GITS_Phase2 BID PROJECT MANUAL 250303.pdf
PDF 8 MB Posted
- Attached to
- Baseball & Softball Field Renovations
- Solicitation number
- RFP-GITS-250000001678-1
- Issued by
- Wayne County, Michigan
About this file
This document is a comprehensive Project Manual for the Grosse Ile Township Schools 2022 Bond - Athletics Phase 2 project located in Grosse Ile, Michigan, involving multiple jurisdictions including the school district, local government, and various engineering and architectural firms. The project encompasses renovations to baseball and softball facilities at Grosse Ile High School, including site work, drainage improvements, synthetic turf installation, dugouts, fencing, scoreboards, and electrical upgrades. The project will be bid as a General Contractor package, with sealed bids due on March 21, 2025, at 11:00 a.m. EST. A non-mandatory pre-bid meeting is scheduled for March 12, 2025, at 10:00 a.m. at the high school. The project involves constructing improvements at two field sites with specific milestone completion dates: Varsity Fields are to be completed by September 19, 2025, and Junior Varsity Fields by October 24, 2025.
The project is funded through a 2022 Bond program, with a comprehensive set of bid requirements including a 5% bid bond, performance and payment bonds for contracts over $50,000, and specific insurance requirements. Bidders must submit various documentation including familial relationship disclosures, Iran Economic Sanctions Act Affidavit, and criminal background checks. The contract will be awarded based on factors beyond just the lowest financial bid, with the school district reserving the right to accept or reject any bids. The project includes specific technical specifications for materials, installation methods, and quality control, with detailed requirements for synthetic turf, concrete work, fencing, and athletic field equipment. Contractors must meet specific qualifications, including experience with similar projects and certifications from relevant professional associations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual
Grosse Ile Township Schools 2022 Bond – Athletics Phase 2 Grosse Ile, Michigan
Date: March 3, 2025
Issued for: Construction Documents
Owner: Grosse Ile Township Schools 23276 E. River Road Grosse Ile, MI 48138
Owner’ Representative: Plante Moran Realpoint 3000 Town Center, Ste. 100 Southfield, MI 48075
Landscape Architect: Foresite Design, Inc.
3269 Coolidge Highway Berkley, MI 48072 Ph: 248-547-7757 Email: mike@foresitedesign.com
Civil Engineer: Spalding DeDecker, Associates 905 South Blvd, East Rochester Hills, MI 48307
Electrical Engineer: Unified Building Systems Engineering, LLC 75 N. Main Street, Ste. 221 Mt. Clemens, MI 48043 mailto:mike@foresitedesign.com
THIS PAGE IS INTENTIONALLY LEFT BLANK
FORESITE DESIGN, INC. GROSSE ILE TOWNSHIP SCHOOLS
SECTION 00 0110
TABLE OF CONTENTS
00 0110 - Page 1 of 4
GITS 2022 BOND – ATHLETICS PHASE 2
TABLE OF CONTENTS
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 1113 Advertisement for Bid 00 1115 Scope of Work 00 2113 Instructions to Bidders 00 2300 Schedule and Phasing 00 4200 Proposal Form 00 4336 List of Subcontractors 00 6513 Material Compliance Form 00 7300 Supplementary Conditions 00 7400 A105-2017 Standard Form of Agreement Between Owner and Contractor 00 8500 File Transfer Agreement
APPENDIX A – SITE LOGISTICS PLAN
DIVISION 01 – GENERAL REQUIREMENTS
01 2300 Alternates 01 2619 Clarification Request 01 3523 Safety Requirements 01 4100 Regulatory Requirements 01 5600 Cleaning 01 5629 Temporary Protective Walkways 01 7123 Field Engineering 01 7700 Project Closeout 01 7823 Operating, Maintenance Warranty Data 01 7839 Project Record Documents
DIVISION 02 – EXISTING CONDITIONS
02 3208 Soil Borings 02 4113 Demolition
DIVISION 03 – CONCRETE
03 3000 Cast In Place Concrete 03 3053 Concrete Turf Anchor
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 1050 Turf Wood Nailer
DIVISION 10 – SPECIALTIES
10 7516 Flag Pole
00 0110 - Page 2 of 4
GITS 2022 BOND – ATHLETICS PHASE 2
DIVISION 11 – EQUIPMENT
11 6833 Athletic Field Equipment 11 6837 Shaded Dugout Structure 11 6838 Baseball & Softball Equipment 11 6843 Scoreboard
DIVISION 13 – SPECIAL CONSTRUCTION
13 3400 Precast Concrete Dugouts
DIVISION 31 – EARTHWORK
31 1000 Site Preparation 31 1018 Soil Erosion Control 31 2000 Earth Moving 31 2010 Earthwork - Athletics 31 3219 Geotextile Fabric
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 1123 Aggregate Drainage Layer 32 1809 Synthetic Turf – Batting Cage 32 1819 Synthetic Turf 32 3104 Chainlink Fence – Baseball/Softball 32 3130 Chainlink Fence – Vinyl 32 9119 Topsoil 32 9223 Lawns - Sod 32 9227 General Lawn Restoration
DIVISION 33 - UTILITIES
33 4100 Storm Sewers, Underdrains and Drainage Structures 33 4615 Subdrainage Systems – Turf Draintile
DRAWINGS
Sheet # Title Cover Sheet C1.1 Drainage Area Map C2.1 Utility Plan C2.2 Stormwater Calculations & Details C2.3 Stormtech MC-7200 Underground Detention Details
00 0110 - Page 3 of 4
GITS 2022 BOND – ATHLETICS PHASE 2
C2.4 Stormwater Maintenance Exhibits C3.1 Soil Erosion and Sedimentation Control Plan C4.1 Topographic Survey (1 of 6) C4.2 Topographic Survey (2 of 6)
C4.3 Topographic Survey (3 of 6)
C4.4 Topographic Survey (4 of 6)
C4.5 Topographic Survey (5 of 6)
C4.6 Topographic Survey (6 of 6)
L1.00 Demolition Plan – Site A L1.01 Site Plan - Site A L1.02 Dimension Plan - Site A L1.03 Fence Plan - Site A L1.04 Grading Plan - Site A L1.05 Drainage and Utility Plan - Site A L2.00 Demolition Plan – Site B L2.01 Site Plan - Site B L2.02 Dimension Plan - Site B L2.03 Fence Plan - Site B L2.04 Grading Plan - Site B LD1.01 General Turf Details LD1.02 Site Details LD1.03 Turf & General Fence Details LD1.04 Varsity Backstop Details LD1.05 JV Backstop Details LD1.06 Varsity Dugout Details LD1.07 JV Dugout Details LD1.08 Bullpen Details LD1.09 Batting Cage Details LD1.10 Turf Graphis Reference Details LD1.11 Baseball Turf Details LD1.12 Softball Turf Details
00 0110 - Page 4 of 4
THIS PAGE IS INTENTIONALLY LEFT BLANK
ADVERTISEMENT FOR BID
00 1113 - Page 1 of 2
GITS 2022 BOND – ATHLETICS PHASE 2
ADVERTISEMENT FOR BIDS
Grosse Ile Township Schools – 2022 Bond Athletics Phase 2
Project Description: The Grosse Ile Township School’s Board of Education is accepting Sealed Bids to provide baseball and softball renovations at Grosse Ile High School. Proposed work includes site work, drainage, synthetic turf, dugouts, fencing, scoreboards, and electrical as part of a General Contractor package.
