Glenarm_Street_53944_E-1833_From_Arroyo_Parkway_to_El_Molino_Ave.pdf
PDF 4 MB Posted
- Solicitation number
- 2023-IFB-LM-877
- Issued by
- Los Angeles County, California
About this file
These are Water Distribution engineering design plans for the Glenarm Street water main infrastructure project by the Pasadena Water & Power Department, spanning from Arroyo Parkway to El Molino Avenue. The detailed technical drawings document a comprehensive water infrastructure upgrade involving the installation of approximately 14-feet to 260-feet of 8-inch and 12-inch class 52 ductile iron water mains, including lateral connections, gate valves, fittings, and associated infrastructure components. The project involves renewing water services, reconnecting water service laterals, and connecting to new 12-inch water mains under multiple work orders (53944, 53394, 5629, and 5269).
The engineering plans include precise technical specifications, detailed site maps, station locations, special notes for water main installation, and a comprehensive bill of materials. The project is approved by the Pasadena Department of Transportation and Cal-Trans, with a traffic control plan required prior to permit issuance. The drawings are dated with a scale of 1"=30' and include detailed technical annotations for precise infrastructure placement, including specifications for pipe materials, connection methods, and abandonment of existing infrastructure. The project appears to be part of a municipal infrastructure improvement initiative focused on updating and enhancing the city's water distribution system.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Yannie Wu-Bowman (Aug 26, 2021 08:50 PDT) https://cityofpasadena.na2.echosign.com/verifier?tx=CBJCHBCAABAAGef6sHZYapYSDS-PuGJ8XKnyPQLUtoyh
8-25-21 Water Main - Glenarm St Phase 2 Final Audit Report 2021-08-26
Created: 2021-08-26
By: David Wong (dawong@cityofpasadena.net)
Status: Signed
Transaction ID: CBJCHBCAABAAGef6sHZYapYSDS-PuGJ8XKnyPQLUtoyh
"8-25-21 Water Main - Glenarm St Phase 2" History Document created by David Wong (dawong@cityofpasadena.net) 2021-08-26 - 3:41:25 PM GMT- IP address: 204.89.11.102
Document emailed to Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) for signature
2021-08-26 - 3:42:27 PM GMT
Email viewed by Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) 2021-08-26 - 3:50:13 PM GMT- IP address: 204.89.11.102
Document e-signed by Yannie Wu-Bowman (YWu-Bowman@cityofpasadena.net) Signature Date: 2021-08-26 - 3:50:47 PM GMT - Time Source: server- IP address: 204.89.11.102
Agreement completed.
2021-08-26 - 3:50:47 PM GMT
| 2021-08-26T11:03:04-0700 | |
| Agreement certified by Adobe Sign |
File details come from the government source that posted it. Updated .