GIVE Ctr W_Renv_Addendum_20231027.pdf
PDF 5 MB Posted
- Attached to
- GIVE Center West - Renovations
- Solicitation number
- PE-77021-NONST-2024-000000024
- Issued by
- Gwinnett County, Georgia
About this file
This document is Addendum #3 for the GIVE Center West Renovations project, a state and local contract opportunity located in Norcross, Georgia. The addendum provides revisions to the original construction documents dated October 4, 2023, including changes to the advertisement, specifications, and drawings. Key updates include revising the bid date to November 2, 2023, replacing discontinued toilet accessory products, adding a new manufacturer for science lavatory equipment, omitting roof top air conditioning units, and modifying HVAC, plumbing, and electrical systems. The addendum also addresses several questions and answers related to the project requirements.
The document does not provide information on pricing terms, set asides, incumbents, funding sources, or other salient commercial details. It focuses solely on technical and administrative revisions to the construction documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GIVE Ctr W_Renv_00 11 19_G Ad for Bid_2023100.pdf | ||
| 2023_11_16 _ Bid Awarded (GCPS) _ GIVE Ctr W .pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #3
GIVE CENTER WEST RENOVATIONS
5550 PEACHTREE INDUSTRIAL BOULEVARD
NORCROSS, GA 30071
LPB-223035
SECTION 00 90 03
October 27, 2023
The following items shall take precedence over the Plans and Specifications for the above named project and shall become a part of the Contract Documents. Where any item called for in the Specifications or indicated on the Drawings is supplemented hereby, the original requirement shall remain in effect. Where any original item is amended, voided or superceded hereby, the provisions of such item not specifically amended, voided or superceded shall remain in effect.
The following changes are to be incorporated into the Construction Documents dated October 4, 2023. All those receiving this Addendum should modify their set of Contract Documents to show the below described changes. Changes are as follows:
I. PREVIOUS ADDENDA
1.1 Addendum #1, October 6, 2023.
A. Item 2.1- 00 11 19 - Advertisement was revised in Addendum #1.
See Item 2.1 below for further revision.
1.2 Addendum #2, October 18, 2023.
II. SPECIFICATIONS
2.1 Section 00 11 19 - Advertisement
A. Change the bid date to Thursday, November 2, 2023, 3:00 PM.
B. Revise Paragraph 1 as follows:
“Sealed bids will be received from bidders........:The furnishing of all labor, materials, and services necessary to perform the construction of GIVE CENTER WEST RENOVATIONS, 5550 Peachtree Industrial Boulevard Norcross, GA 30071 until Thursday, November 2, 2023, 3:00 p.m.”
2.2 Section 10 28 00 - Toilet Accessories
A. Paragraph 2.1.A, Code D: Replace discontinued product A54-974 with the following: “eXtremeAir Series, EXT Model”.
2.3 Section 12 35 00 - Science Lavatory Equipment
A. Paragraph 1.3.A, add an additional manufacturer:
“4. Diversified/Sheldon.”
LPB-223035 GIVE CENTER WEST RENOVATIONS 00 90 03-2
ADDENDUM #3 / 10-27-23
2.4 Section 23 00 00 - HVAC
A. Part 2 - Products:
1. Omit Section 2.1 - Roof Top Air Condition Units.
2. Omit Section 2.2 - Low Ton RTUs.
B. Add new section as follows:
“2.46 - Boiler Water Pumps A. Boiler water pumps shall be a high efficiency, in line, wet rotor, cast-iron booster pump suitable for hydronic heating systems.
Pump shall have PES impeller and direct drive ECM motor with built in thermal overload protection. Pump shall be of the size and capacity indicated on the drawings and shall be as manufactured by Grundfos Magna 3 or approved equal by B&G ecocirc XL.”
