Gardner MS Roof Replacement Bid Plans .pdf
PDF 25 MB Posted
- Solicitation number
- BD-26-1441-COG01-COG01-126408
- Issued by
- Massachusetts
About this file
This bid document set consists of architectural, structural, mechanical, plumbing, and electrical drawings prepared by Tighe & Bond for the Gardner Middle School MSBA Accelerated Repair Program Roof Replacement Project located in Gardner, Massachusetts. The project, issued for bidding in March 2026, encompasses the complete removal and replacement of existing roofing systems across multiple roof levels, installation of new HVAC equipment and controls, plumbing modifications including new roof drains and vent pipes, electrical system updates, and accessibility improvements. The scope includes demolition of existing EPDM and metal roofing systems, installation of new rigid insulation with minimum R-30 value and 6-inch thickness, new membrane and metal roofing applications, replacement of roof drains and vent penetrations, removal and reinstallation of existing mechanical equipment on new curbs with minimum 12-inch clearance above roof surface, and associated structural repairs. The 71-sheet drawing set provides detailed specifications for base bid work and Alternate No. 1, which includes replacement of existing HVAC air handling units with new rooftop units and condensing units. The project includes provisions for future photovoltaic system installation on designated roof areas with maximum 3 PSF solar weight capacity, requiring 2-inch empty conduit infrastructure routed through the building to the electrical room.
Funding for the project is provided through the Massachusetts School Building Authority (MSBA) with project administration by Stone Fleet, Inc. as the Owner's Project Manager and structural engineering by SMMA. The cost estimate is being prepared by Ellana, Inc., with design services by Tighe & Bond and code consulting by JS Consulting Engineers. The project is part of the Commonwealth's accelerated repair program targeting critical infrastructure improvements at educational facilities. The complete roofing system replacement is designed to achieve compliance with Massachusetts Building Code 10th Edition and the Massachusetts Stretch Energy Code, with minimum insulation R-value requirements and proper slope and drainage provisions. The electrical work includes disconnect switch installations, conduit extensions for HVAC equipment connections, new control circuits for BMS system integration, and provisions for future renewable energy systems. No specific contract award date, term length, or pricing information is provided in the drawing set, as these details would be contained in the separate bid documents and contract specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Specifications for Gardner MS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pl ot te d
O n:
M ar
9, 6-
:2 1p m B y:
J
Ps ze ni cz ny La st S av ed
3/
9/
Ti gh e
B on d:
J
M
\M
0)
G ar dn er
M id dl e
S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
C
O V
ER
.d w g
PREPARED BY:
PROJECT
LOCATION
GARDNER MIDDLE SCHOOL
MSBA ACCELERATED REPAIR PROGRAM
ROOF REPLACEMENT PROJECT
GARDNER, MASSACHUSETTS
SITE LOCATION MAP
SCALE: 1" = 2000'
COMPLETE SET 71 SHEETS
JOSEPH P. VIAMARI, PE, LEED AP MATTHEW P. WZOREK, PE
PROJECT TEAM:
OWNER
OWNER'S PROJECT MANAGER
STRUCTURAL ENGINEER
STONE FLEET, INC.
225 DYER STREET, 2ND FLOOR
PROVIDENCE, RI 02903
FUNDING
COST ESTIMATING
ELLANA, INC.
98 NORTH WASHINGTON STREET
SUITE 109
MASSACHUSETTS SCHOOL BUILDING
AUTHORITY
40 BROAD STREET, SUITE 500
BOSTON, MA 02109
BOSTON, MA 02114
SMMA
1000 MASSACHUSETTS AVENUE,
CAMBRIDGE, MA 02138
GARDNER PUBLIC SCHOOLS
160 ELM STREET
GARDNER, MA 01440
ENGINEER
TIGHE & BOND
DESIGNER SERVICES, INC.
53 SOUTHAMPTON ROAD
WESTFIELD, MA 01085
CODE CONSULTANT
JS CONSULTING ENGINEERS, PLLC
224 MAIN STREET, SUIT 2C
SALEM, NH 03079
ISSUED FOR BIDDING
MARCH 2026
N
G-002
LIST OF DRAWINGS
AS SHOWN
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER- G-001.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
9, 6- 1:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 9/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
G
-0
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
M.WZOREK
J.VIAMARI
S.OZTURK
LIST OF DRAWINGS
SHEET NO. DRAWING NO. DRAWING TITLE
GENERAL
1 G-001 COVER SHEET
2 G-002 LIST OF DRAWINGS
3 G-003 EXISTING ROOF PHOTOGRAPHS
4 G-004 GENERAL NOTES
ARCHITECTURAL
5 AD-101 ROOF DEMOLITION PLAN
6 A-101 ROOF PLAN
7 A-102 ACCESSIBILITY IMPROVEMENTS PLAN
8 A-201A ALTERNATE NO.1: CEILING REPAIR PLAN
9 A-401 EXTERIOR ELEVATIONS - 1
10 A-402 EXTERIOR ELEVATIONS - 2
11 A-403 EXTERIOR ELEVATIONS - 3
12 A-404 EXTERIOR ELEVATIONS - 4
13 A-501 ROOF DETAILS - 1
14 A-502 ROOF DETAILS - 2
15 A-503 ROOF DETAILS - 3
16 A-504 ROOF DETAILS - 4
17 A-505 ROOF DETAILS - 5
18 A-506 ROOF DETAILS - 6
19 A-507 ROOF DETAILS - 7
20 A-508 ROOF DETAILS - 8
21 A-509 ROOF DETAILS - 9
22 A-510 ROOF DETAILS - 10
23 A-511 ROOF DETAILS - 11
24 A-512 ROOF DETAILS - 12
25 A-513 ROOF DETAILS - 13
26 A-514 ROOF DETAILS - 14
27 A-515 ROOF DETAILS - 15
28 A-516 ROOF DETAILS - 16
29 A-517 ROOF DETAILS - 17
30 A-518 ROOF DETAILS - 18
STRUCTURAL
31 S-100 ROOF ALLOWABLE SOLAR LOCATIONS
32 S-101 ROOF SNOW LOADS
PLUMBING
33 P-001 PLUMBING GENERAL NOTES, LEGEND, ABBREVIATIONS,
SCHEDULE AND DETAILS
34 P-101 PLUMBING ROOF PLAN
35 P-102 PLUMBING FIRST FLOOR PLAN
MECHANICAL
36 H-001 HVAC GENERAL NOTES, LEGEND, AND ABBREVIATIONS
37 H-101 HVAC ROOF PLAN
38 H-102 HVAC ROOF PLAN AREA C
39 H-103 HVAC ROOF PLAN AREA A
40 H-104 HVAC FLOOR PLANS - AREA A
41 H-105 HVAC FLOOR PLANS - AREA B
42 H-501 HVAC DETAILS
43 HD-101A HVAC DEMOLITION ROOF PLAN - ALTERNATE #1
44 H-101A HVAC ROOF PLAN - ALTERNATE #1
45 HD-103A ALTERNATE NO.1 : HVAC DEMOLITION FLOOR PLANS -
AREA A
46 HD-104A ALTERNATE NO.1 : HVAC DEMOLITION FLOOR PLANS -
AREA B
47 H-103A ALTERNATE NO. 1: HVAC FLOOR PLANS - AREA A
48 H-104A ALTERNATE NO.1 : HVAC FLOOR PLANS - AREA B
49 H-502A ALTERNATE NO.1 : HVAC CONTROL DIAGRAMS - 1
50 H-503A ALTERNATE NO.1 : HVAC CONTROL DIAGRAMS - 2
51 H-504A ALTERNATE NO.1: HVAC CONTROL DIAGRAMS - 3
52 H-601A HVAC SCHEDULES - ALTERNATE #1
ELECTRICAL
53 E-001 ELECTRICAL LEGEND
54 E-002 ELECTRICAL GENERAL NOTES AND ELECTRICAL
DETAILS
55 E-100 ELECTRICAL OVERALL ROOF PLAN
56 ED-101 ELECTRICAL ROOF PLAN - EXISTING CONDITIONS &
DEMOLITION
57 E-101 ELECTRICAL ROOF POWER PLAN - NEW WORK
58 E-102 ELECTRICAL PARTIAL ROOF POWER PLAN - NEW WORK
59 E-103 ELECTRICAL PARTIAL FLOOR PLANS - AREA C
60 E-104 PARTIAL FIRST FLOOR PLANS
61 ED-101A ALTERNATE NO. 1: ELECTRICAL ROOF PLAN - EXISTING
CONDITIONS & DEMOLITION
62 ED-102A ALTERNATE NO. 1: ELECTRICAL LOWER LEVEL FLOOR
PLAN - AREA A
63 ED-103A ALTERNATE NO. 1: ELECTRICAL FIRST FLOOR PLAN -
AREA A
64 ED-104A ALTERNATE NO. 1: ELECTRICAL LOWER LEVEL FLOOR
PLAN - AREA B
65 E-101A ALTERNATE NO.1: ELECTRICAL ROOF PLAN
66 E-102A ALTERNATE NO. 1: ELECTRICAL PARTIAL ROOF POWER
PLAN
67 E-103A ALTERNATE NO.1: ELECTRICAL PARTIAL FIRST FLOOR
PLAN - AREA C
68 E-104A ALTERNATE NO.1: ELECTRICAL LOWER LEVEL FLOOR
PLAN - AREA A
69 E-105A ALTERNATE NO. 1: ELECTRICAL PARTIAL LOWER LEVEL
PLAN - AREA B
70 E-200 BASE BID: ELECTRICAL SCHEDULES
71 E-200A ALTERNATE NO.1: ELECTRICAL SCHEDULES
NO SCALE
A
LEGEND:
PHOTOGRAPH LOCATIONA
EPDM ROOF - HIGH
NO SCALE
C
- NO SCALE
D
ROOF ACCESS HATCH
NO SCALE
F
- NO SCALE
G
ROOF TOP EQUIPMENT
NO SCALE
H
EPDM ROOF - HIGH
NO SCALE
I
BALLASTED ROOF SECTION
AND LOWER METAL ROOF
NO SCALE
B
G-003
EXISTING ROOF
PHOTOGRAPHS
AS SHOWN
N
GARDNER MIDDLE SCHOOL KEYPLAN
NO SCALE
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER- G-001.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 4/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
G
-0
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
M.WZOREK
J.VIAMARI
S.OZTURK
METAL CANOPY ROOF
NO SCALE
K
NO SCALE
BALLASTED ROOF ANTENNA
NO SCALE
J
EPDM ROOF - MIDDLE
EPDM ROOF - LOW
NO SCALE
L
- NO SCALE
M
E
A B
C
D E F
G
H I J
K L
M
EPDM ROOF - HIGH EPDM ROOF - HIGH
EPDM ROOF - HIGH
EPDM ROOF - LOW
OVERALL EPDM ROOF AREAS -
DRONE FLIGHT VIEW
NO SCALE
N
- NO SCALE
O
- NO SCALE
P
LOWER METAL ROOF AREA -
DRONE FLIGHT VIEW
HIGHER METAL ROOF AREA -
DRONE FLIGHT VIEW
GENERAL NOTES
CONSTRUCTION NOTES
DEMOLITION NOTES
1. ALL MECHANICAL AND ELECTRICAL WORK SHALL BE COORDINATED WITH ROOFING CONTRACTOR, BUILDING OWNER, AND ALL TRADES INVOLVED.
