This is an addendum to a Request for Proposals issued by Genesee Intermediate School District (GISD) for New Building Fiber installation services, dated April 10, 2019. The RFP addresses vendor questions raised during a mandatory pre-bid meeting held on April 5, 2019. The project involves installing fiber optic cable into Randels Elementary School with termination into a vendor-provided fiber tray in the Main Distribution Frame (MDF). The scope includes routing fiber through existing or new ducts and pathways to a demarcation point on the second floor ceiling of a new building. GISD Network Operations will be responsible for installing 4x4 port fiber multiplexers, while the awarded vendor is responsible only for providing this equipment. The bid submission deadline remains unchanged at April 17, 2019 at 11:00 a.m. Vendors are permitted to submit alternative bids including options for all underground routing, provided that the mandatory bid is also submitted.
The addendum clarifies that the Performance and Payment Bond and PLM Bond are required only from the awarded bidder and should not be submitted with the initial bid proposal. Regarding existing infrastructure, vendors have flexibility in selecting between two existing 4-inch ducts for fiber routing, with the discretion to use cost considerations when making this determination. The district is open to alternative proposals for the pathway solution, allowing vendors to either tie into existing pathways via a new vault or propose an entirely new pathway with riser installation. Vendors are also permitted to over-lash onto existing fiber at the school along the route from the road to the back parking lot. Site drawings and a pre-bid meeting attendee sign-in sheet were provided as separate addenda to support the bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Genesee Intermediate School District
GISD New Building Fiber (2019) RFP Addendum Number 1 dated April 10, 2019
This Addendum addresses vendor questions received during the mandatory pre-bid meeting on April 5, 2019 and via email. NOTE: The bid date for this Request for Proposals remains unchanged, April 17, 2019 at 11:00 a.m. All other terms and conditions of the bid shall remain in full force and effect.
Questions
1. Site Drawings
Provided as Addendum 2.
2. Pre-bid Meeting Vendor Sign-In Sheet
Provided as Addendum 3.
3. Will the fiber be going into Randels Elementary or using an existing splice point?
Fiber should go into Randels Elementary. Please terminate into a vendor provided fiber tray in the MDF at Randels Elementary. Do not use an existing splice point.
4. Is the awarded vendor to install the 4x4 port fiber multiplexers? Or just provide the item?
GISD Network Operations will install the multiplexers.
5. Are we to use the empty existing 4” duct” that is in the IDF room on the 1st floor? The opposite end, routing, footage was not able to be verified. There is a 2nd existing 4” duct that has an existing fiber cable in it. This is possibly AT&T duct/fiber to an existing handhole on Elms Rd.
We have no preference on which duct you use, but consider costs when determining which duct to use.
6. Existing pathway to new building was pretty sketchy so for bidding purposes are we to propose to locate and tie into existing pathway by way of setting a new vault or should we be proposing a new pathway to the back side new building and riser up to second floor ceiling environment to demarcation point?
We are open to either option. Please consider costs while quoting this. If you would like to provide an alternative bid with separate options, that is acceptable as well.
7. Page 4 Bidding Requirement #5 says “Awarded bidder shall also submit a PLM Bond in an amount equal to the final contract amount” – on Page 5 #13 #2 – Performance and Payment Bond is requested to be submitted with Bid Proposal. Please clarify
PLM Bond only needs to be submitted by awarded bidder.
8. As it stands now are still looking for an add alt for all underground?
We will consider alternate bids if the mandatory bid has also been submitted. An all Underground
Alternative bid is not a mandatory bid, but we will certainly consider both options.
9. Can we over lash onto the fiber at the school coming from the road going to the back of the parking lot?
Yes, you can over lash onto the fiber at the school.