This is an Addendum No. 2 to a solicitation issued by the Town of Glastonbury, Connecticut for the replacement and installation of oxygen controllers, sensors, and mounting hardware at the Town of Glastonbury Wastewater Treatment Facility located at 2149 Main Street in Glastonbury, Connecticut. The solicitation, identified as GL-2027-17, seeks bids for the purchase and installation of oxygen control equipment and related hardware necessary for wastewater treatment operations. Bidders must submit proposals online through the Town's e-Procurement portal at https://glastonburyct.bonfirehub.com/ with bids due October 6, 2026. All bids will be publicly opened and read aloud via Zoom on the specified due date and time, and no late submissions will be accepted. The solicitation documents, available through the e-Procurement portal, contain detailed technical specifications, drawings, site conditions, and evaluation criteria to guide bidder proposals.
The addendum modifies or clarifies terms established in the original solicitation and any preceding addenda. Specific details regarding pricing terms, funding sources, contract duration, renewal options, and any set-asides are not detailed in this addendum summary and would require review of the complete addendum document and original solicitation for comprehensive procurement details.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TOWN OF GLASTONBURY
GL-2027-17
REPLACEMENT AND INSTALLATION OF OXYGEN CONTROLLERS AND SENSORS
ADDENDUM NO. 2
October 5, 2026
BID DUE DATE: October 6, 2026 @ 11:00 A.M.
REVISED DUE DATE: October 15, 2026 @ 11:00 A.M
The attention of bidders submitting proposals for the above-referenced project is called to the following Addendum to the specifications. The items set forth herein, whether of omission, addition, substitution or other change, are all to be included in and form a part of the proposed Contract Documents for the work. Bidders shall acknowledge this Addendum on the Bid Proposal Page (BP-1).
NOTIFICATION TO BIDDERS:
Please note: The Bid due date and time have been changed to October 15, 2026 at 11 A.M.
There has been a change to the language in Detailed Specifications Part 3 Execution (page DS- 4).
The below language supersedes the sections 3.2 and 3.3.
3.2 Installation Excluding Electric
3.3 Manufacturer’s representative will include a half-day of start-up service by a factory-trained technician, if requested.
1. Contractor will schedule a date and time for start-up.
2. Contractor will require the following people to be present during the start-up procedure.
a. Company factory trained representative
b. Owner’s personnel
Note: This addendum consists of 1 page including the above text.