2.5 Section 23 09 00 - DDC
A. Omit Section 3.1 A - Temp control for RTUs.
III. DRAWINGS
3.1 Sheet A151 - REVISED SHEET ATTACHED
A. Remove RTUs, pipe curbs, and walkway pads as shown.
3.2 Sheet M101 - REVISED SHEET ATTACHED
A. Remove RTUs, add WSHPs, modify ductwork, add piping.
3.3 Sheet M201 - REVISED SHEET ATTACHED
A. Add section at water source heat pump that applies to units on M101.
3.4 Sheet M202 - REVISED SHEET ATTACHED
A. Revise as follows:
1. Delete 3/M202 RTU Condensate Drain Detail.
2. Add 3/M202 Fume Hood Exhaust Detail.
3. Modify 5/M202 Typical MDF/IDF Room Airconditioning Detail.
3.5 Sheet M301 - REVISED SHEET ATTACHED
A. Omit RTU schedules. Revise WSHPs, CT-1, HX-1, Boilers, Pumps &
ERU-6
3.6 Sheet M302 - REVISED SHEET ATTACHED
A. Revise VRF schedule.
3.7 Sheet M401 - REVISED SHEET ATTACHED
A. Remove RTU schematic and I/O Points.
3.8 Sheet P-101 - REVISED SHEET ATTACHED
A. Revise gas piping.
3.9 Sheet P-102 - REVISED SHEET ATTACHED
A. Revise gas piping.
LPB-223035 GIVE CENTER WEST RENOVATIONS 00 90 03-3
3.10 Sheet P-103 - REVISED SHEET ATTACHED
A. Revise gas piping.
3.11 Sheet E104 - REVISED SHEET ATTACHED
A. Revise transformer labeling.
3.12 Sheet E201 - REVISED SHEET ATTACHED
A. Remove (13) roof top units. Add (14) water source heat pumps.
3.13 Sheet E202 - REVISED SHEET ATTACHED
A. Add thermostats and revise the footprint of the Boilers B1 & B2.
3.14 Sheet E203 - REVISED SHEET ATTACHED
A. Remove one (1) thermostat and add one (1) thermostat.
3.15 Sheet E301 - REVISED SHEET ATTACHED
A. Add fire alarm remote annunciator. Remove one (1) duct mounted smoke detector. Relocate two (2) duct mounted smoke detectors.
3.16 Sheet E401 - REVISED SHEET ATTACHED
A. Revise Detail 6/E401.
3.17 Sheet E402 - REVISED SHEET ATTACHED
A. Revise panel schedules, riser diagram and Mech Equipment Legend.
Add Load Summary.
3.18 Sheet E403 - REVISED SHEET ATTACHED
A. Revise panel schedules.
IV. QUESTIONS & ANSWERS
4.1 QUESTION: Is there an allowance set up for the project for an ERRC/BDA system?
ANSWER: No.
4.2 QUESTION: The drawings call for the expansion of the existing fire alarm system. They indicate horn/strobes to be used for the project.
Is this project going to require a voice evac system with speaker/ strobe instead of horn strobes?
ANSWER: No. Voice evacuation is not provided by the fire alarm system.
4.3 QUESTION: Are the intercom call buttons in the classrooms going to be provided by the electrical contractor per detail 6 on E401?
ANSWER: Junction boxes and conduit for call back buttons are provided and installed by the electrical contractor.
Call back buttons are provided and installed by Division 27 00 00.
LPB-223035 GIVE CENTER WEST RENOVATIONS 00 90 03-4
4.4 QUESTION: Is there going to be a new fire alarm remote annunciator?
There is no location shown on the electrical drawings for it.
ANSWER: Yes, added in Vestibule 1.3.100. See Addendum #3.
4.5 QUESTION: The current transformer schedule does not list T-SL.
ANSWER: See Addendum #3.
4.6 QUESTION: The current SPD schedule is short 1: 120/208V SPD.
ANSWER: See Addendum #3.
4.7 QUESTION: Is there going to need to be an enclosed breaker or fused disconnect added on the secondary side of T-SL since panel SL is now located within line of sight of T-SL?
ANSWER: See Addendum #3.
