This document is a Statement of Work (SOW) for the delivery of approximately 325 tons of 21A crusher run gravel to the Great Dismal Swamp National Wildlife Refuge (NWR) in Suffolk, Virginia.

The gravel is required for road construction and replacement of a water control structure on the refuge. The material is to be delivered and stockpiled during the period of July 15-25, 2024, with coordination of deliveries through refuge staff. Pricing is requested on a per-ton basis for the delivered gravel. Vendors must follow all local and state transportation regulations, and provide daily written tickets to the refuge staff to ensure accurate load counts and volumes.

The related federal contract opportunity is a Quote Request for Gravel/Rock at the Great Dismal Swamp NWR, solicitation number 140FS324Q0112, issued by the Department of the Interior's Fish and Wildlife Service.

View the file

Other files

File Type Posted
Sol_140FS324Q0112_Amd_0001.pdf PDF
Sol_140FS324Q0112.pdf PDF
A21_Map.pdf PDF
B03_-_WD.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of the Interior

FWS GREAT DISMAL SWAMP NWR

3100 DESERT ROAD

SUFFOLK VA 23434-8973

STATEMENT OF WORK

GRAVEL MATERIAL

for

Road Construction

PART A – GENERAL INFORMATION AND INSTRUCTIONS

GENERAL DESCRIPTION OF WORK: Deliver (stockpile) approximately 325 tons of 21A crusher run gravel. All 21A run crusher run gravel will be delivered to Great Dismal Swamp NWR. Delivery will be coordinated with on site staff. Gravel is stockpiled for use to replace water control structure.

PART B – PERFORMANCE REQUIREMENTS

Delivery Site:

1. 1330 White Marsh Rd, Suffolk, VA 23434

Material Estimates: (325 tons)

1. 21A crusher run stone aggregate ~ 325 tons.

Pricing Schedule:

1. Price Per ton Delivered 21A crusher run stone aggregate.

Material will be provided during the primary operations during the July 15-July 25 of 2024. Coordination of deliveries will be done through refuge staff while the job is being completed. General refuge hours are 6AM – 6PM Monday – Friday.

The project is expected to run for a limited 2-week period during this time.

PART C – OTHER PERFORMANCE REQUIREMENTS AND INFORMATION

DOCUMENTATION AND REPORTING: Written ticket will be provided to refuge staff daily to ensure load counts and volumes are accurate. All local and state transportation regulations apply.

CONTACT INFORMATION: