Glenarm_Street_53944_E-1833_From_Arroyo_Parkway_to_El_Molino_Ave.pdf

PDF 4 MB Posted

Attached to
Furnish Labor and Materials For the Installation of Zinc Coated Ductile Iron Water Main in Bellefontaine St and Glenarm St - WD-23-05
Solicitation number
2023-IFB-LM-877
Issued by
Los Angeles County, California

About this file

These are Water Distribution engineering design plans for the Glenarm Street water main infrastructure project by the Pasadena Water & Power Department, spanning from Arroyo Parkway to El Molino Avenue. The detailed technical drawings document a comprehensive water infrastructure upgrade involving the installation of approximately 14-feet to 260-feet of 8-inch and 12-inch class 52 ductile iron water mains, including lateral connections, gate valves, fittings, and associated infrastructure components. The project involves renewing water services, reconnecting water service laterals, and connecting to new 12-inch water mains under multiple work orders (53944, 53394, 5629, and 5269).

The engineering plans include precise technical specifications, detailed site maps, station locations, special notes for water main installation, and a comprehensive bill of materials. The project is approved by the Pasadena Department of Transportation and Cal-Trans, with a traffic control plan required prior to permit issuance. The drawings are dated with a scale of 1"=30' and include detailed technical annotations for precise infrastructure placement, including specifications for pipe materials, connection methods, and abandonment of existing infrastructure. The project appears to be part of a municipal infrastructure improvement initiative focused on updating and enhancing the city's water distribution system.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Yannie Wu-Bowman (Aug 26, 2021 08:50 PDT) https://cityofpasadena.na2.echosign.com/verifier?tx=CBJCHBCAABAAGef6sHZYapYSDS-PuGJ8XKnyPQLUtoyh

8-25-21 Water Main - Glenarm St Phase 2 Final Audit Report 2021-08-26

Created: 2021-08-26

By: David Wong (dawong@cityofpasadena.net)

Status: Signed

Transaction ID: CBJCHBCAABAAGef6sHZYapYSDS-PuGJ8XKnyPQLUtoyh

"8-25-21 Water Main - Glenarm St Phase 2" History Document created by David Wong (dawong@cityofpasadena.net) 2021-08-26 - 3:41:25 PM GMT- IP address: 204.89.11.102

Document emailed to Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) for signature

2021-08-26 - 3:42:27 PM GMT

Email viewed by Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) 2021-08-26 - 3:50:13 PM GMT- IP address: 204.89.11.102

Document e-signed by Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) Signature Date: 2021-08-26 - 3:50:47 PM GMT - Time Source: server- IP address: 204.89.11.102

Agreement completed.

2021-08-26 - 3:50:47 PM GMT

2021-08-26T11:03:04-0700
Agreement certified by Adobe Sign

File details come from the government source that posted it. Updated .