GMP 1_2 - Contractor Awareness Meeting Presentation.pdf

PDF 5 MB Posted

Attached to
FM 1978 Water Reclamation Facility
Solicitation number
1978-0100
Issued by
Hood County, Texas

About this file

This is a Contractor Awareness Meeting Presentation for the FM 1978 Water Reclamation Facility Design-Build Project in San Marcos, Texas, led by Burns & McDonnell as the primary design-builder. The project involves construction of a new greenfield water reclamation facility with initial capacity of 2 million gallons per day (MGD) and ultimate capacity of 8 MGD, driven by regional development. The scope encompasses 17 major components including site civil work, pump stations, treatment basins, administrative and chemical buildings, electrical systems, and outfall infrastructure. GMP 1 & 2 (Early Works) RFP is anticipated for April 1, 2026, with bids due May 1, 2026, and construction mobilization in October 2026. GMP 3 (Balance of Plant) will follow with RFP in June 2026 and mobilization in January 2027. A pre-bid site visit is scheduled for April 9, 2026. Substantial completion is targeted for August 2028. The project utilizes progressive design-build delivery with single source responsibility, expedited scheduling, early contractor input, and transparent pricing models.

The presentation identifies 26 distinct bid packages covering work categories including erosion control, deep foundations, cast-in-place concrete, structural steel, waterproofing, doors and windows, painting, mechanical systems, electrical work, site work, yard piping, and process equipment installation. Subcontractor RFPs will be issued April 1, 2026, with price submissions due May 1, 2026. Construction is scheduled to start October 2026 following City Council and Burns & McDonnell NTP in July 2026 and IFC issuance in August 2026. The project encourages participation from qualified small, minority-owned, and women-owned businesses. Burns & McDonnell's project team includes Kelley Reeves (Pre-Construction Manager), Ryan Pedersen (Construction Manager), John Ellis (Site Superintendent), Adam Bogusch (Design Manager), and Hillary Fontenot (EPC Project Manager). Supplier registration is available through www.burnsmcd.com/suppliers.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

03.24.2026

San Marcos, TX FM 1978 Water Reclamation Facility Design Build Project – Contractor Awareness Meeting

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Meeting Info

• Sign In Sheet:

• Please Put in the Meeting Chat (Needed for RFP)

• Name

• Company

• Email Address

• Phone

• Please Ask Questions in the Meeting Chat or at the End

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

B U

R N

S

M c

D O

N N

E L

L P

R O

P R

IE

T

A R

Y

IN

F

O R

M A

T

IO

N

Burns & McDonnell Team

Kelley Reeves Pre-Construction Manager kmreeves@burnsmcd.com

816-491-4140

Ryan Pedersen Construction Manager rpedersen@burnsmcd.com 281-705-8415

John Ellis Site Superintendent

Adam Bogusch Design Manager

Hillary Fontenot EPC Project Manager hfontenot@burnsmcd.com 817-570-0088 mailto:kmreeves@burnsmcd.com mailto:rpedersen@burnsmcd.com mailto:hfontenot@burnsmcd.com

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

PROGRESSIVE

DESIGN-BUILD

DELIVERY

Single Source Responsibility

Expedited Schedule

Early Contractor Input

Transparent Pricing Models

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Project Location & Goals

• New Greenfield Water Reclamation Facility

• 2MGD Currently w/ 8MGD Ultimate Capacity

• Driven by Development in the area

• GMP 1&2 (Early Works)

• Anticipated RFP 4/1/26

• Bids Due 5/1/26

• Mobilize by October 2026

• GMP 3 (Balance of Plant)

• Anticipated RFP June 2026

• Mobilize by January 2027

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

PROJECT

SCOPE

OVERVIEW

1) Site Civil

2) Site Roadways (Temp)

3) Fleming Pass Roadway

4) WAS Holding Tank

5) Influent Pump Station

(Caison)

6) Dewatering Building

7) Headworks

8) Splitter Structures

9) Process/Biological BNR Basin

10) Process Basin Blowers

11) Clarifiers

12) RAS-WAS Pump Station

13) Administration Building

14) SWGR/Generators

15) Chemical Building

16) UV Filters

17) Outfall Pipe & Structure

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N o Erosion Control o Mass Excavation / Grading o Fine Grading / Topsoil o Seeding / Slope Protection o Demolition o Deep Foundations (Drilled