Architect &
Project Contact:
Foresite Design, Inc.
3269 Coolidge Highway Berkley, MI 48072
(248) 547-7757 Michael Sims mike@foresitedesign.com Questions addressed ONLY to Foresite Design during Bidding Period. Failure to follow instruction may lead to rejection of Bid.
Bid Documents: Bid Documents including Bid Forms may be obtained directly from Foresite Design. Please email Christy O’Berry at christy@foresitedesign.com for access.
Bid Documents may also be obtained from local plan rooms (GRBX, CAM, etc.).
Bid Documents will be available on or after February 27, 2025.
Non-Mandatory Pre-Bid
Meeting:
A non-mandatory in person meeting will be held on Wednesday, March 12, 2025 at 10:00am.
The meeting will be held at Grosse Ile High School 7800 Greys Dr, Grosse Ile Township, MI 48138 (meet at north end of main lot)
Bid Due Date: 11:00 a.m. (EST), Friday, March 21, 2025.
Each Bid shall be submitted in duplicate on the forms provided and must be completed in full.
The Bid shall be sealed and marked with the name of the Bidder and Project name. Bids are to be addressed and delivered to:
Grosse Ile Township Schools Attn: Audrie Kalisz – Athletics Phase 2
Public Bid Opening: Sealed Bids will be publicly opened and read aloud at the Grosse Ile Township School’s
Administration Building (23276 E. River Road, Grosse Ile, MI 48138) on Friday, March 21, 2025 at 11:00 a.m. (EST).
The Board of Education will not open, consider, nor accept a Bid received after the date and time specified. All late Bids will be unopened and made available to the respective Bidder for pick-up, at their sole cost and expense for a period of two (2) weeks.
Bid Bond: A Bid Bond executed by a Treasury listed surety company acceptable to the Grosse Ile
Township Schools or a cashier’s check in the amount of at least 5% of the sum of the Bid shall be submitted with any Bid. All Bids shall be firm for a period of ninety (90) days.
Labor and Material &
Performance Bond Successful Bidders whose Bids are $50,000 or more will be required to furnish satisfactory Performance and Payments Bonds by a Treasury listed surety in the amount of 100% of their Bid. The cost of Bond(s) shall be included in each Bid.
Nonexempt: All materials and supplies incorporated and used in construction of the Work and becoming a permanent part of this Project will not be exempt from State Sales Tax and/or Use Tax. All required Sales Tax/Use Tax shall be included in the Bid price.
Disclosure Statements: Bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the Owner and any employee of Bidder and any member of the Board of Education or the superintendent. Additionally, Bids shall be accompanied by a sworn and notarized statement for the Familial Relationship Disclosure, Iran Economic Sanctions Act Affidavit of Compliance, Non-Collusive Affidavit and Criminal Background-Sex Offender Affidavit. Bids not accompanied with these sworn and notarized statements will not be accepted by the Board.
mailto:mike@foresitedesign.com mailto:christy@foresitedesign.com
ADVERTISEMENT FOR BID
00 1113 - Page 2 of 2
GITS 2022 BOND – ATHLETICS PHASE 2
Contract Award: The Grosse Ile Township School’s Board of Education reserves the right to accept or reject any and all Bids, either in whole or in part, to waive any informalities or irregularities therein, or to award the contract to other than the contractor(s) submitting the best financial Bid (low bidder), in its sole and absolute discretion.
SECTION 00 1115
SCOPE OF WORK
00 1115 - Page 1 of 5
GENERAL NOTES (Applicable to All Bid Categories)
1. Contractor shall visit the site and familiarize themselves with the project layout, existing conditions, site access, etc. and all other obstacles with the work areas. Contractor is responsible for all means of setting up and relocating their equipment and materials to perform this work as well as in conjunction with other trade contractors. There will be no additional compensation made for reason of omission or interpretation as it relates to the aforementioned required site visit.
2. Bidder/Contractor shall include all costs for State and Local laws, taxes, codes, ordinances, building rules and regulations, as are or may become applicable to the Work.
3. Bidders shall exclude costs of quality control construction testing from bid unless required on the proposal form. Independent testing will be hired directly by the Owner/Owner’s Representative and contractor shall cooperate with the testing agency.
4. Each contractor shall be solely responsible and make every effort to locate existing underground utilities. This shall include consulting with all local utility companies, using a signal locator prior to excavation for private utility lines, or consulting with a private utility locating company.
5. The Scope of Work for each Bid Category includes cleaning and maintaining streets free of dirt, debris, mud, gravel caused by the construction operations as it pertains to their scope of work.
Contractors shall be aware that local authorities intend to enforce local ordinances in this regard.
Penalties resulting from contractor negligence in adhering to the State and Local ordinances, laws, codes shall be the responsibility of the Contractor. All excess materials shall be legally disposed of off-site unless indicated otherwise.
6. Each Contractor shall provide daily cleanup of your Identifiable Debris and Dust Control required to complete your work. Provide all portable dumpsters, dust control, and equipment necessary to remove all debris generated from work. Debris not properly disposed of and deemed identifiable by onsite trades, will be removed by Owner and back charged at 1.0 times the cost.
7. The Scope of Work for each Bid Category includes strict adherence to the safety requirements as defined in the General Conditions and Supplementary General Conditions and current MIOSHA Guidelines.
8. All contractors are to provide their own means of hoisting and/or transporting materials and equipment to the project areas.
9. Each Contractor shall review existing building and site conditions prior to commencement of work and advise the Owner’s Representative of any claim of changes in the work within seventy-two (72) hours therefore, or waive its right for claim of changes in the existing site conditions. Each Contractor shall be responsible for restoring site to its original conditions upon completion of their respective work.
10. Milestone Schedule. All trades will be required to confirm a detailed schedule prior to award of this contract. Each contractor/subcontractors shall coordinate and cooperate with other contractors for expedient completion of the work of this project.
11. Provide all required closeout documents, as-built drawings, etc. within fifteen (15) days upon issuance of Notice of Substantial Completion and as a condition of Final Payment.
00 1115 - Page 2 of 5
GITS 2022 BOND – ATHLETICS PHASE 2
PROPOSAL A: GENERAL CONSTRUCTION
CM Supplementary Conditions General Conditions
Division 1 General Requirements Division 2 Existing Conditions
Specification Section 02 3208 Soil Borings Specification Section 02 4113 Demolition Specification Section 03 3000 Cast In Place Concrete Specification Section 03 3053 Concrete Turf Anchor Specification Section 06 1050 Turf Wood Nailer Specification Section 10 7516 Flagpole Specification Section 11 6833 Athletic Field Equipment Specification Section 11 6837 Shaded Dugout Structure Specification Section 11 6838 Baseball & Softball Equipment Specification Section 11 6843 Exterior Scoreboard Specification Section 13 3400 Pre-Cast Concrete Dugouts Specification Section 31 1000 Site Preparation Specification Section 31 1018 Soil Erosion Control Specification Section 31 2000 Earthmoving Specification Section 31 2010 Earthwork - Athletics Specification Section 31 3219 Geotextile Fabric Specification Section 32 1123 Aggregate Drainage Layer Specification Section 32 1809 Synthetic Turf – Batting Cage Specification Section 32 1819 Synthetic Turf – Baseball & Softball Specification Section 32 3104 Chainlink Fence – Baseball/Softball Specification Section 32 3130 Chainlink Fence - Vinyl Specification Section 32 9119 Topsoil Specification Section 32 9223 Lawns - Sod Specification Section 32 9227 General Lawn Restoration Specification Section 33 4100 Storm Sewers, Underdrains and Drainage Structures Specification Section 33 4615 Subdrainage Systems – Turf Draintile
General Scope of Work:
1. Requirements of items included under General Work to be completed by all contractors.
2. Provide all engineering and layout as required to complete this work. Contractor shall be responsible for their own layout as it pertains to scope of work.
1. Electrical service will be a part of this scope. Electrical drawings/specifications will be provided in an Addendum or Bulletin.
2. Alternate No. 1: Provide black vinyl chainlink fence in lieu of galvanized chainlink fence, varsity baseball & softball fields only.
3. Obtain approvals, permits, and coordinate the inspection and testing of the electrical systems with the governing agencies. Pay for all fees and testing charges in conjunction with the testing of each system.
4. Provide and install complete soil erosion control measures, including required permits, regulatory performance bonds and weekly maintenance. Note: Strict enforcement of soil erosion control system maintenance is required as part of this project. Work includes maintenance of system
00 1115 - Page 3 of 5
GITS 2022 BOND – ATHLETICS PHASE 2
during Construction, after each rain each. Contractor shall employ a Certified Stormwater Operator for system logs, removal of system at the completion of the project or until approved to remove by governing authorities.
5. Allowance – Permit Allowance: Contractor shall provide an allowance in the amount of $30,000.00 for permits and inspections related to electrical work, soil erosion & sedimentation control, and stormwater management. Provide supporting documentation related to fees incurred. Unused monies will revert back to Owner.
6. Furnish and install pavement protection as required for work. Refer to Site Logistics Plan for proposed construction access and staging areas.
7. Allowance – Site Access: Contractor shall provide an allowance in the amount of $35,000.00 for work required for Site Access. Work includes time and materials for fence removal/re-installation, replacement of damaged concrete / asphalt pavements or temporary lay down areas. Provide supporting documentation related to fees incurred.
Unused monies will revert back to Owner.
8. Furnish, install, maintain and remove all necessary shoring, bracing, fall protection, barricades, flashers, and other safety equipment in accordance with MIOSHA/OSHA rules and regulations as required for the performance of the work and safety of the workers.
9. Provide all labor and equipment necessary for the complete site demolition as shown within the Construction Limits unless specifically noted to be completed by others. Work includes but not limited to: concrete, asphalt, chainlink fence & backstops, foul poles, stone, infield mix, sawcutting, flagpole, storm system as noted, dugouts, batting cages & footings, topsoil and unsuitable soil. Work includes removal and backfill of post footings as specified.
10. Demolition of all underground utility items shown on Civil drawings.
11. Provide labor, material and equipment necessary for disconnect and removal of electrical items as noted on drawings. Cut, cap, tag and make safe any existing electrical systems prior to any demolition. Properly identify and mark any system and its components that are to be removed by others.
