About this file

This document summarizes a federal contract award notice and related contract documents. The Defense Information Systems Agency awarded GTT Global Telecom Government Services, LLC a contract valued at $259,893.33 on July 28, 2022 to provide, install, and maintain a 2.5GB wave service between buildings in Rome, New York and Mechanicsburg, Pennsylvania for 60 months with no basic termination liability. The contract requires the contractor to provide a diverse end-to-end circuit with specific testing, documentation, outage reporting, and infrastructure compliance requirements. The contract period is through July 2027 and payment will be made using the Delivery Ticket Invoice process.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ORDER

IQO CONTRACT

FM: PL8211

TO: GTT GLOBAL TELECOM GOVERNMENT SERVICES LLC - 7A5Z1

DATE (MM/DD/YYYY): 7/28/2022

SUBJECT: HC101322PA401

A. TYPE ACTION: REAWARD

1. PURPOSE: 1. IN ACCORDANCE WITH SOLICITATION HC101322QA265, PROCEED TO

PROVIDE, INSTALL AND MAINTAIN A 2.5GB WAVE SERVICE BETWEEN BLDG 700, ROOM

104A, 362 OTIS STREET, ROME, NY AND BLDG 308, ROOM 203, 5450 CARLISLE PIKE,

MECHANICSBURG, PA FOR 60 MONTHS WITH NO BASIC TERMINATION LIABILITY (BTL).

2. THE SERVICE DATE TO BE MET IS: 28 AUG 22 (SIP). THE GOVERNMENT ASSUMES THAT

CONTRACTORS HAVE CONSIDERED ALL ISSUES THAT MAY DELAY THE DELIVERY OF

CIRCUIT ON REQUESTED SERVICE DATE AND MAY CANCEL, TERMINATE, OR REQUEST

CONSIDERATION IAW STANDARD PROVISION 42 FOR FAILURE TO MEET CONTRACTUAL

SERVICE.

3. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH AWARD

GGTG000617EBM/TSR SG15MAR227238 AND MUST BE ENGINEERED AND PROVISIONED

TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS

(SDP) FROM TSR SG15MAR227238; MEANING THE PHYSICAL PATHS ARE TOTALLY

SEPARATE INCLUDING MAN HOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER

BUILDS. ADDITIONALLY AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION

FROM TSR SG15MAR227238.

4. CONTRACTOR SHALL FOLLOW THE APPROVED COLOR POWERPOINT DRAWINGS

SHOWING THE ROUTES FROM THE COMMERCIAL DEMARKS TO THE SUPPORTING

CENTRAL OFFICES AND/OR WIRING CENTERS, ENSURING THE PHYSICAL END TO END

DIVERSITY REQUIREMENTS ARE BEING MET. 5. CONTRACTORS MUST COMPLY WITH

TESTING AND ACCEPTANCE REQUIREMENTS.

5. TESTING MUST BE COORDINATED WITH CUSTOMER ACCEPTANCE AUTHORITY BEFORE

NOTICE OF COMPLETION IS SUBMITTED TO DITCO.

6. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION (NOC) IN IDEAS. NOC MUST

BE COORDINATED WITH GOVERNMENT TESTING AND ACCEPTANCE AUTHORITY OR

CUSTOMER POC ACCEPTING THE SERVICE.

7. TSP:TSP0EWRC5-01

8. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE

END TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM CJON:

SG15MAR227238, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING

HC101322PA401 / GGTG000618EBM

MAN HOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. THE

TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR

TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL DEMARCS TO

THE M. SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. DRAWINGS MUST

INCLUDE SEPARATION DISTANCES BETWEEN DIVERSE REQUIREMENTS, TOTAL FIBER

MILES AND ROUND TRIP DELAY (RTD), AND FIBER ROUTES RED LINED END TO END SO

THE GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS

ARE MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/

PATH CONNECTIVITY DIAGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF

PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH. 8.

THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON THE

EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY POINT

(SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE GOVERNMENT

ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED TO -3 TO -9

DBM. 9. THE VENDOR MUST TERMINATE 10GB ETHERNET SERVICE AT SERVICE DELIVERY

LOCATIONS, IAW UNIQUE INSTALLATION FACTORS. 10. THE VENDOR MUST CONDUCT

WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS. 11. THE

VENDOR MUST CONTACT DISA GOC IP BACKBONE ENGINEERING AND IMPLEMENTATION

GROUP UPON RECEIPT OF A VALID TSO TO ESTABLISH THE COORDINATION AND

ACTIVATION PROCESS. PHONE: (C) 618-418-8627, (D) 418-8627. 12. THE VENDOR MUST

CONTACT DISA GOC TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-

TO-END TESTING. PHONE: (C) 618-418-8627, (D) 418-8627. 13. THE PROVIDER MUST

CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP SIDE OF THEIR OR LOCAL

EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE AT THE "A" LOCATION

TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT SUITE

AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION BETWEEN THE COMMERCIAL

DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST ENSURE N. TEST & ACCEPTANCE

INSTRUCTIONS: TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND

AT THE "Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE

GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR

24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK

INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)

IAW ITU-T-Y.1564.

CIRCUIT REQUIRES THE FOLLOWING PARAMETERS: (A) FIBER TERMINATION: FRAME

FORMAT: 10GB ETHERNET (OPTICAL HANDOFF-10GB ETHERNET-LAN-PHY-SINGLE MODE

FIBER), 1310NM. "SC" OR "LC" CONNECTORS AS DETERMINED BY SITE SURVEY. NOTE:

WHEN EXTENDED REACH OPTICS ARE USED THAT CHANGE THE TX/RX WAVELENGTH OF

THE OPTIC, THE VENDOR WILL NOTIFY THE GOVERNMENT 30 DAYS PRIOR TO DELIVERY.

(B) COMMITTED INFORMATION RATE (CIR): 10GB. (C) ETHERNET FRAME SIZE WILL BE

CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION UNIT (MTU) OF 9000 OCTETS BYTES)

JUMBO FRAMES. (D) NO NETWORK INTERFACE UNIT, DEDICATED PATH. (E) GFE CLOCKING:

VENDOR ESFU (OR EQUIVALENT) NOT TO BE ENGINEERED INTO CIRCUIT.

(F) TESTING CRITERIA: VENDOR MUST TEST THE CIRCUIT FOR 24 HOURS IAW THE FULL

ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK INTERCONNECT DEVICES

STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR) IAW ITU-T-Y.1564. NOTE:

ETHERNET FRAME SIZE DESIGNATOR 'H' (MTU) IS EQUAL TO 9000 BYTES. (G) LINE MUST

REMAIN FULLY OPERATIONAL AND AVAILABLE TO USERS 24 HOURS A DAY, SEVEN DAYS

PER WEEK, MONTHLY PERFORMANCE OF 99.5% AVAILABILITY OR BETTER.

(H) 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.

(I) VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.

(J) VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER. (K) TELECOM PROVIDER

MUST MAINTAIN OPERATIONS, MAINTENANCE AND ADMINISTRATION MONITORING OF

ETHERNET CIRCUIT. O. REMARKS CONTINUED: (L) THE COMMERCIAL CIRCUIT WILL

BE ACCEPTED ON BEHALF OF THE GOVERNMENT BY THE DISA GOC IP BACKBONE

ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. (C) 618-418-8627, (D)

418-8627. 2. VENDOR WINNING AWARD IS RESPONSIBLE FOR INSTALLATION AND

MAINTENANCE OF THE SERVICE IAW THE UNIQUE INSTALLATION FACTORS. 3. INSIDE

WIRING IS AUTHORIZED IAW THE UNIQUE INSTALLATION FACTORS. 4. VENDOR MUST

COORDINATE SITE VISIT WITH POC'S 72 HOURS IN ADVANCE PRIOR TO REQUIRING

ACCESS TO FACILITIES AT BOTH USER LOCATIONS. 5. VENDOR MUST CONTACT DISA GOC

TIER-II ENGINEERING 48 HOURS PRIOR TO BEGINNING THEIR END-TO-END TESTING. 6. ALL

EQUIPMENT AND CIRCUIT PROBLEMS WILL BE REPORTED BY PHONE TO THE DISA GOC

IP BACKBONE ENGINEERING AND IMPLEMENTATION GROUP, SCOTT AFB, IL. PRIMARY: (C)

618-418-9950, (D) 418-9950 TOLL FREE: 855-868-9950.

MINIMUM TECHNICAL SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE:

10.3125 GIGABITS/S, +- 100 PPM LINE CODE: OPTICAL 1. TEST AND ACCEPTANCE: THIS

CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK TEST

BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627. 2. ERROR

PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING

PARAMETER THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN

99.5% OR BETTER. FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT

HIGHEST FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS. JITTER SHALL BE

LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC. 3. MEAN TIME TO LOSS

OF BIT COUNT INTEGRITY (MTTLBCI) SHALL P. REMARKS CONTINUED: BE GREATER

THAN 24 HOURS. 4. ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL

BE MEASURED IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT

(SDP) SITE-A TO THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD

SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE

GOVERNMENT'S MISSION. THE GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM

THE RTD DURING THE TURN-UP AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE

CONTRACTORS PROPOSAL, DISA IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.

9. THIS IS A REAWARD OF A CURRENT SERVICE, (CSA#GGTG000113EBM). THE CURRENT

CSA WILL BE ADMINSTRATIVELY DISCONTINUED WITHIN 30 DAYS OF INCUMBENT

CONTRACTOR RECEIVING AWARD OR EARLIER. THE DISCONTINUE DATE OF CURRENT CSA

WILL BE DATED THE DAY PRIOR TO THE START DATE OF NEW CSA.

If there are more than two locations, their information will be found in Attachment B to this Order.

B. ALLA NUMBER:

C. TSP AUTHORIZATION CODE: TSP0EWRC5-01

D. DEMANDER'S CODE:

E. SERVICE DATE (MM/DD/YYYY): 8/28/2022

F. TYPE OF CIRCUIT/BANDWIDTH/DATA RATE: 2.488 Gigabit

G. LOCATION OF TERMINATION A:

1. ADDRESS: 700; 362 OTIS STREET; ROME, NY, 13441-4812

2. ROOM: 104A; 1 FL

H. LOCAL PART A:

1. EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards.

2. INTERFACE: SONET OC-48; OPTICAL; SNAP CLICK (SC)

3. DEMARK: (BLDG) 700; RM 104A; 1 FL; 362 OTIS STREET; ROME, NY, 13441-4812

4. NPA/NXX: 315/334

5. UNIQUE INSTALLATION FACTORS: A. VENDOR IS RESPONSIBLE FOR INSTALLATION

AND MAINTENANCE OF SINGLE MODE FIBER FROM LINE SIDE OF DISA IE1 PROVIDED FIBER

TERMINATING PATCH PANEL INSTALLED IN ODXC SUITE (UODWROM010) BLDG 700, ROOM

104A TO DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION

PANEL (FDP) BLDG 700, ROOM ROOM 104A.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM DISA IE1 PROVIDED FIBER PATCH

PANEL TO DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER DISTRIBUTION

PANEL (FDP) WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE

FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE

CONTINUOUS.

C. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO.

AS APPLICABLE AT DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL (FDP) BLDG 700, ROOM 104A. ADDITIONALLY, VENDOR MUST

SHOW SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN

INSTALLATION IS COMPLETE.

D. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS

IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

6. INSIDE WIRE INSTALLATION/MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES

7. CONTACT: (PMRY POC) MR. DANIEL FOLEY; DANIEL.FOLEY.6@US.AF.MIL; (CMCL)

315-334-6152; (DSN) 312-587-6152

(ALT POC) CIRCUIT ACTIONS;

USAF.NY.224-ADG.LIST.224-SS-SC-CIRCUIT-A CTIONS@MAIL.MIL; (CMCL) 315-334-6760;

(DSN) 587-6760

I. TERMINATION EQUIPMENT A: FIBER CABLE X-CONNECT, IN-HOUSE,INSIDE WIRE,SINGLE-

MODE, 1310NM, TELCO

J. LOCATION OF TERMINATION B:

1. ADDRESS: 308; 5450 CARLISLE PIKE; MECHANCSBRG, PA, 17050-0975

2. ROOM: 203; 2 FL

K. LOCAL PART B:

1. EXTENSION OF TELECOMMUNICATIONS SERVICE: All facilities between vendor's commercial communications interface point and termination location shall be provided by vendor. All cables shall be run in accordance with local site standards.

2. INTERFACE: SONET OC-48; OPTICAL; SNAP CLICK

3. DEMARK: (BLDG) 308; (RM) 203; 2 FL; 5450 CARLISLE PIKE; MECHANCSBRG, PA,

17050-0975

4. NPA/NXX: 717/790

5. UNIQUE INSTALLATION FACTORS: A. VENDOR IS RESPONSIBLE FOR INSTALLATION

AND MAINTENANCE OF SINGLE MODE FIBER FROM DROP SIDE OF COMMERCIAL FIBER

POINT OF PRESENCE FIBER DISTRIBUTION PANEL (FDP) BLDG 308, ROOM 203 TO LINE

SIDE OF DISA IE1 PROVIDED FIBER TERMINATING PATCH PANEL INSTALLED IN ODXC

SUITE (UODWMEC010) BLDG 308, ROOM 203. TERMINATE WITH "SC" CONNECTORS TO DISA

PROVIDED FIBER TERMINATING PATCH PANEL.

B. VENDOR MUST PROVIDE FIBER STRANDS FROM THEIR POINT OF PRESENCE TO ODXC

SUITE WITHOUT SPLICING AND OR USE OF CONNECTORS TO CONNECT 2 OR MORE

FIBER STRANDS MEANING THE FIBER CANNOT BE BROKEN IN THE MIDDLE AND MUST BE

CONTINUOUS.

C. LENGTH OF SINGLE MODE FIBER JUMPERS REQUIRED WILL BE BASED ON LOCATION OF

THEIR POINT OF PRESENCE.

D. CIRCUIT MUST BE TAGGED WITH LOCAL CIRCUIT ID AND LONG HAUL CIRCUIT NO.

AS APPLICABLE AT DROP SIDE OF COMMERCIAL FIBER POINT OF PRESENCE FIBER

DISTRIBUTION PANEL (FDP) BLDG 308, ROOM 203. ADDITIONALLY, VENDOR MUST SHOW

SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN SERVICE

IS COMPLETE.

E. VENDOR MUST SCHEDULE/COORDINATE WITH POC'S LISTED ON THIS ORDER 72 HOURS

IN ADVANCE PRIOR TO SITE SURVEYS OR INSTALLATIONS.

6. INSIDE WIRE INSTALLATION/MAINTENANCE REQUIRED: CPIWI-YES/CPIWM-YES

7. CONTACT: (PMRY POC) MR. DAN S BRAMBLEY;

ISA.MECHANICSBURG.EIS.MBX.CIRCUITS-CKTS @MAIL.MIL;

DANIEL.S.BRAMBLEY.CIV@MAIL.MIL; (CMCL) 717-918-6200; (DSN) 322-918-6200

L. TERMINATION EQUIPMENT B: FIBER CABLE X-CONNECT, IN-HOUSE, INSIDE WIRE,

SINGLE-MODE, 1310NM, TELCO

M. ADDITIONAL INFORMATION:

1. CSA NUMBER: GGTG000618EBM

2. BASIC AGREEMENT NUMBER: HC101321H0003

3. TSR NUMBER: SG15MAR227235

4. CCSD: DIYU6EX2

5. DIVERSITY REQUIREMENTS: YES

6. LOCATIONS TO BE AVOIDED: N/A

7. TRANSMISSION MEDIA TO BE AVOIDED: N/A

8. NETWORKS TO BE AVOIDED: N/A

9. CIRCUIT PARAMETERS: SEE PURPOSE STATMENT

10. TESTING REQUIREMENTS: SEE PURPOSE STATMENT

11. GOVERNMENT ACCEPTANCE ACTIVITY: DISA DGOC/D418-8627; C618-418-8627

12. SECURITY REQUIREMENTS: ESCORT REQUIRED. SECURITY CLEARANCE NOT

REQUIRED. VENDOR MUST CONTACT SITE POC ATLEAST 72 HOURS PRIOR TO ANY SITE

VISIT OR INSTALATION.

13. SITE ACCESS REQUIREMENTS: ESCORT REQUIRED. SECURITY CLEARANCE NOT

REQUIRED. VENDOR MUST CONTACT SITE POC ATLEAST 72 HOURS PRIOR TO ANY SITE

VISIT OR INSTALATION.

14. STANDARD PROVISIONS: Incorporated in full text below

15. CHARGES: See Attachment

16. DITCO FUND CITE: 97X4930.5F20 000 C1013 0 068142 2F 233003

17. EXPIRATION DATE: Telecommunications service provided under this contract will continue until 28 JUL 2027, unless sooner discontinued.

18. SIMULTANEOUS ACTION TSR NUMBER:

N. ADDRESS FOR SUBMISSION OF INVOICES: SEE STANDARD PROVISION 49 - STANDARD

PROVISION 49 (DTI)

Z. DITCO CONTACT:

Benjamin Sparlin

618-418-6836 benjamin.r.sparlin.civ@mail.mil

Angelina Hutson

DITCO Contracting Officer

618-418-6496 angelina.hutson.civ@mail.mil

Attachment A - CLINs and Charges

Currency: USD

CLIN/SLIN Item # Description Qty Unit NRC MRC EXT Price PoP From PoP To Location

0001 MRC 8/28/2022 7/28/2027 ROME;

CCI; 36

0001AA MONTHLY

RECURRING

CHARGE

1 EA $4,400.00 $4400.00 8/28/2022 7/28/2027 ROME;

CCI; 36

Total EXT MRC: $4400.00 for POP from 8/28/2022 to 7/28/2027

Total EXT NRC: $0.00

Section G - Contract Administration Data

Included Clauses

G1 - Points of Contact - OCT 2021

Communications with the Contractor will be conducted with the identified Point(s) of Contact (POC). Should a change in POC be required, the Contractor shall initiate this request through notification to the Contracting Officer.

Contracting Officer

Name: ANGELINA HUTSON

Organization/Office Symbol: Phone No.: DISA/ DITCO

E-Mail Address: ANGELINA.HUTSON.CIV@MAIL.MIL

Contract Specialist

Name: BEN SAPRLIN

Organization/Office Symbol: Phone No.: DISA/ DITCO

E-Mail Address: BENJAMIN.R.SPARLIN.CIV@MAIL.MIL

COR/Mission Partner Point of Contact (Note: To be filled in upon contract award)

Name:

Organization/Office Symbol: Phone No.:

E-Mail Address:

Contractor Point of Contact

Contractor Legal Business Name:

DUNS:

CAGE CODE:

Contractor POC:

E-Mail Address:

Phone Number:

Fax Number:

(End of text)

Standard Provisions

252.204-7018 - Prohibition on the Acquisition of Covered Defense Telecommunications

Equipment or Services - JAN 2021

(a) Definitions. As used in this clause--

Covered defense telecommunications equipment or services means--

(1) Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation, or any subsidiary or affiliate of such entities;

(2) Telecommunications services provided by such entities or using such equipment; or

(3) Telecommunications equipment or services produced or provided by an entity that the Secretary of Defense reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

Covered foreign country means--

(1) The People's Republic of China; or

(2) The Russian Federation.

Covered missions means--

(1) The nuclear deterrence mission of DoD, including with respect to nuclear command, control, and communications, integrated tactical warning and attack assessment, and continuity of Government; or

(2) The homeland defense mission of DoD, including with respect to ballistic missile defense.

Critical technology means--

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in

Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration

Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled--

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018 (50

U.S.C. 4817).

Substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition. In accordance with section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91), the contractor shall not provide to the Government any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless the covered defense telecommunication equipment or services are covered by a waiver described in Defense Federal Acquisition Regulation Supplement 204.2104.

(c) Procedures. The Contractor shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service, to carry out covered missions, that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.

(d) Reporting.

(1) In the event the Contractor identifies covered defense telecommunications equipment or services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, the Contractor shall report at https://dibnet.dod.mil the information in paragraph (d)(2) of this clause.

(2) The Contractor shall report the following information pursuant to paragraph (d)(1) of this clause:

(i) Within 3 business days from the date of such identification or notification: The contract number; the order number(s), if applicable; supplier name; brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 30 business days of submitting the information in paragraph (d)(2)(i) of this clause: Any further available information about mitigation actions undertaken or recommended. In addition, the Contractor shall describe the efforts it undertook to prevent use or submission of a covered defense telecommunications equipment or services, and any additional efforts that will be incorporated to prevent future use or submission of covered telecommunications equipment or services.

(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial items.

(End of clause)

52.204-25 - Prohibition on Contracting for Certain Telecommunications and Video

Surveillance Services or Equipment - NOV 2021

(a) Definitions. As used in this clause--

Backhaul means intermediate links between the core network, or backbone network, and the small subnetworks at the edge of the network (e.g., connecting cell phones/towers to the core telephone network). Backhaul can be wireless (e.g., microwave) or wired (e.g., fiber optic, coaxial cable, Ethernet).