Shafts) o Asphalt Paving o Concrete Paving o Sidewalks o Fencing o Structural Precast o Masonry o Struc / Misc Metals o Pre-Engineered Metal Bldgs o Caulking o Roofing o Water/Dampproofing o Overhead Coiling Doors o Glass & Glazing o Doors, Frames, Hardware o Building Interior Fit-Out o Laboratory Casework o Paint & Coatings o Overhead Cranes & Hoists o HVAC / Plumbing o Electrical o Yard Piping o Structural Concrete o Rough Carpentry o Process Equipment Install

Qualified small, minority-owned and women-owned businesses are encouraged to participate

Scopes of Work

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Bid Package Description of Scope S100 Early Site Work GMP 1 & 2 - SWPPP, Grading, Temp Roads GMP 1&2 - Construction Early Works

S250 Deep Foundations GMP 3 - Construction Balance of Plant

S300 Cast-in-Place Concrete - Small Pads /Structures

S310 Cast-in-Place Concrete - FlatWork /Roadwork (Fleming Pass)

S320 Cast-in-Place Concrete - FlatWork /Roadwork (Plant Site)

S330 Cast-in-Place Concrete GMP 2 – WAS Tank, BNR, Int Walls Caisson & Process Mech

S340 Cast-in-Place Concrete GMP 3 – Structural /Water Bearing, Over Excavation & Related Fill

S350 Cast-In-Place Concrete – Caisson (Influent Pump Station) S500 Structural Steel, Miscellaneous Metals, FRP Fabrications S550 Hoisting – Bridge Crane

S700 Waterproofing

S800 Door, Windows, Glazing & Openings

S850 Misc Carpentry, Gypson Board, Interior Walls, Cabinetry, Signs, Specialties

S900 Painting & Coatings

S1100 Instrumentation, Controls & Integration S1300 Pre-Engineered Metal Buildings & Canopies S2200 Plumbing S2250 Fire Protection

S2300 HVAC & Mechanical

S2600 Electrical GMP 1&2

S2650 Electrical GMP 3

S3100 Site Work GMP 3 - SWPPP, Final Grading, Perm Fencing, and Landscaping

S3300 Yard Piping & Utilities

S4600 Process Pipe & Equipment (US, AS, & 5' from BLDG)

Scope of Work - Packages

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

200 – Influent Lift Station (Caisson)

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

710 – WAS

Holding Tank

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

720 – Dewatering Building

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

310 – Headworks

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

420 – Biological Nutrient Removal (BNR) Basin

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

520 – Clarifiers

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

610 – Filters &

UV

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Scope of Work

800 – Admin Building

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Subcontractor Price Submission

5/1/2026

Subcontractor RFP’s Issued

4/1/2026

City Council/ BMcD NTP July 2026

Start Construction October 2026

Project Schedule IFC Issued for

Price Adjustment August 2026

Subcontractor

NTP

September 2026

GMP 3 Similar Timeline starting in June 2026

• Substantial Completion August 2028

Pre-Bid/Site Visit 4/9/2026

GMP 1&2

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N o Erosion Control o Mass Excavation / Grading o Fine Grading / Topsoil o Seeding / Slope Protection o Abatement / Demolition o Deep Foundations (Drilled

Shafts) o Asphalt Paving o Concrete Paving o Sidewalks o Fencing o Structural Precast o Masonry o Struc / Misc Metals o Pre-Engineered Metal Bldgs o Caulking o Roofing o Water/Dampproofing o Overhead Coiling Doors o Glass & Glazing o Doors, Frames, Hardware o Building Interior Fit-Out o Laboratory Casework o Paint & Coatings o Overhead Cranes & Hoists o HVAC / Plumbing o Electrical o Yard Piping o Structural Concrete o Rough Carpentry o Process Equipment Install

Qualified small, minority-owned and women-owned businesses are encouraged to participate

Scopes of Work

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Meeting Info

• Sign In Sheet:

• Please Put in the Meeting Chat (Needed for RFP)

• Name

• Company

• Email Address

• Phone

• Please Ask Questions in the Meeting Chat or at the End

O

N

FID

EN

TIAL BU

SIN

ESS, FIN

AN

C

IAL AN

D

PRO

PRIETARY IN

FO

RM

ATIO

N

Supplier Registration Link www.burnsmcd.com/suppliers

Questions?

Covers
Slide 1
Slide 2
Slide 3
Slide 4
Slide 5
Slide 6
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11
Slide 12
Slide 13
Slide 14
Slide 15
Slide 16
Slide 17
Slide 18
Slide 19
Slide 20
Slide 21

File details come from the government source that posted it. Updated .