GCC-F L23GC165 Project Drawings 2024-03-01.pdf

PDF 25 MB Posted

Attached to
Construct Sports Court, Germanna Community College, Fredeericksburg Campus, PC#L23GC165
Solicitation number
63468
Issued by
Spotsylvania County, Fredericksburg City, Virginia

About this file

This document is a project drawing for a state and local contract opportunity issued by the Virginia Community College System (VCCS) for the construction of a sports court at the Germanna Community College, Fredericksburg Campus, located in Fredericksburg, Virginia, with the project code L23GC165. The project generally consists of the construction of an asphalt sports court, including an eight-foot chain link fence and associated support service space such as sidewalks. Sealed bids for this project will be received electronically through eVA or at the VCCS office in Richmond, Virginia, with a deadline of 2:00 P.M. on Tuesday, May 7, 2024. A pre-bid conference will be held on Thursday, April 18, 2024, at the Germanna Community College, Fredericksburg Campus. The contract will be awarded to the successful bidder, and the project is located within the jurisdictions of Spotsylvania County and Fredericksburg City.

The contract requires a Standard Commonwealth Bid Bond (Form CO-10.2) and Contract Security, regardless of the bid amount. The bidder must be a registered vendor in eVA. The project is funded by the Commonwealth of Virginia, and the specific funding sources and amounts are not provided in the document. The current environment and any incumbent information are also not included in the document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M ar ch

N /A

BB/JL BB/JL CS

1 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

C O

V

ER

S H

EE

T

VCS NAD 83

WSSI and County GIS Data

NVD 88

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

BEFORE YOU DIG

CALL

"MISS UTILITY"

OF VIRGINIA

1-800-552-7001

TOLL FREE

OWNER/APPLICANT:

COMMONWEALTH OF VIRGINIA STATE BOARD FOR

COMMUNITY COLLEGES

C/O WILLIAM E. PRICE, CAPITAL OUTLAY PROJECT MANAGER

4001 WAKEFIELD CHAPEL RD

ANNANDALE, VIRGINIA 22003

ENGINEER:

CHRISTOPHER M. SCHRINEL, P.E.

WETLAND STUDIES AND SOLUTIONS, INC.

1620 BROOK RD

RICHMOND, VIRGINIA 23220

RESPONSIBLE LAND DISTURBER:

SIGNATURE:_________________________________

RLD#: ______________________

SITE LOCATION:

GERMANNA COMMUNITY COLLEGE

FREDERICKSBURG CAMPUS

10000 GERMMANA POINT DRIVE

FREDERICKSBURG, VIRGINIA 22408

/0

1/

PROJECT LOCATION

VICINITY MAP

NOT TO SCALE

LOCATION MAP

1" = 1000'

PROJECT LOCATION

GERMANNA COMMUNITY COLLEGE -

FREDERICKSBURG CONSTRUCT SPORTS COURT

FREDERICKSBURG AREA CAMPUS

Project Code: L23GC165

PLAN REVIEWER:

PRINTED NAME:_________________________________

SIGNATURE:____________________________________

DEQ PLAN REVIEWER #: _________________________

NOTE: A VARIANCE REQUEST FOR THE USE OF SILT SOCK (SS) IN PLACE OF SILT

FENCE HAS BEEN APPROVED BY DEQ. SEE SHEET 5.Lee F. Hixon, Ph.D., P.E.

DCA0315

ch

BB/JL BB/JL CS

2 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

VCS NAD 83

WSSI and County GIS Data

NVD 88

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

EX

IS

TI

N

G C

O N

D

IT

IO

N

S A

N D

D

EM

O

LI

TI

O

N P

LA

N

/0

1/

1"

0'

D ec em be r 2

BB/JL BB/JL CS

3 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

VCS NAD 83

WSSI and County GIS Data

NVD 88

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m O

V

ER

A

LL

S

IT

E

LA

Y O

U T

PL

A

N

/0 1/

1"

0'

25C

SOIL INFORMATION AND MAP (NTS)

25C

25C

BB/JL BB/JL CS

4 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

VCS NAD 83

WSSI and County GIS Data

NVD 88

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

ER

O

SI

O

N A

N D

S

ED

IM

EN

T C

O N

TR

O

L A

N D

G R

A D

IN

G

P

LA

N

SAF

SAF

/0

1/

Project Site

D ec em be r 2

D

A

TE

SC

A

LE

: 1

0'

W et la nd

S tu di es a nd

S ol ut io ns , I nc

C op yr ig ht C

SS

12"

SS

12"

SS

12"

SS

12"

SAF

EROSION AND SEDIMENT CONTROL LEGEND

IP

IP

CE

CE

TO

SO

SOTO

SOTO

SOTO

SOTO

SOTO

IP

SF

SS

12" ch

N /A

BB/JL BB/JL CS

5 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

ER

O

SI

O N

A N

D S

ED

IM

EN

T

C O

N

TR

O L

N A

R R

A

TI

V E

/0

1/

PROJECT DESCRIPTION

THE PURPOSE OF THIS PROJECT IS TO INSTALL PAVEMENT AND FENCING TO PROVIDE A MULTI-USE SPORTS COURT AREA WITH ACCESS VIA SIDEWALK. THE PROJECT CONSISTS OF REMOVING PORTIONS OF AN EXISTING GRAVEL AREA AND AN EXISTING ROPE AND REBAR FENCE. THE LIMITS OF DISTURBANCE FOR THIS PROJECT IS APPROXIMATELY 0.36 AC. THERE WILL AN OVERALL DECREASE IN IMPERVIOUS LANDCOVER, WHICH WILL RESULT IN AN INCREASE TO PERVIOUS LANDS (IMPERVIOUS TO MANAGED TURF).

EXISTING SITE CONDITIONS

THE PROJECT IS LOCATED ON A PORTION OF THE PROPERTY OWNED AND OPERATED BY GERMANNA COMMUNITY COLLEGE AT 10000 GERMANNA POINT DRIVE, FREDERICKSBURG, VA 22408. THE COORDINATES OF THE LAND DISTURBANCE ARE 38°13'58" N, 77°29'34" W. THE PROJECT SITE IS GRAVEL / MANAGED TURF WITH SHALLOW SLOPES. AN EXISTING FIRE ACCESS ROAD IS LOCATED WITHIN THE PROJECT AREA. THE PROJECT AREA DRAINS TO THE WEST TO AN EXISTING STORM SEWER SYSTEM WHICH LEADS TO A RETENTION BASIN THAT IS ULTIMATELY DISCHARGED TO AN UNNAMED TRIBUTARY OF MASSAPONAX CREEK. UNDERGROUND ELECTRIC IS KNOWN TO BE WITHIN THE WORK AREA. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONFIRMING THE LOCATION OF ANY UTILITIES WITH MISS UTILITY PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES. GCC WILL PROCURE A THIRD-PARTY UTILITY LOCATOR TO MARK ONSITE UTILITIES WITHIN THE

PROJECT AREA, ESPECIALLY THOSE NOT IN COUNTY RECORDS.

GENERAL NOTES

1. A PRE-CONSTRUCTION MEETING SHALL BE CONDUCTED AT THE SITE WITH THE VCCS PROJECT MANAGER, PRIMARY CONTRACTOR, CERTIFIED RESPONSIBLE LAND DISTURBER (RLD) AND THE ENGINEER PRIOR TO ANY DISTURBANCE. CONTRACTOR SHALL PROVIDE 5 DAYS NOTICE BEFORE BEGINNING CONSTRUCTION. SEE NOTES UNDER SUGGESTED CONSTRUCTION SEQUENCE FOR ADDITIONAL

INFORMATION REGARDING THE PRE-CONSTRUCTION MEETING.

2. FOR WATERING SOD, CONTRACTOR SHALL HAVE ACCESS TO AN EXISTING SPIGOT WHICH IS LOCATED AT THE BUILDING TO THE SOUTH OF THE PROJECT AREA AS NOTED ON THE PLAN. CONTRACTOR TO ACQUIRE KEY AT PRE-CONSTRUCTION MEETING TO ACCESS SPIGOT. IF SPIGOT BECOMES DAMAGED DURING CONSTRUCTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ANY REPAIRS NEEDED.

3. UNLESS OTHERWISE SPECIFIED, METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH VIRGINIA EROSION AND SEDIMENT CONTROL

HANDBOOK AND VIRGINIA BMP CLEARINGHOUSE.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS PRIOR TO BEGINNING CONSTRUCTION.

5. THE APPROVAL OF THESE PLANS SHALL IN NO WAY RELIEVE THE OWNER OF COMPLYING WITH OTHER APPLICABLE LOCAL, STATE, AND

FEDERAL REQUIREMENTS, STANDARDS, AND SPECIFICATIONS.

6. AN APPROVED SET OF PLANS AND ALL PERMITS MUST BE AVAILABLE AT THE CONSTRUCTION SITE THROUGHOUT THE DURATION OF THE

PROJECT.

7. BURNING OF CONSTRUCTION OR DEMOLITION MATERIALS (INCLUDING BUT NOT LIMITED TO TREE MATERIAL) IS NOT PERMITTED ON SITE.

8. CONSTRUCTION DEBRIS SHALL BE CONTAINED IN ACCORDANCE WITH THE VIRGINIA LITTER CONTROL ACT. NO LESS THAN ONE LITTER

RECEPTACLE SHALL BE PROVIDED ON SITE.

9. ALL WORK SHALL BE IN COMPLIANCE WITH THE OVERHEAD HIGH VOLTAGE LINES SAFETY ACT.

10.CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY, CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH

OSHA STANDARDS AND LOCAL REQUIREMENTS.

11. AREAS OUTSIDE THE LIMITS OF DISTURBANCE SHOWN ON THE PLANS SHALL NOT BE DISTURBED BY THE CONTRACTOR'S OPERATIONS. IF

THESE AREAS ARE IMPACTED BY ACCIDENTAL OPERATIONS OR DISCHARGES, THE OWNER AND PLAN APPROVING AUTHORITY SHALL BE NOTIFIED AND WORK WILL CEASE IN THE AREA EXCEPT FOR IMMEDIATE STABILIZATION EFFORTS AS DIRECTED BY THE PLAN APPROVING AUTHORITY. ANY REQUIRED RESTORATION EFFORTS BY THE CONTRACTOR WILL BE AT THE CONTRACTOR'S EXPENSE.

12.CONTRACTOR SHALL PREVENT DUST, SEDIMENT AND DEBRIS FROM EXITING THE SITE AREA AND BE RESPONSIBLE FOR CLEANUP AND

CORRECTIVE ACTION IF SUCH OCCURS.

13.DAMAGE RESULTING FROM CONSTRUCTION SHALL BE REPAIRED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.

14.SURVEY PERFORMED BY WSSI FOR THIS PROJECT. SUPPLEMENTAL INFORMATION HAS BEEN PROVIDED FROM ORIGINAL CONSTRUCTION

PLANS AND AERIAL PHOTOGRAPHY

15.IF CONTRACTOR FINDS DISCREPANCIES BETWEEN THE PLANS AND ACTUAL FIELD CONDITIONS, THE OWNER AND ENGINEER SHALL BE

NOTIFIED PRIOR TO MAKING ANY ADJUSTMENTS TO THE PLANS.

UTILITY NOTES

1. CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF ALL UNDERGROUND UTILITIES. THE LOCATION OF EXISTING UTILITIES ARE NOT

NECESSARILY SHOWN ON THE PLANS AND WHERE SHOWN ARE ONLY APPROXIMATE. THE CONTRACTOR SHALL, ON HIS OWN INITIATIVE AND AT NO EXTRA COST, HAVE LOCATED ALL UNDERGROUND LINES AND STRUCTURES AS NECESSARY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO UNDERGROUND UTILITIES AND STRUCTURES. THE CONTRACTOR SHALL CONTACT "MISS UTILITY" AT 1-800-552-7001 72 HOURS PRIOR TO EXCAVATION AND SHALL NOT DISTURB THE SOIL UNTIL THE DIG TICKET HAS BEEN PROCESSED.

2. THE LOCATION OF EXISTING UTILITIES SHOWN IS AN APPROXIMATE REPRESENTATION ONLY. THE UTILITY INFORMATION SHOWN DOES NOT GUARANTEE EXISTENCE, SERVICEABILITY, OR OTHER DATA CONCERNING THE UTILITIES NOR GUARANTEE AGAINST THE POSSIBILITY THAT ADDITIONAL UTILITIES MAY BE PRESENT. PRIOR TO ORDERING MATERIALS OR BEGINNING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY AND DETERMINE THE EXACT LOCATIONS AND ELEVATIONS AND SHALL CONFIRM THAT THERE ARE NO INTERFERENCES WITH EXISTING UTILITIES AND PROPOSED WORK. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANIES AND BE RESPONSIBLE FOR RELOCATION OF THE UNDERGROUND UTILITIES CONFLICTING WITH THE PROPOSED LAND DEVELOPMENT.

3. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE LOCATION, ELEVATION AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR, AND THE INFORMATION FURNISHED IN WRITING TO THE ENGINEER AND OWNER FOR THE RESOLUTION OF THE CONFLICT. CONTRACTOR'S FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO SOLVE THE CONFLICT.

