About this file

This document summarizes a federal solicitation for Distributed Antenna System upgrades and annual inspection services. The Department of Veterans Affairs will issue a Request for Quote on August 8th seeking offers from SDVOSB firms to provide DAS modernization for the VA Puget Sound Healthcare System located in Seattle, WA. Interested vendors should monitor SAM.gov where the solicitation will be posted with a closing date of August 26th. The resulting firm fixed-price contract will have a one year base period of performance from date of award through January 31, 2023 and three one-year option periods extending to January 31, 2026. The solicitation will require work under NAICS code 811213 with a small business size standard of $12 million.

View the file

Other files for this federal contract opportunity

Other files attached to K059--Distributed Antenna System (DAS) Modernization, newest first.
File Type Posted
Bldg 1.pdf PDF
Bldg 100.pdf PDF
Bldg. 24.pdf PDF
Bldg 1 Basement.pdf PDF
Schematic.pdf PDF
36C26022Q0896.docx DOCX document
Bldg. 20.pdf PDF
Channel info.pdf PDF
Bldg. 101.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI-392

RFI-364

RFI-366

RFI-364

RFI-366

RFI-564

RFI-563

RFI-572

RFI-150

RFI-151

RFI-347

RFI-364

RFI-366

RFI-392

8"

PV

C(

NW

PV

C(

NE

"P

VC

(S E)

"P

VC

(S W)

NC

(N E)

PV

C(

NW

2"

PV

C(

NE

8"

PV

C(

SE

PV

C(

SE

PV

C(

NW

8"

CO

NC

(N E)

8"

CO

NC

(S E)

CB RI

M=

.3

IE

.5 "P

IE

s s s s s s s ss s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s pm pmpmpm cs cs cs cs cs cs cs cs cs cspmpm cs cs cs cs cs cs cs cs cs cs cs cs cs rs rs c ckck ck ck ck k k k k ck k ck ck ck pmpmpm pm k cs l l lpm ck ck pmpc rs pcpcpc pc pcpcrsck ck rs rs l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l pc pc

DN

UP

DN

DN

UP

UP

FDFD FD

DN

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

AE210 C5 AE212C5

RAMP UP TO LEVEL 2 ABOVE

SLOPE = 4.7%

LEVEL 1

1A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

" IDF

1A-4

5'

390' - 8"

AE211 C5

AE211

F1

AE213C5

STAIR 2

1A-2

LOBBY

1A-3

STAIR 3

1A-5

STAIR 4

1A-6

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE703

D7

AE402

C3

AE721

F1

AE402

F1

AE402

F3

RAMP DN TO LEVEL B1 BELOW

SLOPE = 4.88%

AE702

D6

AE404

D1

AE212

F1

AE213

F1

0.07'

0.00'

0.00'

-1.85'

-0.91'0.00' -5.36' 5.21'

-6.30'

0.26'

-0.26'0.00'

0.00'

0.00' 0.00' 0.00' 0.00'

0.00'

0.00'

0.00'

0.00'

0.00'

-0.94'

-0.94'

0.00'

-0.94'

0.08'

0.08'

0.14'

0.07'

0.07'

-0.94'

0.00'

0.00'

4.27'

0.07'

-0.12'

-0.12' -0.12' 0.07'

506 506506

506506506506506 506506506506 506506

507507 507507

BICYCLE

AREA

AE401

F1

SIM

102102

712 712

712712712712

SLOPED

LANSCAPE.

SEE LANSCAPE

DRAWINGS

UNDERGROUN

D GARAGE

EDGE

RAILING

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

EXHAUST

SHAFT

STAIR 5

1B-1

AE403

E6

AE224

E1

AE224

B1

ABOVE

AE722

F2

AE705

4C

AE224

F1

AE224

C1

AE403

F4

AE403

E4

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

01 - CONFORMED TO BID ADDENDA 01.17.2014

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL 1 TOWER

AE140

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"F1 LEVEL 1 TOWER

KEY

VALUE KEYNOTE

001 EAST WING UNDERGROUND PARKING

STRUCTURE BELOW

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

115 FUTURE PAYSTATION LOCATION

310 ARCHITECTURAL CONCRETE (AC-1), SEE

AE870 FOR REVEALS & FORM-TIE

PATTERN

501 STAINLESS STEEL SECURITY BOLLARD

SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE BARRIER

AND STEEL GUARD RAIL, SEE E6/AE831

513 LINK CANOPY, SEE AS413

533 TUBE STEEL BEAM SPANNING COL TO COL

FOR SUPPORT AT INTERMEDIATE LANDING

534 CURVED ALUMINIUM PANELS SEE

B1/AE812

541 STAINLESS STEEL SECURITY BOLLARD,

SSD. TO PROTECT PIPING. CO-ORDINATE

LOCATIONS WITH FA.

542 STRUCTURAL SUPPORT AT SCREENWALL

SSD.

706 CONTROL JOINT W/ COVER, SEE AE871

712 DRAINAGE SLEEVE AT SHEAR WALL, S.S.D.

906 4" WIDE WHITE STRIPING PAINTED ON

CONCRETE, TYP

911 WHITE TRAFFIC ARROW PAINTED ON

CONCRETE, SEE DETAIL F6/AE404

1/16" = 1'-0"B1 PLAZA LEVEL EAST WING CIRCULATION

Level 1 (Tower) Auto Parking Stalls Description Stall Count

Typical 147 Grand total: 147

Level 1 (Tower) Bicycle racks Description Rack Count

Bicycles (3 ea rack) 1 Bicycles (5 ea rack) 4

RFI-111

RFI-111

RFI-111 RFI-111

RFI-111

RFI-111

RFI-253:

Transition (TYP)

RFI-740

8"

PV

C(

NW

PV

C(

NE

"P

VC

(S E)

"P

VC

(S W)

NC

(N E)

PV

C(

NW

2"

PV

C(

NE

8"

PV

C(

SE

PV

C(

SE

PV

C(

NW

8"

CO

NC

(N E)

8"

CO

NC

(S E)

CB RI

M=

.3

IE

.5 "P

IE

s s s s s s s ss s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s s pm pmpmpm cs cs cs cs cs cs cs cs cs cspmpm cs cs cs cs cs cs cs cs cs cs cs cs cs rs rs c ckck ck ck ck k k k k ck k ck ck ck pmpmpm pm k cs l l lpm ck ck pmpc rs pcpcpc pc pcpcrsck ck rs rs l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l l pc pc

DN

UP

DN

DN

UP

UP

FDFD FD

DN

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

AE210 C5 AE212C5

RAMP UP TO LEVEL 2 ABOVE

SLOPE = 4.7%

LEVEL 1

1A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

" IDF

1A-4

5'

390' - 8"

AE211 C5

AE211

F1

AE213C5

STAIR 2

1A-2

LOBBY

1A-3

STAIR 3

1A-5

STAIR 4

1A-6

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE703

D7

AE402

C3

AE721

F1

AE402

F1

AE402

F3

RAMP DN TO LEVEL B1 BELOW

SLOPE = 4.88%

AE702

D6

AE404

D1

AE212

F1

AE213

F1

0.07'

0.00'

0.00'

-1.85'

-0.91'0.00' -5.36' 5.21'

-6.30'

0.26'

-0.26'0.00'

0.00'

0.00' 0.00' 0.00' 0.00'

0.00'

0.00'

0.00'

0.00'

0.00'

-0.94'

-0.94'

0.00'

-0.94'

0.08'

0.08'

0.14'

0.07'

0.07'

-0.94'

0.00'

0.00'

4.27'

0.07'

-0.12'

-0.12' -0.12' 0.07'

506 506506

506506506506506 506506506506 506506

507507 507507

BICYCLE

AREA

AE401

F1

SIM

102102

102102

712 712

712712712712

SLOPED

LANSCAPE.

SEE LANSCAPE

DRAWINGS

UNDERGROUN

D GARAGE

EDGE

RAILING

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

EXHAUST

SHAFT

STAIR 5

1B-1

AE403

E6

AE224

E1

AE224

B1

ABOVE

AE722

F2

AE705

4C

AE224

F1

AE224

C1

AE403

F4

AE403

E4

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL 1 TOWER

AE140

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"F1 LEVEL 1 TOWER

KEY

VALUE KEYNOTE

001 EAST WING UNDERGROUND PARKING

STRUCTURE BELOW

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

115 FUTURE PAYSTATION LOCATION

310 ARCHITECTURAL CONCRETE (AC-1), SEE

AE870 FOR REVEALS & FORM-TIE

PATTERN

501 STAINLESS STEEL SECURITY BOLLARD

SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE BARRIER

AND STEEL GUARD RAIL, SEE E6/AE831

513 LINK CANOPY, SEE AS413

533 TUBE STEEL BEAM SPANNING COL TO COL

FOR SUPPORT AT INTERMEDIATE LANDING

534 CURVED ALUMINIUM PANELS SEE

B1/AE812

541 STAINLESS STEEL SECURITY BOLLARD,

SSD. TO PROTECT PIPING. CO-ORDINATE

LOCATIONS WITH FA.

542 STRUCTURAL SUPPORT AT SCREENWALL

SSD.

706 CONTROL JOINT W/ COVER, SEE AE871

712 DRAINAGE SLEEVE AT SHEAR WALL, S.S.D.

906 4" WIDE WHITE STRIPING PAINTED ON

CONCRETE, TYP

911 WHITE TRAFFIC ARROW PAINTED ON

CONCRETE, SEE DETAIL F6/AE404

1/16" = 1'-0"B1 PLAZA LEVEL EAST WING CIRCULATION

Level 1 (Tower) Auto Parking Stalls Description Stall Count

Typical 147 Grand total: 147

Level 1 (Tower) Bicycle racks Description Rack Count

Bicycles (3 ea rack) 1 Bicycles (5 ea rack) 4

SUPERSEDED

UP

UP

DN

FDFD FD

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

AE210 C5 AE212C5

AE212

F1

RAMP DN TO LEVEL 1 BELOW

SLOPE = 4.7%

RAMP UP TO LEVEL 3 ABOVE

SLOPE = 4.7%

LEVEL 2

2A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

AE211 C5

AE211

F1

AE213C5

AE213

F1

STAIR 2

2A-2

LOBBY

2A-3

STAIR 3

2A-4

STAIR 4

2A-5

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE721

C2

AE402

C3

AE402

F1

AE402

F3

AE404

D1

9' - 7 3/4"

AE703

B7

E Q

E Q

E Q

11.39'

11.33'

11.33'

9.50'

10.44'11.33'

6.12' 16.54'

5.17'

11.07'

11.07'11.33'

11.33'

11.33'

11.33' 11.33' 11.33' 11.33'

11.33'

11.33'

11.33'

11.33'

10.39'

10.39'

11.33'10.39'

11.25

11.25

11.47'

11.39'

11.39'

10.39'

11.33'

11.33'

15.60

MOTORCYCLE

PARKING

506506

506 506506

506506 506506506506 506506

507507 507507

AE702

D6

118118102102118118102

712 712

712712712712

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL 2 TOWER

AE150

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 LEVEL 2 TOWER

KEY

VALUE KEYNOTE

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

118 SCREEN WALL

310 ARCHITECTURAL CONCRETE (AC-1), SEE

AE870 FOR REVEALS & FORM-TIE

PATTERN

320 PERIMETER CONCRETE VEHICLE

BARRIER AND GUARDRAIL, SEE F6/AE831

501 STAINLESS STEEL SECURITY BOLLARD

SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL, SEE

E6/AE831

534 CURVED ALUMINIUM PANELS SEE

B1/AE812

541 STAINLESS STEEL SECURITY BOLLARD,

SSD. TO PROTECT PIPING. CO-ORDINATE

LOCATIONS WITH FA.

542 STRUCTURAL SUPPORT AT

SCREENWALL SSD.

706 CONTROL JOINT W/ COVER, SEE AE871

712 DRAINAGE SLEEVE AT SHEAR WALL,

S.S.D.

911 WHITE TRAFFIC ARROW PAINTED ON

CONCRETE, SEE DETAIL F6/AE404

Level 2 (Tower) Auto Parking Stalls Description Stall Count

Typical 149 Grand total: 149

Level 2 (Tower) Motorcycle Parking Description Stall Count

Motorcycle 5 Grand total: 5

RFI-111RFI-111

RFI-111

RFI-111

RFI-111

RFI-111

RFI-253:

Transition (TYP)

RFI-516 - Aluminum Closure

DN

DN

RDFD FD

OD

RDOD

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

D1

AE301

C1

AE302

AE210 C5 AE212C5

AE212

F1

IDF

3A-6

RAMP DN TO LEVEL 2 BELOW

SLOPE = 4.7%

RAMP UP TO LEVEL 4 ABOVE

SLOPE = 4.7%

LEVEL 3

3A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"50' - 0"32' - 0"20' - 0"

IDF

3A-4

AE211 C5

AE211

F1

AE213C5

AE213

F1

AE704

B6

LOBBY

3A-3

STAIR 2

3A-2

STAIR 3

3A-5

STAIR 4

3A-7

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE703

D7

AE402

C1

AE402

C3

AE721

C2

AE402

F1

AE402

F3

F1

AE301

F1

AE723

F5

AE310

F3

AE310

F1

AE302

F2

AE311

F4

AE312

F5

AE313

F6

AE314

F4

AE314

F3

AE315

F1

AE314

F4

AE316

F1

AE316

F5

AE317

F1

AE317

AE404

D1

F1

AE315

6' - 0"

26' - 11 7/8"

21.72'

21.72'

22.66'22.66'

22.4' 20.83'

21.77'

16.5'

17.44' 27.87'

26.93'

22.66'

22.66'

22.72'

22.72'

22.66'

22.4' 22.66' 21.72'

22.66'

22.66'

22.74'

22.74'

22.66'

22.72'

22.66'

22.66'

22.66'

22.8'

22.66'

22.72'

22.66'

21.72'

F3

AE313SIM

22.66'

MOTORCYCLE

PARKING

506506506506 506506

506506

TYP506506506

TYP2602

AE702

D6

118118

102102118118

507 507507 507507

712712

712 712

712712

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL 3 TOWER

AE160

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 LEVEL 3 TOWER

KEY

VALUE KEYNOTE

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

118 SCREEN WALL

310 ARCHITECTURAL CONCRETE (AC-1),

SEE AE870 FOR REVEALS &

FORM-TIE PATTERN

320 PERIMETER CONCRETE VEHICLE

BARRIER AND GUARDRAIL, SEE

F6/AE831

501 STAINLESS STEEL SECURITY

BOLLARD SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL,

SEE E6/AE831

534 CURVED ALUMINIUM PANELS SEE

B1/AE812

542 STRUCTURAL SUPPORT AT

SCREENWALL SSD.

706 CONTROL JOINT W/ COVER, SEE

AE871

712 DRAINAGE SLEEVE AT SHEAR

WALL, S.S.D.

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

2602 15' HIGH POLE LIGHT FIXTURE -

MOUNT ON CONCRETE COLUMN

BASE, S.E.D.

Level 3 (Tower) Auto Parking Stalls Description Stall Count

Typical 148 Grand total: 148

Level 3 (Tower) Motorcycle Parking Description Stall Count

Motorcycle 5 Grand total: 5

RFI-111

RFI-111

RFI-111

RFI-111

RFI-111

RFI-253:

Transition (TYP)

RFI-520

RFI-643 SEE ALSO

C1/AE851

RFI-657

DN

RD RD

OD

RD

OD

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

AE210 C5 AE212C5

AE212

F1

RAMP DN TO LEVEL 3 BELOW

SLOPE = 4.7%

LEVEL 4

4A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

AE211 C5

AE211

F1

AE213C5

AE213

F1

AE702

B4

AE703

B5

STAIR 2

4A-2

LOBBY

4A-3

STAIR 3

4A-4

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE721

C2

AE404

D1

34.00'

33.53'33.06'

34.00'

34.06'

34.00'

34.00'

33.74'

33.74'33.06'

34.00'

33.06'

34.00'34.00'

34.00'34.14'

34.00'

34.00'

32.17'

33.11'34.00'

29.67'

28.73'

34.14'

34.14'

34.06' 34.06'34.06'

AE405

C5

506506 506 TYP

507507

507507

TYP2602

118118

102102118118

12' - 0"

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL 4 TOWER

AE170

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 LEVEL 4 TOWER

KEY

VALUE KEYNOTE

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

118 SCREEN WALL

310 ARCHITECTURAL CONCRETE (AC-1),

SEE AE870 FOR REVEALS &

FORM-TIE PATTERN

311 CAST IN PLACE CONCRETE

PLANTER

318 CONCRETE PAD FOR ANTENNA,

SSD, SEE TELECOM DRAWINGS

320 PERIMETER CONCRETE VEHICLE

BARRIER AND GUARDRAIL, SEE

F6/AE831

501 STAINLESS STEEL SECURITY

BOLLARD SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL,

SEE E6/AE831

509 METAL SIDING PANEL SYSTEM

534 CURVED ALUMINIUM PANELS SEE

B1/AE812

805 STRUCTURAL GLAZING

906 4" WIDE WHITE STRIPING PAINTED

ON CONCRETE, TYP

2602 15' HIGH POLE LIGHT FIXTURE -

MOUNT ON CONCRETE COLUMN

BASE, S.E.D.

Level 4 (Tower) Auto Parking Stalls Description Stall Count

Typical 85 Grand total: 85

RFI-111

RFI-111

RFI-253:

Transition (TYP)

RFI-571

RFI-651

RFI-571

RFI-657

RFI-730

RFI-752

UP

FD

FDFD

UP

FD

FD

FD

FD

FD

FD

FD

FD

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

ACCESSIBLE LOADING AREAS

STRIPING LEGEND

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION

AND SHEET AE404 FOR TYPICAL STALL STRIPING

DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

K

J

H

AE210

F1

A

D

G

1 10 11 12 13 14

8765432

B

C

E

F

15 16 17 18 19 20

/1 AE112 /1 AE112

D1

AE301

C1

AE302

AE210 C5 AE212C5

AE212

F1

RAMP UP TO LEVEL B2 ABOVE

SLOPE = 4.88%

FIRE RISER

B3A-7WATER / FIRE

SPRINKLER

B3A-2

STORAGE

B3A-6

LEVEL B3

B3A-1

ENTRANCE

F1

AE311

F1

AE310

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

390' - 8"

BACKFILL

AE211 C5

AE211

F1

AE213C5

AE213

F1

AE701

F7

AE703

F7

AE704

F6

STAIR 1

B3A-3

LOBBY

B3A-4

STAIR 3

B3A-5

STAIR 4

B3A-8

WITH

SCREEN

WITH

SCREEN

AE401

F7

AE401

F4

AE401

B4

AE720

F1

SCI/D

SCI/D

ACC.

ACC.

ACC.

F1

AE301

E1

AE304

EMER PREP

STORAGE

B3A-9

F1

AE723

SCI/D

SCI/D

WATER / FIRE

SPRINKLER

B3A-2

F5

AE310

F3

AE310

F1

AE302

F2

AE311

F4

AE312

F5

AE313

F6

AE314

F4

AE314

F3

AE315

F1

AE314

F4

AE316

F1

AE316

F5

AE317

F1

AE317

AE404

D1

9'

F1

AE315

3' - 0"

5'

-34.93'

-35.00

-35.00'

-35.00' -29.63'

-35.00'

35.00'

-35'.00'

-35.00' -35.00' -35.00'

-35.00'

-35.00'

-35.00'

-35.00'

-35.00'

-35.93'

-35.93'

-35.00'-35.93'

-34.93' -34.93

-34.93'

-35.93'

-35.00'

-35.00' -35.00'

-30.56'

-35.43'

-35'.00'

-35'.00'

-35'.00'

F3

AE313

E Q

E Q

2'

812812

AS103 B6

20' - 0"

541541

712 712

712712712712

SEE AE130

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B3 TOWER

AE110

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

KEY

VALUE KEYNOTE

105 FLOOR DRAIN, SPD.

301 CONCRETE WALL, SSD

307 CONCRETE COLUMN, SSD

309 CONCRETE CAST IN PLACE

CONCRETE STAIRS AND LANDING

310 ARCHITECTURAL CONCRETE (AC-1),

SEE AE870 FOR REVEALS &

FORM-TIE PATTERN

315 6" HIGH CONCRETE ISLAND (FOR

FUTURE ACCESS CONTROL

EQUIPMENT)

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL,

SEE E6/AE831

517 METAL PAN STAIRS, WITH

CONCRETE INFILL TREADS AND

LANDING

519 STEEL PROTECTION PLATE

FASTENED TO CONCRETE

541 STAINLESS STEEL SECURITY

BOLLARD, SSD. TO PROTECT

PIPING. CO-ORDINATE LOCATIONS

WITH FA.

706 CONTROL JOINT W/ COVER, SEE

AE871

707 SEISMIC JOINT,SEE AE802

712 DRAINAGE SLEEVE AT SHEAR

WALL, S.S.D.

812 METAL SECURITY GRILL

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

2201 OIL WATER SEPARATOR. SEE

STRUCTURAL DRAWINGS

Level B3 (Tower) Auto Parking Stalls Description Stall Count

Typical 123 Grand total: 123

1/16" = 1'-0"

1 B3 TOWER

Delta No Date Revision Description

06.05.2013 CONSTRUCTION DOCUMENTS -CD2

1 01.17.2014 CONFORMED TO BID ADDENDA

2 07.23.2014 CO-04

RFI247:

Drainage Flow Contour Lines

RFI-033

RFI-033

RFI-111

RFI-111

RFI-111

RFI-111

RFI-175

RFI-225

RFI-230

RFI-247

RFI-247

RFI-247

RFI-247

RFI-247

RFI-253:

Transition (TYP)

RFI-203 &

RFI-257

RFI-269

AE110-170 (TYP)

RFI-569

RFI-650

RFI-343

RFI-735

See RFI-739 for updated FE cabinet locations

UP

FD

FDFD

UP

FD

FD

FD

FD

FD

FD

FD

FD

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

ACCESSIBLE LOADING AREAS

STRIPING LEGEND

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

K

J

H

AE210

F1

A

D

G

1 10 11 12 13 14

8765432

B

C

E

F

15 16 17 18 19 20

/1 AE112 /1 AE112

D1

AE301

C1

AE302

AE210 C5 AE212C5

AE212

F1

RAMP UP TO LEVEL B2 ABOVE

SLOPE = 4.88%

FIRE RISER

B3A-7WATER / FIRE

SPRINKLER

B3A-2

STORAGE

B3A-6

LEVEL B3

B3A-1

ENTRANCE

F1

AE311

F1

AE310

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

390' - 8"

BACKFILL

AE211 C5

AE211

F1

AE213C5

AE213

F1

AE701

F7

AE703

F7

AE704

F6

STAIR 1

B3A-3

LOBBY

B3A-4

STAIR 3

B3A-5

STAIR 4

B3A-8

WITH

SCREEN

WITH

SCREEN

AE401

F7

AE401

F4

AE401

B4

AE720

F1

SCI/D

SCI/D

ACC.

ACC.

ACC.

F1

AE301

E1

AE304

EMER PREP

STORAGE

B3A-9

F1

AE723

SCI/D

SCI/D

WATER / FIRE

SPRINKLER

B3A-2

F5

AE310

F3

AE310

F1

AE302

F2

AE311

F4

AE312

F5

AE313

F6

AE314

F4

AE314

F3

AE315

F1

AE314

F4

AE316

F1

AE316

F5

AE317

F1

AE317

AE404

D1

9'

0"

F1

AE315

3' - 0"

5'

-34.93'

-35.00

-35.00'

-35.00' -29.63'

-35.00'

35.00'

-35'.00'

-35.00' -35.00' -35.00'

-35.00'

-35.00'

-35.00'

-35.00'

-35.00'

-35.93'

-35.93'

-35.00'-35.93'

-34.93' -34.93

-34.93'

-35.93'

-35.00'

-35.00' -35.00'

-30.56'

-35.43'

-35'.00'

-35'.00'

-35'.00'

F3

AE313

E Q

E Q

2'

506506

812812

AS103 B6

20' - 0"

541541

712 712

712712712712

SEE AE130

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B3 TOWER

AE110

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

KEY

VALUE KEYNOTE

105 FLOOR DRAIN, SPD.

301 CONCRETE WALL, SSD

307 CONCRETE COLUMN, SSD

309 CONCRETE CAST IN PLACE

CONCRETE STAIRS AND LANDING

310 ARCHITECTURAL CONCRETE (AC-1),

SEE AE870 FOR REVEALS &

FORM-TIE PATTERN

315 6" HIGH CONCRETE ISLAND (FOR

FUTURE ACCESS CONTROL

EQUIPMENT)

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL,

SEE E6/AE831

517 METAL PAN STAIRS, WITH

CONCRETE INFILL TREADS AND

LANDING

519 STEEL PROTECTION PLATE

FASTENED TO CONCRETE

541 STAINLESS STEEL SECURITY

BOLLARD, SSD. TO PROTECT

PIPING. CO-ORDINATE LOCATIONS

WITH FA.

706 CONTROL JOINT W/ COVER, SEE

AE871

707 SEISMIC JOINT,SEE AE802

712 DRAINAGE SLEEVE AT SHEAR

WALL, S.S.D.

812 METAL SECURITY GRILL

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

2201 OIL WATER SEPARATOR. SEE

STRUCTURAL DRAWINGS

Level B3 (Tower) Auto Parking Stalls Description Stall Count

Typical 123 Grand total: 123

1/16" = 1'-0"

1 B3 TOWER

SUPERSEDED

FD

FD

FD

FD

K

L

M

N

P

J

Q

H

R

F1

AE303

G

1 432

/1 AE110 /1 AE110

C1

AE303

21' - 2"

30' - 11"

33' - 8"

30' - 11"

21' - 2"

137' - 10"

LEVEL B3

EAST WING

B3B-1

ELEV.

MACHINE

ROOM

B3B-2

EXHAUST

SHAFT

STAIR 5

B3B-3

LOBBY

B3B-4

AE705

6F

AE403

C1

ACC.

ACC.

SCI/D

SCI/D

ACC.

SCI/D

SCI/D

ACC.

ACC.

ACC.

32' - 0"

32' - 0"

32' - 0"

32' - 0"

33' - 0"

22' - 0"

208' - 11"

2' - 0"

SCI/D

(VAN)

SCI/D

(VAN)

SCI/D

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

SCI/D

(VAN)

SCI/D

ACC.

ACC.

ACC.

ACC.

ACC.

ACC.

SCI/D

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

ACC.

AE404

D2

9'

7' - 0"

8' - 0"

-35'.00'

-35.00'

-35.64'

-35'.00'

-35'.00'

-35'.64'

-35'.00'

-35'.00'

-35'.00'

-35'.00'

-35'.00'

-35'.00'

-35'.00'

-35'.00'

4' - 2" 4' - 9 13/16"

4' - 8 13/16"

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

AE305

AE305

EXAUST FAN

ROOM

B3B-5

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

ACCESSIBLE LOADING AREAS

STRIPING LEGEND

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION

AND SHEET AE404 FOR TYPICAL STALL STRIPING

DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

SHEET KEY PLAN

PLAN

NORTHAREA B

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B3 EAST WING

AE112

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 B3 EAST WING

KEY

VALUE KEYNOTE

004 EAST WING PAVILLION ABOVE

115 FUTURE PAYSTATION LOCATION

307 CONCRETE COLUMN, SSD

310 ARCHITECTURAL CONCRETE (AC-1),

SEE AE870 FOR REVEALS &

FORM-TIE PATTERN

517 METAL PAN STAIRS, WITH

CONCRETE INFILL TREADS AND

LANDING

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

2201 OIL WATER SEPARATOR. SEE

STRUCTURAL DRAWINGS

Level B3 (East Wing) Auto Parking Stalls Description Stall Count

ACC. 13

SCI/D 19

SCI/D (VAN) 13

Grand total: 45

Delta No Date Revision Description

06.05.2013 CONSTRUCTION DOCUMENTS -CD2

1 07.23.2014 CO-04

RFI111:

No Architectural Concrete

RFI-175

RFI247:

Drainage Flow Contour Lines

RFI-253:

Transition (TYP)

RFI-291

RFI-567

RFI-276

RFI-343

RFI-668

RFI-664

RFI-686

RFI-675

RFI-683

RFI-724 LB3

Bollards, TYP

RFI-741

RFI-741

UP

UP

DN

FDFD FD

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

K

J

H

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

/1 AE122/1 AE122

AE210 C5 AE212C5

AE212

F1

LEVEL B2

B2A-1

ELEC

B2A-7

IDF

B2A-8

32' - 0"

IDF

B2A-5

5'

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

390' - 8"

MAIN ELEC.

ROOM

B2A-2

AE211 C5

AE211

F1

AE213C5

AE213

F1

AE701

C7

AE703

D7

STAIR 1

B2A-3

LOBBY

B2A-4

STAIR 3

B2A-6

STAIR 4

B2A-9

WITH

SCREEN

AE401

D7

AE401

D1

ACC.

ACC.

ACC.

SCI/D

SCI/D

SCI/D

RAMP DN TO LEVEL B3 BELOW

SLOPE = 4.88%

RAMP UP TO LEVEL B1 ABOVE

SLOPE = 4.88%

9'

SCI/D

AE404

D2

9' - 8"

8' - 8"

-23.27'

-23.33

-23.33'

-25.18'

-24.24'-23.33' -28.69' -17.97'

-29.63'

-23.59'

-23.59'-23.33'

-23.33'

-23.33'

-23.33' -23.33' -23.33'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

-24.27'

-24.27'

-23.33'-24.27'

-23.27'

-23.27'

-24.27'

-23.33'

-23.33'

-18.91'

-23.27'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

506 402402

506506506

506 506

506506 506506

506911

812812 507507

AE720

F5

AS103 B6

712 712

712 712

712712712712

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION

AND SHEET AE404 FOR TYPICAL STALL STRIPING

DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B2 TOWER

AE120

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

KEY

VALUE KEYNOTE

102 STAINLESS STEEL AND GLASS

PEDESTRIAN GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

402 CONCRETE WALL UPTO LEVEL B2

501 STAINLESS STEEL SECURITY

BOLLARD SSD.

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE

BARRIER AND STEEL GUARD RAIL,

SEE E6/AE831

533 TUBE STEEL BEAM SPANNING COL

TO COL FOR SUPPORT AT

INTERMEDIATE LANDING

541 STAINLESS STEEL SECURITY

BOLLARD, SSD. TO PROTECT

PIPING. CO-ORDINATE LOCATIONS

WITH FA.

706 CONTROL JOINT W/ COVER, SEE

AE871

707 SEISMIC JOINT,SEE AE802

712 DRAINAGE SLEEVE AT SHEAR

WALL, S.S.D.

812 METAL SECURITY GRILL

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

Level B2 (Tower) Auto Parking Stalls Description Stall Count

DAV 5

Typical 139 Grand total: 144

1/16" = 1'-0"1 B2 TOWER -

Delta No Date Revision Description

06.05.2013 CONSTRUCTION DOCUMENTS -CD2

1 07.23.2014 CO-04

RFI-112

RFI-033 RFI-033

RFI-111

RFI-111

RFI-111

RFI-111

RFI-146

RFI-175

RFI-221

RFI-253:

Transition (TYP)

RFI-329

RFI-329

NOTE: RFI-329

Applies to AE120-170

RFI-371

RFI-394

RFI-704

RFI-682 IDF Rooms, TYP

RFI-746

FD

FD

K

L

M

N

P

J

Q

H

R

G

/1 AE120

LEVEL B2

EAST WING

B2B-1

21' - 2"

30' - 11"

33' - 8"

30' - 11"

21' - 2"

EXHAUST

SHAFT

IDF ROOM

B2B-2

STAIR 5

B2B-3

LOBBY

B2B-4

AE705

6C

AE403

F1

ACC.

ACC.

ACC.

SCI/D

SCI/D

SCI/D

SCI/D

SCI/D

(VAN)

SCI/D

(VAN)

SCI/D

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

ACC.

ACC.

SCI/D

SCI/D

ACC.

ACC.

9'

/1 AE120

5' - 0"

SCI/D

SCI/D

(VAN)

SCI/D

(VAN)

SCI/D

ACC.

ACC.

ACC.

ACC.

ACC.

ACC.

ACC.

ACC.

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

137' - 10"

5' - 6"

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

(VAN)

SCI/D

SCI/D

SCI/D

(VAN)

AE404

D2

-23.33'-23.33'

-23.97'

-23.33'

-23.33'

-23.97'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

-23.33'

SCI/D

(VAN)

AE403

F4

2' - 11 31/32" 2' - 10 1/32"

AE403

E4

EXHAUST

FAN ROOM

B2B-5

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

ACCESSIBLE LOADING AREAS

STRIPING LEGEND

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION

AND SHEET AE404 FOR TYPICAL STALL STRIPING

DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

SHEET KEY PLAN

PLAN

NORTHAREA B

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B2 EAST WING

AE122

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 B2 EAST WING

KEY

VALUE KEYNOTE

004 EAST WING PAVILLION ABOVE

115 FUTURE PAYSTATION LOCATION

707 SEISMIC JOINT,SEE AE802

911 WHITE TRAFFIC ARROW PAINTED

ON CONCRETE, SEE DETAIL

F6/AE404

Level B2 (East Wing) Auto Parking Stalls Description Stall Count

ACC. 13

SCI/D 19

SCI/D (VAN) 13

Grand total: 45

Delta No Date Revision Description

06.05.2013 CONSTRUCTION DOCUMENTS -CD2

1 07.23.2014 CO-04

RFI111: No Architectural Concrete

RFI-175

RFI-253:

Transition (TYP)

RFI-381

RFI-401

6 8 "P

VC

(N E)

STOP

C P

DN

UP DN

UP

DN

UP

FDFD FD

AE210

F1

A

D

G

1 10 11 12 13 1498765432

B

C

E

F

15 16 17 18 19 20

AE210 C5 AE212C5

ENTRANCE

IDF

B1A-6

LEVEL B1

B1A-1

18' - 0"32' - 0"18' - 0"18' - 8"18' - 0"18' - 0"18' - 8"18' - 8"18' - 8"18' - 8"18' - 0"18' - 0"18' - 0"18' - 8"18' - 8"32' - 0"18' - 0"32' - 0"20' - 0"

390' - 8"

5'

ELEV. EQUIP.

ROOM

B1A-2

AE211 C5

AE211

F1

AE213C5

AE702

F6

AE701

C4

STAIR 2

B1A-3

STAIR 1

B1A-2

LOBBY

B1A-4

STAIR 3

B1A-5

STAIR 4

B1A-7

WITH

SCREEN

WITH

SCREEN

WITH

SCREEN

AE402

D6

AE720

F7

AE402

F3

DAV

DAV

DAV

DAV

DAV

RAMP UP TO LEVEL 1 ABOVE

SLOPE = 4.88%

RAMP DN TO LEVEL B2 BELOW

SLOPE = 4.88%

MOTORCYCLE

PARKING

MOTORCYCLE

PARKING

AE404

F3

AE404

E1

AE404

D1

AE212

F1

AE213

F1

AE401

F1

29' - 6"

AE704

D6

11.6'

11.66'

-11.66'

-13.51'

-12.57'11.66' -17.02' -6.3'

-17.96'

-11.92'

-11.92' 11.66'

11.66'

11.66'

11.66' -11.66' -11.66'

-11.66'

-11.66'

-11.66'

-11.66'

-11.66'

-12.6'

-12.6'

-11.66' -12.6'

-11.6'

-11.6

-12.6'

-11.66'

11.66'

-7.24'

EQ EQ

11.66'11.76'

11.76'

11.72' 11.66'

506506

506506

506 506506 506 506

506506506

506 506 506

SIM

SIM

SIM

507507

BICYCLE

AREA

712 712

712 712

712712712712

S E

E A

E

WALL TYPE LEGEND

CONCRETE , SSD

CMU WALL

GUARDRAIL STRAND VEH. BARRIER

FLOOR FINISH LEGEND

SWIRL FINISH

BROOM FINISH

TRAFFIC COATING

PAINT INTERIOR OF PARKING STRUCTURE WHITE;

(CLGS, WALLS, AND INT. COLUMNS), INCLUDING INT.

FACES OF EXT. SHEAR WALLS AND EXT. COLUMNS .

EXT. FACE OF COLUMNS AND EXT. FACE OF SHEAR

WALLS TO REMAIN NATURAL CONCRETE. PAINT

ALSO ALL EXPOSED PIPING AND CONDUITS

REFER TO AG SERIES FOR SIGNAGE LOCATION AND

SHEET AE404 FOR TYPICAL STALL STRIPING DETAILS

PROVIDE 8'-6” MINIMUM VERTICAL CLEARANCE ON

LEVELS, B3, B2 AND B1. PROVIDE 8'-2” MINIMUM

VERTICAL CLEARANCE ON LEVELS 1, 2 AND 3

SLABS SLOPE TO FLOOR DRAINS AS SHOWN.

VERIFY FIELD DIMENSIONS PRIOR TO PREPARING

SHOP DRAWINGS, FABRICATING STAIRS OR OTHER

BUILDING SYSTEMS/ ELEMENTS SPANNING FLOOR

LEVELS.

1.

2.

3.

4.

5.FLOOR SLAB WILL BE SEALED WTH A HIGH

PENETRATION SILANE SEALER

REFER TO FIRE LIFE SAFETY DRAWINGS FOR FIRE

EXTINGUISHER CABINETS

6.

Office of Construction and Facilities Management

Project Number

Building Number

Drawing Number

Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

ARCHITECTCONSULTANTS:

Revisions: Date

FULLY SPRINKLERED

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F on e ei gh t i nc h on e fo ot on e qu ar te r i nc h on e fo ot th re e ei gh t i nc h on e fo ot on e ha lf in ch o ne fo ot th re e qu ar te r i nc h on e fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot

6"

6"

6" 6"

Department of Veterans Affairs

987654321

Drawing Scale

CONSTRUCTION DOCUMENTS -CD2 06.05.2013

SHEET KEY PLAN

PLAN

NORTH

AREA A

KEY NOTESNO.

NOTES

VOL. 2

JUNE 05, 2013

CONSTRUCTION DOCUMENT 2

VA#663-405A

1660 South Columbian Way, Seattle, WA 98105As indicated

SCGA

LEVEL B1 TOWER

AE130

Parking Structure and Entry Drive, VAPSHCS Seattle Division, Phase 1

PARKING STRUCTURE AND ENTRY DRIVE

1/16" = 1'-0"1 B1 TOWER

KEY

VALUE KEYNOTE

102 STAINLESS STEEL AND GLASS PEDESTRIAN

GUARDRAIL SYSTEM

110 PHOTOVOLTAIC PANELS

310 ARCHITECTURAL CONCRETE (AC-1), SEE

AE870 FOR REVEALS & FORM-TIE PATTERN

315 6" HIGH CONCRETE ISLAND (FOR FUTURE

ACCESS CONTROL EQUIPMENT)

320 PERIMETER CONCRETE VEHICLE BARRIER

AND GUARDRAIL, SEE F6/AE831

506 ACTIVE VEHICLE BARRIER SYSTEM

507 PERIMETER CONCRETE VEHICLE BARRIER

AND STEEL GUARD RAIL, SEE E6/AE831

519 STEEL PROTECTION PLATE FASTENED TO

CONCRETE

521 BICYCLE RACKS

534 CURVED ALUMINIUM PANELS SEE B1/AE812

541 STAINLESS STEEL SECURITY BOLLARD,

SSD. TO PROTECT PIPING. CO-ORDINATE

LOCATIONS WITH FA.

542 STRUCTURAL SUPPORT AT SCREENWALL

SSD.

712 DRAINAGE SLEEVE AT SHEAR WALL, S.S.D.

906 4" WIDE WHITE STRIPING PAINTED ON

CONCRETE, TYP

911 WHITE TRAFFIC ARROW PAINTED ON

CONCRETE, SEE DETAIL F6/AE404

Level B1 (Tower) Motorcycle Parking Description Count

Motorcycle 40 Grand total: 40

Level B1 (Tower) Bicycle racks Description Rack Count

Bicycles (5 ea rack) 5

Level B1 (Tower) Auto Parking Stalls Description Stall Count

DAV 5

Typical 123 Grand total: 128

B102 Parking Structure

RFI-111

RFI-111

RFI-111

RFI-111

RFI-111

RFI-111

RFI-253:

Transition (TYP)

RFI-246

RFI-686

RFI-746

TY180 - DAS Pathways Plan BLDG 100 - Basement & Sub Basement
TY015 - DAS Riser Diagram
AE140 - Level 1 Tower
AE150 - Level 2 Tower
AE160 - Level 3 Tower
AE170 - Level 4 Tower
AE110 - Level B3 Tower
AE112 - Level B3 East Wing
AE120 - Level B2 Tower
AE122 - Level B2 East Wing
AE130 - Level B1 Tower