GHS Walk_in Cooler _ Sheet1 (1).pdf
PDF 53 KB Posted
- Attached to
- Gilmer High School Walk-in Cooler Replacement
- Solicitation number
- PE-55095-NONST-2025-000000007
- Issued by
- Banks County, Georgia
About this file
This is a bid evaluation summary document from Gilmer County Schools School Nutrition department for a walk-in cooler project at GHS (presumably Gilmer High School). The project involves installing a new 14'x24' cooler for the GHS cafeteria, with work scheduled to be completed during summer 2025. Four vendors submitted bids for the project: Boelter, Manning Brothers, Mobile Fixtures & Equipment, and Chef/Culinary Depot.
The bid evaluation compared vendors across five equally-weighted criteria (20% each): Stability, Relevance, Suitability, Team, and Fee. Boelter received the highest overall score of 5.0 and submitted the lowest bid at $97,662.53, followed by Manning Brothers ($101,256.65), Mobile Fixtures & Equipment ($106,693.93), and Chef/Culinary Depot ($134,314.32). Boelter is being recommended as the provider based on their perfect evaluation scores, lowest bid, and history of providing excellent equipment and service to Gilmer County Schools for several years. The renovation is noted to result in increased work space and dry storage.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GHS Walk_In Cooler Bid_docx.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GHS Walk-In Cooler 2025-02
School Nutrition
Company Name Total Cost Boelter $97,662.53
Manning Brothers $101,256.65 Mobile Fixtures & Equipment $106,693.93
Chef/Culinary Depot $134,314.32
Boelter Manning Brothers
Mobile Fixtures & Equipment
Chef/Culinary Depot
20% Stability 5 5 5 5 20% Relevance 5 5 5 5 20% Suitability 5 5 5 4 20% Team 5 5 5 4 20% Fee 5 4 3 2
5 4.8 4.6 4
Recommending Boelter as the provider of the new 14'x24' cooler for the GHS cafeteria.
Boelter has provided Gilmer County Schools with excellent equipment and service for several years.
Work will be completed during the summer of 2025 This renovation will result in an increase of work space and dry storage.
File details come from the government source that posted it. Updated .