12. Remove and dispose of existing scoreboards, steel supports and concrete footings.
13. Provide and install any earthwork and engineered fill required for work of this category.
Excavations must be compacted and ready to accept concrete.
14. Temporarily remove, relocate, and re-install non-elevated bleachers.
15. Provide tree clearing and removal of all trees and shrubs, including root systems as noted on drawings.
16. Prepare and proof roll sub-grades, including sub-grade for site concrete and dugout trades.
17. Contractor is responsible for scheduling all construction testing with Owner’s Independent Testing
Agency as noted in Bid Documents and shall comply with all recommendations.
18. Provide necessary dewatering associated with this work division.
19. Jet and vacuum all existing drainage structures within the project limits prior to project completion.
20. Allowance – Irrigation Adjustments: Contractor shall provide an allowance in the amount of $10,000.00 for work associated with adjusting the existing irrigation system at the baseball & softball field. Work includes time and materials for field locating existing system, partial demolition for new work, and adjusting new heads, lateral lines, and valves with proposed work. Provide supporting documentation related to fees incurred. Unused monies will revert back to Owner.
21. Excavate topsoil as required and export off site. Prepare site for proof-roll inspection and maintain positive drainage during all earthwork operations.
22. Remove and legally dispose of all excess materials and debris generated by scope of work.
23. Saw cut and remove existing asphalt and/or concrete paving as noted. Field verify sawcut areas for new dugouts with Architect prior to cutting operations.
24. Provide temporary pavement measures for vehicle or walkway traffic.
25. Provide all earthwork operations as shown. Work includes but not limited to rough grading, subgrade fine grading and finish grade fine grading.
00 1115 - Page 4 of 5
GITS 2022 BOND – ATHLETICS PHASE 2
26. Provide all labor, materials, and equipment necessary for the complete installation of new chainlink fence, backstops, and gates.
27. Furnish and install new baseball and softball equipment to include: foul poles, protective fence cap, portable on-deck circles, bases & sleeves, pitchers/home plates and backstop padding.
28. Furnish and install new batting cage system complete. Design of system footings shall be a delegated design by system manufacturer as specified.
29. Furnish and install new flagpole and flag as noted.
30. Furnish and install new site utilities as shown. Work includes, but not limited to, perforated and solid wall draintile PVC pipe, HDPE pipe, concrete pipe, HDPE detention pipe and new storm sewer structures as indicated. Work includes all backfill and tie-ins as noted on Drawings.
31. Adjust and repair all structures as shown and/or noted. Set structures for final paving/lawn elevations.
32. Provide labor, materials and equipment necessary for complete installation of new concrete turf anchor, wood nailer and sawcutting of concrete turf anchor. New turf anchor to be installed around infields and bullpens.
33. Furnish and install synthetic turf field drainage system, geotextile fabric, flat draintile, and free draining aggregate stone as indicated.
34. Provide all labor, materials and equipment necessary for a complete installation of the synthetic turf and infill system as shown on the plans and specified. Infill turf is applicable to the infields and bullpens.
35. Provide all labor, materials and equipment necessary for a complete installation of non-infilled synthetic turf for the batting cages.
36. Provide inlaid lines, markings, logos and lettering as shown.
37. Contractor is responsible to attach turf to wood nailer.
38. Include all required turf testing and turf warranties as specified.
39. Furnish and install new pre-engineered concrete dugout structures for the Varsity Baseball &
Softball Fields. Work shall include precast panels, angles, bolts, nuts, inserts, braces/kickers, welded assemblies, anchors, dowels, form strips, and attachment points. Connections shall comply with loads and movement criteria outlined in the Contract Documents and manufacturer’s delegated design engineer.
40. Installation of pre-engineered concrete dugout structures shall include hoisting, temporary bracing, framing and shoring to maintain the stability during installation. Precast units shall be set level, plumb and square at the specified elevations and locations.
41. Furnish and install new pre-engineered metal dugout structures for the Junior Varsity (JV) Baseball & Softball Fields. Work shall include steel and aluminum supports and bracing, metal panel roofing, angles, bolts, nuts, inserts, welded assemblies, anchors, dowels, form strips, and attachment points. Connections shall comply with loads and movement criteria outlined in the Contract Documents and manufacturer’s delegated design engineer. Dugout structure shall be mounted to new reinforced concrete pad.
42. All new pre-engineered concrete and pre-engineered metal dugout structures are considered a delegated design by the system manufacturer. Provide complete design drawings, engineering calculations, erection plans, installation methods, etc. by a delegated design engineer from system manufacturer.
43. Provide rough-ins and final electrical connections for equipment and specialties as specified.
Furnish and install all electrical equipment and accessories as required and noted within the Contract documents.
44. This contractor will provide all conduit, wiring, panels, devices, switches, and accessories necessary for the installation of the complete power system. Furnish and install all specified backing and supports for fixtures and equipment.
45. Provide proper identification of panels, circuits and systems.
46. Provide and coordinate sleeves, embedment’s, etc. in cast-in-place concrete work.
47. Provide and install all raceways per the Contract documents.
48. Provide labor, material and equipment necessary for the installation of new scoreboards, architectural truss, steel supports and concrete footings. Contractor responsible for new conduits, 00 1115 - Page 5 of 5
GITS 2022 BOND – ATHLETICS PHASE 2
wire, excavation and backfill for underground electrical work included in the complete installation of this item. Work shall include new steel supports and concrete footings: provide delegated design of steel support and concrete footings from system manufacturer.
49. Provide labor, material and equipment necessary for the installation of new electrical circuiting, outlets, and switches to new varsity dugouts. Contractor responsible for new conduits, wire, excavation and backfill for underground electrical work included in the complete installation of this item.
50. It is the responsibility of this contractor to cut, patch and revise all holes and penetrations for the installation of their own work. Holes and penetrations are to be patched to meet fire stop requirements using approved materials. All penetrations through walls, floors, and ceilings will be fire and smoke stopped in accordance with UL details and shall comply with State Fire Marshall Requirements.
