GFP Attachment AAR.xlsx
XLSX spreadsheet 9 MB Posted
- Attached to
- COLUMBIA Class Aft Alignment Ring (AAR) Federal contract opportunity
- Solicitation number
- N0016723Q0128
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation DD Form 254_CLB AAR.pdf | ||
| CDRL A001 Technical Certification Package.pdf | ||
| CDRL A002 GFP Report.pdf | ||
| GFI List_CLB AAR.pdf | ||
| DOD 5220.22-M - National Industrial Security Program (NISPOM).pdf | ||
| CDRL A001_DI-MISC-80678.pdf | ||
| CDRL A002 DI-MGMT-82146.pdf | ||
| N0016723Q0128 CSS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT INFO
ERROR:#REF! GOVERNMENT FURNISHED PROPERTY * denotes a required field
Attachment Number* Attachment Date*
GOVERNMENT CONTRACTING OFFICER
Name Email Phone
Document Description* Contract Award Mod Number Amendment No.
CUSTODIAL PROCUREMENT INSTRUMENT IDENTIFICATION
Contract Number Type* DoD Contract (FAR)
| SOLICITATION, CONTRACT or UNIFORM PIID NUMBER* | Order Number | OR | |
| PIID FORMAT (FY16+) | Old Order Format |
Issuing Office DoDAAC Issuing Year Contract Type Sequence Number Issuing Office DoDAAC Issuing Year Contract Type Sequence Number
Consolidated GFP Attachment Version 2.1
Requisitioned /xl/drawings/drawing1.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing1.xml#NON_Serially_Managed_ItemsSerially Managed /xl/drawings/drawing1.xml#Serially_Managed_Items Serially Managed Items
* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.
If any one of duration, time unit, or delivery event are populated, all 3 must be populated.
Serially Managed Items
| LINE NUMBER* | ITEM NAME* | ITEM DESCRIPTION* | NSN† | MFR CAGE†,†† | PART NUMBER†,†† | MODEL NUMBER† | QTY* | UNIT OF MEASURE* | UNIT ACQ COST | USE AS-IS* | DELIVERY DATE | DURATION | TIME UNIT | DELIVERY EVENT | NOTES | |
| 1 | CLB AAR Inconel 625 Forging, per DWG_0292B | Material Stock to machine final CLB AAR | 2W651 | 0292 Rev B | ||||||||||||
| S/N 31115-03 | 1 | Each | $ 1,000,000.00 | true |
Requisitioned /xl/drawings/drawing2.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing2.xml#NON_Serially_Managed_ItemsContract Information /xl/drawings/drawing2.xml#CONTRACT_INFO Non-Serially Managed Items
* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.
If any one of duration, time unit, or delivery event are populated, all 3 must be populated.
NON-Serially Managed Items
LINE NUMBER* ITEM NAME* ITEM DESCRIPTION* NSN† MFR CAGE†,†† PART NUMBER†,†† MODEL NUMBER† QTY* UNIT OF MEASURE* UNIT ACQ COST USE AS-IS* DELIVERY DATE DURATION TIME UNIT DELIVERY EVENT NOTES
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .