This scope of work document outlines requirements for a ground penetrating radar inspection of piers and wharves at the US Coast Guard Yard in Baltimore, Maryland. The contractor will be required to perform GPR inspections on five assets totaling approximately 148,950 square feet to locate any voids or sinkholes throughout the deck surfaces. The contractor must mark all discovered voids and sinkholes using yellow paint and provide the Coast Guard with a satellite map precisely showing their locations. The period of performance is 45 working days from notice to proceed. The related federal contract opportunity is a solicitation from the Department of Homeland Security Coast Guard seeking these GPR inspection services with a solicitation number provided.

View the file

Other files

File Type Posted
31800PR230000128 RFQ.docx DOCX document
WAGE DETERMINATION.txt TXT text file
GPR Project Area Map.pdf PDF
Smart Matrix _ Acquisition.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

1. GENERAL REQUIREMENTS: Work consists of the provision for all labor, materials and equipment as required to perform a Ground Penetrating Radar (GPR) inspection, located at USCG YARD, 2401 Hawkins Point RD, Baltimore, MD.

2. COMMENCEMENT AND COMPLETION OF WORK: The period of performance will commence work NLT 45-days after notice to proceed and work diligently to complete the entire work ready for use by 45 working days after contract award. The Contractor can schedule work performance period by contacting Ryan Northcraft 410-636-7017 or Ryan.A.Northcraft@uscg.mil.

3. SCOPE OF WORK:

Requirements.

a. Contractor shall provide all labor, materials and equipment as required to perform a GPR inspection of approximately 148,950 square feet of piers and wharves to locate any voids and sink holes throughout the deck. Contractor shall perform the inspection on the following assets:

· Pier #1: 400 feet long by 60 feet wide

· Pier #2: 400 feet long by 60 feet wide

· Pier #3: 330 feet long by 60 feet wide

· South Wharf: 900 feet long by 56 feet wide

· West Wharf: 1025 feet long by 30 feet wide

b. Contractor will mark all voids and sink holes on the deck surface using a yellow traffic zone marking paint. Contractor shall schedule all work areas three business days in advance with the COR, to allow Yard optimal time to clear the area to be inspected.

c. Contractor will provide USCG with a satellite view map of inspected assets showing the exact location of all voids and sink holes discovered.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with Ryan Northcraft at (410) 636-7017. The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

5. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify or otherwise affect the terms of this contract.

6. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the U.S. Coast Guard Contracting Officer.

7. PERMITS: The contractor shall without additional expense to the government, obtain all appointments, licenses, and permits required for the prosecution of the work. The contractor shall comply with all applicable federal, state and local laws.

8. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

9. UPON COMPLETION OF WORK: Contact Ryan Northcraft at 410-636-7017.

10. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: Contact Ryan Northcraft at 410-636-7017 or Ryan.A.Northcraft@uscg.mil