GEC__RFP_No._202610__Maintenance_of_Traffic_in_Post_Disaster_Enviroment_Environment__Cost_Proposal_Form.xlsx
XLSX spreadsheet 15 KB Posted
- Solicitation number
- 2026-11
- Issued by
- Glades County, Florida
About this file
This is a Cost Proposal Form for Request for Proposal No. 2026-10 issued by Glades Electric Cooperative, Inc. (GEC) for Maintenance of Traffic Services in Post-Disaster Environment covering 2026 and 2027 emergency response operations. The services encompass traffic control and direction at various locations across GEC's service territory in Highlands, Okeechobee, Hendry, and Glades counties in Florida during hurricane restoration efforts and at staging areas or base camps. Contractors must be capable of 24/7 emergency response with a two-hour on-site response time and provide designated points of contact. The contract term extends through the remainder of 2025, with duration to be determined by GEC upon issuance of a Notice to Proceed, Task Order, or Task Release.
The Cost Proposal Form requires bidders to submit labor rates for 2026 and 2027 across multiple positions including Manager, Field Supervisor, Crew Supervisor, and Flagger, with separate rates for straight time (ST), overtime (OT), and double time (DT). Equipment rates must also be provided for items such as arrowboards, cones, signs, light towers, rumble strips, message boards, barricades, pickups, and trailers. Bidders may add additional labor positions and equipment as applicable. All pricing must include necessary labor, materials, supervision, equipment, tools, transportation, mileage, and required insurance. Lodging, meals, and fuel must be documented as pass-through costs with no markup to maintain FEMA compliance. The form requests labor pricing assumptions and clarifications, particularly regarding when overtime and double time rates apply.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 2026-09
| Cost Proposal Form |
| Instructions: Please complete all items highlighted yellow. |
| Bid Name | RFP No. 2026-10 Maintenance of Traffic Services in Post-Disaster Environment |
| Company Name: | |
| Corporate Address: | |
| Bid Contact | Please list the individual responsible for completing the Form. |
| Person Name: | |
| Email: | |
| Phone #: | |
| Contract Contact | Please list the individual responsible for signing the contract. |
| Name: | |
| Email: | |
| Phone #: |
| Rates | |||||||
| Instructions: Please enter the applicable rates in the Form below. | |||||||
| Labor Rates | |||||||
| 2026 Rates | 2027 Rates | ||||||
| Labor Description | ST | OT | DT | Labor Description | ST | OT | DT |
| Manager | Manager | ||||||
| Field Supervisor | Field Supervisor | ||||||
| Crew Supervisor | Crew Supervisor | ||||||
| Flagger | Flagger |
| Additional Labor Rates: Please list any other positions below. Insert additional rows if needed. However, Cost Forms will be evaluated based on the positions and rates above. | |||||||
| Labor Description | ST | OT | DT | Labor Description | ST | OT | DT |
| Labor Pricing Assumptions and Clarifications |
| Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. NOTE: Lodging, meals, and fuel (if not included in above rates) must be properly documented pass-through costs with no markup in order to be FEMA compliant. |
| Instructions: Please enter the applicable rates in the Form below. It is not necessary to complete all rates, just complete what is applicable. | |||||
| Equipment Rates | |||||
| 2026 Rates | 2027 Rates | ||||
| Equipment | Rate | Unit of Measure | Equipment | Rate | Unit of Measure |
| Arrowboard | Arrowboard | ||||
| Cones | Cones | ||||
| Signs | Signs | ||||
| Light Tower | Light Tower | ||||
| Rumble Strips | Rumble Strips | ||||
| Message Board | Message Board | ||||
| Barracades | Barracades | ||||
| Pickup | Pickup | ||||
| Trailer | Trailer |
Additional Equipment Rates: Please list any other offered equipment below. Insert add additional rows if needed.
Equipment Type Rate Equipment Type Rate
| Equipment Pricing Assumptions and Clarifications |
| Instructions: Using the space below, please provide additional assumptions and clarifications needed for the above rates. Example: OT applies all storm work, DT rate on Holidays. NOTE: Lodging, meals, and fuel (if not included in above rates) must be pass-through costs with no markup in order to be FEMA compliant. |
File details come from the government source that posted it. Updated .