51. Provide labor, materials and equipment necessary for new concrete paving, base material, and sawcutting as noted on plans. Work includes concrete flatwork around dugouts and at batting cages.
52. Provide labor, materials and equipment necessary for new concrete paving, base material, and sawcutting as noted on plans. Work includes concrete flatwork around dugouts and at batting cages.
53. Provide new topsoil and seed as indicated on drawings and provide all required lawn maintenance as specified. Seed all general areas disturbed during construction.
54. Furnish and install new topsoil and sod at areas noted on drawings. Coordinate sod and irrigation installation to ensure success of sod growth.
55. Provide all cleanup as it relates to Scope of Work.
56. Conduct tutorial with Owner on proper maintenance of synthetic turf.
57. Conduct Owner training on all new scoreboards.
58. Furnish turf attic stock of materials as specified.
59. Provide all required closeout documents upon completion of project.
Excluded Work:
1. Technology work (new or renovations to existing)
END OF SECTION 00 1115
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
00 2113 - Page 1 of 6
GITS 2022 BOND – ATHLETICS PHASE 2
STANDARD FORM
The Standard Form of Instructions to Bidders, AIA Document A701, 1997 edition, issued by the American Institute of Architects, is part of this specification. Copies are on file and may be obtained at the office of the Architect.
TABLE OF ARTICLES
1. Definitions 6. Post-Bid Information
2. Bidder's Representation 7. Performance Bond and Payment Bond
3. Bidding Documents 8. Form of Agreement Between Owner and Contractor
4. Bidding Procedures 9. Description of Work
5. Consideration of Bids 10. Warranty & Indemnity
The following includes modifications or additions to the above standard form which are applicable to this project.
ARTICLE 1
DEFINITIONS
1.2 All definitions set forth in the General Conditions of the Contract for Construction, AIA Document
A201, are applicable to these Instructions to Bidders.
1.3 Addenda are written or graphic instruments issued prior to the execution of the Contract which modify or interpret the bidding documents, including Drawings and Specifications, by additions, deletions, clarifications or corrections. Addenda will become part of the Contract Documents when the Construction Contract is executed. All changes in cost resulting from addenda shall be included in proposals.
ARTICLE 2
BIDDER'S REPRESENTATION
2.1.3 Each bidder, by making his bid, represents that he has visited the site and familiarized himself with the local conditions under which the work is to be performed. No claims for extra compensation shall be allowed due to failure of any Bidder to examine the conditions that exist at the building site nor for conditions or difficulties encountered in the execution of the work which may have been avoided by such examination.
In submitting his proposal, the Bidder also:
• represents that he has reviewed the work outlined in the Description of Work and fully understands the scope of the work required by interfacing Bid Categories as well as that required by Bid Categories covered in his proposal;
00 2113 - Page 2 of 6
GITS 2022 BOND – ATHLETICS PHASE 2
• acknowledges that the scope of the work is not necessarily restricted to a single trade, specification division, or section and that his proposal includes the work of all trades within the Bid Category or Categories covered in his proposal;
• agrees that his proposal, if accepted by the Owner, will be the basis for a contract directly with the Owner and to enter into such contract in accordance with the intent of the Contract Documents.
2.1.5 The Bidder shall familiarize himself, prior to bidding, with the work requirements of all other contractors which precede, interface, follow, or are concurrent with the work of this Category.
ARTICLE 3
BIDDING DOCUMENTS
3.3 SUBSTITUTIONS
3.3.1 Each Bidder represents that his bid is based upon the materials and equipment described in the Bidding Documents.
3.3.2 The successful Contractor must include without approved substitution, all materials and equipment which are specifically identified by manufacturer's name, model or catalog number in the respective Specification Section. Where more than one (1) product or material manufacturer is specified, the Bidder may use the one of his choice in his base bid.
It is required that Bidder indicated his choice of material by identifying same in check list attached to his proposal together with the cost attributed to such material. This cost shall be a part of Base Bid, not in addition thereto.
Other substitutions will be considered only when:
A. Request of substitution by the Bidder is made seven (7) days prior to the bid opening and approval for such request is given in the form of an Addendum.
B. Offered as a voluntary alternate presented on the Bidder's letterhead together with the amount to be deducted from his base proposal. The Owner may accept or reject such voluntary alternate based upon his best judgment.
3.3.2.1 Each such request shall include a complete description of their proposed substitute, the name of the material or equipment for which it is to be substituted, drawings, cuts, performance and test data and any other data or information necessary for a complete evaluation.
3.3.2.2 The Owner shall receive the benefit of all cost differences resulting from any substitution.
3.3.2.3 Any revisions necessary after substitutions of equipment or materials have been approved shall be the full responsibility of the Contractor without extra cost to the Owner.
3.3.4 Refer to Article 3.19 of Supplementary Conditions regarding substitutions after Award of
Contract.
00 2113 - Page 3 of 6
ARTICLE 4
BIDDING PROCEDURES
4.1 PREPARATION OF BIDS
4.1.1 All bids must be prepared on the forms provided by the Architect and submitted in accordance with the Instructions to Bidders.
4.2 BID SECURITY
4.2.2 ANY BID NOT ACCOMPANIED BY A BID BOND, CERTIFIED OR CASHIER'S CHECK
MAY BE REJECTED.
4.2.2.1 Either a CERTIFIED OR CASHIER'S CHECK on an open, solvent bank or a BID
BOND issued by an approved bonding company payable to Grosse Ile Township Schools in an amount equal to five percent (5%) of the bid shall be submitted with each proposal as liquidated damages if successful Bidder fails to sign contract and file necessary general insurance within fifteen (15) days after Notice of Award from Architect or Owner.
4.2.2.2 The bonding company on issuing a bid bond thereby obligates themselves to furnish a Performance, Labor and Material Bond within (10) ten days, in the full amount of the contract should subject Bidder be Low Bidder.
4.2.2.3 The bid deposit of all except the three (3) lowest responsible bidders will be returned within three (3) days after the opening of bids. The bid deposit of the three (3) lowest responsible bidder will be returned within 48 hours after the contract and their required bonds have been finally approved by the Owner.