4.8 QUESTION: Transformers T-LC and T-LCC appear to be labeled incorrectly on the floor plans.
ANSWER: Corrected in Addendum #3.
4.9 QUESTION: Is the electrical contractor responsible for wiring the occ sensors and relays for lighting provided by the mechanical contractor?
ANSWER: Occupancy sensors are to be provided and installed under separate contract by the Owner. Lighting relays are to be provided by HVAC and installed by the Electrical Contractor.
END OF ADDENDUM #3
ATTACHMENTS
X1X2X3X4X5X6X7X8X9X10X11X12 X11.5 X1.5X2.5X3.5X4.5X9.5
XA
XB
XC
XD
XE
XF
XG
XJ
XK
XL
XM
XN
XP
XQ
XH
X0.9 X1.1
X1.3X1.8X2.5X3.1X3.6X4.3
X4.6
X4.7
X1X2X3X4X5X6X7X8X9X10X11X12 X11.5 X1.5X2.5X3.5X4.5X9.5
XA
XB
XC
XD
XE
XF
XG
XJ
XK
XL
XM
XN
XP
XQ
XH
X0.9 X1.1
X1.3X1.8X2.5X3.1X3.6X4.3
X4.6
X4.7
1 1/16" = 1'-0"
OVERALL RENOVATION ROOF PLAN
NORTH
TRUE
NORTH
JOB
EXISTING MEMBRANE
ROOFING ON 1
2" HD COVER
BOARD ON EXISTING
BUILT-UP ROOFING SYSTEM
WITH 2" FIBERGLASS
INSULATION (R=7.8)
A151
TYP. ROOF
PATCH
E/GU
ERU-6
ERU-5
EXISTING
EXISTING
EXISTING EXISTING
EXISTING
A152
A152
E/DSE/DSE/DSE/DSE/DSE/DSE/DSE/DSE/DSE/DSE/DSE/DS
PC
EXISTING MEMBRANE ROOFING ON
2" HD COVER BOARD ON EXISTING
BUILT-UP ROOFING SYSTEM WITH 2"
FIBERGLASS INSULATION (R=7.8)
DSS-43
EF-F1
EF-M1
DSS-42
RH
DSS-4
DSS-45
PC
EF-S1
EF-S2
KE
DSS-41
PC
EXISTING
EXISTING
EXISTING
EXISTINGEXISTING
EXISTING EXISTING
EXISTING
EXISTING
EXISTING
EXISTINGEXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING EXISTING
EXISTING
INTAKE HOOD
EXISTING EXPANSION
JOINT COVER TO REMAIN
EXISTING EXPANSION
JOINT COVER TO REMAIN
SEE SHEET A801 & A802 FOR
CANOPY PLANS, SECTIONS &
DETAILS
SEE SHEET A802
FOR CANOPY
DETAILS
SEE SHEET A802
FOR CANOPY
DETAILS
RL
E/RD E/RD
REMOVE EXISTING
EQUIPMENT
A151
2 TYP. ROOF
DECK PATCH
A151
A151
TYP. ROOF
HYDRANT
HY
HY
HY
HY
HY
A201
A201
A201
A802
A802
A151 2/3
NEW MEMBRANE
WALKWAY PADS
A151
TYP. EQUIP.
SUPPORT
A152
RH
EXISTING
INTAKE HOOD
INTAKE INTAKE
FLUE FLUE
EF-S1
EF-S3
MODIFY EXISTING
OPENING FOR NEW
ROOF HATCHADD. #2
ADD. #
INSTALL ALL SHEET METAL PER
SMACNA GUIDELINES.
P.T. WOOD NAILER SUPPLIED
W/ ROOF CURB
1'- 0"
F.V
P.T. WOOD NAILERS
INSULATED PREFABRICATED METAL
CURB
WELDED SPLICE
FASTENER AND SEAM PLATE AT 12" O.C. MAX
MEMBRANE
BONDING ADHESIVE
SEAM PLATE POSITIONED 12" BEYOND WALL
CUT-EDGE SEALANT IF REQUIRED BY ROOFING
MANUFACTURER
1 14" GALVANIZED ROOF NAILS
AT 6" O.C. MAX
EXISTING MEMBRANE ROOFING SYSTEM ON
EXISTING 12" COVER BOARD ON EXISTING
FIBERGLASS RIGID INSULATION ON 11
2" METAL
DECK
4 3" = 1'-0"
SUPPORT CURB DETAIL
PROVIDE ANGLE BRACING PER
STRUCTURAL REQUIRED FOR ROOF
DECK OPENINGS.
8" MI
N.
ALUMINUM PIPE VAULT
SEE MECH. DWGS.
P.T. WOOD NAILER SUPPLIED W/ROOF CURB
FASTENER AND SEAM PLATE AT 12" O.C.
MAX. POSITION FASTENERS PER
MANUFACTURER RECOMMENDATIONS
WELDED SPLICE
MEMBRANE BASE FLASHING ON BONDING
ADHESIVE
PIPING/CONDUIT
SEE PLUMBING OR
ELECTRICAL DWGS.
FILL VOID W/
BATT INSULATION
NEW P.T. WOOD BLOCKING
TYP.
EXTEND RIGID INSULATION INSIDE CURB. CUT
HOLES ONLY AS NECESSARY FOR PIPES TO PASS
THRU DECK
2" METAL ROOF DECK
EXISTING MEMBRANE ROOFING SYSTEM
TO REMAIN
6 3" = 1'-0"
PIPE CURB DETAIL
8" M
IN
WELDED SPLICE AS REQ'D
WELDED SPLICE
CONTINUOUS BEAD OF SEALANT AND WATER MASTIC PER
ROOFING MNFR RECOMMENDATIONS
PRE-MOLDED MEMBRANE VENT BOOT
(USE REINFORCED FLASHING MEMBRANE
IF REQ'D BY MANUFACTURER)
FASTENER AND SEAM PLATE AT
12" O.C. MAX
TPO FLASHING (UNSUPPORTED) OR TPO
MEMBRANE AS FLASHING
ROUND PENETRATION
CUT EDGE SEALANT IF REQ'D BY
MANUFACTURER
STAINLESS STEEL CLAMPING RING
WATER MASTIC
EXISTING MEMBRANE ROOFING
SYSTEM TO REMAIN
7 3" = 1'-0"
VTR DETAIL
FASTENER AND SEAM PLATE
AT 12" O.C. MAX
6"
MECHANICALLY ATTACHED MEMBRANE
ROOFING ON 12' HD ISO COVER BOARD
ON POLYISO RIGID INSULATION ON
EXISTING CONCRETE DECK
EXISTING MECHANICALLY
ATTACHED MEMBRANE
ROOFING ON COVER BOARD
WELDED SPLICE
CUT-EDGE SEALANT
EXISTING RIGID INSULATION
EXISTING BUILT UP ROOFING
ON COVER BOARD
2" FIE
LD
V
ER
IFY
3 3" = 1'-0"
ROOF PATCH DETAIL
EXISTING METAL ROOF DECK
6"6"
MIN. MIN.
36/7 PATTERN
ATTACH ROOF DECK TO SUPPORT WITH #12 SCREWS IN
A 36/7 PATTERN. ATTACH SIDE LAPS WITH #10 X 3 4"
SELF-TAPPING SCREWS @ 8" O.C.
Note:
EXISTING ANGLE LOCATIONS VARY @ EXISTING OPENING
36" COVERAGE
LAPLAP
EXISTING ROOF
DECK
EXISTING ROOF
DECK
DECK
PATCH
2 3/4" = 1'-0"
ROOF DECK PATCH DETAIL
EXISTING MEMBRANE ROOFING
SYSTEM TO REMAIN
WELDED SPLICE
CUT EDGE SEALANT IF REQ'D BY
MANUFACTURER
TURN-UP MEMBRANE AROUND PIPE
SUPPORT AND SLIDE RUBBER BOOT
DOWN INTO POSITION
AIR VENT
BACKFLOW
PREVENTER
AND DRAIN
FASTENER AND SEAM PLATE
5 1 1/2" = 1'-0"
ROOF HYDRANT DETAIL
PRE-FABRICATED
EQUIPMENT SUPPORT
8" M
IN
EXISTING MEMBRANE ROOFING SYSTEM
TO REMAIN
FASTENER AND SEAM PLATE AT 12" O.C.
MAX. POSITION FASTENERS PER
MANUFACTURER RECOMMENDATIONS
WELDED SPLICE
MEMBRANE BASE FLASHING
ON BONDING ADHESIVE
8 3" = 1'-0"
EQUIPMENT SUPPORT DETAIL A151
OV
ER
AL
L R
EN
OV
AT
IO
N
RO
OF
P
LA
N
DE
TA
ILS
223035
EDITION:
l p
AL
L
R
IG
H
TS
R
ES
ER
VE
D
L
IN
D
SA
Y
PO
PE
B
R
AY
FI
EL
D
W
ES
T
PI
KE
S
TR
EE
T, LA
W R
EN
C
EV
IL
LE
, G
A
PH
O
N E:
(7
) 9
-8 l pb at la nt a.
co m
PROJECT NO.:
DRAWN BY:
CHECKED BY:
B c
CURRENT REV. DATE:
ISSUE DATE
Author Checker
G
IV
E C
EN
TE
R W
ES
T
R
EN
O
VA
TI
O
N S
P
EA
C H
TR
EE
IN
D
U
ST
R
IA
L
BO
U
LE
VA
R
D N
O R
C R
O
SS
G
EO
R
G
IA
PE
AC
H
TR
EE
R
O
AD
N W
SU
W
AN
EE
G
EO
R
G
IA
G W
IN
N
ET
T
C O
U N
TY
PU
BL
IC
S C
H O
O
LS
SCHEMATIC 07-28-23
PRELIM TO DOE 07-28-23
FA
C
IL
IT
Y C
O D
E:
-0
DESIGN/DEVELOP 08-17-23
50% REVIEW 08-17-23
99% SUBMITTAL 09-12-23
PERMIT SET 09-12-23
PERMIT RESUB. 10-04-23
BIDDING 10-04-23
ROOF LEGEND
NO. DESCRIPTION DETAIL
E/GU EXISTING METAL GUTTER TO REMAIN
E/DS EXISTING METAL DOWNSPOUT TO REMAIN
E/RD EXISTING ROOF DRAIN TO REMAIN
PC PIPE CURB 6/A151
RTU ROOF TOP UNIT SEE MECH. DWGS.
ERU ENERGY RECOVERY UNIT SEE MECH. DWGS.
DSS SPLIT SYSTEM COMPRESSOR SEE MECH. DWGS.
RH ROOF HATCH 1/A152
RL ROOF LADDER 2/A152
KE KILN EXHAUST SEE MECH. DWGS.
HY ROOF HYDRANT 5/A151
EF EXHAUST FAN SEE MECH. DWGS.
VTR VENT THROUGH ROOF 7/A151
SYMBOL LEGEND
NO. DESCRIPTION DETAIL
EXISTING ROOF
MEMBRANE ROOF PATCH 2,3/A151
MEMBRANE WALKWAY PADS SEE SPECS.
ADDENDUM #2 10-18-23
ADDENDUM #3 10-27-23
| 00 90 03a Text--ADD#3 (002).pdf |
| Give West ADDENDUM #3 COMBINED - SMALL (003).pdf |
| Sheets and Views |
| A151 OVERALL RENOVATION ROOF PLAN & DETAILS |
| OVERALL RENOVATION ROOF PLAN |
| SUPPORT CURB DETAIL |
| PIPE CURB DETAIL |
| VTR DETAIL |
| ROOF PATCH DETAIL |
| ROOF DECK PATCH DETAIL |
| ROOF HYDRANT DETAIL |
| EQUIPMENT SUPPORT DETAIL |
File details come from the government source that posted it. Updated .