This is a Government Cost Estimate for the removal of three Soil Disposal Vessels (SDVs) at Baca and Haystack locations under solicitation 140A0926Q0006, issued by the Department of the Interior Bureau of Indian Affairs Navajo Region. The project is organized into four primary tasks: pre-work submittal including health and safety plans, work schedules, sampling and analysis plans, and compliance documentation; coordination planning meetings with Navajo Nation and Bureau of Indian Affairs; soil sampling from multiple pit areas (Entrance Pad, Exit Pad, Vat, Fire Pit, and Discharge Pit) totaling 363 borings at 3 samples each at $165 per sample; and mobilization/site setup including excavator rental and equipment costs.

The estimate further encompasses demolition, excavation, and restoration activities including removal of concrete and wooden structures, excavation of contaminated soil, disposal, and backfill with clean soil. Project reporting includes draft and final reports with Professional Engineer certification. The cost estimate reflects 363 soil sampling borings at $190 per sample ($69,070 for sampling costs), laboratory fees totaling $212,355, mobilization costs of $70,785, and various demolition and excavation activities estimated at approximately $190,220. The subtotal cost estimate is provided with New Mexico McKinley Gross Receipts Tax applied at 8.3125% and Indirect Costs and Expenses (ICE) adjustments included in the final calculation.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Government Cost Estimate - Removal of three (3) SDV at Baca and Haystack
Task 1Pre-work Submittal (includes draft and final)
Health and Safety Plan$
Work Plan/Work Schedule - Phase 1 and 2$
Sampling and Analysis Plan
Quality Assuance/Quality Control Plan
Cultural and Biological Compliance Forms (NN)$ - 0
Task 2Coordination
Planning meeting with NN and BIA$$ - 0
Task 3Sampling
Soil sampling (Vat area 363 boring at 3 samples each @ $165)$$
Laboratory Fee
Task 4Moblilization/Site Setup
Moblization (excavator)$
Equipment Owned/Rental
Materials/Supplies$
Task 2Demolition/Evacavation/Restoration
Removal (concrete and wooden structures)$
Excavation of contaminated soil$
Disposal$
Backfill w/Clean Soil$
Restoration$$ - 0
Task 4Reports
Draft of Final Report$
PE Certification
Final Report$ - 0
SubTotal$ - 0
NM Mckinley GRT 8.3125%$
ICE$

Sheet4

EstNo. of BoringCountCost
69
52
1213363$ 70,785.00
@195$ 212,355.00
$ 29,807.55
$ 15,796.50430$ 106.06
$ 34,319.44
$ 34,113.42430$ 159.15
$ 111,293.67430$ 258.82
$ 174.67
@175$ 190,220.93
$ 165.00
@165$ 179,685.00

Sheet2

Sheet3

Entrance Pad3
Exit Pad3
Vat620x20400100
Fire Pit3
Discharge Pit3
discharge line3
21
Sample cost$ 190.00
$ 3,990.00