Bidder or Bidder’s Subcontractor(s), the City will consider the references from
Bidder’s key personnel. Each reference shall include, at a minimum, the customer’s company name, and the contact person’s name, title, telephone number, e-mail address, contract number (if applicable), total contract amount/construction cost, and a description of the work performed. These references shall attest to the City’s satisfaction that the Bidder/key personnel/Subcontractor has sufficient expertise to perform the requested work.
C. Bidders shall have a minimum experience of no less than five (5) years in government, employing specialty technicians certified by the proposed product manufacturer and/or its authorized representative.
2.5. METHOD OF AWARD
Award shall be made to the responsive and responsible Bidder that submits the lowest evaluated price, as determined by the
City. Because estimated quantities are not provided, the City will determine the lowest evaluated price by calculating the aggregate total of all unit prices submitted on the Price Sheet, with each listed item assigned a quantity of one (1) solely for purposes of bid evaluation and comparison. The resulting evaluated total shall be used only to determine the lowest-priced Bidder and shall not represent the anticipated Contract value, guaranteed quantities, or the amount of Work that will be authorized under the Contract.
The unit prices submitted by the Successful Bidder shall become the Contract unit prices and shall be used for Work authorized by the
City during the Contract term. Actual quantities will be determined based upon the City’s needs, and the City makes no representation or guarantee regarding the quantity or dollar amount of Work that may be issued under the Contract.
The City reserves the right to reject any or all Bids, to waive minor irregularities, informalities, or technicalities, to accept any item or group of items unless qualified by the Bidder, and to acquire reduced or additional quantities at the unit prices submitted in the Bid.
https://coopercityfl-org.zoom.us/u/kqc6teBTl
The City intends to award a single contract; however, the City reserves the right to make such award as determined to be in its best interest. Contract award shall be made by the City Commission of the City of Cooper City ("City Commission") at a duly authorized public meeting.
The Recommended Bidder shall timely execute an Agreement with the City and submit all required bonds, insurance certificates, affidavits, licenses, and other documents required of the Solicitation and the City. Failure of the Recommended Bidder to execute the
Agreement and/or provide all required bonds, insurance certificates, affidavits, licenses, and other documents required of the
Solicitation and the City within the timeframes specified within the solicitation may deem the Bidder non-responsive, constitute a rejection of the award and/or default by the Bidder.
In the event the Recommended Bidder fails to execute the Agreement and/or fails to provide all required bonds, insurance certificates, affidavits, licenses, and other documents required of the Solicitation and the City, is determined to be non-responsible, withdraws its
Bid, refuses to honor its Bid pricing, or otherwise fails to satisfy the requirements necessary for contract execution, the City reserves the right to revoke the award, may forfeit the Bidder's bid bond/security to the City, which forfeiture shall be considered not as a penalty, but as liquidated damages sustained by the City. The City may also proceed to the next lowest responsive and responsible
Bidder. The City may continue this process in successive order of Bid ranking until a contract is successfully executed and all required documents are received and approved by the City.
The City further reserves the right to reject all Bids and resolicit if deemed to be in the City's best interest. The City may seek any remedies available at law or in equity, including recovery of excess procurement costs, damages, and/or suspension or debarment from future City solicitations as permitted by applicable law, ordinance, or policy.
Bidders recognize and agree that circumstances outside the fault or control of either party may occur between the bid date and the award of the Solicitation that may cause pricing to be subject to rapid and unpredictable changes. The Parties agree it is in the best interest of the City to avoid paying estimated and potentially overstated amounts, while also allowing the City to benefit from potential price improvements resulting from market fluctuations. Accordingly, Bidders agree as follows:
A. This provision shall apply only to the period between one hundred eighty-one (181) calendar days after the proposal submittal date
(following expiration of the bid bond) and the award of the Solicitation. Bidders shall be responsible for all cost escalation risks between the proposal due date and one hundred eighty (180) calendar days after the bid due date. The Bid amount, as awarded, shall be deemed full compensation for any escalation occurring prior to award of the Solicitation.
B. All risks of any further cost escalation after award of the Solicitation shall be borne solely by the Recommended Bidder. No requests for adjustment due to escalation costs shall be considered after award of the Solicitation.
C. The Recommended Bidder shall be entitled to a one-time price adjustment for cost escalation occurring between one hundred eighty-one (181) calendar days after the bid due date and the award of the Solicitation. Such adjustment shall be based upon changes in the Engineering News-Record (ENR) Building Cost Index (BCI), utilizing a simple percentage calculation. The adjustment shall be calculated by dividing the BCI value in effect during the month of award by the BCI value in effect during the month corresponding to one hundred eighty-one (181) calendar days after the bid due date.
D. The one-time price adjustment shall apply only if the current BCI value varies by more than five percent (5%) from the BCI value prevailing during the month in which proposals were received. Any adjustment shall be limited to the marginal escalation exceeding the five percent (5%) threshold and shall not include additional profit or overhead.
E. The City reserves the right to audit the Recommended Bidder’s records related to any adjustment requested or granted under this provision. Bidder agrees that all payments contemplated under this provision are subject to the audit provisions contained within the
Solicitation and Contract documents.
F. Any price adjustments, whether upward or downward, shall be equitably passed through to subcontractors responsible for purchasing the affected materials.
2.6. INDEMNIFICATION
See General Terms and Conditions.
2.7. INSURANCE
As a condition precedent to the effectiveness of this Agreement, during the term of this Agreement and during any renewal or extension term of this Agreement, Contractor shall, at its sole expense, provide insurance of such types and with such terms and limits as noted below. Providing proof of and maintaining adequate insurance coverage are material obligations of Contractor. Contractor shall provide the City a certificate of insurance evidencing such coverage. Contractor’s insurance coverage shall be primary insurance for all applicable policies, in respect to the City’s interests for this Agreement. The limits of coverage under each policy maintained by
Contractor shall not be interpreted as limiting Contractor’s liability and obligations under this Agreement. All insurance policies shall be through insurers authorized or eligible to write policies in the State of Florida and possess an A.M. Best rating of A-, VII or better, subject to approval by the City’s Risk Management office.
The coverages, limits, and/or endorsements required herein protect the interests of the City, and these coverages, limits, and/or endorsements shall in no way be relied upon by Contractor for assessing the extent or determining appropriate types and limits of coverage to protect Contractor against any loss exposures, whether as a result of this Agreement or otherwise. The requirements contained herein, as well as the City’s review or acknowledgement, are not intended to and shall not in any manner limit or qualify the liabilities and obligations assumed by Contractor under this Agreement.
The following insurance policies and coverages are required:
2.7.1. Commercial General Liability
Coverage must be afforded under a Commercial General Liability policy with limits not less than:
• $1,000,000 each occurrence and $2,000,000 aggregate for Bodily Injury, Property Damage, and Personal and Advertising
Injury
• $1,000,000 each occurrence and $2,000,000 aggregate for Products and Completed Operations
Policy must include coverage for contractual liability and independent contractors.
The City, a Florida municipality, its officials, employees, and volunteers are to be included as an additional insured with a CG 20 26 04
13 Additional Insured – Designated Person or Organization Endorsement or similar endorsement providing equal or broader Additional
Insured Coverage with respect to liability arising out of activities performed by or on behalf of Contractor. The coverage shall contain no special limitation on the scope of protection afforded to the City, its officials, employees, and volunteers.
2.7.2. Business Automobile Liability
Coverage must be afforded for all Owned, Hired, Scheduled, and Non-Owned vehicles for Bodily Injury and Property Damage in an amount not less than $1,000,000 combined single limit each accident.
If Contractor does not own vehicles, Contractor shall maintain coverage for Hired and Non-Owned Auto Liability, which may be satisfied by way of endorsement to the Commercial General Liability policy or separate Business Auto Liability policy.
2.7.3. Workers' Compensation and Employer's Liability
Coverage must be afforded per Chapter 440, Florida Statutes. Any person or entity performing work for or on behalf of the City must provide Workers’ Compensation insurance. Exceptions and exemptions will be allowed by the City’s Risk Manager, if they are in accordance with Florida Statute.
Contractor waives, and Contractor shall ensure that Contractor’s insurance carrier waives, all subrogation rights against the City, its officials, employees, and volunteers for all losses or damages. The City requires the policy to be endorsed with WC 00 03 13 Waiver of our Right to Recover from Others or equivalent.