GENERAL EROSION & SEDIMENT CONTROL NOTES (VESCH TABLE 6-1)

ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE

CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS (9VAC-25-840 EROSION AND SEDIMENT CONTROL REGULATIONS).

ES-2: THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE-CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION.

ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING.

ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES.

ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF-SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER

FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY.

ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT

EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY.

ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES

AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.

ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE.

ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF-PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE

IMMEDIATELY.

ADJACENT PROPERTIES

THE LAND SURROUNDING THE PROJECT AREA IS STILL PART OF THE PROPERTY OWNED BY VCCS SO THERE ARE NO ANTICIPATED IMPACTS TO ADJACENT PROPERTIES. HOWEVER, THE ADJACENT PROPERTIES ARE MOSTLY COMMERCIAL TO THE WEST, RESIDENTIAL TO THE SOUTH, AND VACANT (WOODED) LAND TO THE EAST.

OFF-SITE AREAS

NO OFF-SITE LAND-DISTURBING ACTIVITIES HAVE BEEN DESIGNED OR PERMITTED WITH THIS PLAN. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN THOSE INDICATED ON THESE PLANS, INCLUDING BUT NOT LIMITED TO OFF-SITE BORROW OR WASTE AREAS, THE CONTRACTOR SHALL SUPPLY THE OWNER WITH A SUPPLEMENTARY PLAN FOR SUBMITTAL TO THE PLAN-APPROVING AUTHORITY. THE PROPOSED LAND DISTURBANCE IS NOT INTENDED TO INCLUDE ANY OFF-SITE ACTIVITIES EXCEPT FOR DISPOSAL OF FELLED TREES AND/OR EXCAVATED MATERIALS AND THE CONTRACTOR IS RESPONSIBLE FOR ENSURING PROPER DISPOSAL. IN THE CASE OF OFF-SITE DISTURBANCE ASSOCIATED WITH THE PROJECT, THE CONTRACTOR SHALL NOTIFY THE PLAN APPROVING AUTHORITY TO DETERMINE IF A SEPARATE ESC PLAN OR CONSTRUCTION GENERAL PERMIT IS NECESSARY. ANY OFF-SITE BORROW OR SPOIL AREA MUST HAVE AN APPROVED PLAN TO SUPPLEMENT THE OVERALL PROJECT PLAN. PROOF OF PERMITS MUST BE PROVIDED FOR OFF-SITE AREAS

THAT ARE UNDER OTHER PERMITS.

SOILS

PREDOMINANT ON-SITE SOILS IN THE PROJECT AREA ARE KEMPSVILLE GRAVELLY SANDY LOAM, 7 TO 15 PERCENT SLOPES, VERY DEEP, WELL DRAINED SOILS WITH A B HYDROLOGIC GROUP RATING AND A K FACTOR (ERODIBILITY RATING) OF 0.15. THESE SOILS HAVE MODERATE PERMEABILITY. THE SURFACE LAYER IS A DARK GRAYISH BROWN FINE SANDY LOAM ABOUT 4 INCHES THICK AND THE SUBSURFACE LAYERS IS A LIGHT YELLOWISH BROWN FINE SANDY LOAM ABOUT 10 INCHES THICK. THE SUBSOIL EXTENDS TO A DEPTH OF 41 INCHES. SEE SOILS MAP

SHEET 4.

WETLANDS AND RESOURCE PROTECTION AREAS (RPA) AND CRITICAL AREAS

NO WATERCOURSES, WATERBODIES, OR WETLANDS EXIST WITHIN THE LIMITS OF DISTURBANCE, AND THERE ARE NO WETLANDS OR PERENNIAL STREAMS IN OR ADJACENT TO THE LIMITS OF DISTURBANCE, THEREFORE THERE IS NO RPA WITHIN OR IMMEDIATELY ADJACENT

TO THIS PROJECT. THERE ARE NO CRITICAL AREAS WITHIN THE LOD.

EROSION AND SEDIMENT CONTROL PRACTICES

UNLESS OTHERWISE INDICATED AND APPROVED BY THE VIRGINIA COMMUNITY COLLEGE SYSTEM (VCCS) OR GERMANNA COMMUNITY COLLEGE (GCC), ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). THE MINIMUM STANDARDS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS SHALL BE ADHERED TO UNLESS

OTHERWISE WAIVED OR APPROVED BY VARIANCE.

STRUCTURAL PRACTICES

1. SAFETY FENCE - VESCH 3.01

SAFETY FENCE SHALL BE INSTALLED ALONG THE SOUTH EDGE OF THE LIMITS OF DISTURBANCE TO KEEP PEDESTRIANS OUT OF THE

WORK AREA.

2. STABILIZED CONSTRUCTION ENTRANCE - VESCH 3.02

A CONSTRUCTION ENTRANCE SHALL BE CONSTRUCTED AT THE SOUTHEAST CORNER OF THE PROJECT LIMITS AT THE EDGE OF THE EXISTING PAVED ROAD PRIOR TO ANY LAND DISTURBING ACTIVITIES AND SHALL REMAIN IN PLACE THROUGHOUT THE PROJECT.

3. COMPOST FILTER SOCK. THE PROJECT IS REQUESTING A VARIANCE TO UTILIZE COMPOST FILTER SOCK DUE TO LONG SLOPE LENGTHS.

THE VARIANCE REQUEST APPROVAL LETTER FROM THE DEQ IS PROVIDED BELOW.

COMPOST FILTER SOCK SHALL BE INSTALLED AS A PERIMETER CONTROL MEASURE AS SHOWN ON THE PLANS.

4. SILT FENCE - VESCH 3.05

SILT FENCE SHALL BE INSTALLED AROUND THE STOCKPILE AND AS INDICATED ON THE PLANS.

5. INLET PROTECTION - VESCH 3.07

INLET PROTECTION SHALL BE INSTALLED AT THE EXISTING STORM SEWER CATCH BASIN TO THE WEST OF THE PROJECT AREA.

VEGETATIVE PRACTICES

6. TEMPORARY SEEDING - VESCH 3.31

ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR 14 DAYS OR LONGER SHALL BE SEEDED WITHIN 7 DAYS OF INITIAL DISTURBANCE. TEMPORARY SEED SHALL BE APPLIED TO THE DIVERSION DIKES IMMEDIATELY FOLLOWING THEIR CONSTRUCTION.

7. SODDING - SUPPLEMENTAL SPECIFICATION 32-9223

ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE SODDED IMMEDIATELY UPON COMPLETION OF FINAL GRADING. REFER TO SUPPLEMENTAL SPECIFICATION 32-9223 FOR INFORMATION ON SOIL PREPARATION, TURF SELECTION, INSTALLATION INSTRUCTIONS, AND PERFORMANCE REQUIREMENTS. TYPE OF SOD SHALL BE TALL FESCUE OR PER THE DIRECTION OF GCC STAFF.

