Galley Hood Repair SOW.1.docx

DOCX document 68 KB Posted

Attached to
Replace Base NOLA Galley Hood Exhaust System
Solicitation number
3107026Q0000320
Issued by

About this file

This is a Performance Work Statement (PWS) for the replacement of galley hood exhaust systems at U.S. Coast Guard Base New Orleans, located at the NASA Michoud Assembly Facility in New Orleans, Louisiana. The contractor must furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to perform complete galley hood replacement and Fire Marshal Code inspections in compliance with NFPA 96 standards and federal, state, and local fire safety regulations.

The scope includes replacement of two exhaust-only wall canopy hoods with 430 stainless steel construction, UL-classified Kleen-Gard baffle filters, canopy light fixtures with thermal-resistant components, exhaust and supply risers with volume dampers, and a complete ventilation system consisting of an upblast exhaust unit, sloped filtered supply unit, down discharge, hinged curbs, and grease cups. The electrical system must include 3-phase power with variable frequency drives, NEMA 1 enclosures, and digital prewire lighting relay kits; inverter-duty 3-phase motors are required for VFD compatibility. All work must be performed between 8:00 AM and 3:00 PM, Monday through Friday, with scheduling coordinated through the Contracting Officer's Representative. The contractor has 14 calendar days following contract award to submit all required documentation (warranty information, manuals, work schedules, system component plans, and certifications), with the Coast Guard providing 7 calendar days for review. Work must commence within 14 calendar days of approval and be completed within 30 calendar days. The contractor is responsible for all site safety, environmental compliance including RCRA hazardous waste management, storm drain protection, VOC regulation compliance, and daily site cleanup. All personnel require valid federal identification (REAL ID, passport, TWIC, or military ID) and must be registered in SAM.gov. This is a small business set-aside solicitation under NAICS code 238210 with a firm-fixed-price award method based on best value using lowest price technically acceptable criteria, with evaluation factors including price, technical acceptability, and past performance.

View the file

Other files

File Type Posted
Constructions.Solicitation.1.docx DOCX document
SF1442-14b.solicitation.offer.and.award.docx DOCX document
Construction Terms and Conditions.docx DOCX document
la41.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Galley Hood Replacement

Located at U.S. Coast Guard Base New Orleans on the NASA Michoud Assembly Facility 1790 Saturn Blvd.

New Orleans, LA 70129

February 2026

Commanding Officer United States Coast Guard Base New Orleans, LA Facilities Engineering Department New Orleans, LA 70129

DCC Thomas Barss Base New Orleans, LA

PART 1: GENERAL

1. INTENT: The intent of this project is to initiate replacement of Base New Orleans Galley Hood which follows local, state, and federal fire marshal code requirements at U.S Coast Guard Base New Orleans, as outlined in this Performance Work Statement (PWS).

2. SCOPE OF WORK: Contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel to perform all Fire Marshal Code inspections and services at Base New Orleans. No repairs outside of the Performance Work Statement are authorized without permission from the contracting officer or their representative.

3. QUALIFICATIONS: Contractor shall provide personnel who have the qualifications, knowledge and working experience on galley hood systems.

4. CONTINUITY OF FACILITIES OPERATION: Schedule work to minimize interference with the facility’s normal operations. Perform all on-site work between 8:00 AM and 3:00 PM, Monday through Friday (federal holidays excluded), unless otherwise approved by the Contracting Officer or Contracting Officer’s representative.

5. GOVERNMENT FURNISHED MATERIALS: None

6. GOVERNMENT FACILITIES AND UTILITIES: Electrical power and water are available within proximity. The Contractor will be permitted to utilize these utilities in performing the work, provided that the existing systems are not overloaded. Telephone services will not be available for use by the contractor. Building restroom facilities are available for use.

7. SAFETY: The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property, and avoids work interruptions. To accomplish this end, the Contractor shall provide appropriate safety barricades, signal lights, etc. as well as complying with and abiding by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series), 29 CFR 1926 (series), State and Local safety laws, rules, and regulations. Any operation defined as “Hot Work” as per OSHA/NFPA requires a permit to be issued. In the event of Hot Work, the Contractor will notify the COR with dates and times Hot Work will be performed. Contractor is to give at least 48 hours’ notification. This includes welding, cutting, brazing, grinding or any work that could produce sparks or heat and may initiate a fire.

8. ENVIRONMENTAL COMPLIANCE: Any waste generated because of the project shall either be recycled or be disposed of IAW the Resource Conservation and Recovery Act (RCRA). Any Hazardous Waste shall be manifested off site with Base New Orleans listed as the Generator and signatory. Any hazardous waste shall be analyzed, characterized, stored, and disposed of IAW RCRA and all applicable federal, state (i.e., DOT) and local laws and ordinances. All solid waste/trash shall be removed from site and not disposed of in onsite dumpsters. Waste and recycling areas are reserved for RCF Tenants and shall not be used by Contractors at any time. All work will be performed IAW the BASE New Orleans Spill Prevention Control and Countermeasures Plan. All chemicals required for this project shall be preapproved by the contract POC along with SDS’s. All solid waste shall be removed from the RCF after each working day. All extra chemicals and products shall be removed from the site upon work completion, as the Emergency Planning and Community Right-To-Know Act requires Coast Guard to maintain an inventory of all Hazardous Materials located at the site. A laydown area as required, and an Erosion and Sediment Control Plan shall be preapproved by the COR as needed. Nothing shall be discharged to a storm drain at any time during the project. All storm drains within range of a potential discharge shall be covered/sealed during installation and kept covered until the work has been completed and the system has been deemed fully operational and compliant with all applicable CG policies/plans/permits/laws/ordinances. All storm drains and waterways within range of a potential discharge shall be covered/sealed or protected by silt fence. All storm drains and waterways within range of a potential discharge shall be covered/sealed or protected by silt fence.

9. SITE VISIT: All site visits should be scheduled with the Contracting Officer’s Representative via email, no less than three (3) business days prior to the end of the solicitation and are required. Any personnel coming on site without a TWIC, military, or prior approved ID, will need to provide first and last name to representative at a minimum of two (2) days prior to arrival, so a security badge can be created to allow access on the base. All personnel accessing base must have a Federally issued ID (REAL ID, passport, TWIC, military, etc.)

· Contracting Officers Representative (COR) CWO Carlton “Mike” Ackiss Cell: (504) 239-4937 Email: carlton.m.ackiss@uscg.mil

10. MATERIALS:

a) The Contractor will furnish all materials, equipment, instruments, tools, safety lines and harnesses, and other items necessary for accomplishment of these services.

b) Materials shall be delivered to the jobsite in their original unopened packages, clearly marked with the manufacturer’s name, brand name, and description of contents. Storage shall be in accordance with manufacturers’ recommendations in a clean, dry, well-ventilated area. Store materials shall be protected from sunlight and kept away from excessive heat. The contractor shall not store any highly flammable materials in the work area and all chemicals used shall be preapproved by POC. Laydown areas and parking should be in non-vegetated areas when possible.

c) The Contractor is required to comply with local VOC laws and regulations. All applicable Safety Data Sheets shall be available upon request.

11. LOCATIONS: Base New Orleans is located on the NASA Michoud Facility in New Orleans East. 1790 Saturn Blvd New Orleans LA, 70129

12. LIABILITY OF CONTRACTOR: Any damage to government property caused by the contractor shall be repaired or replaced by the contractor at no cost to the government. The contractor shall not disconnect any service without approval from the Technical Representative.

PART 2 PERFORMANCE STANDARDS

1. PERFORMANCE REQUIREMENTS: The Contractor shall provide replacement and testing of galley hood systems that comply with the National Fire Protection Association (NFPA) 96 – Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations. Contractors shall provide certified technicians. All services shall be provided for the following equipment but not limited to: Galley hood #1, Galley hood #2, ventilation system, electrical system and in accordance with NFPA, local, state and federal Fire Marshal code requirements and shall meet or exceed industry standard. All materials are subject to COR approval prior to installation.

1) Hood #1 and Hood #2

a. Exhaust-Only Wall Canopy Hood with Supply Plenum with Built-in Back Standoff

b. 430 SS Where Exposed

c. FILTER - 20" tall x 16" wide Kleen-Gard Stainless Steel Baffle Filter with Handles and Bottom Hanging Hook, UL Classified

d. Canopy Light Fixture - High Temp Assembly, Includes Clear Thermal and Shock Resistant Globe, Bulbs

e. Exhaust Riser

f. Supply Riser with Volume Dampers

g. Grease Cup

h. Wrapper Channel - Front, Left

i. Balance Dampers

2) Ventilation System

a. Upblast exhaust unit

b. Sloped, filtered, supply unit

c. Down discharge

d. Hinged curbs

e. Grease cups

3) Electrical system

a. 3 Phase w/ control for 1 Exhaust Fan, 1 Supply Fan, Exhaust on in Fire, Lights out in Fire. INVERTER DUTY 3 PHASE MOTOR REQUIRED FOR USE WITH VFD.

b. Variable Frequency Drives, NEMA 1 Enclosure, Programmed

c. SS HINGED ELECTRICAL BOX NEMA 1 - VENTED. Stainless plate instead of filter assembly.

d. Digital Prewire Lighting Relay Kit. Includes hood lighting relay & terminal blocks.

1. LABOR LAWS: The Service Contract Act applies to the procurement.

2. SITE RESTORATION & CLEAN UP: The work site shall be cleaned up at the completion of each workday. Upon completion of the job, the Contractor shall clean up the job site, returning it to a state of cleanliness equal to or exceeding that in which it was found. The Contractor shall properly dispose of any trash, extra materials, dirt, debris, or other litter that remains, off-site. There will be no final acceptance of the contract until the Contracting Officers Representative approves the appearance of the job site.

3. GOVERNMENT FACILITIES AND REGULATIONS: The Contractor, their employees, and any sub-contractors shall become familiar with and obey all Base/ Unit regulations. All personnel employed on the project shall keep within the limits of the work area and shall not enter any other area outside of the work site unless to do so in the performance of their duties. There shall be No Smoking in any Coast Guard Building. All smoking must be done in the designated smoking area.

4. CONTRACT TIMELINE: The Contractor shall provide all required information and complete this contract within this time schedule, unless approved by the Contracting Officer.

a. Provide all required submittals to the Contracting Officer within 14 calendar days after contract award as applicable.

b. The U.S. Coast Guard will have 7 calendar days to review the submittals and respond to Contractor.

c. Contractor shall provide projected delivery schedule during proposal and provide a firm delivery date within 14 calendar days after the contract has been awarded.

d. The Contractor, upon receiving notification that the U.S. Coast Guard has approved the submittals and having received the Contractors firm delivery date schedule, will have 14 Calendar days to begin work on the project & 30 Calendar days to complete. The Contractor shall notify the Contracting Officer of any long lead time delivery of equipment, so that the Contracting Officer can modify the delivery date of the contract.

5. SUBMITTALS: Once awarded, the following list of submittals required for successful execution of this PWS and sets the specific minimum requirements for this contract. The submittal contain sufficient information that can be used to determine compliance with the material with these specifications and referenced specifications.

a. Warranty information

b. User and Maintenance Manuals

c. Detailed work schedule submitted to COR no less than ten (10) business days prior to commencement of work

d. Detailed plan of all system components submitted to COR for approval prior to execution

e. Report on findings

f. Written Certifications

g. Quote for repair as needed.

6. EXECUTION: Installation, workmanship, fabrication, assembly, erection, examination, inspection, and testing shall be in accordance with appropriate sections of (NFPA) 96 – Standard for Ventilation Control and Fire Protection of Commercial Cooking Operations and 29 CFR 1910, 1926.

a) The Contractor shall schedule all work with the Technical Representative. The Contractor shall understand the importance to schedule and complete all work in a timely fashion. The Contractor shall minimize the impact for the command and/or mission of the personnel located at each location.

b) The Contractor shall perform all work IAW all Federal, EPA, OSHA, and State of Louisiana laws and regulations.

image1.png