Contractor must be in compliance with all applicable State and federal workers’ compensation laws, including the U.S. Longshore and
Harbor Workers’ Compensation Act and the Jones Act, if applicable.
2.7.4. Insurance Certificate Requirements
A. Contractor shall provide the City with valid Certificates of Insurance (binders are unacceptable) no later than ten (10) days prior to the start of work contemplated in this Agreement.
B. Contractor shall provide to the City a Certificate of Insurance having a thirty (30) day notice of cancellation; ten (10) days’ notice if cancellation is for nonpayment of premium.
C. In the event that the insurer is unable to accommodate the cancellation notice requirement, it shall be the responsibility of
Contractor to provide the proper notice. Such notification will be in writing by registered mail, return receipt requested, and addressed to the certificate holder.
D. In the event the Agreement term or any surviving obligation of Contractor following expiration or early termination of the
Agreement goes beyond the expiration date of the insurance policy, Contractor shall provide the City with an updated
Certificate of Insurance no later than ten (10) days prior to the expiration of the insurance currently in effect. The City reserves the right to suspend the Agreement until this requirement is met.
E. The Certificate of Insurance shall indicate whether coverage is provided under a claims-made or occurrence form. If any coverage is provided on a claims-made form, the Certificate of Insurance must show a retroactive date, which shall be the effective date of the initial contract or prior.
F. The City shall be included as an Additional Insured on all liability policies, with the exception of Workers’ Compensation.
G. The City shall be granted a Waiver of Subrogation on Contractor’s Workers’ Compensation insurance policy.
H. The title of the Agreement, Bid/Contract number, event dates, or other identifying reference must be listed on the Certificate of
Insurance.
The Certificate Holder should read as follows:
City of Cooper City – Risk Management Office 9090 SW 50th Place Cooper City, FL 33328-4227
Contractor has the sole responsibility for all insurance premiums and shall be fully and solely responsible for any costs or expenses as a result of a coverage deductible, co-insurance penalty, or self-insured retention; including any loss not covered because of the application of such deductible, co-insurance penalty, self-insured retention, or coverage exclusion or limitation. Any costs for including the City as an Additional Insured shall be at Contractor’s expense.
If Contractor’s primary insurance policy/policies do not meet the minimum requirements as set forth in this Agreement, Contractor may provide evidence of an Umbrella/Excess insurance policy to comply with this requirement.
Contractor’s insurance coverage shall be primary insurance in respect to the City’s interests for this Agreement, its officials, employees, and volunteers. Any insurance or self-insurance maintained by the City shall be non-contributory.
Any exclusion or provision in any insurance policy maintained by Contractor that excludes coverage required in this Agreement shall be deemed unacceptable and shall be considered breach of contract.
All required insurance policies must be maintained until the Agreement work has been accepted by the City, or until this Agreement is terminated, whichever is later. Any lapse in coverage may be considered breach of contract. In addition, Contractor must provide to the City confirmation of coverage renewal via an updated certificate of insurance should any policies expire prior to the expiration of this Agreement. The City reserves the right to review, at any time, coverage forms and limits of Contractor’s insurance policies.
Contractor shall provide notice of any and all claims, accidents, and any other occurrences associated with this Agreement to
Contractor’s insurance company or companies and the City’s Risk Management office as soon as practical.
It is Contractor’s responsibility to ensure that any and all of Contractor’s independent contractors and subcontractors comply with these insurance requirements. All coverages for independent contractors and subcontractors shall be subject to all of the applicable requirements stated herein. Any and all deficiencies are the responsibility of Contractor. The City reserves the right to adjust insurance limits from time to time at its discretion with notice to Contractor.
2.8. INSURANCE - SPECIAL COVERAGES
2.8.1. Inland Marine/Installation Floater
Coverage shall be purchased for all risks of damage or other loss, including transport, storage, loading and unloading, and installation, to materials or movable property while in the care, custody, and control of Contractor. Coverage form must be on a direct primary basis with limits equal to the highest possible replacement cost value of materials or movable property in the care, custody, and control of
Contractor.
2.8.2. Pollution and Remediation Legal Liability (Hazardous Materials)
For the purpose of this section, the term “hazardous materials” includes all materials and substances that are designated or defined as hazardous by Florida or federal law or by the rules or regulations of Florida or any federal agency. If work being performed involves hazardous materials, Contractor shall procure and maintain any or all of the following coverages (which will be specifically addressed upon review of exposure):
2.9. PRICING
The pricing proposed by Awarded Bidder(s) shall remain fixed and firm for the Contract term. Bidder warrants, by virtue of bidding, that the bid and prices quoted in the solicitation will be firm for acceptance by the City for a period of one-hundred and twenty (120) days from the bid due date unless otherwise stated herein. Bidder acknowledges that, in certain circumstances, the City may require this amount of time to evaluate and award a bid.
Pricing shall be inclusive of all costs associated with the administrative, documentation, reporting, scheduling, and submittal requirements of the Solicitation. Such costs shall be deemed incidental to the Work and shall be included within the Bidder's pricing.
No separate payment, reimbursement, or additional compensation will be made for these requirements, and the Successful Bidder shall not separately bill or invoice the City for such costs. Administrative and documentation requirements include, but are not limited to, preparation and submission of product information, shop drawings, technical data, material specifications, manufacturer certifications, daily work logs, weekly progress reports, photographic documentation, project schedules and schedule updates, television survey/inspection records and recordings, and other project documentation required by the Contract Documents.
Bidder's pricing shall include all labor, materials, equipment, software, reproduction, electronic media, physical media, delivery, and other costs necessary to satisfy this Solicitation.
2.10. METHOD OF PAYMENT
See General Terms & Conditions.
2.11. BID BOND
Bids must be accompanied by a Bid Bond/Security made payable to the City in an amount equal to five percent (5%) of the Bidder’s maximum Bid price and in the form of a certified check, bank money order, or a Bid Bond/Security issued by an authorized surety. The original bid bond shall be mailed within five (5) business days after the bid opening to: City of Cooper City - Purchasing Division, 9090
SW 50th Place, Cooper City, FL 33328. Failure to provide a Bid Bond/Security (submitted with proposal and/or mailed original) may deem the Bidder non-responsive.
The Bid Bond/Security of the Awarded Contractor will be retained until such Bidder has executed the Contract Documents, furnished payment and performance bonds and met the other conditions of the Notice of Award, whereupon the Bid Bond/Security will be returned. If the Awarded Contractor fails to execute and deliver the Contract Documents and furnish the required security within ten
(10) days of the issuance of the Notice of Award, the City may consider Proposer to be in default, annul the Notice of Award, and the
Bid Bond/Security of that Bidder shall be forfeited. Such forfeiture shall be the City’s exclusive remedy if Bidder defaults. The Bid
Bond/Security of Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the City until the earlier of seven days after the Effective date of the Agreement or 61 days after the Bid opening, whereupon the Bid
Bond/Security furnished by such Bidders will be returned.
The Bid Bond/Security of Bidders whom the City believes do not have a reasonable chance of receiving the award will be returned within 21 days after the award.
2.12. PAYMENT AND PERFORMANCE BOND
Within ten (10) days after being notified of the award, Contractor shall furnish a Performance Bond and a Payment Bond containing all the provisions of the Performance Bond and Payment Bond. The payment bond shall be in the amount of one hundred percent (100%) of the Contract Price and the performance bond shall be in the amount of one hundred percent (100%) of the Contract Price guaranteeing to City of Cooper City the completion and performance of the Work covered in such Contract as well as full payment of all suppliers, laborers, and Subcontractors employed pursuant to this Project. Each Bond shall be with a surety company that:
• of recognized standing, authorized to do business in the State of Florida as surety, having a resident agent in the State of
Florida, and having been in business with a record of successful continuous operation for at least the past five (5) years.
• hold a current Certificate of Authority as acceptable surety on federal bonds in accordance with United States Department of Treasury Circular 570, Current Revisions. If the amount of the Bond exceeds the underwriting limitation set forth in the circular, in order to qualify as a proper surety herein, the net retention of the surety company shall not exceed the underwriting limitation in the circular, and the excess risks must be protected by coinsurance, reinsurance, or other methods in accordance with Treasury Circular 297, Revised (31 C.F.R. §§
223.10, 223.11). Further, the surety company shall provide City of Cooper City with evidence satisfactory to City of Cooper
City that such excess risk has been protected in an acceptable manner.
A surety company that is rejected by City of Cooper City may be substituted by the Bidder or proposer with a surety company acceptable to City, but only if the bid amount does not increase.