4.2.3 (d) Contractor fails to provide required bonding and submit post-bid information required to determine contract award.
4.3 SUBMISSION OF BIDS
4.3.2.1 Proposals shall be addressed as follows:
Attn: Audrie Kalisz – Athletics Proposal
4.3.3 A bid is invalid if it has not been deposited at the designated location prior to the time and date for receipt of any bids indicated in the Advertisement for Bids, or prior to any extension thereof issued to the bidders.
4.3.5 The contractor shall include in the bid and contract price all Sales Taxes and Use Taxes currently imposed by Legislative enactment and as administered by the Department of Revenue on the Bid Date. If the Contractor is not required to pay or bear the burden, or
00 2113 - Page 4 of 6
GITS 2022 BOND – ATHLETICS PHASE 2
obtains a refund or drawback in whole or in part of any Sales or Use Tax, Interest or Penalty thereon, which was required to be and was deemed to have been included in the bid and contract price, the contract price shall be reduced by the amount thereof and the amount of such a reduction whether as a refund or otherwise, shall insure solely to the benefit of the Owner.
4.3.6 If required, a Bidder shall submit to the Architect a properly executed Contractor's qualification statement prior to receipt of proposals. Requested material may include the following:
Bidder's performance record, list of construction equipment, financial statement covering a period of two (2) years and any additional information required to satisfy the Owner that the Contractor is qualified to fulfill the Contract.
4.3.7 Within one (1) hour after the completion of the opening of the bids, the General Contractors who submitted the three lowest bids must submit a list of the names of each subcontractor who will provide labor or a portion of the work or improvement to the Contractor for which he will be paid an amount exceeding 5 percent of the prime Contractor’s total bid or $40,000 whichever is greater. If the General Contractor fails to submit such a list within the required time, his bid shall be deemed not responsive.
4.4 MODIFICATION OR WITHDRAWAL OF BID
4.4.1 Unless otherwise provided in any supplement to these Instructions to Bidders, no Bidder shall modify, withdraw or cancel his bid or any part thereof for sixty (60) days after the time designated for the receipt of bids in the Advertisement for Bids.
4.4.2.1 Prior to receipt of the bids, Addenda will be mailed or delivered to each person or firm recorded by the Architect as having received the bidding documents and will be available for inspection wherever the bidding documents are kept available for that purpose. Addenda issued after receipt of bids will be mailed or delivered only to the selected bidder.
ARTICLE 5
CONSIDERATION OF BIDS
5.2 REJECTION OF BIDS
5.2.1 The Bidder acknowledges the right of the Owner to reject any or all bids and to waive any informality or irregularity in any bid received. In addition, the Bidder recognizes the right of the Owner to reject a bid if the Bidder failed to furnish any required BID SECURITY, or to submit the data required by the Bidding Documents, or if the bid is in any way incomplete or irregular.
5.3 ACCEPTANCE OF BID (AWARD)
5.3.1 Emphasis is placed upon the fact that the Owner's decision regarding award of contracts will be influenced by such factors as quality, completion time, construction features, his best judgment of value, etc., and not entirely upon cost, and further, shall reserve the right to accept or reject any or all bids and to waive irregularities in proposals.
5.3.3 Contracts will be awarded based upon proposals received for one Bid Category only or for
00 2113 - Page 5 of 6
GITS 2022 BOND – ATHLETICS PHASE 2
all work combined under a single proposal.
5.3.4 Time is the essence of the Contract. It is understood that the work is to be carried through to completion with the utmost speed, consistent with good workmanship. The work of all trades shall be complete on days indicated except for minor replacement, correction or adjustment items which will not interfere with the complete operation and utilization of all parts of the contract work. The time of completion will be an important factor in determining award of the contract. Failure to comply with the construction document will result in rejection of the bid and/or cancellation of award.
5.3.5 Amounts entered in Proposal for Breakdowns or Unit Costs are subject to award, unless specifically noted otherwise.
ARTICLE 6
POST-BID INFORMATION
6.3 SUBMITTALS
6.3.1 Upon request by the Architect, the selected Bidder, within seven (7) days thereafter, shall submit the following:
6.3.1.1 A designation of the work to be performed by the Bidder with his own forces. Not to exceed a 10% markup for self performed/subcontracted work, material, and labor
6.3.1.2 A list of names of the Sub-Contractors or other persons or organizations (including those who are to furnish the materials or equipment fabricated to a special design) proposed for such portions of the work as may be designated, the names of the Sub-Contractors proposed for the principal portion of the work.
6.3.1.3 A statement of costs for each major item or work included in the bid or in detail as requested by the Architect.
6.3.2 The Bidder will be required to establish to the satisfaction of the Architect and Owner the reliability and responsibility of the proposed Sub-Contractors to furnish and perform the work described in the divisions of the Specifications pertaining to such proposed Sub- Contractor's respective trades.
6.3.3 Prior to the Award of Contract, the Architect will notify the Bidder in writing if either the
Owner or the Architect, after due investigation, has reasonable and substantial objection to any person or organizations on such list and refuses in writing to accept such person or organization. The Bidder may, at this option, withdraw his bid without forfeiture of bid security, notwithstanding anything to the contrary contained in Paragraph 4.3.3. If the Bidder submits an acceptable substitute with an increase in his bid price to cover the difference in cost occasioned by such substitution the Owner may, at his discretion, accept the increased bid price or he may disqualify the Bidder.
6.3.4 Sub-Contractors, manufacturers, material suppliers and other persons and organizations proposed by the Bidder and accepted by the Owner and Architect must be used on the work for which they were proposed and accepted and shall not be changed except with written approval of the Owner or Architect. Failure to provide the information, as stated, will result in rejection of bid and/or cancellation of award (post-award).
00 2113 - Page 6 of 6
ARTICLE 7
PERFORMANCE BOND AND PAYMENT BOND
7.1 BOND REQUIREMENTS
7.1 The Owner shall require the Bidder to furnish bonds covering the faithful performance of the
Contract and the payment of all obligations arising there under in such form and amount as the Owner may prescribe and with such sureties secured through the Bidder's usual sources as may be agreeable to the parties. Premiums shall be paid by the Bidder. The bonding companies are to be limited to those listed on U.S. Department of Treasury Circular 570. All surety bonds will be checked for validity before an Award will be made. If for any reason the bonds are not valid, the selected Contractor's Proposal will be null and void.
7.2 TIME OF DELIVERY AND FORM OF BONDS
7.2.1 The Bidder shall deliver the required bonds to the Owner not later than (10) ten days from the date of intent to enter the contract, or if the work is commenced prior thereto in response to a letter of intent or Notice of Award, the Bidder shall, prior to commencement of the work, submit evidence satisfactory to the Owner that such bonds will be issued.
7.2.2.1 All successful Bidders, except those noted above, shall be required to furnish
Performance and Labor and Material Bonds in the following amounts:
1. Performance Bond in the full amount of the contract insuring the faithful performance of all provisions of the contract and the satisfactory completion of the work embraced there under within the time agreed upon, and the covering of guarantees herein provided for. This bond shall also insure the Owner against defective material or workmanship in any work under the contract for a period of one (1) year after completion and acceptance of the project.
2. Payment Bond in the full amount of the contract for the protection of sub-contractors, labor and material men
7.2.4 The Bidder shall require the attorney-in-fact who executes the required bonds on behalf of the surety to affix thereto a certified and current copy of his Power of Attorney indication the monetary limit of such power.
ARTICLE 10
WARRANTY AND INDEMNITY
10.1 WARRANTY
10.1 All work shall be guaranteed in writing against defects in workmanship and materials for two (2) years from issuance by the Board of Education’s architect of the Certificate of Substantial Completion, or approval, acceptance and final payment by the Board of Education, whichever occurs first.
10.2 INDEMNITY
00 2113 - Page 7 of 6
10.2 Contractor shall indemnify, defend and hold the Grosse Ile Township Schools harmless from any damages to property or personal injuries resulting from or reasonable attributable to any defects in supplies or services provided by contractor hereunder.
END OF SECTION 00 2113
SECTION 00 2300
SCHEDULE AND PHASING
00 2300 - Page 1 of 2
GITS 2022 BOND – ATHLETICS PHASE 2
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Attention is directed to Division 00 Procurement and Contracting Requirements, and to Division 01
General Requirements which are hereby made a part of this section.
1.2 MILESTONE SCHEDULE
A. The following are the milestone schedule dates for the listed work and will become part of the Contract Documents. Successful Contractor shall be required to provide a Master Construction Schedule after award.
MILESTONE ACTIVITY SCHEDULED START SCHEDULED COMPLETION
General Construction – Varsity Fields June 23, 2025 September 19, 2025 General Construction – JV Fields July 28, 2025 October 24, 2025
B. Close coordination will be required between all construction trades to ensure construction operations can be completed within the scheduled time.
C. It is expressly agreed that time is of the essence for the completion of Work and Contractor agrees to perform the Work within the designated time specified. Contractor is responsible for any damage and expenses arising or resulting from the failure of Contractor to perform the Work in accordance with the specifications and milestone schedule.
1.3 CONSTRUCTION SCHEDULE PROCESS
A. Contractor shall commence work in the field within five (5) days upon receiving a “Notice to Proceed” from Foresite Design, Inc. Contractor shall be responsible for performing and completing the Work to the approval of the Owner and Foresite Design, inc.
B. Contractor shall submit to Foresite Design, Inc. within fifteen (15) days upon Award of Contract, information including but not limited to scheduling, anticipated work activities and working days, shop drawings and shall also note issues relating to availability of materials.
C. If Contractor delays progress for any reason other than delays specifically excused under the Contract Documents, Contractor shall take any and all necessary actions to expedite its Work and maintain the project schedule at no additional expense to the Owner or Foresite Design, Inc.
D. Contractor agrees that it shall have no claim against the Owner or Foresite Design, Inc. for an increase in awarded contract price nor for a payment or allowance of any kind for damage, loss, or expense arising from delays, regardless of whether the delay is the basis for an extension of time.
This provision includes claims from damages, loss, or expense arising from interruptions to necessary suspension of Contractor’s Work to enable others to perform their work.
E. The Contractor shall be back-charged an observation fee of $1,000.00 per day for each day that the
SECTION 00 2300
00 2300 - Page 2 of 2
GITS 2022 BOND – ATHLETICS PHASE 2
Contractor fails to meet the projected deadlines, weather permitting, and through no fault of the Owner, or Foresite Design, Inc.
1. Observation Fees, as agreed upon by Owner, Contractor and Architect, will be deducted from Contractor’s direct Contract with the Owner and fees paid by the Owner to Foresite Design, Inc.
END OF SECTION 00 2300
SECTION 00 4200
PROPOSAL FORM
00 4200- Page 1 of 10
GITS 2022 BOND – ATHLETICS PHASE 2
PROPOSAL FOR: Grosse Ile 2022 Bond – Athletics Phase 2 Grosse Ile High School 7800 Grays Drive
PROPOSAL TO: Grosse Ile Township Schools
Attn: Audrie Kalisz
ARCHITECT: FORESITE DESIGN, INC
3269 Coolidge Highway Berkley, MI 48072 248-547-7757 Email: mike@foresitedesign.com
SUBMITTING CONTRACTOR: _________________________________________________________
ADDRESS: _________________________________________________________________________
PHONE:___________________________________EMAIL: __________________________________
1. BASE PROPOSAL
I have carefully examined the bidding documents which include the Instructions to Bidders, all General Conditions and Supplemental Conditions, all drawings title "Grosse Ile Township Schools” and all various addenda as prepared by FORESITE DESIGN, INC. which cover the general and architectural trades, as well as the premises and conditions affecting this work.
