RFI Responses

View the file

Other files

File Type Posted
Clean_Soil_Stockpile_Area_Map.pdf PDF
7_WD_CO20160012.pdf PDF
2_GLEN_15-3301_SOW.pdf PDF
4_GLEN_15-3301_Specifications.pdf PDF
5_Design_Guide_Version_March_2016.pdf PDF
1_1442_FA255017R1014.pdf PDF
6_GLEN_15-3301_Form_66.xlsx XLSX spreadsheet
3_GLEN_15-3301_Drawings.PDF PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GLEN 15-3301 Repair East Drainage Crossing Amendment #2

FA2550-17-R-1014

RFI Questions and Responses

1. When are RFI’s due by?

a. Government Response: All RFI’s are due by 12 July 17. Responses will be provided no later than 17 July 17.

2. What is the status of the recycle of the materials:

a. Rip-rap – Reuse

b. Clean soil material – stockpile where shown on attached map

c. Other – Properly dispose of and provide recycle receipts

3. Road Replacement on each end – defined in requirement documentation.

a. Government Response: Please clarify approach in proposal.

4. Temporary Fencing – Will need to be provided for security reasons.

a. Government Response: Yes. The contractor is responsible for securing the work area at all times.

5. Drawings indicate “Minnekata limestone” to be encountered when excavating the box culvert, however the boring logs do not indicate as such. Please clarify.

a. Government Response: It is unclear why this may be, however it should be assumed that costs for blasting and working bedrock are not needed. Any bedrock encountered would be an unforeseen site condition.

6. There is an existing stockpile in the footprint of the project. Is it the contractor’s responsibility to haul this material to the base stockpile?

a. Government Response: No.

7. Is there any site close to the project to borrow material from or is the intent to solely import materials? If there is, is the material satisfactory for filling the site to grade?

a. Government Response: No, the intent is to solely import suitable materials.

File details come from the government source that posted it. Updated .