Each Bond shall continue in effect for one (1) year after Final Completion and acceptance of the Work with liability equal to one hundred percent (100%) of the Contract Price, or an additional bond provided to ensure that Contractor will, upon notification by City, correct any defective or faulty Work or materials that appear within one (1) year after Final Completion of this Contract.
All bonds shall be written through surety insurers authorized to do business in the State of Florida as surety, with the following qualifications according to the latest edition of Best’s Insurance Guide, published by AM Best Company, Oldwick, New Jersey:
Amount of Bond Min. Policy Holder's Rating
Strength/Financial Size
$500,000.00 and Below A / V
$500,00.01 to $2,500,000.00 A / VI
$2,500,000.01 to $5,000,000.00 A / VII
$5,000,000.01 to $10,000,000.00 A / VIII
Equal or Greater Than $10,000,000.01 A / IX
For projects that do not exceed $200,000.00, City of Cooper City may accept a Bid Bond, Performance Bond, or Payment Bond from a surety company that has twice the minimum surplus and capital required by the Florida Office of Insurance Regulation at the time the solicitation is issued, if the surety company is otherwise in compliance with the provisions of the Florida Insurance Code, and if the surety company holds a currently valid Certificate of Authority issued by the United States Department of the Treasury under Sections
9304 to 9308 of Title 31 of the United States Code. The Certificate and Affidavit shall be submitted with the Bid Bond, Performance
Bond, or Payment Bond.
Pursuant to the requirements of Section 255.05, Florida Statutes, Contractor shall ensure that the bond(s) referenced above shall be recorded in the Official Records of Broward County and provide City of Cooper City with evidence of such recording.
In lieu of a Performance Bond and a Payment Bond, Contractor may furnish alternate forms of security in the form of cash, money order, certified check, cashier’s check, or unconditional letter of credit. Such alternate forms of security shall be subject to the approval of City of Cooper City and for same purpose, and shall be subject to the same conditions as those applicable above, and shall be held by City of Cooper City for one (1) year after completion and acceptance of the Work.
2.13. EXAMINATION OF CONTRACT DOCUMENTS AND SITE
It shall be the responsibility of the Bidder to examine all the Contract Documents and Project site, to become fully informed of the conditions to be encountered, of the character, quality and quantities of work to be performed and materials to be furnished, and of the operational activities of the Airport, which activities must be maintained without interference from this Work.
The records of borings, test excavations and other subsurface investigations, if any, made for design purposes for the City, are contained in the Contract Documents for examination. Such records are offered as information only and solely for the convenience of
Bidders. The City does not warrant or guarantee that the said records will disclose the actual subsurface conditions. Bidders are hereby cautioned that the interpretation of the records and the conclusions drawn there from as to the actual existing subsurface conditions are his sole responsibility. The Contractor shall have no claim against the City if in carrying out the work he finds that the actual conditions encountered do not conform to those indicated by said borings, test excavations and other subsurface investigations.
The submission of a bid shall be prima facie evidence that the Bidder has examined the Contract Documents and is satisfied as to the conditions to be encountered in performing the Work and as to the requirements of the proposed Contract, Plans and Specifications.
Written Objections and Rights of Protest: Any question, issue, objection or disagreement concerning, generated by, or arising from the published requirements, terms, conditions or processes contained in the solicitation document shall be deemed waived by the protester and shall be rejected as a basis for a bid protest, unless it was brought by that bidder to the attention, in writing, of the purchasing agent, purchasing manager or other contact person of the City department that issued the solicitation document, at least two (2) work days (not less than 48 hours) prior to the hour of bid opening or proposal submission. This allows the issuing department the opportunity to consider, and to resolve or clarify in a timely fashion, through the issuance of an addendum, any such matter that is apparent on the face of the solicitation document, including but not limited to ambiguities or inconsistencies within the document
2.14. LIQUIDATED DAMAGES
Liquidated Damages at the rate of $500 per day, will be deducted from the Contract amount for each calendar day of delay due to a
Non-Excusable Delay.
2.15. NOTIFICATION TO BEGIN WORK
The Successful Bidder(s) shall neither commence any Work nor enter any City premises, land or right of way for the purpose of working until a Purchase Order and/or Notice to Proceed has been issued. The aforementioned notification shall be superseded by any emergency Work that may be specified herein.
2.16. WEATHER
No work shall be done when the weather is unsuitable. The Contractor shall take necessary precautions (in the event of impending severe weather, including hurricanes, tropical storms or major rain/wind storms) to protect all work, materials, or equipment from damage or deterioration due to floods, driving rain, and/or wind. The City reserves the right, to order that additional protection measures over and beyond those proposed by the Contractor, be taken to safeguard all components of the Project.
The mixing and placing of concrete or pavement courses, the laying of masonry, and installation of sewers and water mains and stormwater pipes shall be stopped during rainstorms, if ordered by the Engineer; and all freshly placed work shall be protected by canvas or other suitable covering in such manner as to prevent running water from coming in contact with it. Sufficient coverings shall be provided and kept ready at hand for this purpose. The limitations and requirements for mixing and placing concrete or laying of masonry, in cold weather shall be as described elsewhere in these Specifications.
Weather Day. is defined as a normal work day during which the Contractor was unable to perform critical path work for a continuous period of more than four (4) hours during that day.
The Contractor shall be required to submit a record of rain delay in accordance with the contract documents and within 48 hours of the occurrence of the event to the Engineer and the City for review.
Weather Days must be reported in the Progress Schedule Update Narrative Report and substantiated with the amount of rainfall obtained from the nearest City identified rain gauge and a description of the activity that was interrupted.
Hurricane Precautions.
During such periods of time as are designated by the United States Weather Bureau as being a hurricane watch or warning, the
Contractor, at no cost to the City, shall take all precautions necessary to secure the Project site in response to all threatened storm events.
Compliance with any specific hurricane watch or warning precautions will not constitute additional work.
Suspension of the Work caused by an impending or actual storm event will entitle the Contractor to additional Contract Time equivalent to the time lost as a result of the threatened or actual storm event and shall not give rise to a claim for compensable delay.
• In the event of a threatened storm that does not occur, the Contract Time will be equivalent to the time between United States
Weather Bureau notice of a watch or warning and the lifting of same.
• In the event of an actual storm event, the Contract Time will be equivalent to the time between United States Weather Bureau notice of a watch or warning and the time required to establish safe working conditions.
2.17. USE OF CONTRACT BY OTHER GOVERNMENTAL AGENCIES
Unless otherwise stipulated by the Bidder in its proposal, the Bidder agrees to make available to all government agencies, departments, and municipalities the proposed prices submitted in accordance with the terms and conditions of this Solicitation
Document, should any governmental entity desire to buy under the Contract resulting from this Solicitation Document.
Any other governmental agency, department, or municipality that avails itself of this contract will establish its own contract, place its own orders, issue its own purchase orders, and issue its own exemption certificates as required by the Bidder. It is understood and agreed that the City of Cooper City is not a legally bound party to any contractual agreement made between any other governmental entity and the Bidder as a result of this Bid.
2.18. MATHEMATICAL ERRORS
In the event of multiplication /extension error(s), the unit price will prevail. In the event of addition error(s) the extension totals will prevail. Written prices shall prevail over figures. All bids shall be reviewed mathematically and corrected, if necessary, using these standards, prior to additional evaluation.
2.19. ARCHITECT/ENGINEER/FIELD REPRESENTATIVE
A. The Architect/Engineer shall respond to questions which may arise as to the quality and acceptability of materials furnished, work performed, and as to the manner of performance and rate of progress of the work in accordance with the time frames prescribed in the Contract Documents. The Architect/Engineer shall decide all questions which may arise as to the interpretation of the Contract Documents relating to the Work, and the fulfillment of the Contract on the part of the Contractor, and those decisions shall be binding on the Contractor.
B. The Architect/Engineer is not authorized to revoke, alter, or waive any requirement of the Contract.
C. The Architect/Engineer, Owner and Field Representative shall have free access to the Work and materials at all times to facilitate the performance of his duties.