Covered foreign country means The People's Republic of China.

Covered Telecommunications Equipment or Services means-

(1) Telecommunications equipment produced by Huawei Technologies company or ZTE Corporation (or any subsidiary or affiliate of such entities);

(2) For the purpose of public safety, security of Government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera

Communications Corporation, Hangzhou Hikvision Digital Technology company, or Dahua Technology company (or any subsidiary or affiliate of such entities);

(3) Telecommunications or video surveillance services provided by such entities or using such equipment; or

(4) Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the Government of a Covered foreign country.

critical technology means-

(1) Defense articles or defense services included on the United States Munitions List set forth in the International Traffic in Arms Regulations under subchapter M of chapter I of title 22, Code of Federal Regulations;

(2) Items included on the Commerce Control List set forth in Supplement No. 1 to part 774 of the Export Administration

Regulations under subchapter C of chapter VII of title 15, Code of Federal Regulations, and controlled-

(i) Pursuant to multilateral regimes, including for reasons relating to national security, chemical and biological weapons proliferation, nuclear nonproliferation, or missile technology; or

(ii) For reasons relating to regional stability or surreptitious listening;

(3) Specially designed and prepared nuclear equipment, parts and components, Materials, software, and technology covered by part 810 of title 10, Code of Federal Regulations (relating to assistance to foreign atomic energy activities);

(4) Nuclear facilities, equipment, and material covered by part 110 of title 10, Code of Federal Regulations (relating to export and import of nuclear equipment and material);

(5) Select agents and toxins covered by part 331 of title 7, Code of Federal Regulations, part 121 of title 9 of such Code, or part 73 of title 42 of such Code; or

(6) Emerging and foundational technologies controlled pursuant to section 1758 of the Export Control Reform Act of 2018

(50 U.S.C. 4817).

Interconnection arrangements means arrangements governing the physical connection of two or more networks to allow the use of another's network to hand off traffic where it is ultimately delivered (e.g., connection of a customer of telephone provider A to a customer of telephone company B) or sharing data and other information resources.

Reasonable inquiry means an inquiry designed to uncover any information in the entity's possession about the identity of the producer or provider of Covered Telecommunications Equipment or Services used by the entity that excludes the need to include an internal or third-party audit.

Roaming means cellular communications services (e.g., voice, video, data) received from a visited network when unable to connect to the facilities of the home network either because signal coverage is too weak or because traffic is too high.

substantial or essential component means any component necessary for the proper function or performance of a piece of equipment, system, or service.

(b) Prohibition.

(1) Section 889(a)(1)(A) of the John S. McCain national defense authorization Act for fiscal year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses Covered Telecommunications Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system. The contractor is prohibited from providing to the Government any equipment, system, or service that uses Covered Telecommunications

Equipment or Services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104.

(2) Section 889(a)(1)(B) of the John S. McCain national defense authorization Act for fiscal year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract, or extending or renewing a contract, with an entity that uses any equipment, system, or service that uses Covered Telecommunications Equipment or

Services as a substantial or essential component of any system, or as critical technology as part of any system, unless an exception at paragraph (c) of this clause applies or the covered telecommunication equipment or services are covered by a waiver described in FAR 4.2104. This prohibition applies to the use of Covered Telecommunications Equipment or Services, regardless of whether that use is in performance of work under a Federal contract.

(c) Exceptions. This clause does not prohibit contractors from providing--

(1) A service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements;

or

(2) Telecommunications equipment that cannot route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.

(d) Reporting requirement.

(1) In the event the contractor identifies Covered Telecommunications Equipment or Services used as a substantial or essential component of any system, or as critical technology as part of any system, during contract performance, or the contractor is notified of such by a subcontractor at any tier or by any other source, the contractor shall report the information in paragraph

(d)(2) of this clause to the contracting officer, unless elsewhere in this contract are established procedures for reporting the information; in the case of the Department of Defense, the contractor shall report to the website at https://dibnet.dod.mil. For indefinite delivery contracts, the contractor shall report to the contracting officer for the indefinite delivery contract and the contracting officer(s) for any affected order or, in the case of the Department of Defense, identify both the indefinite delivery contract and any affected orders in the report provided at https://dibnet.dod.mil.

(2) The contractor shall report the following information pursuant to paragraph (d)(1) of this clause

(i) Within one business day from the date of such identification or notification: the contract number; the order number(s), if applicable; supplier name; supplier Unique Entity Identifier (if known); supplier Commercial and Government Entity

(CAGE) code (if known); brand; model number (original equipment manufacturer number, manufacturer part number, or wholesaler number); item description; and any readily available information about mitigation actions undertaken or recommended.

(ii) Within 10 business days of submitting the information in paragraph (d)(2)(i) of this clause: any further available information about mitigation actions undertaken or recommended. In addition, the contractor shall describe the efforts it undertook to prevent use or submission of Covered Telecommunications Equipment or Services, and any additional efforts that will be incorporated to prevent future use or submission of Covered Telecommunications Equipment or Services.

(e) Subcontracts. The Contractor shall insert the substance of this clause, including this paragraph (e) and excluding paragraph (b)(2), in all subcontracts and other contractual instruments, including subcontracts for the acquisition of commercial products or commercial services.