2. SEE SHEET H-SHEETS FOR HVAC EQUIPMENT REQUIREMENTS.
3. FIELD VERIFY QUANTITY OF MECHANICAL EQUIPMENT, PIPING, AND SUPPORTS TO BE REMOVED.
4. PROVIDE TEMPORARY CAPS FOR ALL DUCTWORK. NO DUCTWORK SHALL REMAIN OPEN AT ANY TIME.
5. PERFORM ALL REMOVAL AND REINSTALLATION OF ALL EQUIPMENT AND DUCTWORK. REINSTALLATION SHALL BE PERFORMED AFTER INSTALLATION OF NEW
ROOFING AND FLASHING BY ROOFING CONTRACTOR.
6. PRIOR TO UNIT REMOVAL, PERFORM PRE-BALANCE OF ALL AIR HANDLERS AND EXHAUST FANS SCHEDULED TO REMAIN. RECORD AIRFLOWS FOR FINAL BALANCING
EFFORTS AND PROVIDE INFORMATION TO THE ENGINEER.
7. DURING DEMOLITION, CONTROL WIRING IS TO BE DISCONNECTED AND PROTECTED FOR FUTURE USE/RE-CONNECTION. EXTEND ALL WIRING AND CONDUIT AS NECESSARY FOR CURB REPLACEMENT. RECONNECT ALL CONTROL WIRING FOR PROPER OPERATION.
8. REMOVE AND DISPOSE OF ALL EXISTING CURBS. NEW CURBS SHALL BE RAISED TO PROVIDE A MINIMUM OF 12" OF CLEARANCE FROM ADJACENT ROOFING. AT
ALL ROOF CURBS INSTALL NEW CRICKETS TO ENSURE PROPER DRAINAGE.
9. NEW SLEEPERS ARE TO BE PROVIDED BY THE ROOFING CONTRACTOR.
10. ELECTRICAL CONTRACTOR SHALL DISCONNECT AND MAKE SAFE THE EXISTING MECHANICAL EQUIPMENT FOR REMOVAL BY HVAC CONTRACTOR. THE EXISTING FEEDER SHALL BE DE-ENEREGIZED AND LOCKED OUT FOR THE DURATION OF THE NEW ROOF WORK. THE ELECTRICAL CONTRACTOR SHALL RECONNECT FEEDER TO EXISTING MECHANICAL EQUIPMENT UPON THE RE-INSTALLATION BY HVAC CONTRACTOR. ELECTRICAL CONTRACTOR SHALL EXTEND CONDUITS AND WIRING
AS REQUIRED.
11. ALL CONDUIT RUNS ACROSS ROOF SHALL BE REMOVED AND REINSTALLED UPON COMPLETION OF ROOF UNLESS CONDUITS AND WIRE HAVE BEEN PREVIOUSLY
ABANDONED IN WHICH CASE THEY SHALL BE REMOVED AND DISPOSED OF.
MECHANICAL AND ELECTRICAL GENERAL NOTES
1. COORDINATE PROPOSED METHODS AND OPERATIONS OF DEMOLITION WITH OWNER'S DESIGNATED REPRESENTATIVE AND SCHOOL STAFF PRIOR TO START OF DEMOLITION WORK. INCLUDE IN SCHEDULE COORDINATION FOR SHUT-OFF, CAPPING AND CONTINUATION OF UTILITY SERVICES IF REQUIRED.
2. COORDINATE INTERRUPTIONS IN DAILY OPERATIONS IN ADVANCE WITH OWNER'S REPRESENTATIVE. THIS SHALL INCLUDE SERVICE INTERRUPTIONS AND CONNECTIONS, RELOCATION OF OCCUPANTS, REMOVAL OF EQUIPMENT, AND SHIFTS IN LOCATION OF WORK.
3. CONDUCT DEMOLITION AND DEBRIS REMOVAL IN A SAFE MANNER TO MINIMIZE INTERFERENCE WITH CORRIDORS, HALLS, STAIRS, AND OTHER ADJACENT FACILITIES AND TO AVOID DAMAGE TO SAME. DO NOT CLOSE OR OBSTRUCT TRAFFIC WAYS WITHOUT PRIOR APPROVAL.
4. PROVIDE TEMPORARY SHORING DURING THE COURSE OF DEMOLITION WORK TO MAINTAIN STABILITY AND PREVENT DAMAGE TO EXISTING STRUCTURE. ERECT TEMPORARY ENCLOSURES AROUND ALL EXTERIOR OPENINGS CREATED IN THE BUILDING. THE BUILDING SHALL BE LEFT WEATHER TIGHT AND SECURE AT THE END OF
EACH WORK DAY.
5. PROVIDE TEMPORARY DUST ENCLOSURES AROUND ALL AREAS OF WORK. PREVENT DUST, AND DEBRIS FROM REACHING ADJACENT AREAS OF BUILDING.
6. UNLESS OTHERWISE INDICATED ON THE DRAWINGS ALL PORTIONS OF THE EXISTING BUILDING, INCLUDING FINISHES DISTURBED BY DEMOLITION OF EXISTING CONSTRUCTION AND/OR INSTALLATION OF NEW CONSTRUCTION, SHALL BE REPAIRED AND RESTORED TO ORIGINAL OR BETTER CONDITION.
7. REMOVE AND DISPOSE OF THE EXISTING SINGLE-PLY ROOF SYSTEM DOWN TO THE ORIGINAL DECK INCLUDING BALLAST, MEMBRANE, FIBERBOARD AND INSULATION AS
SHOWN.
8. REMOVE AND DISPOSE OF THE EXISTING METAL ROOF SYSTEM DOWN TO THE ORIGINAL DECK INCLUDING METAL PANELS, FIBERBOARD, AND INSULATION AS SHOWN.
9. ALL EXISTING ROOF EDGE BLOCKING TO BE REMOVED AND REPLACED AS SHOWN ON DETAILS.
10. REMOVE AND DISPOSE OF ALL EQUIPMENT CURBS.
11. REMOVE ONLY AS MUCH ROOF AREA AS CAN BE REPLACED OR PROTECTED PRIOR TO END OF EACH WORK DAY.
1. COMPLY WITH THE MASSACHUSETTS BUILDING CODE 780 CMR TENTH EDITION CHAPTER 34, MASSACHUSETTS STRETCH ENERGY CODE 225 CMR 23.00, AND ANY OTHER CODES AND REGULATIONS OF AUTHORITIES HAVING JURISDICTION. SUBMIT COPIES OF ANY INSPECTION REPORTS AND OTHER SIMILAR COMMUNICATIONS
TO OWNER AND DESIGNER.
2. EXISTING CONDITIONS WERE BASED ON DRAWINGS TITLED "GARDNER MIDDLE SCHOOL", PREPARED BY A. ANTHONY TAPPE & ASSOCIATES, INC., DATED OCTOBER
1995, AND FIELD RECONNAISSANCE.
3. BOLD TEXT AND LINES INDICATE PROPOSED WORK. LIGHT TEXT AND LINES INDICATE APPROXIMATE EXISTING CONDITIONS.
4. FIELD VERIFY ALL EXISTING CONDITIONS INCLUDING DIMENSIONS, STRUCTURES, AND UTILITIES. REPORT ALL DISCREPANCIES WITH THE DRAWINGS TO THE
DESIGNER.
5. THE DRAWINGS HAVE BEEN COMPILED FROM THE BEST AVAILABLE INFORMATION AND ARE NOT INTENDED TO LIMIT THE SCOPE OF WORK. THE CONTRACTOR MAY UNCOVER HIDDEN CONDITIONS NOT SHOWN IN THE CONTRACT SET. ANY DEVIATIONS SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE DESIGNER.