D. Subject to concurrence by the Owner, the Architect/Engineer shall have the right to observe and reject any material or work performed which does not meet the requirements of the Contract Documents. When the Architect/Engineer discovers any work in progress or completed that does not meet the requirements of the Contract Documents, the Architect/Engineer shall reject that portion of the Work affected and shall confirm such rejection in writing, as soon as practical, detailing the reasons for the rejection. Work rejected by the Architect/Engineer will not be paid for, nor shall any work associated to remove, remediate, or correct such non-conforming work be considered Extra Work. Any such observation and/or rejection shall not be construed as undertaking supervisory control of the Work or of means and methods employed by the Contractor or his subcontractors and shall not relieve the Contractor of any of his responsibilities or obligations under the Contract. The
Contractor shall not request or attempt to require the Architect/Engineer to undertake such supervisory control or to administer, supervise, inspect, assist, or act in any manner so as to relieve the Contractor from such responsibilities or obligations.
E. The fact that the Architect/Engineer has not made early discovery of materials furnished or work performed which does not meet the requirements of the Contract Documents, shall not bar the Architect/Engineer from subsequently rejecting said materials or work.
F. If either the Architect/Engineer or the Field Representative requests it, the Contractor, at any time before acceptance of the work, shall remove or uncover such portions of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the Contract Documents. Should the work thus exposed or examined prove acceptable, the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be paid for as Extra Work. Should the work so exposed or examined prove unacceptable, the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be at no additional cost to the Owner.
G. Any work done or materials used which are not in compliance with the Contract Documents may be ordered removed and replaced at the Contractor's expense.
H. The Owner and other agencies having jurisdiction over the work hereunder shall be afforded free access to the site to perform such inspections and tests as may be required to determine conformance of the Work with the Contract Documents.
I. Neither the Architect/Engineer nor the Field Representative shall be responsible for any safety obligations imposed on the
Contractor by applicable industry standards, licensing requirements, laws, or regulatory requirements.
J. Inspectors may additionally be employed by the Owner or the Architect/Engineer. Inspectors will be authorized to inspect all work and materials which are to become a part of the completed Project. Inspectors will have no authority to revoke, alter or waive any requirements of the Specifications or to make any changes in the Plans. Each Inspector will be authorized to call the attention of the Contractor to any failure of the work to conform to the Plans or the Specifications and will have authority to suspend the work affected until any question at issue can be referred to and decided by the Engineer. The Inspector will have no authority to delay the Contractor by failure to inspect the work and materials with reasonable promptness.
K. If authorized in writing by the Owner, the Field Representative and/or Architect/Engineer will administer the Contract and the orders of the Owner are to be given through the Field Representative and/or Architect/Engineer. The Field Representative and/or Architect/Engineer shall make initial determinations as to the amount and quality of the several kinds of work performed and materials furnished which are to be paid for under the Contract, subject to review and approval by the Owner.
L. The Field Representative may observe the Contractor's work for compliance with the Contract Documents. Such observation shall extend to all, or any part of the work done and to the preparation, fabrication, or manufacture of the material to be used. Owner reserves the right to observe the work via its own employees, Field Representatives, Inspector’s, or the
Architect/Engineer.
M. Upon discovery, the Field Representative shall call the Contractor's attention to faulty workmanship or defective materials and shall reject work and materials not conforming to the requirements of the Contract Documents.
N. When any work in progress or completed does not meet the requirements of the Contract Documents, the Field
Representative shall have the authority to order the Contractor to shut down that portion of the work affected until the affected work is corrected to the satisfaction of the Field Representative. The Field Representative shall confirm this order in writing as soon as practicable, detailing the reasons for the shutdown. Work performed in violation of the Field Representative's order to shutdown will not be accepted or paid for.
O. The Field Representative is not authorized to revoke, alter, or waive any requirements of the Contract. If authorized in writing by the Owner, the Field Representative will negotiate and act on behalf of the Owner to the authorized limits of his authority as specified in the Contract Documents.
P. Whenever the Contractor intends to build, assemble, or perform any portions of the Work away from the site, the Contractor shall promptly notify the Field Representative of such intentions, including where and when such work is to be performed before such work starts. The Contractor shall also make arrangements for access thereto by the Owner, Field Representative and/or the Architect/Engineer so that the aforementioned portions of the Work may be inspected as needed.
Q. The fact that the Field Representative has not made early discovery of materials furnished or work performed which does not meet the requirements of the Contract Documents, shall not bar the Field Representative from subsequently rejecting said materials or work and does not relieve the Contractor of his responsibility to meet the requirements of the Contract
Documents.
R. The Field Representative shall not act as a foreman or perform other duties for the Contractor, nor interfere with the management of the work by the Contractor.
S. The administration, observation of the work, and actions by the Field Representative, as herein provided, shall not be construed as undertaking supervisory control of the construction work or of means and methods employed by the Contractor or his subcontractors and shall not relieve the Contractor from any of his responsibilities or obligations under the Contract; the
Contractor shall not request or attempt to require the Field Representative to undertake such supervisory control or to administer, to supervise, to inspect, to assist, or to act in any manner so as to relieve the Contractor from such responsibilities or obligations.
T. If authorized in writing by the Owner, the Field Representative shall decide all questions relating to the rights of different prime contractors on the Project or site.
U. All materials and each part or detail of the work shall be subject to observation by the Field Representative and/or the
Architect/Engineer. The Architect/Engineer and the Field Representative shall be allowed access to all parts of the work and shall be furnished with such information and assistance by the Contractor as is required.
2.20. REJECTION OF BIDS
Bids which do not contain completed and properly executed forms and affidavits, as required and included in these Bid Documents may be rejected by the City.
Bids which are not responsive to the Bid Documents shall be rejected by the City.
Bids will be considered irregular and may be rejected if they contain omissions, alterations of form, additions not called for, unauthorized alternate bids, or other irregularities.
If it is determined that prices submitted in the Bid are excessive, best offers are determined to be unreasonable, or it is otherwise determined to be in the City’s best interest to do so.
Until the Contract is tentatively awarded by the City Commission, the City reserves the right to waive informalities and irregularities contained in the Bid, or to reject any or all Bids, or to re-advertise for Bids, whichever is in the City's best interests.
Any of the following additional factors may be considered sufficient cause for the rejection of the Bid.
i. Bid submitted on a form other than that furnished by the City.
ii. Submission of more than one Bid for the same Work by an individual, firm, partnership or corporation under the same or different names;
iii. Evidence of collusion among Bidders;
iv. Previous participation in collusive bidding on work for the City;
v. Submission of an unbalanced Bid in which the prices bid for some items are out of proportion to the prices bid for other items;
vi. Lack of Competency of Bidder. The Contract will be awarded only to a Bidder considered to be capable of performing the Work as required by the Contract Documents. The City may declare any Bidder ineligible at any time during the process of receiving bids or awarding the Contract where developments arise which, in the opinion of the City, adversely affect the Bidder's competency to perform the work and to discharge its responsibilities under the Contract;
vii. Lack of capability as shown by past performance of Bidder's work for the City, judged from the standpoint of workmanship and progress;
viii. Unfinished Work for which the Bidder is committed by Contract, which, in the judgment of the City, might hinder or prevent the prompt completion of Work under this Contract if awarded to such Bidder;
ix. Being in arrears on any existing Contract, or having been sued to enforce the City's rights on a construction
Contract, or having failed to complete the Work, the punch list, or warranty items, or having defaulted on a previous Contract with the City.
x. If the Bid is not accompanied by the Bid guaranty, if applicable.
2.21. ADDENDA - CHANGES WHILE BIDDING
It is the Bidder's obligation to notify the City’s Purchasing Division prior to the opening of Bids of any conflicts, ambiguities or discrepancies it finds in the Contract Documents, in order to allow City to issue appropriate addenda.
The City reserves the right to make changes to the Contract Documents, as it finds necessary or in its best interest, at any time prior to the opening of Bids.
All questions shall be in writing and shall be submitted under the questions & answer tab prior to 12:00 pm, on Friday, November 20, 2026, in order to be given consideration.
All interpretations and supplemental instructions will be issued as a written Addendum to the Contract Documents. If any Bidder fails to acknowledge the receipt of any Addendum, its Bid will be construed as though receipt of the Addendum had been acknowledged.
Only the interpretations or corrections of the Bid Documents given by addenda shall be binding, and prospective Bidders are warned that no other source is authorized to give information concerning, explaining or interpreting the Bid Documents. Bidders shall not rely on any oral interpretation, nor correction of any apparent ambiguity, inconsistency or error offered by any person.
2.22. EMPLOYEES AND CONTRACTOR(S)
All employees and contractors of the Successful Bidder(s) shall be considered to be, at all times, the sole employees or contractors of the Successful Bidder(s) under its sole discretion and not an employee, contractor, or agent of the City.