STANDARD PROVISION - 02 - UNDERSTANDING OF DITCO IQO ACQUISITION

DESKBOOK - APR 2019

Contractor/Telecommunications Provider (TP) acknowledges it has read and understands the current published "DITCO

Inquiry/Quote/Order (IQO) Acquisition Deskbook" version 7.1 available from the Integrated Defense Enterprise Acquisition

System (IDEAS) Contractor web site https://depsland.csd.disa.mil/html/vendor/vendorreference.html. Contractor agrees that the most recent Standard Provisions as set forth in this order take precedent over any conflicting terms and conditions in the BA.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND."

STANDARD PROVISION - 13 - END-TO-END SERVICE - AUG 2015

This telecommunications service shall be provided on an end-to-end basis, to include all facilities required to extend this service from Contractor provided commercial communications interface point to termination location (i.e., inside wire, etc.). Installation, provision, and maintenance of such service extensions shall be provided as firm fixed prices, and be included in Contractor’s quote as non-recurring charge (NRC) and/or monthly recurring charge (MRC), as applicable. Such service extension charges will be considered in the evaluation of quotes. Quotes containing other than firm fixed price charges for installation, provision, and maintenance of service extensions may be excluded from consideration for award. The U.S. Government shall not be obligated to pay charges which are not specified in the quote and authorized in resultant Order. Contractor receiving this contract shall have total responsibility for end-to-end technical sufficiency (i.e., end-to-end provisioning and restoral/maintenance) for entire telecommunication service.

ACCEPTABLE CONTRACTOR RESPONSE: The acceptable Contractor response to Standard Provision – Thirteen is

“UNDERSTAND,” and provide separately itemized service extension NRC and/or MRC in quote.

STANDARD PROVISION - 27 - APPROVALS AND PERMITS - AUG 2017

Contractor/Telecommunications Provider (TP) receiving this contract shall be responsible for having or obtaining all approvals and permits necessary to provide this service. The requirement that the TP obtain all approvals and permits is a contract administration issue. Inability of Contractor/TP to obtain any such approval or permit shall not be a valid basis for not meeting service date or providing service. Failure of a Contractor/TP to obtain any approval or permit necessary to provide this service may result in termination of this contract by U.S. Government for default at no cost to U.S. Government and/or receipt of a negative past performance rating.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY.

STANDARD PROVISION - 30 - CONTRACT PERIOD - AUG 2017

This telecommunications service contract shall continue on a month to month basis with a not to exceed date of 28 JUL 2027.

After this period the contract will be considered expired with no authority for service to continue unless mutually agreeable by both parties. Should service continue through the end of this contract period, no modification will be issued to authorize discontinuance of service. The minimum service period shall be one month. Accordingly the U.S. Government may discontinue service, at no additional cost to U.S. Government. U.S. Government will provide Contractor/Telecommunications Provider (TP)

30 days notice prior to discontinuing service before the not to exceed period. Contractors shall consider the ability of the

Government to discontinue service with 30 days notice when determining the reasonableness of incurring any costs. See

DFARS 252.239-7007, Cancellation Or Termination Of Orders.

Quotes that do not accept the minimum one month service period may be excluded from the competition and found unacceptable. In the event U.S. Government is unable to obtain quotes that meet this minimum service period, U.S.

Government may consider quotes with a minimum service period greater than one month.

The Government reserves the right to re-solicit these contracted services prior to the end of the not to exceed contract period when commercial market pricing demonstrates these services become available at lower prices.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."

STANDARD PROVISION - 33 - COMPLETION NOTICE - AUG 2017

Contractor/Telecommunications Provider (TP) shall provide a completion notice to DITCO within 72 hours of delivering service to

U.S. Government acceptance activity. The customer then has an additional 72 hours to notify DITCO if they disagree that the service is complete. A completion notice must include following information: (1) Contract PIID number; (2) DITCO CSA number,

(3) DITCO TSR number, (4) type of action, (5) contracted service date, (6) date service was delivered to and accepted by U.S.

Government acceptance activity; (7) commercial circuit identifier or phone number; (8) Contractor's/TP's trouble reporting number; (9) Contractor bill cycle end date; (10) a listing of any equipment installed on government premises by location and any deviations from service ordered; (11) name, phone number, and e-mail address U.S. Government representative (non-DITCO) that accepted service; and (12) Contractor/TP POC name, phone number, and e-mail address; (13) Local Exchange Company

(LEC) circuit identification (ID) number(s). Unless deviations are identified, completion notice will serve as Contractor/TP's confirmation that service was provided in accordance with contract. A follow-up completion notice will be required when deviations are cleared. Failure of Contractor/TP to provide completion notice may result in delay in invoice payment. DITCO's preferred method of receiving a completion notice is via Integrated Defense Enterprise Acquisition System (IDEAS). However, Contractors/TPs not authorized to obtain a PKI certificate may submit their completion notice via email to the applicable following address that issued the inquiry:

DITCO-Scott (IQO Section) disa.scott.ditco.mbx.pl8211@mail.mil

DITCO-Scott (PL8212 Section) disa.scott.ditco.mbx.pl8212@mail.mil

DITCO-Pacific (Ford Is Office) disa.jbphh.ditco.mbx.iqo@mail.mil

DITCO-Pacific (Alaska Office) disa.jber.ditco.other.ditcoako@mail.mil

DITCO-Europe (Stuttgart Office) disa.stuttgart.ditco.mbx.pl511@mail.mil

DITCO-Europe (SWA Bahrain Office) disa.stuttgart.ditco.mbx.pl52@mail.mil

ACCEPTABLE CONTRACTOR/TELECOMMUNICATION PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."

STANDARD PROVISION - 37 - JEOPARDY NOTICE - AUG 2017

Contractor/Telecommunications Provider (TP) shall immediately provide a Jeopardy Notice via Integrated Defense Enterprise

Acquisition System (IDEAS) prior to the contracted service date as soon as Contractor/TP becomes aware contract service date may not be or cannot be met. A Jeopardy Notice must include following information: (1) Contract PIID number; (2) DITCO CSA number; (3) TSR number; (4) contracted service date; (5) explanation of why contracted service date may not be or cannot be met; (6) revised service date requested; and (7) name, phone number, and email address of Contractor/TP representative that can be contacted for any questions concerning the Jeopardy Notice. DITCO's preferred method of receiving a jeopardy notice is via Integrated Defense Enterprise Acquisition System (IDEAS). However, Contractors/TPs not authorized to obtain a PKI certificate may submit their jeopardy notice via email to the applicable following address that issued the inquiry:

DITCO-Scott (IQO Section) disa.scott.ditco.mbx.pl8211@mail.mil

DITCO-Scott (PL8212 Section) disa.scott.ditco.mbx.pl8212@mail.mil

DITCO-Pacific (Ford Is Office) disa.jbphh.ditco.mbx.iqo@mail.mil

DITCO-Pacific (Alaska Office) disa.jber.ditco.other.ditcoako@mail.mil

DITCO-Europe (Stuttgart Office) disa.stuttgart.ditco.mbx.pl511@mail.mil

DITCO-Europe (SWA Bahrain Office) disa.stuttgart.ditco.mbx.pl52@mail.mil

DISA's acknowledgement of the Contractor/TP's representation of delayed performance is not an explicit or implicit acceptance of the performance delay nor is it a waiver of any rights or remedies allowed under the contract, the FAR, or applicable case law.

Moreover, it is not an acknowledgment that DISA is responsible for any part of the Contractor/TP's delayed performance.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATION PROVIDER (TP) RESPONSE: "UNDERSTAND/WILL COMPLY."

STANDARD PROVISION - 38 - STATUS REPORT - AUG 2017

Due to the criticality of this telecommunications service, Contractor/Telecommunications Provider (TP) shall provide an updated status report to DITCO contracting officer weekly. Status report shall include (1) Contract PIID number; (2) DITCO CSA number,

(3) TSR number, (4) contracted service date, (5) explanation of current status of telecommunications service installation and how current status provides assurance that contracted service date will be met, and (6) name, phone number, and e-mail address of Contractor/TP representative to contact for any questions concerning the status report.

STANDARD PROVISION - 39 - CIRCUIT DOCUMENTATION - AUG 2017

Contractor/Telecommunications Provider (TP) shall provide complete circuit routing maps for the end-to-end circuit documenting physical routing and location of supporting equipment and facilities. Contractor/TP maps/diagrams provided for quotes must reflect the most accurate information and route details available at the time the quote is submitted. Information provided in the maps will be used to determine if the Contractor/TP's quote meets the technical requirements identified in the Inquiry. Lack of required information or detail may result in the vendor solution to be determined technically unacceptable.

Contractor/TP will provide updated maps/diagrams to DITCO no later than 30 days after the vendor sends the Notice of

Completion (NOC), if there have been any authorized changes made to the original fiber path/routes or any technical details

(including round-trip latency) provided in the original quote. If no changes have been made, vendor will include a statement on their NOC that the original diagrams/maps provided reflect the as-built route/path/configuration.

Such documentation shall be provided to the DITCO contracting office and contact at each service point post award and prior to acceptance by the U.S. Government acceptance activity.

Specific documentation requirements:

A. Customer premise equipment (CPE) and interface at each termination location.

B. Route maps showing the physical diversity requirements are being met.

C. Major equipment and facilities locations (i.e., multiplexers, switches, central offices, etc.) location and precise fiber distance between the commercial demark and the nearest Servicing Wire Center (SWC) or Central Office (CO) must be included for each end of the leased portion of the circuit.

D. Location and address of all gateway Central Offices (hand-off between carriers).

E. Cable head, cable landing stations, and cable stations, if applicable.

F. Location of manholes and handholes in relationship to physical landmarks such as buildings, streets, bridges, etc. (where diversity requirements necessitate that level of detail).

G. Locations of slack coils to facilitate response to maintenance requirements.

H. Earth stations and satellite, if applicable.

This documentation must be provided in electronic format. Acceptable formats are Microsoft Office (PowerPoint, Word, and

Excel), Visio, AutoCAD and Adobe PDF. DITCO Europe requires that electronic documentation be provided in .KMZ or .KML file formats.

And provide the required information and maps/drawings.

STANDARD PROVISION - 41 - SCHEDULED OUTAGES - AUG 2017

To ensure this service is available to support U.S. Government requirements, Contractor/Telecommunications Provider (TP) shall utilize alternate or spare facilities whenever possible to eliminate or minimize service interruptions. However, when a scheduled service interruption cannot be avoided, Contractor/TP shall obtain the approval of appropriate approval authority before initiating any scheduled outage. To obtain such approval, a written "circuit release request" must be submitted to appropriate approval authority at least 21 calendar days prior to requested circuit release date.

When an interruption of service is required to correct hazardous or degraded conditions, a 48-hour prior notification is required, if practicable. Contractor/TP shall notify the U.S. Government service acceptance activity as soon as it is known that a service interruption will occur. The request from Contractor/TP must include the same information as identified below, and additionally, identify the hazardous or degraded conditions that exist which preclude providing the U.S. Government with 21-day advance notice.

In emergency situations, when loss of life or property might occur through lack of immediate action, Contractor/TP must make every reasonable attempt to notify the U.S. Government service acceptance activity identified on the CSA immediately, and coordinate arrangements for the service interruption to the maximum extent possible. Within five business days of the interruption, Contractor/TP must submit the same information as identified below, and additionally, identify the emergency conditions that existed which precluded providing the U.S. Government with 21-day advance notice.

"Circuit Release Request" must include following information: (1) Contractor/TP requesting circuit release, and name and phone number of Contractor/TP representative responsible for managing circuit release; (2) Contract PIID number; (3) DITCO CSA number of circuit for which release is being requested; (4) date and inclusive times of scheduled circuit release, along with an alternate circuit release date and time; (5) purpose of scheduled circuit release; (6) statement indicating all equipment, parts, and/or supplies required to complete action are on-hand, or their expected delivery date; (7) statement indicating that all avenues of bypass capability (e.g., alternate facilities, spare facilities, etc.) Have been considered; and (8) estimated maximum recovery time to restore circuit. The authority for approving circuit releases for this service is U.S. Government CCO/CMO.

Failure of Contractor/TP to obtain an approved circuit release prior to initiating a scheduled outage may result in U.S.

Government termination of this contract for default at no cost to U.S. Government and/or receipt of a negative past performance rating.

STANDARD PROVISION - 42 - CONSIDERATION - AUG 2015

Upon Contractor/telecommunications Provider (TP) caused failure to provide telecommunications service by the specified date in the contract, failure to make progress as to endanger performance by that date, or failure to comply with any contract terms or conditions; U.S. Government may cancel or terminate this contract pursuant to contract clause DFARS 252.239-7007 at no cost to the Government. However, U.S. Government may elect to waive its right to cancel or terminate and request Contractor/TP to provide consideration to U.S. Government in lieu thereof. Consideration will be negotiated on a case-by-case basis. If

Contractor/TP fails to meet the service date or comply with any contract terms or conditions and U.S. Government elects to request consideration, Contractor/TP hereby agrees to negotiate in good faith and provide such consideration. Quotes, which fail to accept this standard provision, may be excluded from consideration for award.

ACCEPTABLE CONTRACTOR/TELECOMMUNICATIONS PROVIDER (TP) RESPONSE: “UNDERSTAND/WILL COMPLY.”

STANDARD PROVISION - 44 - SYSTEM FOR AWARD MANAGEMENT REGISTRATION -

MAR 2014

(a) Definitions. As used in this clause-

"Central Contractor Registration (CCR) database" means the retired primary Government repository for Contractor information required for the conduct of business with the Government.

"Commercial and Government Entity (CAGE) code" means-

(1) A code assigned by the Defense Logistics Agency (DLA) Logistics Information Service to identify a commercial or

Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLA records and maintains in the CAGE master file. This type of code is known as an "NCAGE code."

"Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System+4 (DUNS+4) number" means the DUNS number means the number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at Subpart 32.11) for the same concern.

"Registered in the SAM database" means that-

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, into the SAM database;

(2) The Contractor's CAGE code is in the SAM database; and

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS), and has marked the record "Active". The Contractor will be required to provide consent for TIN Attachment, Page 1 of 4 validation to the Government as a part of the SAM registration process.

"System for Award Management (SAM)" means the primary Government repository for prospective federal awardee information and the centralized Government system for certain contracting, grants, and other assistance related processes. It includes-

(1) Data collected from prospective federal awardees required for the conduct of business with the Government;

(2) Prospective Contractor submitted annual representations and certifications in accordance with FAR Subpart 4.12; and

(3) The list of all parties suspended, proposed for debarment, debarred, declared ineligible, or excluded or disqualified under the nonprocurement common rule by agencies, Government corporations , or by the Government Accountability Office.

(b)

(1) The Contractor shall be registered in the SAM database prior to submitting an invoice and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The SAM registration shall be for the same name and address identified on the contract, with its associated CAGE code and DUNS or DUNS+4.

(3) If indicated by the Government during performance, registration in an alternate system may be required in lieu of SAM.

(c) If the Contractor does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) A Contractor may obtain a DUNS number-

(i) Via the internet at http://fedgov.dnb.com/webform or if the Contractor does not have internet access, it may call Dun and

Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The Contractor should indicate that it is a Contractor for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The Contractor should be prepared to provide the following information:

(i) Company legal business name.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company physical street address, city, state and Zip Code.

(iv) Company mailing address, city, state and Zip Code (if separate from physical).

(v) Company telephone number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) Reserved.

(e) Processing time for registration in SAM, which normally takes five business days, should be taken into consideration when registering. Contractors who are not already registered should consider applying for registration at least two weeks prior to invoicing.

(f) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis from the date of initial registration or subsequent updates its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(g)

(1)

(i) If a Contractor has legally changed its business name, "doing business as" name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in Subpart 42.12, the Contractor shall provide the responsible Contracting Officer sufficient documentation to support the legally changed name with a minimum of one…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .