About this file

This is Addendum No. 2 to Bid No. GL-2026-30 issued by the Town of Glastonbury, Connecticut for the Cider Mill Pump Station Force Main Replacement project. The addendum, released June 26, 2026, addresses bidder inquiries regarding the scope of work for removal and replacement of approximately 1,000 linear feet of existing 4-inch cast iron force main with a 4-inch HDPE SDR11 Thermal Butt Fused force main on Cider Mill Road. The project also includes furnishing, installing, and maintaining a temporary sanitary sewer bypass during construction and performing pavement restoration. The bid due date remains July 1, 2026 at 11:00 a.m. EDT. Bidders must acknowledge receipt of this addendum by inserting its number on Page BP-1 of their bid proposal.

The addendum clarifies a specific technical question regarding force main relocation. A bidder inquired whether the force main could be relocated six feet from its existing position to allow full installation with minimal shutdown and eliminate bypass pumping requirements, with the old cast iron main subsequently filled with flowable fill. The Town's response confirms that relocation is not feasible due to the presence of ledge in the area; the design requires reinstallation of the proposed force main within the existing ledge trench cavity limits. This clarification establishes the definitive scope boundaries for all bidding contractors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF GLASTONBURY

BID NO. GL-2026-30

CIDER MILL PUMP STATION FORCE MAIN REPLACMENT

ADDENDUM NO. 2

JUNE 26, 2026

BID DUE DATE: JULY 1, 2026 11:00 A.M.

The attention of bidders submitting proposals for the above-referenced project is called to the following Addendum to the specifications. The items set forth herein, whether of omission, addition, substitution or other change, are all to be included in and form a part of the proposed Contract Documents for the work. Bidders shall acknowledge this Addendum in the Bid Proposal by inserting its number on Page BP-1.

QUESTIONS AND ANSWERS

Q1-1: Is there a possibility to move the force main so it is 6’ away from the other one? This way, we can install the entire main, and with a brief shut-down, eliminate the need for any by-pass pumping. Then when its all completed, we could pump the old cast iron force main full of flowable fill.

A1-1: Relocation of the force main as mentioned above is not feasible due to the presence of ledge.

The design is to re-install the proposed force main within the existing ledge trench cavity limits.

NOTE: This Addendum consists of 1 page including above text.