GHS Walk_in Cooler _ Sheet1 (1).pdf

PDF 53 KB Posted

Attached to
Gilmer High School Walk-in Cooler Replacement
Solicitation number
PE-55095-NONST-2025-000000007
Issued by
Banks County, Georgia

About this file

This is a bid evaluation summary document from Gilmer County Schools School Nutrition department for a walk-in cooler project at GHS (presumably Gilmer High School). The project involves installing a new 14'x24' cooler for the GHS cafeteria, with work scheduled to be completed during summer 2025. Four vendors submitted bids for the project: Boelter, Manning Brothers, Mobile Fixtures & Equipment, and Chef/Culinary Depot.

The bid evaluation compared vendors across five equally-weighted criteria (20% each): Stability, Relevance, Suitability, Team, and Fee. Boelter received the highest overall score of 5.0 and submitted the lowest bid at $97,662.53, followed by Manning Brothers ($101,256.65), Mobile Fixtures & Equipment ($106,693.93), and Chef/Culinary Depot ($134,314.32). Boelter is being recommended as the provider based on their perfect evaluation scores, lowest bid, and history of providing excellent equipment and service to Gilmer County Schools for several years. The renovation is noted to result in increased work space and dry storage.

View the file

Other files

File Type Posted
GHS Walk_In Cooler Bid_docx.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GHS Walk-In Cooler 2025-02

School Nutrition

Company Name Total Cost Boelter $97,662.53

Manning Brothers $101,256.65 Mobile Fixtures & Equipment $106,693.93

Chef/Culinary Depot $134,314.32

Boelter Manning Brothers

Mobile Fixtures & Equipment

Chef/Culinary Depot

20% Stability 5 5 5 5 20% Relevance 5 5 5 5 20% Suitability 5 5 5 4 20% Team 5 5 5 4 20% Fee 5 4 3 2

5 4.8 4.6 4

Recommending Boelter as the provider of the new 14'x24' cooler for the GHS cafeteria.

Boelter has provided Gilmer County Schools with excellent equipment and service for several years.

Work will be completed during the summer of 2025 This renovation will result in an increase of work space and dry storage.

File details come from the government source that posted it. Updated .