The undersigned proposes to furnish all labor, materials and equipment, all utilities, transportation services and taxes for the general construction as indicated under each proposal in accordance with said documents.
Within one (1) hour after the completion of the opening of the bids, the Contractors who submitted the apparent low bid must submit a list of the names of each subcontractor who will provide labor or a portion of the work or improvement to the Contractor for which he will be paid an amount exceeding 5 percent of the prime Contractor’s total bid or $40,000 whichever is greater. If the Contractor fails to submit such a list within the required time, bid may be deemed not responsive.
A. PROPOSAL A: GENERAL CONSTRUCTION
PROPOSAL A: BASE BID $
Dollars (written sum)
2. ALTERNATES
The Undersigned further proposes to execute the work specified in the respective technical division or indicated on the drawings for the sum added to (unless otherwise noted) the Base Proposal Amount as stated below:
A. ALTERNATE No. 1: Black Vinyl Fence ADD or DEDUCT $ ___________________
00 4200- Page 2 of 10
GITS 2022 BOND – ATHLETICS PHASE 2
3. VOLUNTARY ALTERNATES
The following alternates are offered at this time for the consideration of the Owner. If accepted, the Base Proposal will be changed by the amount listed.
A.
Add to or Delete from Base Proposal Amount: $ _______________________________
B.
Add to or Delete from Base Proposal Amount: $ _______________________________ C.
Add to or Delete from Base Proposal Amount: $ _______________________________
4. PRICE GUARANTEE
The Undersigned agrees that its proposal shall not be withdrawn and the price stated in the Proposal is guaranteed for sixty (60) consecutive days from the bid date.
5. TAXES
The undersigned acknowledges that the prices stated above include all applicable taxes of whatever character or description.
6. ADDENDA
If any Addenda covering changes to the Bidding Documents have been received during the bidding period, the bidder shall fill in their numbers and dates which acknowledge having received the same, and having included in this proposal the work involved.
No. __ Dated ___________________________________
No. __ Dated ___________________________________
No. __ Dated ___________________________________
7. NEGOTIATION
The Undersigned agrees that, should the overall cost exceed the funds available, it will be willing to negotiate with the Owner for the purpose of making further reductions in the Contract Work, and shall agree to give full credit for all such reductions in the work requested by the Owner, including full value of labor, materials, and subcontract work and reasonable proportionate reductions in overhead and profit, thereby arriving at an agreed upon Contract price.
00 4200- Page 3 of 10
GITS 2022 BOND – ATHLETICS PHASE 2
8. UNIT PRICES
All unit prices quoted shall include the sum total of all additional costs of labor, material, overhead, profit, fees, general conditions, and such other costs incidental to the work described. Any increase in cost must be approved by the Owner in writing prior to work being performed.
For all revisions involving the deletion of Contract work, it is agreed that full credit shall be given the Owner for such work deleted on a unit basis as quoted hereinafter.
UNIT PRICING BID PROPOSAL A (SITE WORK)
A 4G Aggregate Base Stone $ ________________ Per ton B Turf Finishing Stone $ ________________ Per ton C 21AA Limestone Aggregate $ ________________ Per ton D Class II Sand $ ________________ Per cubic yard (cy) E Sawcut Asphalt $_________________ Per lineal foot (lf) F 12” Diameter Yard Inlet Structure $ ________________ Per unit (ea) G Undercut and replacement of poor soils $ ________________ Per cubic yard (cy) H Undercut (removal only) $ ________________ Per cubic yard (cy) I Additional Excavation $ ________________ Per cubic yard (cy) J Furnish and install 1” x 3” Stone $ ________________ Per cubic yard (cy) K Install geotextile fabric for undercutting $ ________________ Per square yard (sy) L Install geogrid (Tensar TriAx) for undercutting $ ________________ Per square yard (sy) M 12” Concrete Turf Anchor & Wood Nailer $_________________ Per lineal foot (lf) N 4” Non-reinforced Concrete and Base $_________________ Per square foot (sf) O 6” Reinforced Concrete and Base $_________________ Per square foot (sf) P 4” Asphalt and Base $_________________ Per ton (ton) Q 8’ Black Vinyl Chainlink Fence $_________________ Per lineal foot (lf) R 4’ Black Vinyl Chainlink Fence $_________________ Per lineal foot (lf) S 8’ Galvanized Chainlink Fence $_________________ Per lineal foot (lf) T 4’ Galvanized Chainlink Fence $_________________ Per lineal foot (lf)
Any increased cost based on the unit prices must be approved by Owner’s written change order prior to starting work. Quantities must be confirmed by a Testing Agency or Architect and the Owner.
9. PROJECT COMPLETION
Contractor shall complete the entire work and obtain a Certificate of Substantial Completion by the substantial completion date indicated in Section 00 2300 Schedule and Phasing. Contractor and Owner agree that if the Certificate of Substantial Completion is obtained later than the date noted, the project completion date shall be adjusted by an amount of time properly documented in Change Orders. If the Owner and Contractor do not agree with the adjustment in Contract time due to Change directives, such adjustment shall be determined by the Architect.
10. RIGHTS RESERVED BY OWNER
The Owner reserves the unconditional right to waive any irregularities, reject any or all proposals or to accept proposals which in the judgment of the Owner will serve the best interests of the Owner.
The Owner reserves the right to award to a Contractor based on factors other than low bid.
00 4200- Page 4 of 10
GITS 2022 BOND – ATHLETICS PHASE 2
11. PROPOSAL GUARANTEE (BID BOND)
Is required: Refer to AIA Document A701-2018 “Instruction to Bidders” Amount: 5% of contract sum
12. CONTRACT SECURITY (Performance and Labor & Material Payment Bond) Is required: Refer to AIA Document A701-2018 “Instruction to Bidders” Amount: 100% of contract sum
13. CONTRACT EXECUTION
The Undersigned agrees to execute a Contract for work covered by this Proposal as provided for in the Bidding Documents. The Undersigned declares the legal status indicated below:
( )…