8. MULCHING - VESCH 3.35

MULCH SHALL BE APPLIED WITH ALL TEMPORARY SEEDING APPLICATIONS. MULCH SHALL BE WHEAT OR OAT STRAW SPREAD BY HAND OR MACHINE BLOWN DURING SPRING OR LATE FALL PERIODS. FIBER MULCH IS ALSO ACCEPTABLE DURING SPRING AND EARLY FALL PERIODS.

FIBER MULCH MAY ALSO BE USED TO ANCHOR STRAW MULCH ON STEEP SLOPES AND ADJACENT TO CRITICAL AREAS.

9. TOPSOIL - SUPPLEMENTAL SPECIFICATION 32-9113

TOPSOIL SHALL BE UNIFORMLY DISTRIBUTED TO A MINIMUM COMPACTED DEPTH OF 4 INCHES. REFER TO SUPPLEMENTAL SPECIFICATION

32-9113 FOR INFORMATION ON PREPARATION, PLACEMENT, AND PERFORMANCE REQUIREMENTS.

MAINTENANCE

IN GENERAL, ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAINFALL (>0.25"). IN

PARTICULAR, THE FOLLOWING ITEMS WILL BE CHECKED:

1. STRUCTURAL CONTROLS (SEE LIST ABOVE) WILL BE CHECKED REGULARLY FOR SEDIMENT BUILDUP WHICH WILL PREVENT DRAINAGE. IF

THE CONTROL MEASURE IS CLOGGED BY SEDIMENT, IT SHALL BE AND CLEANED AND/OR REPLACED.

2. AREAS WHICH MAY BE ERODED BY RAIN OR OTHERWISE DAMAGED DURING THE PROGRESS OF WORK SHALL BE REPAIRED BY THE

CONTRACTOR. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ANY SUCH ERODED MATERIAL AND THE ADJACENT AREAS.

3. COMPOST FILTER SOCK WILL BE CHECKED REGULARLY FOR UNDERMINING OR DETERIORATION. SEDIMENT SHALL BE REMOVED WHEN

THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF-WAY TO THE TOP OF THE BARRIER.

4. THE SODDED AREAS WILL BE CHECKED REGULARLY TO ENSURE THAT IT IS IN GOOD CONDITION. ANY AREAS THAT APPEAR TO BE DYING

SHALL BE CUT OUT AND REPLACED AS NECESSARY.

5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO A PAVED OR

PUBLIC ROAD SURFACE.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES NECESSARY

TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY VCCS STAFF OR THEIR DESIGNEE.

INSPECTIONS

PER SECTION 4.2.1 OF THE VCCS ANNUAL STANDARDS AND SPECIFICATIONS FOR ESC AND SWM, VCCS IS RESPONSIBLE FOR HAVING A

DEQ-CERTIFIED ESC/SWM INSPECTOR CONDUCT THE FOLLOWING SITE INSPECTIONS:

· AFTER THE INSTALLATION OF INITIAL EROSION AND SEDIMENT CONTROL MEASURES;

· AT LEAST ONCE IN EVERY TWO-WEEK PERIOD;

· WITHIN 48 HOURS FOLLOWING ANY RUNOFF PRODUCING STORM EVENT;

· AT THE COMPLETION OF THE PROJECT; AND,

· PERIODICALLY AS DEEMED NECESSARY BY VCCS.

INSPECTIONS SHALL BE DOCUMENTED USING THE INSPECTION FORM IN APPENDIX E-1 OF THE VCCS STANDARDS AND SPECIFICATIONS.

CONTRACTOR IS RESPONSIBLE FOR ADDRESSING CORRECTIVE ACTIONS IDENTIFIED ON INSPECTION FORMS WITHIN TIMEFRAME SPECIFIED BY

THE INSPECTOR.

RESPONSIBLE LAND DISTURBER

THE CONTRACTOR SHALL NAME A PERSON WHO IS CERTIFIED BY THE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY (VDEQ) AS A RESPONSIBLE LAND DISTURBER (RLD). THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING THE PLAN APPROVING AUTHORITY WITH THE

NAME AND CERTIFICATION NUMBER OF THE RLD.

TEMPORARY AND PERMANENT SITE REHABILITATION

1. TEMPORARY STABILIZATION OF ALL DISTURBED AREAS IS REQUIRED BY EACH CONTRACTOR PERFORMING WORK. TEMPORARY EROSION

CONTROL MEASURES, SUCH AS SILT SOCK, SILT FENCE, MULCHING, SEEDING, AND STONE SHALL BE APPLIED TO DENUDED AREAS WITHIN 7 DAYS. IF A PORTION OF DENUDED AREA IS TO BE LEFT FOR MORE THAN ONE YEAR, PERMANENT STABILIZATION OR RESTORATION OF

THAT AREA SHALL BE REQUIRED.

2. PERMANENT SITE REHABILITATION SHALL BE PERFORMED AFTER ALL WORK IS COMPLETED OR IS LEFT FOR MORE THAN A YEAR. THE REHABILITATION OF THE SITE SHALL INCLUDE THE STABILIZATION AND PERMANENT SEEDING OF TEMPORARY ACCESS POINTS, STOCKPILES, AND ALL OTHER DISTURBED AREAS RESULTING FROM CONSTRUCTION ACTIVITIES.

3. TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER PERMANENT STABILIZATION.

PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL THE GROUND COVER IS UNIFORM, MATURE ENOUGH TO

SURVIVE, AND WILL INHIBIT EROSION.

4. THE CONTRACTOR SHALL ESTABLISH PERMANENT VEGETATIVE COVER ON ALL DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED FOLLOWING THE SPECIFIC MEASURES BELOW IN CONJUNCTION WITH VESCH AND AS&S.

5. ALL STOCKPILES SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES IN ACCORDANCE WITH MINIMUM STANDARD 2 (SEE SHEET 6). THE CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL

STOCKPILES ON SITE.

6. SITE STABILIZATION

PERMANENT OR TEMPORARY SOIL STABILIZATION WILL BE APPLIED TO DENUDED AREAS WITHIN 7 DAYS OF REACHING FINAL GRADE OR WHEN

SOIL WILL BE UNDISTURBED FOR MORE THAN 14 DAYS ON ANY PORTION OF THE SITE.

SITE RESTORATION OF GRAVEL AREAS

1. FOR EXISTING GRAVEL TO BE DEMOLISHED, PROVIDE FULL-DEPTH EXCAVATION OF GRAVEL.

2. IMPORT FILL. COMPACT IN 4-INCH LIFTS AT 95% PROCTOR.

3. PROVIDE 4 INCHES OF TOPSOIL.

BASKETBALL GOAL SYSTEM

1. GOAL POST SHALL BE CONSTRUCTED OF 6-INCH SQUARE, 3/16-INCH WALL STRUCTURAL STEEL. POST SHALL HAVE A 45° EXTENSION ARM

THAT IS 6-INCH SQUARE, 3/16-INCH WALL STRUCTURAL STEEL TUB. POST SHALL BE DESIGNED SO THE GOAL MOUNTS DIRECTLY TO THE POST. POST SHALL BE NON-ADJUSTABLE 10 FEET GOAL HEIGHT. POST SHALL HAVE A MINIMUM SET BACK FROM THE FRONT OF THE POST TO THE FRONT OF THE BACKBOARD OF 5 FEET. POLE SHALL HAVE 40% GLASS BLACK POLYESTER POWDER COATED FINISH AND CARRY A LIFETIME FUNCTIONAL WARRANTY. THE TOP OF THE POST SHALL HAVE A CAP TO KEEP OUT RAIN.

2. BACKBOARD SHALL BE 42 INCHES BY 72 INCHES AND MADE OF ½-INCH TEMPERED GLASS. THE GLASS SHALL BE FRAMED WITH ALUMINUM EXTENSIONS AND HAVE A WHITE BORDER AND SHOOTER'S SQUARE. BACKBOARD SHALL HAVE PADDING ALONG THE

BOTTOM FRAME AND ALONG BOTH SIDES OF THE FRAME UP TO THE GOAL.

3. GOAL SHALL BE BREAKAWAY AND MADE OF 5/8” SOLID STEEL POWDER COATED FOR THE RIM, INCLUDING SHOCK ABSORBING MECHANISM ENCLOSED WITHIN A FORMED STEEL COVER. GOAL SHALL FIT 5” X 5” HOLE PATTERN. RIM SHALL HAVE 12 NO-TIE NET HOLDERS AND BE ORANGE IN COLOR. 12 LOOP NYLON NET AND MOUNTING HARDWARE SHALL BE INCLUDED. NET SHALL BE 680/32

BRAIDED WHITE.

4. LINE PAINT

4.1. LINE PAINT SHALL BE 100% ACRYLIC ALL WEATHER LINE PAINT SPECIFICALLY DESIGNED FOR STRIPPING ON ASPHALT SURFACES.

SUGGESTED CONSTRUCTION SEQUENCE

1. A PRE-CONSTRUCTION MEETING SHALL BE CONDUCTED AT THE SITE WITH THE VCCS PROJECT MANAGER, PRIMARY CONTRACTOR, CERTIFIED RESPONSIBLE LAND DISTURBER (RLD) AND THE ENGINEER PRIOR TO ANY DISTURBANCE.

1.1. THE PRE-CONSTRUCTION MEETING SHALL BE PLANNED AND CONDUCTED CONSISTENT WITH SECTION 3.4 OF THE VCCS STANDARDS AND

SPECIFICATIONS FOR ESC AND SWM.

1.2. THE VCCS PRE-CONSTRUCTION MEETING FORM IN APPENDIX D-2 OF THE VCCS ANNUAL STANDARDS AND SPECIFICATIONS FOR ESC AND

SWM SHALL BE COMPLETED AT THE PRE-CONSTRUCTION MEETING AND PRIOR TO THE COMMENCEMENT OF WORK. A COPY OF THE FORM

SHALL BE MAINTAINED BY THE VCCS PROJECT MANAGER AND THE CONTRACTOR.

2. ANY APPLICABLE PERMITS SHALL BE OBTAINED PRIOR TO ANY WORK.

3. PLAN AND COMMENCE CONSTRUCTION WORK DURING DRY WEATHER CONDITIONS.

4. PRIOR TO COMMENCING ANY EARTHWORK, INSTALL TEMPORARY CONSTRUCTION ENTRANCE.

5. INSTALL OTHER TEMPORARY EROSION AND SEDIMENT CONTROLS PRIOR TO ANY LAND DISTURBANCE - INCLUDING SAFETY FENCE, COMPOST FILTER SOCK, AND INLET PROTECTION.

6. BEGIN DEMOLITION, EXCAVATION, AND ROUGH GRADING ACTIVITIES ACCORDING TO PLANS.

7. TEMPORARY SEEDING AND MULCHING MAY BE REQUIRED TO STABILIZE THE SITE UNTIL PERMANENT STABILIZATION IS ESTABLISHED.

BLANKETS AND SOIL STABILIZATION MATTING MAY BE NECESSARY TO STABILIZE EMBANKMENT SLOPES OR OTHER SLOPED AREAS.

8. INSTALL SIDEWALK AND FIRE LANE GEOGRID SYSTEM FOR FIRE LANE ACCESS.

9. BEGIN CONSTRUCTION ON THE MULTI-USE COURT:

9.1. SUBGRADE PREPARATION

9.1.1. REMOVE ALL TOPSOIL, DEBRIS, AND LARGE ROCKS FROM AREAS TO BE PAVED

9.1.2. COMMENCE SOIL GRADING, LEVELING, AND COMPACTING OF THE SOIL SUBGRADE LAYER, ENSURING ADEQUATE COMPACTION TO

NOT LESS THAN 95 PERCENT PROCTOR.

9.2. BASE CONSTRUCTION

9.2.1. INSTALL A 6" BASE LAYER OF COMPACTED AGGREGATE STONE WHERE NECESSARY TO MEET PROPOSED GRADES, ENSURING ADEQUATE COMPACTION (SEE GEOTECHNICAL REPORT AND BID SPECS FOR COMPACTION RECOMMENDATIONS). THE SURFACE OF THE COMPLETED BASE MUST NOT DEVIATE MORE THAN 12 INCH WHEN MEASURED WITH A 10-FOOT STRAIGHT EDGE.

9.3 TACK COAT

9.3.1 INSTALL A 2" ASPHALT LEVELING BINDER COURSE LAYER, ENSURING A LEVEL AND COMPACT SURFACE.

9.4 SURFACE COURSE CONSTRUCTION

9.4.1 AFTER DRYING PROCESS, POUR THE FINAL TOP SURFACE LAYER OF 1" ASPHALT OVER THE PREVIOUS ASPHALT COURSE.

9.4.2 AFTER CURING PROCESS, CHECK THE SURFACE FOR ANY HIGH OR LOW SPOTS AND REPAIR IF NECESSARY. THE FINISHED SURFACE

MUST NOT DEVIATE MORE THAN 14 INCH WHEN MEASURED WITH A 10-FOOT STRAIGHT EDGE.

9.5 PAINT COURT WITH 100% ACRYLIC PAINTS WITH 2 COATS OF RESURFACER AND 2 COATS OF COLOR COAT (4 COATS TOTAL). FOLLOW

MANUFACTURER'S RECOMMENDATION. SEE SHEET 3 FOR COLORS.

9.6 INSTALL APPLICABLE EQUIPMENT

9.6.1 BASKETBALL GOAL POST

9.6.1.1 INSTALL POST PLUMB IN CONCRETE FOUNDATION AS INDICATED.

9.6.2 BASKETBALL GOAL

9.6.2.1 INSTALL GOAL TO POST PER MANUFACTURER'S WRITTEN INSTRUCTIONS.

9.6.3 BASKETBALL BACKBOARD

9.6.3.1 INSTALL BACKBOARD TO GOAL PER MANUFACTURER'S WRITTEN INSTRUCTIONS.

9.7 PREPARE THE COURT SURFACE FOR LINE PAINTING AND APPLY 100% ACRYLIC LINE PAINT AS INDICATED AND PER MANUFACTURER'S

WRITTEN INSTRUCTIONS.

10.INSTALL FENCE.

11.ENSURE EROSION AND SEDIMENT CONTROL MEASURES ARE MAINTAINED AND INSPECTED THROUGHOUT THE DURATION OF THE PROJECT

AND REPLACE AS NECESSARY, IN ACCORDANCE WITH THE VESCH.

12.COMMENCE TOPSOILING, MULCHING, AND SODDING ONCE FINAL ELEVATIONS HAVE BEEN REACHED.

13.ONCE PERMANENT STABILIZATION ON THE SITE HAS BEEN ESTABLISHED, WHEREIN VEGETATION IS UNIFORM, MATURE ENOUGH TO

SURVIVE, AND WILL INHIBIT EROSION, ALL THE TEMPORARY EROSION AND SEDIMENT MEASURES SHALL BE REMOVED.

14.CONTACT THE ENGINEER FOR ANY DEVIATION FROM THE PLANS.

SILT SOCK VARIANCE REQUEST APPROVAL LETTER

ch

N /A

BB/JL BB/JL CS

6 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d

V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m M

IN

IM

U M

S

TA

N D

A R

D S

N A

R R

A

TI

V E

/0

1/

9VAC25-840-40. Minimum standards.

1. Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site.

Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days. Permanent stabilization shall be applied to areas that are to be left dormant for more than one year.

RESPONSE: FOR TEMPORARY AND PERMANENT SITE REHABILITATION, SEE NOTES ON SHEET 5.

2. During construction of the project, soil stock piles and borrow areas shall be stabilized or protected with sediment trapping measures. The applicant is responsible for the temporary protection and permanent stabilization of all soil stockpiles on site as well as borrow areas and soil intentionally transported from the project site. RESPONSE: FOR STOCKPILE STABILIZATION, SEE NOTES UNDER TEMPORARY AND PERMANENT SITE

REHABILITATION, SHEET 5.

3. A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieved that is uniform, mature enough to survive and will inhibit erosion. RESPONSE: FOR

TEMPORARY AND PERMANENT SITE REHABILITATION, SEE NOTES ON SHEET 5.

4. Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional before upslope land disturbance takes place. RESPONSE: PERIMETER CONTROLS SUCH AS SILT SOCK ARE CALLED OUT FOR INSTALLATIONS PRIOR TO ANY LAND DISTURBANCE, SEE CONSTRUCTION SEQUENCE ON SHEET 5.

5. Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. RESPONSE: N/A

6. Sediment traps and sediment basins shall be designed and constructed based upon the total drainage area to be served by the trap or basin.

RESPONSE: N/A

a. The minimum storage capacity of a sediment trap shall be 134 cubic yards per acre of drainage area and the trap shall only control drainage areas less than three acres. RESPONSE: N/A

b. Surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres shall be controlled by a sediment basin. The minimum storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area. The outfall system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-hour duration. Runoff coefficients used in runoff calculations shall correspond to a bare earth condition or those conditions expected to exist while the sediment basin is utilized. RESPONSE: N/A

7. Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. RESPONSE: ALL DISTURBED AREAS SHALL BE STABILIZED BY SOD AS SHOWN ON SHEET 4. SHOULD EXCESSIVE EROSION OCCUR WITHIN ONE YEAR OF PERMANENT STABILIZATION, CONTRACTOR SHALL REMEDY THE ISSUES AT NO ADDITIONAL COST TO THE OWNER.

8. Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume or slope drain structure. RESPONSE: N/A

9. Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. RESPONSE: THERE ARE NO KNOWN WATER SEEPS WITHIN THE LIMITS OF DISTURBANCE, BUT SHOULD ANY OCCUR, ADDITIONAL PROTECTION SHALL BE PROVIDED.

10. All storm sewer inlets that are made operable during construction shall be protected so that sediment-laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. RESPONSE: N/A

11. Before newly constructed stormwater conveyance channels or pipes are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. RESPONSE: N/A

12. When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. RESPONSE: N/A

13. When a live watercourse must be crossed by construction vehicles more than twice in any six-month period, a temporary vehicular stream crossing constructed of nonerodible material shall be provided. RESPONSE: N/A

14. All applicable federal, state and local requirements pertaining to working in or crossing live watercourses shall be met. RESPONSE: N/A

15. The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. RESPONSE: N/A

16. Underground utility lines shall be installed in accordance with the following standards in addition to other applicable criteria: RESPONSE: N/A

a. No more than 500 linear feet of trench may be opened at one time.

b. Excavated material shall be placed on the uphill side of trenches.

c. Effluent from dewatering operations shall be filtered or passed through an approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or off-site property.

d. Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization.

e. Restabilization shall be accomplished in accordance with this chapter.

f. Applicable safety requirements shall be complied with.

17. Where construction vehicle access routes intersect paved or public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto the paved surface. Where sediment is transported onto a paved or public road surface, the road surface shall be cleaned thoroughly at the end of each day. Sediment shall be removed from the roads by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual development lots as well as to larger land-disturbing activities. RESPONSE: A CONSTRUCTION ENTRANCE HAS BEEN INCORPORATED INTO THE EROSION AND SEDIMENT CONTROL PLAN (SEE

SHEET 4).

18. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after the temporary measures are no longer needed, unless otherwise authorized by the VESCP authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. RESPONSE: SEE NOTE 12 UNDER SUGGESTED

CONTRUCTION SEQUENCE ON SHEET 5.

NOTE: FOR DEMONSTRATION OF COMPLIANCE WITH MINIMUM STANDARD 19, SEE PART M. BELOW

19. Properties and waterways downstream from development sites shall be protected from sediment deposition, erosion and damage due to increases in volume, velocity and peak flow rate of stormwater runoff for the stated frequency storm of 24-hour duration in accordance with the following standards and criteria. Stream restoration and relocation projects that incorporate natural channel design concepts are not man-made channels and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels:

a. Concentrated stormwater runoff leaving a development site shall be discharged directly into an adequate natural or man-made receiving channel, pipe or storm sewer system. For those sites where runoff is discharged into a pipe or pipe system, downstream stability analyses at the outfall of the pipe or pipe system shall be performed.

b. Adequacy of all channels and pipes shall be verified in the following manner:

(1) The applicant shall demonstrate that the total drainage area to the point of analysis within the channel is 100 times greater than the contributing drainage area of the project in question; or

(2) (a) Natural channels shall be analyzed by the use of a two-year storm to verify that stormwater will not overtop channel banks nor cause erosion of channel bed or banks;

(b) All previously constructed man-made channels shall be analyzed by the use of a 10-year storm to verify that stormwater will not overtop its banks and by the use of a two-year storm to demonstrate that stormwater will not cause erosion of channel bed or banks; and

(c) Pipes and storm sewer systems shall be analyzed by the use of a 10-year storm to verify that stormwater will be contained within the pipe or system.

c. If existing natural receiving channels or previously constructed man-made channels or pipes are not adequate, the applicant shall:

(1) Improve the channels to a condition where a 10-year storm will not overtop the banks and a two-year storm will not cause erosion to the channel, the bed, or the banks;

(2) Improve the pipe or pipe system to a condition where the 10-year storm is contained within the appurtenances;

(3) Develop a site design that will not cause the pre-development peak runoff rate from a two-year storm to increase when runoff outfalls into a natural channel or will not cause the pre-development peak runoff rate from a 10-year storm to increase when runoff outfalls into a man-made channel; or

(4) Provide a combination of channel improvement, stormwater detention or other measures which is satisfactory to the VESCP authority to prevent downstream erosion.

d. The applicant shall provide evidence of permission to make the improvements.

e. All hydrologic analyses shall be based on the existing watershed characteristics and the ultimate development condition of the subject project.

f. If the applicant chooses an option that includes stormwater detention, he shall obtain approval from the VESCP of a plan for maintenance of the detention facilities. The plan shall set forth the maintenance requirements of the facility and the person responsible for performing the maintenance.

g. Outfall from a detention facility shall be discharged to a receiving channel, and energy dissipators shall be placed at the outfall of all detention facilities as necessary to provide a stabilized transition from the facility to the receiving channel.

h. All on-site channels must be verified to be adequate.

i. Increased volumes of sheet flows that may cause erosion or sedimentation on adjacent property shall be diverted to a stable outlet, adequate channel, pipe or pipe system, or to a detention facility.

j. In applying these stormwater management criteria, individual lots or parcels in a residential, commercial or industrial development shall not be considered to be separate development projects. Instead, the development, as a whole, shall be considered to be a single development project.

Hydrologic parameters that reflect the ultimate development condition shall be used in all engineering calculations.

k. All measures used to protect properties and waterways shall be employed in a manner which minimizes impacts on the physical, chemical and biological integrity of rivers, streams and other waters of the state.

l. Any plan approved prior to July 1, 2014, that provides for stormwater management that addresses any flow rate capacity and velocity requirements for natural or man-made channels shall satisfy the flow rate capacity and velocity requirements for natural or man-made channels if the practices are designed to (i) detain the water quality volume and to release it over 48 hours; (ii) detain and release over a 24-hour period the expected rainfall resulting from the one year, 24-hour storm; and (iii) reduce the allowable peak flow rate resulting from the 1.5, 2, and 10-year, 24-hour storms to a level that is less than or equal to the peak flow rate from the site assuming it was in a good forested condition, achieved through multiplication of the forested peak flow rate by a reduction factor that is equal to the runoff volume from the site when it was in a good forested condition divided by the runoff volume from the site in its proposed condition, and shall be exempt from any flow rate capacity and velocity requirements for natural or man-made channels as defined in any regulations promulgated pursuant to § 62.1-44.15:54 or 62.1-44.15:65 of the Act.

m. For plans approved on and after July 1, 2014, the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act and this subsection shall be satisfied by compliance with water quantity requirements in the Stormwater Management Act (§ 62.1-44.15:24 et seq. of the Code of Virginia) and attendant regulations, unless such land-disturbing activities (i) are in accordance with provisions for time limits on applicability of approved design criteria in 9VAC25-870-47 or grandfathering in 9VAC25-870-48 of the Virginia Stormwater Management Program (VSMP) Regulation, in which case the flow rate capacity and velocity requirements of § 62.1-44.15:52 A of the Act shall apply, or (ii) are exempt pursuant to § 62.1-44.15:34 C 7 of the Act.

RESPONSE: THESE PLANS ARE IN ACCORDANCE WITH THE REQUIREMENTS OF § 62.1-44.15:52 A, 9VAC25-870-66, AND THE VCCS AS&S -

SEE SHEET 10 FOR STORMWATER MANAGEMENT INFORMATION.

n. Compliance with the water quantity minimum standards set out in 9VAC25-870-66 of the Virginia Stormwater Management Program (VSMP) Regulation shall be deemed to satisfy the requirements of this subdivision 19.

ch

N /A

BB/JL BB/JL CS

7 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

N O

TE

S

A N

D D

ET

A

IL

S

/0

1/

WORK AREA

INSTALLATION - SECTION VIEW

AREA TO BE PROTECTED

FLOW

WORK AREA

INSTALLATION - PLAN VIEW

FILTREXX® SILT SOXX™

NOTES:

1. COMPOST FILTER SOCKS (SILT SOCKS) SHOULD BE USED IN SENSITIVE AREAS (E.G. WETLANDS, STREAM

CROSSINGS) OR OTHER AREAS IN WHICH GROUND DISTURBANCE SHOULD BE MINIMIZED.

2. FILTER MEDIA INSIDE AND AS NECESSARY UP SLOPE OF FILTER SOCK TO BE FILTREXX MEDIA OR APPROVED

EQUAL.

3. STAKES SHOULD BE INSTALLED THROUGH THE MIDDLE OF SOCKS, 10' APART.

4. STAKE SIZE: 2'x2'x36"

5. STAKES DRIVEN AT DEPTH OF 12" FOR SAND AND SILT LOAM SOILS AND 8" FOR CLAY SOILS, WITH A MINIMUM

OF 3" EXPOSED ABOVE SOCK.

6. OVERLAPPING SECTION FROM CONNECTION SHALL BE AT LEAST 18".

7. INSTALLATION OF THE SOCK IS TO BE EITHER ENTRENCHED (MAXIMUM OF 8-FOOT SPACING WHEN PLACED IN 4-INCH TRENCH) OR NOT ENTRENCHED (4-FOOT SPACING BETWEEN STAKES.) SOCK SHOULD NOT BE

ENTRENCHED WITHIN DESIGNATED WETLANDS.

8. ON LOCATIONS WERE GREATER THAN A 200-FOOT LONG SECTION OF GROUND IS TO BE TREATED WITH A COMPOST SOCK, THE SOCK LENGTHS SHOULD BE SLEEVED. AFTER ONE SOCK SECTION (200 FEET) IS FILLED AND KNOTTED OR ZIP TIED, THE SECOND SOCK SECTION SHALL BE PULLED OVER THE FIRST 1-2 FEET AND "SLEEVED", CREATING AN OVERLAP. ONCE OVERLAPPED, THE SECOND SECTION IS FILLED WITH COMPOST STARTING AT THE SLEEVED AREA. TO CREATE A SEAMLESS APPEARANCE, THE SOCKS MAY BE STAKED AT THE OVERLAPPED AREA (WHERE THE SLEEVE IS) TO KEEP THE SECTIONS TOGETHER. SLEEVING AT THE JOINTS IS NECESSARY BECAUSE IT REDUCES THE OPPORTUNITY FOR WATER TO PENETRATE THE JOINTS

WHEN INSTALLED IN THE FIELD.

9. CAN BE SEEDED AT THE TIME OF INSTALLATION IF PERIMETER CONTROL IS TO BE LEFT AS A PERMANENT

FILTER. ENGINEER WILL SPECIFY SEEDING REQUIREMENTS.

OVERLAPPING SECTIONS

FORM CONNECTION

18"

STAKE

CLOSED END

FLOW

2" HEADWIDTH

WOODEN STAKES

PLACED 10' O.C.

FILTREXX® SILT SOXX™

(SEE NOTES FOR SIZING)

FILTREXX® SILT SOXX™

(SEE NOTES FOR SIZING)

2" HEADWIDTH

WOODEN STAKES

PLACED 10' O.C.

MAINTENANCE NOTES:

1. THE COMPOST (SILT) SOCK MUST BE REPLACED IF CLOGGED OR TORN. IF CLOGGING BECOMES EXCESSIVE, THE SOCK MAY NEED TO BE REPLACED WITH A LARGER DIAMETER OR A DIFFERENT

MEASURE.

2. SEDIMENT SHOULD BE REMOVED WHEN ACCUMULATIONS HAVE REACHED 12 THE ABOVE GROUND HEIGHT

OF THE FILTER SOCK.

3. THE COMPOST (SILT) SOCK SHALL BE INSPECTED UNTIL LAND DISTURBANCE IS COMPLETE AND THE

AREA ABOVE MEASURE HAS BEEN PERMANENTLY STABILIZED.

4. ONCE ALL SOIL HAS BEEN STABILIZED AND CONSTRUCTION ACTIVITY HAS BEEN COMPLETED, THE COMPOST MEDIA MAY BE REMOVED FROM THE PROJECT SITE OR DISPERSED WITH A LOADER, RAKE, BULLDOZER, OR SIMILAR DEVICE AND MAY BE INCORPORATED INTO THE SOIL AS AN AMENDMENT OR LEFT ON THE SOIL SURFACE TO AID IN PERMANENT SEEDING OR LANDSCAPING, EXCEPT IN WETLAND AREAS. THE MESH NETTING MATERIAL SHOULD BE EXTRACTED FROM THE MEDIA AND DISPOSED OF PROPERLY. PHOTODEGRADABLE MESH NETTING MATERIAL, IF USED, DOES NOT NEED TO BE EXTRACTED AND DISPOSED OF. USING BIODEGRADABLE COMPOST SOCKS COMPLETELY ELIMINATES THE NEED AND

COST OF REMOVAL AND DISPOSAL.

CONNECTION - PLAN VIEW

NOT TO SCALE

NOT TO SCALENOT TO SCALE

AREA TO BE PROTECTED

NOT TO SCALE

SS

(2) 2"x2"x48+" HARDWOOD STAKES, WRAPPED

TOGETHER WITH 16 GAUGE WIRE, 10' O.C.

2"x2"x36" HARDWOOD STAKE, 10' O.C., STARTING 5' FROM ANGLED STAKES

FILTREXX® PYRAMID STAKING DETAIL

2" ABOVE SOXX TM

12" MIN

Se pt em be r 2

N

/A

BB/JL BB/JL CS

8 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

N O

TE

S

A N

D D

ET

A

IL

S

/0

1/

SUPPLEMENTAL SPECIFICATION 32-9223 - SODDING

SUPPLEMENTAL SPECIFICATION 32-9113 - TOPSOIL

ch

N /A

BB/JL BB/JL CS

9 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

N O

TE

S

A N

D D

ET

A

IL

S

/0

1/ ch

1"

0'

BB/JL BB/JL CS

10 11

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

VCS NAD 83

WSSI and County GIS Data

NVD 88

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

ST

O

R M

W A

TE

R

P

LA

N A

N D

N A

R R

A

TI

V E

STORMWATER NARRATIVE

/0

1/

25C

(HSG B)

25C

(HSG B)

25C

(HSG B)

25C

(HSG B)

ch

N /A

BB/JL BB/JL CS

11 11

FR

ED

ER

IC

K

SB

U R

G , V

A

24702_04 ENG LAYOUTS.dwg

N/A

N/A

FR

ED

ER

IC

K

SB

U R

G A

R

EA

C A

M

PU

S

Sheet #

Design Draft Approved

D A

TE

SC

A

LE

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y of

Computer File Name:

Horizontal Datum:

Boundary and Topo Source:

Vertical Datum:

L:\24000s\24700\24702.04\DRGENG PROJECT FOLDER\24702.04 VCCS GERMANNA\DWG

C W et la nd S tu di es a nd S ol ut io ns

, I nc

C op yr ig ht

W e tl a n d

B ro o k R d R ic h m o n d V ir gi n ia

P h o n e:

-4

-3

St u d ie s an d S o lu ti o n s, I n c.R co m p an y a

DA

VE

Y

R w w w .w et la n d s.

co m

ST

O

R M

W A

TE

R

H Y

D R

O G

R A

PH

S

G

ER

M A

N N

A C

O M

M U

N

IT

Y C

O

LL

EG

E

- F R

ED

ER

IC

K

SB

U

R G

C O

N

ST

R U

C T

SP

O

R

TS

C O

U R

T

N o.

D at e D es cr ip tio n R ev

B y

A pp

B y

R

EV

IS

IO

N S

/0

1/

File details come from the government source that posted it. Updated .