| File | Type | Posted |
|---|---|---|
| Amended Solicitation N0016723Q0100.pdf | ||
| CDRL A001__Certification Inspections.pdf | ||
| CDRL A002_DID 80441D.pdf | ||
| CDRL A001_DID DI-MISC-80678 Cert Data Report.pdf | ||
| GFP Attachment - HY80 Steel Plate Grinding Services.xlsx | XLSX spreadsheet | |
| CDRL A002__GFP.pdf | ||
| N0016723Q0100 CSS.pdf | ||
| Drawing_HY80 Grinding Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVSEA 4340/2 (Rev. Mar 2018) Page 1 of 2
GOVERNMENT FURNISHED INFORMATION
ATTACHMENT # PR#
PROGRAM TITLE: CONTRACT NUMBER: DATE:
CODE:
(1) NUMBER (5) GFI DUE DATE(4) DOCUMENT DATE(3) DOCUMENT NUMBER(2) DOCUMENT TITLE
NAVSEA 4340/2 (Rev. Mar 2018) Page 2 of 2
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
NAVSEA 4340/2 (Rev. Mar 2018) Page of NAVSEA 4340/2 (Rev. Mar 2018) Page of
GOVERNMENT FURNISHED INFORMATION
(1) NUMBER
(5) GFI DUE DATE
(4) DOCUMENT DATE
(3) DOCUMENT NUMBER
(2) DOCUMENT TITLE
NAVSEA Form 4340/2 - Government Furnished Information Instructions
ATTACHMENT #: Leave blank, contracting officer will complete when preparing solicitation or contract.
PR #: Enter Purchase Request (PR) number.
PROGRAM TITLE: Enter the title of the program.
CONTRACT NO.: Leave blank if this requirement will result in a new contract. Insert contract number if the PR will result in the modification to an existing contract.
DATE: Enter the calendar date that this form was prepared.
CODE: Enter the Program Office / Requiring Activity's office code.
NUMBER, Column (1): Enter a sequential number for each item of GFI to be supplied.
DOCUMENT TITLE, Column (2): Enter Document Title for each item.
DOCUMENT NUMBER, Column (3): Enter Document Number assigned to identify a specific document. If no number has been assigned, leave blank.
DOC DATE, Column (4): Enter publication date of the document. If the item has no date assigned, leave blank. This format (MM/DD/YR) for the date is preferred (e.g., 06/25/16).
GFI DUE DATE, Column (5): Insert the date the item is due at the contractor's plant or is to be first available to the contractor for use. A calendar date format (MM/DD/YR) is preferred (e.g., 02/28/19), but following non-calendar methods are acceptable:
DAC - Days after contract award date MAC - Months after contract award date MACM - Months after contract modification date MAOE - Months after option exercise MBD - Months before delivery MBT - Months before the start of ship builder's trials or equipment test
PAGE __ OF __: Assign page numbers sequentially.
11.0.1.20130826.2.901444.899636
| CurrentPage: |
| PageCount: |
| TextField1: 1 - HY80 Grinding Specs. |
| TextField2: TBD |
| TextField7: HY80 Steel Plate Grinding Services |
| TextField8: TBD |
| DateField1: 08 February, 2023 |
| TextField3: Code 622 |
| DateField3: With contract award. |
| DateField2: |
| TextField6: Items #1 - #8 |
| TextField5: Drawing Views 139 through 146 |
| TextField4: Page #1 |
File details come from the government source that posted it. Updated .