6. PERFORM ALL WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS AND PROVIDE ALL ITEMS REQUIRED FOR A COMPLETE FUNCTIONING SYSTEM, INCLUDING
APPROPRIATE BLOCKING AND FLASHING.
7. WHERE REMOVAL OF EXISTING CONSTRUCTION IS REQUIRED FOR PERFORMANCE OF ANY WORK UNDER THIS CONTRACT, REMOVAL AND REINSTALLATION SHALL BE ACCOMPLISHED UNDER THE BASE CONTRACT WHETHER SPECIFICALLY SHOWN OR NOT, INCLUDING RESTORATION OF UTILITIES AND ANY TEMPORARY SHORING OF
STRUCTURAL COMPONENTS.
8. ALL METAL AND MEMBRANE FLASHING TO BE LAPPED POSITIVELY TO DRAIN TO THE BUILDING EXTERIOR.
9. PROVIDE SEPARATION BETWEEN DISSIMILAR METALS AND MATERIALS TO PREVENT GALVANIC ACTION.
10. CONTRACTOR WILL NOT HAVE ACCESS TO BATHROOMS OR INTERIOR FACILITIES.
11. PROVIDE SECURE WORK AREA. NO CONSTRUCTION TRAFFIC SHALL INTERFERE WITH TRAFFIC ENTERING AND EXITING THE FACILITY. A CONSTRUCTION FENCE MAY BE
CONSTRUCTED FOR THE MATERIAL STAGING AREA AS NEEDED.
12. THE EXISTING ROOF DECK IS NOT ADEQUATELY SLOPED AND WILL REQUIRE TAPERED INSULATION FOR DRAINAGE AS SHOWN ON THESE PLANS.
13. INSTALL RIGID INSULATION AS REQUIRED TO PROVIDE A MINIMUM R-VALUE OF 30 AND A MINIMUM THICKNESS OF 6". INSULATION THICKNESS PROVIDED IS THE MINIMUM THICKNESS OF INSULATION ABOVE THE ROOF DECK WITH THE EXCEPTION OF ROOF DRAIN SUMP AREAS.
14. ENSURE THAT THE FINAL ROOF SLOPE IS A MINIMUM OF 1/4" PER FOOT TO DRAINS UNLESS NOTED OTHERWISE.
15. SUPPLY ELECTRICITY AND WATER. OWNER WILL NOT PROVIDE THESE UTILITIES.
16. HEIGHT OF MECHANICAL EQUIPMENT CURBS SHALL PROVIDE 12-INCH MINIMUM CLEARANCE ABOVE NEW ROOF SURFACE.
17. PROVIDE NEW TAPERED CRICKETS AT THE HIGH POINT SIDE OF ALL ROOF PENETRATIONS AND MECHANICAL EQUIPMENT LARGER THAN ONE SQUARE FOOT TO
PROMOTE DRAINAGE.
18. CONFIRM HEIGHTS OF ALL NEW INSULATION AT EXISTING WALL TO ROOF FLASHING PRIOR TO MASONRY REMOVAL REQUIRED TO ACCOMMODATE NEW THRU WALL
FLASHING. MINIMUM FLASHING HEIGHT SHALL BE 8" ABOVE FINISHED ROOF SURFACE.
19. CONFIRM HEIGHTS OF ALL NEW BLOCKING AT ROOF EDGES TO ACCOMMODATE HEIGHT OF NEW INSULATION.
20. RESTORE ALL LANDSCAPING AND SITE FEATURES TO EXISTING OR BETTER CONDITION. ALL DAMAGE TO LANDSCAPING OR SITE FEATURES WILL BE THE
RESPONSIBILITY OF THE CONTRACTOR.
21. ALL FASTENERS USED DURING CONSTRUCTION SHALL BE SPECIFIED FOR COMPATIBILITY WITH PRESSURE-TREATED WOOD.
1. ALL PLUMBING WORK SHALL BE COORDINATED WITH ROOFING CONTRACTOR, BUILDING OWNER, AND ALL TRADES INVOLVED.
2. SEE SHEET P-101 FOR PLUMBING REQUIREMENTS.
3. FIELD VERIFY QUANTITY OF ROOF DRAINS, PIPING, AND SUPPORTS TO BE REMOVED.
4. PLUMBING CONTRACTOR TO PERFORM ALL REMOVAL AND INSTALLATION OF ALL ROOF DRAINS AND PIPING. INSTALLATION FOR ROOF DRAINS SHALL BE
PERFORMED BEFORE INSTALLATION OF NEW ROOFING AND FLASHING BY ROOFING CONTRACTOR.
5. EXTEND ALL EXISTING VENT PIPES TO TERMINATE 18"-24" ABOVE NEW ROOF.
PLUMBING GENERAL NOTES
G-004
S.OZTURK
M.WZOREK
J.VIAMARI
AS SHOWN
ABBREVIATIONS
CL CENTERLINE
DIA DIAMETER
EF EXHAUST FAN
EL/ELEV ELEVATION
ELEC ELECTRIC
EPDM ETHYLENE PROPYLENE DIENE MONOMER
FIN FINISH
FLR FLOOR
FT FOOT/FEET
GA GAUGE
GC GENERAL CONTRACTOR
HDG HOT DIP GALVANIZED
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
MAX MAXIMUM
MIN MINIMUM
OC ON CENTER
PT PRESSURE TREATED
RF ROOF FAN
SS STAINLESS STEEL
TPO THERMOPLASTIC POLYOLEFIN
TYP TYPICAL
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER- G-002.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 4/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
G
-0
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
1. BUILDING/PROJECT DESCRIPTION:
REMOVAL AND REPLACEMENT OF EXISTING ROOFING SYSTEM, REMOVAL AND RESETTING OF EXISTING HVAC EQUIPMENT, ROOF DRAIN REPLACEMENT, ACCESSIBILITY IMPROVEMENTS .
2. APPLICABLE GOVERNING CODES:
BUILDING: 780 CMR MASSACHUSETTS STATE BUILDING CODE 10TH EDITION, MASSACHUSETTS EXISTING BUILDING CODE 780 CMR 34
PLUMBING: MASS STATE PLUMBING CODE, 248 CMR
MECHANICAL: INTERNATIONAL MECHANICAL CODE (IMC) 2021; 780 CMR; 248 CMR
ELECTRICAL: MASS STATE ELECTRICAL CODE, 527 CMR
ENERGY: MASS ENERGY EFFICIENCY CODE, 780 CMR; MASSACHUSETTS STRETCH ENERGY CODE, 225 CMR 23
ACCESSIBILITY: 521 CMR ARCHITECTURAL ACCESS BOARD REGULATIONS
3. USE AND OCCUPANCY:
GROUP E, EDUCATIONAL
4. CONSTRUCTION TYPE:
TYPE IIB - UNPROTECTED NONCOMBUSTIBLE
BUILDING CODE ANALYSIS
1. ANY DAMAGED METAL DECK DISCOVERED DURING DEMOLITION SHALL BE BROUGHT TO THE
ATTENTION OF THE ENGINEER.
2. METAL DECK PANELS REQUIRING REPAIR SHALL BE REPLACED IN ITS ENTIRETY. PANEL REPLACEMENT
LOCATIONS SHALL BE CONFIRMED BY THE ENGINEER OF RECORD.
3. METAL DECK PANELS SHALL BE INSTALLED TO MATCH EXISTING PANEL LAYOUT AND SECUREMENT
PATTERN AS FOLLOWS:
A. PANELS ENDS AND END LAPS: 5/8” DIA. PUDDLE WELD AT EACH RIB
B. INTERMEDIATE SUPPORTS: 5/8” DIA. PUDDLE WELD AT EACH RIB
C. LONGITUDINAL EDGES OF MARGINAL SUPPORTS: 5/8” DIA. PUDDLE WELD AT 12” O.C.
MAXIMUM.
D. SIDE LAPS FOR ADJACENT UNITS: #12 SCREWS AT 30” O.C. MAXIMUM (BUTTON PUNCH AT
30” O.C. MAXIMUM FOR CELLULAR ACOUSTIC METAL DECK)
STRUCTURAL GENERAL NOTES
DETAIL 1
-3" = 1'-0"
TYPICAL EXISTING ROOF SECTION
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING
MEMBRANE, FIBERBOARD, INSULATION,
AND VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING METAL
PANELS, FIBERBOARD, INSULATION, FELT, AND
ICE AND WATER SHIELD
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER,
AND GRAVEL BALLAST
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING METAL
PANELS, FIBERBOARD, INSULATION, FELT, AND
ICE AND WATER SHIELD
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING
MEMBRANE, FIBERBOARD, INSULATION,
AND VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER,
AND GRAVEL BALLAST
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - AD-101.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
D -1
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
S.OZTURK
M.WZOREK
J.VIAMARI
AD-101
ROOF DEMOLITION PLAN
AS SHOWN0 8' 16' 32'
SCALE: 1/16"=1'-0"
N
LEGEND
ROOF DRAIN
EXISTING VENT PIPE PENETRATION
EXISTING ROOF SLOPE LINE
EXISTING INSULATION THICKNESS TEST CUT
ITEM TO BE REMOVED/DEMOLISHED
EXISTING EXPANSION JOINT
ROOF SLOPE DIRECTION
ACCESS HATCH
ROOF LEVEL #1. APPROX ELEV. 16'-0" ABOVE
GRADE. REMOVE AND DISPOSE OF EXISTING EPDM
ROOFING SYSTEM. SEE DETAIL
ROOF DRAINS: SEE SHEET
P-101 FOR DEMOLITION
DETAILS (TYP)
REMOVE AND DISPOSE OF
HVAC EQUIPMENT CURB AND
FLASHING. SEE SHEETS A-511
AND H-101 FOR DETAILS (TYP)
REMOVE AND DISPOSE
OF ACCESS HATCH AND
LADDER. PATCH HOLES LEFT IN
MASONRY BY ACCESS LADDER SCREWS
AS NEEDED
REMOVE AND DISPOSE
OF VENT FLASHING (TYP)
ROOF LEVEL #5. RIDGE ELEV. VARIES.
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM. INCLUDING
GUTTERS AND DOWNSPOUTS.
SEE DETAIL
REMOVE AND DISPOSE
OF EXISTING EPDM
CANOPY ROOFING
SYSTEM. SEE DETAIL
ROOF LEVEL #1. REMOVE AND
DISPOSE OF EXISTING EPDM
ROOFING SYSTEM.
SEE DETAIL
ROOF LEVEL #2. APPROX ELEV. 33'-0" ABOVE GRADE.
REMOVE AND DISPOSE OF EXISTING EPDM ROOFING
SYSTEM. SEE DETAIL
ROOF LEVEL #3. APPROX ELEV. 28'-0" ABOVE GRADE.
REMOVE AND DISPOSE OF EXISTING EPDM ROOFING
SYSTEM AND STONE BALLAST. SEE DETAIL
REMOVE AND
DISPOSE OF
LADDER
REMOVE AND DISPOSE
OF WALKPADS (TYP)
REMOVE AND DISPOSE
OF VENT FLASHING (TYP).
REMOVE AND DISPOSE OF
EXISTING METAL ROOFING
OVER DORMERS, PANELS
AND FLASHING (TYP)
ROOF LEVEL #3. REMOVE AND DISPOSE OF
EXISTING EPDM ROOFING SYSTEM. SEE DETAIL
ROOF LEVEL #4. APPROX RIDGE ELEV. 52'-8"
ABOVE GRADE. REMOVE AND DISPOSE OF
EXISTING METAL ROOFING SYSTEM
INCLUDING GUTTERS AND DOWNSPOUTS.
SEE DETAIL ROOF DRAINS: SEE SHEET
P-101 FOR DEMOLITION
DETAILS (TYP)
WALL MOUNTED CONDENSING UNIT. SEE
SHEET H-101 FOR DETAILS (TYP)
REMOVE AND DISPOSE OF EXISTING
EXPANSION JOINT
REMOVE AND DISPOSE OF
HVAC EQUIPMENT CURB AND
FLASHING. SEE SHEETS A-511
AND H-501 FOR DETAILS (TYP)
A-503
DETAIL 2
-1 1/2" = 1'-0"
TYPICAL EXISTING METAL ROOF SYSTEM
DETAIL 1
-1 1/2" = 1'-0"
TYPICAL EXISTING EPDM ROOF SYSTEM
DETAIL 3
-1 1/2" = 1'-0"
TYPICAL EXISTING CANOPY ROOF SYSTEM
A-501
A-501
A-502
A-502
HIGH
LOW
A-501
AD-101
AD-101
AD-101
AD-101
AD-101
AD-101
AD-101
A-505
A-505
A-505
A-502
A-505
A-505
A-502
LOW
A-502
HIGH
A-505
A-507
A-507
A-507
A-507
REMOVE AND DISPOSE
OF EXISTING ANTENNA,
CABLES, AND CEMENT BLOCKS
A-504
LOW
REMOVE AND
DISPOSE OF
EXISTING
EXPANSION JOINT
A-506
A-506
REMOVE AND DISPOSE OF EXISTING
PERFORATED PIPE
A-503
A-502
HIGH
A-502
LOW
A-504
A-505
A-505
HIGH
A-511
A-505
HIGHLOW
2 12'X1'
PENETRATION
THROUGH EXISTING
ROOF FOR NEW
GOOSENECK.
SEE SHEET H-101
GENERAL NOTES:
1. ROOFING CONTRACTOR SHALL REMOVE AND DISPOSE OF ALL EXISTING HVAC
EQUIPMENT CURBS.
2. SEE SHEET H-101 FOR HVAC EQUIPMENT REQUIREMENTS.
3. EXISTING METAL ROOF DECKS ARE SLOPED AT 4" PER FOOT UNLESS OTHERWISE
NOTED.
4. EXISTING EPDM ROOF SECTIONS HAVE TAPERED INSULATION SLOPED AT
APPROXIMATELY 1/8" PER FOOT.
5. CONTRACTOR TO VERIFY CONDITION OF METAL DECKING. SEE A-515 FOR REPAIR
AND REINFORCEMENT OF METAL DECKING DETAILS.
EXISTING GRAVITY VENTILATOR
EXISTING EXHAUST FAN
A-512
A-512
A-510
A-510
DETAIL 4
-1 1/2" = 1'-0"
TYPICAL EXISTING BALLASTED ROOF SYSTEM
A-512
A-512
A-514
A-510
AD-101
LIMIT OF WORK
REMOVE AND DISPOSE OF EXISTING
DOWNSPOUTS (TYP OF 26)
REMOVE AND DISPOSE OF EXISTING
DOWNSPOUTS (TYP OF 26)
REMOVE AND
DISPOSE
OF EXISTING
DOWNSPOUTS
(TYP OF 26)
A-512
A-501
A-515
A-505
HIGH
A-516 LOW
A-502
HIGH
A-516
LOW
A-517
LOW
A-505
HIGH
A-503
HIGH
A-517
LOW
A-517 LOW
A-507LOW 1
A-508 LOW
A-508
REMOVE AND DISPOSE OF EXISTING METAL ROOFING
OVER DORMERS, PANELS AND FLASHING (TYP). SEE
SHEET A-506 FOR BASE AND EDGE DETAILS
A-515
A-515
CUT, REMOVE, AND DISPOSE OF
CMU BLOCK AND STONE
COPING ABOVE SCUPPERS (TYP
OF 5). SEE SHEET A-518 FOR
DETAILS
DETAIL 1
-3" = 1'-0"
TYPICAL EXISTING ROOF SECTION
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING
MEMBRANE, FIBERBOARD, INSULATION,
AND VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING
FIBERBOARD, INSULATION, ICE AND
WATER SHIELD
UNDERLAYMENT (TYP)
RIGID
INSULATION (TYP)
METAL ROOF PANEL (TYP)
COVERBOARD (TYP)
AIR/VAPOR BARRIER (TYP)
TAPERED RIGID INSULATION (TYP)
COVER BOARD (TYP)
AIR/VAPOR
BARRIER (TYP)
RIGID
INSULATION (TYP)
SUBSTRATE BOARD (TYP)
EPDM ROOFING MEMBRANE (TYP)
SUBSTRATE
BOARD (TYP)
AIR/VAPOR BARRIER (TYP)
3" RIGID INSULATION
COVERBOARD
EPDM ROOFING MEMBRANE
16"
9"
14"
10"
14"
11"
15.5"
14"
10.5"
8"
8"
8"
8" 9"
9"
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, VAPOR BARRIER, AND
GRAVEL BALLAST
PHOTOVOLTAIC READY ZONE SOLAR
INSTALLATION PERMITTED UP TO 3 PSF
SOLAR WEIGHT MAXIMUM
APPROXIMATE AREA = 4,300 SF
PV INVERTER
LOCATION
2-2" CONDUITS
MOUNTED ON RUBBER
SLEEPERS. SEE E-100
FOR DETAILS
SUBSTRATE BOARD (TYP)
UNDERLAYMENT (TYP)
RIGID
INSULATION (TYP)
METAL ROOF PANEL (TYP)
COVERBOARD (TYP)
AIR/VAPOR BARRIER (TYP)
SUBSTRATE BOARD (TYP)
SUBSTRATE
BOARD (TYP)
AIR/VAPOR BARRIER (TYP)
3" RIGID INSULATION
COVERBOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION (TYP)
COVER BOARD (TYP)
AIR/VAPOR
BARRIER (TYP)
RIGID
INSULATION (TYP)
SUBSTRATE BOARD (TYP)
EPDM ROOFING MEMBRANE (TYP)
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-101.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-1
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
S.OZTURK
M.WZOREK
J.VIAMARI
A-101
ROOF PLAN
AS SHOWN0 8' 16' 32'
SCALE: 1/16"=1'-0"
N
ROOF LEVEL #1. APPROX
ELEV. 16'-0"
ROOF DRAIN. SEE
SHEET P-101 FOR
DETAILS (TYP)
HVAC EQUIPMENT CURB AND
FLASHING. SEE SHEETS
A-511 AND H-101 FOR
DETAILS (TYP)
ACCESS HATCH AND
LADDER VENT STACK PENETRATION
FLASHING (TYP)
ROOF LEVEL #5. RIDGE
ELEV. VARIES
EPDM CANOPY
ROOFING SYSTEM
ROOF LEVEL #1. APPROX
ELEV. 16'-0"
ROOF LEVEL #2. APPROX
ELEV. 33'-0"
ROOF LEVEL #3. APPROX
ELEV. 28'-0"
LADDER. SEE
SHEET A-509
WALKPAD (TYP)
VENT STACK PENETRATION
FLASHING (TYP).
METAL ROOFING OVER
DORMERS, PANELS AND
FLASHING (TYP)
ROOF LEVEL #3. APPROX
ELEV. 28'-0"
ROOF LEVEL #4. APPROX
RIDGE ELEV. 52'-8" ROOF DRAIN. SEE SHEET P-101
FOR DETAILS (TYP)
WALL MOUNTED CONDENSING UNIT. SEE
SHEET H-101 FOR DETAILS (TYP)
ROOF EXPANSION JOINT
A-101
HVAC EQUIPMENT METAL
FLASHING. SEE SHEETS H-101
AND A-512 FOR DETAILS
A-503
DETAIL 2
-1 1/2" = 1'-0"
TYPICAL METAL ROOF SYSTEM
DETAIL 1
-1 1/2" = 1'-0"
TYPICAL EPDM ROOF SYSTEM
DETAIL 3
-1 1/2" = 1'-0"
TYPICAL CANOPY ROOF SYSTEM
A-501
A-501
A-502
A-502
HIGH
LOW
A-501
A-101
A-101
A-101
A-101
A-101
A-101
A-101
A-505
A-505
A-505
A-502
A-505
A-505
A-502
LOW
A-502
HIGH
A-505
A-507
A-507
A-507
A-507
A-504
LOW
CANOPY
EXPANSION
JOINT
A-506
A-506
A-503
A-502
HIGH
A-502
LOW
A-504
A-505
A-505
HIGH
A-505
HIGHLOW
ROOF DRAIN
VENT PIPE PENETRATION
GENERAL NOTES:
1. INSTALL NEW CURBING FOR ALL HVAC EQUIPMENT. NEW CURBS MUST BE MINIMUM 12" ABOVE NEW ROOFING.
COORDINATE WITH MECHANICAL CONTRACTOR FOR THE INSTALLATION OF MECHANICAL EQUIPMENT INSTALL NEW
CRICKETS TO ENSURE PROPER DRAINAGE AT ALL ROOF CURBS.
2. ADJUST ELEVATION OF ROOF EDGES TO MATCH THE MAXIMUM INSULATION THICKNESS AT EACH ROOF DECK ELEVATION
TO PROVIDE A LEVEL ROOF PERIMETER.
3. TAPERED INSULATION SHALL BE INSTALLED TO ACHIEVE FINAL SLOPE OF 1/4" PER FOOT MINIMUM UNLESS NOTED
OTHERWISE. CRICKETS TO BE 12" PER FOOT MINIMUM SLOPE.
4. NUMBER OF ROWS, CLAMP SPACING, AND TORQUE SETTINGS OF SNOW RETENTION SYSTEM SHALL BE PER
MANUFACTURER'S RECOMMENDATION BASED ON SNOW LOAD CALCULATIONS.
ROOF SLOPE LINE
BALLASTED GUARDRAIL FOR FALL PROTECTION
APPROXIMATE INSULATION THICKNESS
WALKPAD
ROOF SLOPE DIRECTION
LEGEND
PROPOSED ACCESS HATCH
PROPOSED CRICKETS
42" TALL SCHEDULE 40
GALVANIZED STEEL
BALLASTED GUARDRAIL
VERTICAL POSTS 4' O.C. (TYP).
CONTINUOUS SNOW RETENTION
SYSTEM (TYP). SEE SHEET
A-513 FOR DETAILS.
CONTINUOUS
SNOW RETENTION
SYSTEM (TYP).
SEE SHEET A-513
FOR DETAILS
CONTINUOUS SNOW RETENTION
SYSTEM (TYP). SEE SHEET
A-513 FOR DETAILS
GRAVITY VENTILATOR
EXHAUST FAN
A-512
A-512
A-510
A-512
A-512
A-514
A-516
A-510
LOW
A-508
2 12'X1' GOOSENECK
VENT PIPE
PENETRATION. SEE
SHEET H-101
A-510
METAL ROOFING OVER DORMERS, PANELS
AND FLASHING (TYP). SEE SHEET A-506
FOR EDGE AND BASE DETAILS
A-511
LIMIT OF WORK
A-515
A-515
A-515
SCUPPERS TO BE RAISED AS
NEEDED TO ACCOMMODATE
NEW INSULATION THICKNESS
(TYP OF 5). SEE SHEET A-518
FOR DETAILS.
RUBBER SPLASH BLOCK (TYP OF 4)
ALUMINUM ROOF LEADER SIZED TO MATCH EXISTING (TYP OF 26)
A-503
HIGH
A-502
HIGH
A-516
LOW
ROOF EDGE AT VERTICAL
WALL CORNER A-514
ROOF EDGE AT VERTICAL
WALL CORNER A-514
ROOF EDGE AT VERTICAL
WALL CORNER A-514
ROOF EDGE AT VERTICAL
WALL CORNERA-514
A-517
LOW
A-505
HIGH
A-501
A-517
LOW
A-517LOW
A-508 LOW
A-507LOW
A-515
INTAKE DUCTWORK SUPPORT.
SEE H-101 FOR DETAILS.
HIGH
ALUMINUM ROOF LEADER SIZED
TO MATCH EXISTING (TYP OF 26)
VESTIBULE DRAINAGE
SCUPPER. SEE SHEET
A-515 FOR DETAILS
CONDENSING UNIT
A-508
6" MAX.
9" M
IN
8"
M
IN
K N
EE
C
LE
A R A N
C E
M A X
TO
P
O F
S
PO
U T
2"
16"
3 16
ADJUSTABLE VINYL
CUSHIONS
RECESSED GRILLE FLOOR
SHALL ALIGN WITH ADJACENT
FLOOR AND THRESHOLD
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-101.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-1
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
S.OZTURK
M.WZOREK
J.VIAMARI
A-102
ACCESSIBILITY
IMPROVEMENTS PLAN
AS SHOWN0 4' 8' 16'
SCALE: 1/8"=1'-0"
REMOVE AND REINSTALL EXISTING
RECESSED GRILL FLOOR SYSTEM. ADJUST
HEIGHT AS NECESSARY AND PROVIDE
ADA COMPLIANT TRANSITION.
REMOVE AND DISPOSE OF
EXISTING DRINKING FOUNTAIN.
TEMPORARILY CAP AND PROTECT
EXISTING PLUMBING PIPES
ELECTRICAL CONDUITS.
LOWER FLOOR - MAIN ENTRANCE IMPROVEMENT
1/8"=1'-0"
FIRST FLOOR - DRINKING FOUNTAIN DEMOLITION
1/8"=1'-0"
FIRST FLOOR - PROPOSED DRINKING FOUNTAIN
1/8"=1'-0"
INSTALL NEW ADA COMPLIANT
BI-LEVEL DRINKING FOUNTAIN
WITH BOTTLE FILLER.
SEE SHEETS P-001 AND
E-102 FOR DETAILS.
REPAIR AND PAINT
WALL SECTION
AS NECESSARY. MATCH
EXISTING
N
N
GARDNER KEYPLAN
NO SCALE
MAIN ENTRANCE
ADA IMPROVEMENT
DRINKING FOUNTAIN
ADA IMPROVEMENT ON FIRST FLOOR
FASTEN MAT TO THE GRILLE PER
MANUFACTURER REQUIREMENTS TO
COMPLY WITH ADA STANDARDS
ACCESSIBLE BI-LEVEL DRINKING FOUNTAIN
1 1/2"=1'-0"
30" X 48" OF CLEAR FLOOR SPACE
AT LOWER DRINKING FOUNTAIN
GRILLE FLOOR SECTION DETAIL
NO SCALE
AHU-1
AHU-7
AHU-8
AHU-2
AHU-3
AHU-4
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER-A-201A.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 4/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
-A -2
A .d w g
DESIGNED BY:
ISSUED FOR
BIDDING
A-201A
ALTERNATE NO.1: CEILING
REPAIR PLAN
AS SHOWN
SO
SO
MPW, ABS
0 4' 8' 16'
SCALE: 1/8"=1'-0"
N
ALTERNATE NO. 1: LOWER LEVEL PLAN
SCALE: 1/8"=1'-0"
NOTES:
1. ALL WORK SHOWN ON THIS SHEET SHALL BE
COMPLETED AS PART OF ADD ALTERNATE NO. 1.
GARDNER KEYPLAN
NO SCALE
JPV
ALTERNATE NO.1: HVAC PARTIAL LOWER LEVEL PLAN
SCALE: 1/8"=1'-0"
GARDNER KEYPLAN
NO SCALE
ALTERNATE NO.1: PARTIAL FIRST FLOOR PLAN
SCALE: 1/8"=1'-0"
REMOVE AND REINSTALL
EXISTING CEILING PANELS
AND GRIDS AS NEEDED TO
FACILITATE MECHANICAL
AND ELECTRICAL WORK
(TYP)
N
SEE ELECTRICAL PLANS FOR
LIGHTING FIXTURE SCOPE (TYP)
SEE MECHANICAL PLANS
FOR HVAC EQUIPMENT
SCOPE (TYP) REMOVE AND REINSTALL EXISTING
CEILING PANELS AND GRIDS AS
NEEDED TO FACILITATE
MECHANICAL AND ELECTRICAL
WORK (TYP)
SEE MECHANICAL PLANS
FOR HVAC EQUIPMENT
SCOPE (TYP)
REMOVE AND REINSTALL
EXISTING CEILING PANELS
AND GRIDS AS NEEDED TO
FACILITATE MECHANICAL
AND ELECTRICAL WORK
(TYP)
SEE MECHANICAL PLANS
FOR HVAC EQUIPMENT
SCOPE (TYP)
SEE ELECTRICAL PLANS FOR
LIGHTING FIXTURE SCOPE (TYP)
CUT AND REMOVE
SECTION OF EXISTING
GYPSUM BOARD CEILING
TO FACILITATE
MECHANICAL WORK (TYP)
REPAIR AND PAINT CEILING
AS NECESSARY. MATCH
EXISTING (TYP)
REMOVE AND REPLACE
DAMAGED CEILING
PANELS AND GRIDS AS
REQUIRED (TYP)
REMOVE AND REPLACE
DAMAGED CEILING
PANELS AND GRIDS (TYP)
REMOVE AND REPLACE
DAMAGED CEILING
PANELS AND GRIDS AS
REQUIRED (TYP)
REMOVE AND REPLACE
DAMAGED CEILING
PANELS AND GRIDS AS
REQUIRED (TYP)
METAL ROOFING SYSTEM (TYP)
SNOW RETENTION SYSTEM (TYP).
SEE SHEET A-513 FOR DETAILS.
DOWNSPOUT (TYP)
DORMER. SEE SHEETS A-506 AND
A-510 FOR DETAILS (TYP)
A-506
A-506
A-510
A-505
ALUMINUM DOWNSPOUT WALL BRACKETS
INSTALLED 60" O.C. FASTEN TO EXISTING
BRICK USING MASONRY SCREWS (TYP)
GUTTER SYSTEM (TYP)
SEE SHEET A-505 FOR
DETAILS.
LOUVER - 2 (L - 2). SEE H-103 FOR LOUVER SCHEDULE LOUVER - 1 (L - 1). SEE H-103 FOR
LOUVER SCHEDULE
CONNECT NEW DOWNSPOUT TO
EXISTING UNDERGROUND
DRAINAGE PIPE. CONTRACTOR
SHALL SNAKE EXISTING
DRAINAGE PIPE PRIOR TO
CONNECTING NEW DOWNSPOUT.
DOWNSPOUT SIZE TO MATCH
EXISTING. (TYP)
SPLASH PAD (TYP)
SNOW RETENTION SYSTEM (TYP).
SEE SHEET A-513 FOR DETAILS.
DOWNSPOUT (TYP)
GUTTER SYSTEM (TYP)
SEE SHEET A-505 FOR
DETAILS.
METAL ROOFING
SYSTEM (TYP)
VENT STACK. SEE SHEET
A-101 FOR DETAILS (TYP)
HVAC EQUIPMENT. SEE SHEETS
A-101 AND H-101 FOR DETAILS
(TYP)
ALUMINUM DOWNSPOUT WALL BRACKETS
INSTALLED 60" O.C. FASTEN TO EXISTING
BRICK USING MASONRY SCREWS (TYP) CONNECT NEW DOWNSPOUT TO
EXISTING UNDERGROUND
DRAINAGE PIPE. CONTRACTOR
SHALL SNAKE EXISTING
DRAINAGE PIPE PRIOR TO
CONNECTING NEW DOWNSPOUT.
DOWNSPOUT SIZE TO MATCH
EXISTING (TYP)
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-401.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-4
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
EXTERIOR ELEVATIONS - 1
A-401 0 4' 8' 16'
SCALE: 1/8"=1'-0"
AS SHOWN
J.PSZENICZNY
M.WZOREK
J.VIAMARI
N
GARDNER MIDDLE SCHOOL KEYPLAN
NO SCALE
WEST ELEVATION - 2
1/8"=1'-0" -
2/A-401
WEST ELEVATION - 1
1/8"=1'-0" -
1/A-401
A-101
A-101
ROOF EDGE METAL FASCIA. SEE SHEET
A-502 FOR DETAILS. (TYP)
SCUPPER. SEE SHEET A-501
FOR DETAILS. (TYP)
CANOPY GUTTER
SYSTEM (TYP)
ROOF EDGE METAL FASCIA. SEE SHEET
A-502 FOR DETAILS. (TYP)
PVC CANOPY ROOFING
SYSTEM (TYP)
A-507
A-507
DOWNSPOUT (TYP)
METAL ROOFING SYSTEM (TYP)
SNOW RETENTION SYSTEM (TYP).
SEE SHEET A-513 FOR DETAILS.
DOWNSPOUT (TYP) DOWNSPOUT (TYP)
GUTTER SYSTEM (TYP). SEE SHEET
A-505 FOR DETAILS.1
A-505
A-506
A-506
A-510
A-512
A-505
CONNECT NEW
DOWNSPOUT
TO EXISTING
UNDERGROUND
DRAINAGE
PIPE (TYP)
ALUMINUM DOWNSPOUT
WALL BRACKETS
INSTALLED60" O.C.
FASTEN TO EXISTING
BRICK USING
MASONRY SCREWS (TYP)
A-507
CANOPY GUTTER
SYSTEM (TYP)
A-507
PVC CANOPY ROOFING
SYSTEM (TYP)
A-515
METAL SIDING (TYP)
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-401.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-4
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
EXTERIOR ELEVATIONS - 2
A-402 0 4' 8' 16'
SCALE: 1/8"=1'-0"
AS SHOWN
J.PSZENICZNY
M.WZOREK
J.VIAMARI
SOUTH ELEVATION - 2
1/8"=1'-0" -
EAST ELEVATION
1/8"=1'-0" -
3 3/A-402
2/A-402
GARDNER MIDDLE SCHOOL KEYPLAN
NO SCALE
SOUTH ELEVATION - 1
3"=1'-0" -
1/A-402
N
METAL ROOFING SYSTEM (TYP) HVAC EQUIPMENT. SEE SHEETS
A-101 AND H-101 FOR DETAILS
(TYP)
DORMER. SEE SHEETS A-506 AND
A-510 FOR DETAILS (TYP)1
A-506
A-506
DOWNSPOUT (TYP)
SNOW RETENTION SYSTEM (TYP).
SEE SHEET A-513 FOR DETAILS.
CONNECT NEW DOWNSPOUT TO EXISTING
UNDERGROUND DRAINAGE PIPE. CONTRACTOR
SHALL SNAKE EXISTING DRAINAGE PIPE PRIOR
TO CONNECTING NEW DOWNSPOUT.
DOWNSPOUT SIZE TO MATCH EXISTING (TYP)
GUTTER SYSTEM (TYP)
SEE SHEET A-505 FOR
DETAILS.
ALUMINUM DOWNSPOUT WALL BRACKETS
INSTALLED 60" O.C. FASTEN TO EXISTING
BRICK USING MASONRY SCREWS (TYP)
LOUVER - 3 (L - 3). SEE H-103 FOR
LOUVER SCHEDULE
ROOF EDGE METAL FASCIA. SEE SHEET
A-502 FOR DETAILS. (TYP)
SCUPPER. SEE SHEET A-501
FOR DETAILS. (TYP)
HVAC EQUIPMENT. SEE SHEET
H-101 FOR DETAILS.
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-401.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-4
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
EXTERIOR ELEVATIONS - 3
A-403 0 4' 8' 16'
SCALE: 1/8"=1'-0"
AS SHOWN
J.PSZENICZNY
M.WZOREK
J.VIAMARI
N
GARDNER MIDDLE SCHOOL KEYPLAN
NO SCALE
1/A-403
EAST ELEVATION
1/8"=1'-0" -
2/A-403
NORTH ELEVATION - 1
1/8"=1'-0" -
DOWNSPOUT (TYP)
SNOW RETENTION SYSTEM
(TYP). SEE SHEET
A-513 FOR DETAILS.
DOWNSPOUT (TYP)
HVAC EQUIPMENT. SEE SHEET
H-101 FOR DETAILS.
METAL ROOFING SYSTEM (TYP)
VENT STACK. SEE SHEET
A-101 FOR DETAILS (TYP) DORMER. SEE SHEETS A-506
AND A-510 FOR DETAILS (TYP)
A-506
A-506
A-510
A-505
A-505
A-505
A-512
A-512
A-512
A-514
ALUMINUM STEPPED FLASHING.
A-511
ALUMINUM DOWNSPOUT WALL BRACKETS
INSTALLED 60" O.C. FASTEN TO EXISTING
BRICK USING MASONRY SCREWS (TYP)
A-515
CONNECT NEW DOWNSPOUT TO EXISTING
UNDERGROUND DRAINAGE PIPE.
CONTRACTOR SHALL SNAKE EXISTING
DRAINAGE PIPE PRIOR TO CONNECTING
NEW DOWNSPOUT. DOWNSPOUT SIZE TO
MATCH EXISTING (TYP)
METAL
SIDING (TYP)
SNOW RETENTION SYSTEM
(TYP). SEE SHEET
A-513 FOR DETAILS.
DOWNSPOUT (TYP)
DOWNSPOUT (TYP)
HVAC EQUIPMENT. SEE SHEETS A-101
AND H-101 FOR DETAILS.
DORMER. SEE SHEETS A-506
AND A-510 FOR DETAILS (TYP)
METAL ROOFING SYSTEM (TYP)
A-505
A-506
A-506
A-510
A-512
A-512
A-505
ALUMINUM DOWNSPOUT WALL BRACKETS
INSTALLED 60" O.C. FASTEN TO EXISTING
BRICK USING MASONRY SCREWS (TYP)
CONNECT NEW DOWNSPOUT
TO EXISTING UNDERGROUND
DRAINAGE PIPE. CONTRACTOR
SHALL SNAKE EXISTING
DRAINAGE PIPE PRIOR TO
CONNECTING NEW
DOWNSPOUT. DOWNSPOUT
SIZE TO MATCH EXISTING
(TYP)
METAL SIDING (TYP)
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-401.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-4
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
EXTERIOR ELEVATIONS - 4
A-404 0 4' 8' 16'
SCALE: 1/8"=1'-0"
AS SHOWN
J.PSZENICZNY
M.WZOREK
J.VIAMARI
NORTH ELEVATION - 2
1/8"=1'-0" -
N
GARDNER MIDDLE SCHOOL KEYPLAN
NO SCALE
SOUTH ELEVATION - 3
1/8"=1'-0" -
1/A-404 2/A-404
A-101
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, FASTENERS, ICE AND
WATER SHIELD, AND VAPOR BARRIER
EXISTING METAL FLASHING TO REMAIN. PULL
BACK FLASHING TO FACILITATE DEMOLITION.
COVER BOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION
SPLICE WITH EPDM SEAM TAPE (TYP)
RESTORE EXISTING METAL FLASHING TO ORIGINAL
POSITION AFTER INSTALLATION OF EPDM FLASHING
AND TERMINATION BAR.
STAINLESS-STEEL TERMINATION BAR AND SEALANT
FASTENED WITH APPROPRIATE FASTENERS 12" O.C.
EPDM FLASHING TO RUN UP
UNDERNEATH THE METAL FLASHING
RIGID INSULATION
AIR/VAPOR BARRIER
SUBSTRATE BOARD
BOND BREAKER TAPE AND
SEALANT
CONFIRM CONDITION OF STONE JOINT SEALANTS. APPLY
NEW SEALANT TO REPAIR DAMAGED SEALANTS AS NEEDED.
CONTINUOUS BEAD OF LAP SEALANT (TYP)
2" M
IN
COVER BOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID
INSULATION
RIGID INSULATION
AIR/VAPOR BARRIER
SUBSTRATE BOARD
EPDM FLASHING
PRESERVATIVE-TREATED WOOD BLOCKING
AS REQUIRED (TYP)
SET ALUMINUM SCUPPER IN
SEALANT. SEE SHEET A-518 FOR
ADDITIONAL DETAILS.
METAL FASCIA
SCUPPER COUNTER-FLASHING
RE-INSTALL EXISTING STONE COPING AFTER SCUPPER
COUNTER-FLASHING INSTALLATION CONFIRM CONDITION OF
STONE JOINT SEALANTS. APPLY NEW SEALANT TO REPAIR
DAMAGED SEALANTS AS NEEDED.
CONTINUOUS BEAD OF LAP SEALANT
SPLICE WITH EPDM SEAM TAPE (TYP)
RESTORE EXISTING METAL FLASHING TO ORIGINAL POSITION
AFTER INSTALLATION OF EPDM FLASHING AND TERMINATION BAR.
PRESERVATIVE-TREATED WOOD
BLOCKING AS REQUIRED (TYP)
CONTINUOUS ALUMINUM
CLEAT (TYP)
BACKER ROD AND SEALANT
EXTEND SCUPPER 4"
FROM ROOF EDGE (TYP)
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING,
FASTENERS AND ICE AND WATER SHIELD
EXISTING COUNTER FLASHING TO REMAIN
CUT, REMOVE, AND
DISPOSE SECTION OF
EXISTING CMU BLOCK
OVER EXISTING SCUPPER.
REMOVE AND DISPOSE
EXISTING L.C.C SCUPPER
LINER AND LEADER BOX
REMOVE AND DISPOSE
EXISTING METAL FASCIA
CUT AND REMOVE SECTION OF STONE COPING
ABOVE THE EXISTING SCUPPER. EXTEND
REMOVAL OF STONE COPING TO NEAREST JOINT.
REMOVE AND DISPOSE OF EXISTING PLYWOOD
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 3:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
S.OZTURK
ROOF DETAILS - 1
A-501 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL STONE WALL PARAPET EDGE DETAIL
3"=1'-0" -
EXISTING
PROPOSED
EXISTING
PROPOSED
TYPICAL SCUPPER DETAIL
3"=1'-0" -
NOTES:
1. SEE SHEET A-518 FOR ADDITIONAL OVERFLOW SCUPPER INSTALLATION DETAILS
RIGID INSULATION
COVER BOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION
SUBSTRATE BOARD
TAPERED EDGE STRIPS TO MAINTAIN
CONSISTENT BLOCKING HEIGHT
ROOF EDGE METAL
FASCIA AND SECUREMENT -
CONTINUOUS EXTRUDED
ALUMINUM CLEAT
WITH SNAP-ON
ALUMINUM COVER
CONTINUOUS ALUMINUM HOOK
STRIP WITH STAINLESS
FASTENERS AT 12" MAX. OC
PRESERVATIVE-TREATED WOOD
BLOCKING AS NEEDED (TYP)
AIR/VAPOR BARRIER
WATER CUT OFF MASTIC (TYP)
STAINLESS FASTENERS
12" MAX O.C.
ALUMINUM FASCIA WITH
CONTINUOUS CLEAT
GASKETED STAINLESS STEEL
FASTENERS (TYP)
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING,
FASTENERS AND VAPOR BARRIER
REMOVE AND
DISPOSE EXISTING
FLASHING
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, AND
VAPOR BARRIER
CUT OFF AND DISPOSE OF EXISTING
THROUGH WALL FLASHING
REMOVE AND DISPOSE OF EXISTING BRICK FOR
NEW THROUGH-WALL FLASHING AS NECESSARY.
COORDINATE WITH NEW INSULATION HEIGHT.
RIGID INSULATION
COVERBOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION
SPLICE WITH EPDM SEAM TAPE (TYP)
STAINLESS-STEEL TERMINATION BAR AND SEALANT
FASTENED WITH APPROPRIATE FASTENERS 12" O.C.
STAINLESS 2-PIECE
COUNTER FLASHING WITH CANT
WEEPS 24" O.C.
SET NEW STAINLESS STEEL THROUGH
WALL FLASHING 3" INTO EXISTING JOINT.
PROVIDE WEDGE W/ SEALANT.
BRICK MASONRY
(MATCH EXISTING)
MIN. 5/8" PRESERVATIVE TREATED
PLYWOOD WITH CHAMFERED TOP EDGE
SUBSTRATE BOARD
AIR/VAPOR BARRIER
M
IN
STAINLESS FASTENERS 12" O.C.
STAINLESS STEEL CLEAT (TYP)
STAINLESS FASTENERS 12" O.C.
CONTINUOUS BEAD OF LAP SEALANT
STAINLESS COUNTER FLASHING RECEIVER
TERMINATE EPDM FLASHING BENEATH RECEIVER
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 4:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
ROOF DETAILS - 2
A-502 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL EPDM ROOF EDGE DETAIL
3"=1'-0" -
EXISTING
PROPOSED
TYPICAL EPDM ROOF BASE TIE-IN
3"=1'-0" -
EXISTING
PROPOSED
S.OZTURK
RIGID INSULATION
COVER BOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION
SUBSTRATE BOARD
TAPERED EDGE STRIPS TO MAINTAIN
CONSISTENT BLOCKING HEIGHT
CONTINUOUS ALUMINUM HOOK
STRIP WITH STAINLESS
FASTENERS AT 12" MAX. OC
PRESERVATIVE-TREATED WOOD
BLOCKING AS NEEDED (TYP)
AIR/VAPOR BARRIER
WATER CUT OFF MASTIC (TYP)
STAINLESS FASTENERS 12" O.C.
ROOF EDGE FASCIA
METAL AND
SECUREMENT -
CONTINUOUS
EXTRUDED ALUMINUM
CLEAT WITH SNAP-ON
ALUMINUM COVER
ALUMINUM FASCIA WITH
CONTINUOUS CLEAT
GASKETED STAINLESS STEEL
FASTENERS (TYP)
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING,
FASTENERS AND VAPOR BARRIER
REMOVE AND
DISPOSE EXISTING
FLASHING
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING AND
VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
PARAPET CAP, BLOCKING AND METAL FASCIA
CONTINUOUS ALUMINUM HOOK WITH STAINLESS FASTENERS 12" O.C. (TYP)
EPDM MEMBRANE FLASHING
PRESERVATIVE-TREATED WOOD BLOCKING
AS REQUIRED (TYP)
PREFINISHED ALUMINUM COPING
COVER BOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID INSULATION
PRESERVATIVE-TREATED WOOD BLOCKING
AS REQUIRED (TYP)
RIGID INSULATION
AIR/VAPOR BARRIER
SUBSTRATE BOARD
12"
1/4"
CONTINUOUS BEAD OF LAP SEALANT
SPLICE WITH EPDM SEAM TAPE (TYP)
PROVIDE SELF-ADHERED
AIR/VAPOR BARRIER
TRANSITION OVER
EXISTING AIR/VAPOR
BARRIER
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 3:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
ROOF DETAILS - 3
A-503 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL EPDM ROOF EDGE DETAIL - 2
3"=1'-0" -
EXISTING
PROPOSED
TYPICAL PARAPET DETAIL AT CURTAIN WALL
3"=1'-0" -
EXISTING
SPLICE WITH EPDM SEAM TAPE (TYP)
INTEGRAL VAPOR BARRIER
INSULATION SUPPORT
FIBERGLASS BATT INSULATION
IN POLY SLEEVE
TAPERED RIGID
INSULATION (TYP)
COVER BOARD (TYP)
AIR/VAPOR BARRIER (TYP)
RIGID INSULATION (TYP)
SUBSTRATE BOARD (TYP)
EPDM ROOFING
MEMBRANE (TYP)
FOAM ROD DIA. 1.5 TIMES LARGER THAN MAXIMUM GAP
REINFORCED TERMINATION STRIP (TYP)
PRESERVATIVE-TREATED WOOD BLOCKING
AS REQUIRED (TYP)
RUN AIR/VAPOR BARRIER UP
TO TOP OF BLOCKING
RIGID INSULATION
SUBSTRATE BOARD
AIR/VAPOR BARRIER
CANT STRIP (TYP)
SPLICE WITH EPDM SEAM TAPE (TYP)
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, AND
VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
FOAM EXPANSION TUBE AND COMPRESSIBLE
INSULATION
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING,
FASTENERS AND VAPOR BARRIER
REMOVE AND DISPOSE OF EXISTING
EXPANSION TUBE AND
COMPRESSIBLE INSULATION
EXISTING THROUGH-WALL FLASHING
TO REMAIN
RIGID INSULATION
COVERBOARD
EPDM ROOFING MEMBRANE
TAPERED RIGID
INSULATION
MIN. 5/8" PRESERVATIVE TREATED
PLYWOOD WITH CHAMFERED TOP EDGE
SUBSTRATE BOARD
AIR/VAPOR BARRIER
M
IN
FOAM ROD DIA. 1.5 TIMES LARGER THAN MAXIMUM GAP
INTEGRAL VAPOR
BARRIER INSULATION
SUPPORT
FIBERGLASS BATT
INSULATION IN
POLY SLEEVE
REINFORCED TERMINATION STRIP (TYP)
PRESERVATIVE-TREATED WOOD BLOCKING
AS REQUIRED (TYP)
EXISTING THROUGH-WALL FLASHING
STAINLESS-STEEL TERMINATION
BAR AND SEALANT FASTENED WITH
APPROPRIATE FASTENERS 12" O.C.
EPDM FLASHING TO RUN UP UNDERNEATH
THE THROUGH-WALL FLASHING
SPLICE WITH EPDM SEAM TAPE (TYP)
CONTINUOUS BEAD OF LAP SEALANT
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 3:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
ROOF DETAILS - 4
A-504 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL EXPANSION JOINT
3"=1'-0" -
EXISTING
PROPOSED
TYPICAL PARAPET DETAIL AT CURTAIN WALL
3"=1'-0" -
EXISTING
PREFINISHED
ALUMINUM
GUTTER
MIN. DIMENSIONS:
5" W x 8" H
PREFINISHED
ALUMINUM
DOWNSPOUT/LEADER
IN SAME LOCATION
AS EXISTING
GUTTER STRAP
HEAT-RESISTANT UNDERLAYMENT (TYP)
UNDERLAYMENT TO EXTEND
DOWN THE FACE OF THE
BLOCKING
6" RIGID INSULATION (TYP)
METAL ROOF PANEL
RETAINER CLIP SET IN
BUTYL SEALANT AND
SECURED WITH FASTENERS
PREFINISHED ALUMINUM
FLASHING
PRESERVATIVE-TREATED
WOOD BLOCKING AS
REQUIRED (TYP)
METAL DECK (TYP)
SUBSTRATE BOARD (TYP)
AIR/VAPOR BARRIER (TYP)
COVERBOARD (TYP)
GUTTER SUPPORT
BRACKET
BOND BREAKER TAPE AND
SEALANT
EXTEND SECOND LAYER OF UNDERLAYMENT A MINIMUM
OF 2' BEYOND EXTERIOR BUILDING WALL
REMOVE AND DISPOSE OF EXISTING METAL ROOFING SYSTEM
INCLUDING PANELS, FIBERBOARD, INSULATION, BLOCKING AND
ICE AND WATER SHIELD
REMOVE AND DISPOSE OF
EXISTING GUTTERS AND
DOWNSPOUTS
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING
PANELS, FIBERBOARD, INSULATION,
BLOCKING AND ICE AND WATER
SHIELD
REMOVE AND
DISPOSE OF EXISTING
METAL FASCIA
ROOF EDGE METAL FLASHING
CONTINUOUS ALUMINUM HOOK
STRIP WITH STAINLESS
FASTENERS AT 12" MAX. OC
RUN UNDERLAYMENT DOWN
THE FACE OF THE BLOCKING
PRESERVATIVE-TREATED
WOOD BLOCKING AS
REQUIRED (TYP)
FIELD FORM PANEL LEG TO
I.D. OF "J" CLOSURE
J-CHANNEL WITH TURNDOWN
METAL ROOF PANEL (TYP)
HEAT-RESISTANT UNDERLAYMENT (TYP)
6" RIGID INSULATION (TYP)
AIR/VAPOR BARRIER (TYP)
SUBSTRATE BOARD (TYP)
SUPPORT PLATE
COVERBOARD (TYP)
CLIP FASTENERS TO
PENETRATE TOP FLUTE OF
METAL DECK SUBSTRATE
5/8" MIN THREAD LENGTH
FASCIA TO SOFFIT FLASHING
BUTYL SEALANT TAPE
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 3:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
ROOF DETAILS - 5
A-505 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL METAL EDGE DETAIL - 1
3"=1'-0" -
EXISTING
PROPOSED
TYPICAL METAL EDGE DETAIL - 2
3"=1'-0" -
EXISTING
ROOF EDGE METAL FASCIA
CONTINUOUS ALUMINUM CLEAT
WITH STAINLESS FASTENERS
AT 12" MAX. OC
UNDERLAYMENT TO EXTEND
DOWN THE FACE OF THE
BLOCKING
RETAINER CLIP SET IN
BUTYL SEALANT AND
SECURED WITH FASTENERS
PRESERVATIVE-TREATED
WOOD BLOCKING AS
REQUIRED (TYP)
PRESERVATIVE-TREATED
PLYWOOD (TYP)
FLAT SEAM METAL TRIM
METAL CLEAT
LOUVER
HEAT-RESISTANT HEAT-RESISTANT UNDERLAYMENT (TYP)
RIGID INSULATION
METAL ROOF PANEL
SUBSTRATE BOARD (TYP)
AIR/VAPOR BARRIER (TYP)
COVERBOARD (TYP)
12"
1"
BUTYL SEALANT TAPE
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING
PANELS, FIBERBOARD, INSULATION,
BLOCKING AND ICE AND WATER
SHIELD
REMOVE AND DISPOSE OF EXISTING
LOUVERS AND VENTS
REMOVE AND DISPOSE OF EXISTING
METAL FASCIA
REMOVE AND DISPOSE OF EXISTING
PLYWOOD AND METAL TRIM
REMOVE AND DISPOSE OF EXISTING
METAL ROOFING SYSTEM INCLUDING PANELS,
FIBERBOARD, INSULATION, BLOCKING AND
ICE AND WATER SHIELD
REMOVE AND DISPOSE OF EXISTING
LOUVERS AND VENTS
LOUVER
FLASHING WITH "Z" CLOSURE
HEAT-RESISTANT
UNDERLAYMENT (TYP)
RIGID INSULATION
METAL ROOF PANEL
COVERBOARD (TYP)
PRESERVATIVE-TREATED
WOOD BLOCKING AS
REQUIRED (TYP)
UNDERLAYMENT FLASHING STRIP TO
EXTEND 4" UP THE SIDE AND
OVERLAP PANEL AND "Z" CLOSURE
AIR/VAPOR BARRIER (TYP)
SUBSTRATE BOARD (TYP)
BOND BREAKER TAPE AND
SEALANT
END DAM
CHECKED BY:
DRAWN BY:
FILE:
APPROVED BY:
Gardner, Massachusetts
GARDNER
MIDDLE
SCHOOL ROOF
REPLACEMENT
PROJECT
City of Gardner
DATE:
PROJECT NO:
MARK DATE DESCRIPTION
A 6/20/2025 SCHEMATIC DESIGN SET
B 1/12/2026 60% DESIGN SET
C 3/9/2026 ISSUED FOR BIDDING
M1215-030-GARDNER - A-501.dwg
04/08/2025
M1215-030
SCALE:
Pl ot te d
O n:
M ar
6, 6- 3:
pm
B y:
J Ps ze ni cz ny
La st
S av ed
3/ 6/
Ti gh e
B on d:
J:
\M \M
0) G ar dn er M id dl e S ch oo l\
D ra w in gs \A ut oC
A D
\S he et \M
-0
-G A R D
N
ER
A
-5
.d w g
DESIGNED BY:
ISSUED FOR
BIDDING
ROOF DETAILS - 6
A-506 0 3" 6" 9"
SCALE: 3"=1'-0"
AS SHOWN
S.OZTURK
M.WZOREK
J.VIAMARI
TYPICAL DORMER EDGE DETAIL
3"=1'-0" -
EXISTING
PROPOSED
TYPICAL DORMER BASE TIE-IN DETAIL
3"=1'-0" -
EXISTING
PRESERVATIVE-TREATED WOOD BLOCKING AS REQUIRED (TYP)
RUN AIR/VAPOR BARRIER UP TO TOP OF BLOCKING (TYP)
COVERBOARD
PVC ROOFING MEMBRANE
SUBSTRATE
BOARD
AIR/VAPOR
BARRIER
3" RIGID
INSULATION
METAL CLEAT
HOOK STRIP (TYP)
PVC FLASHING STRIP (TYP)
HOT-AIR WELDED SEAM (TYP)
PVC-CLADDED METAL
FASCIA COVER (TYP)
STAINLESS-STEEL
GROMMETED
FASTENERS. 12" O.C.
1-1/4" HOT DIPPED STAINLESS ROOF NAILS AT 4" O.C.
MAX STAGGERED 1/2" MIN. 1.5" FROM EDGE OF ROOF
REMOVE AND DISPOSE OF EXISTING
ROOFING SYSTEM INCLUDING MEMBRANE,
FIBERBOARD, INSULATION, BLOCKING,
FASTENERS AND VAPOR BARRIER
REMOVE AND
DISPOSE OF
EXISTING METAL
FLASHING
REMOVE AND DISPOSE OF
EXISTING METAL…