This is a geotechnical boring report prepared by the Missouri Department of Transportation (MoDOT) Construction & Materials Geotechnical Section for a foundation investigation of a new wash bay building at the Gallatin Maintenance Facility in Daviess County, Missouri. The report documents subsurface soil conditions and provides engineering recommendations for the planned structure, which will feature CMU block walls. Four borings were conducted at the site between December 22, 2025, reaching depths of 16.5 feet. The investigation included Standard Penetration Tests (SPT), pocket penetrometer testing, unconfined compression testing, and soil classification analysis. Boring locations were distributed across the building footprint at the northwest (NW), northeast (NE), southwest (SW), and southeast (SE) corners of the planned structure.
The subsurface conditions revealed a consistent stratigraphy consisting of 0.6 to 0.8 feet of gravel overlying very stiff to hard lean clay extending to 16.5 feet depth. Fill material composed of native lean clay soils, free of deleterious material, was encountered in the western borings to depths of approximately 5 to 7.5 feet, likely related to adjacent structure construction. No groundwater was encountered during boring operations, though seasonal variation is possible. The geotechnical engineer recommends a net allowable bearing capacity of 2,000 pounds per square foot (psf) for the standardized foundation system, with estimated settlement less than one inch. Key construction recommendations include site grubbing, proof rolling of cut and fill areas, compaction of fill material to 95% of standard proctor maximum dry density, minimum foundation embedding of 36 inches below finished grade for frost protection, and positive drainage grading with minimum 5 percent slope on gravel and landscape areas within 10 feet of the building and 2 percent slope on paved surfaces within 20 feet.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MODOT 0000000359SL_1_SUPPLIER.pdf | ||
| section 01300 and 01700.pdf | ||
| AWO 33.pdf | ||
| Gallatin Truck Wash MainSpec.docx | DOCX document | |
| Gallatin Truck Wash - Signed and Sealed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Our mission is to provide a world-class transportation system that is safe, innovative, reliable and dedicated to a prosperous Missouri.
MEMORANDUM
Missouri Department of Transportation
Construction & Materials Geotechnical Section
TO: Matthew Moppin
CC: Kevin Griep Scott Emmerich
FROM: Noah Calton Geotechnical Specialist
Zachary Troesser, P.E.
Geotechnical Engineer
DATE: February 6, 2026
SUBJECT: Foundation Investigation for Gallatin Wash Bay Job No. Fi3125 Gallatin Maintenance Facility, Daviess County
A foundation investigation has been conducted for a new wash bay building in Daviess County for the Gallatin Maintenance Facility. It is our understanding the proposed structure will have CMU block walls. Attached are logs of borings for the subject project, an aerial photo showing boring locations, and a subsurface diagram. Coordinate and elevation data were provided by Northwest District Survey.
Existing Conditions
The topography in the immediate area of the planned structure is relatively flat and gently drains to the North. The area of the planned building footprint is currently covered in gravel, save for the northwest corner which is vegetated landscape. There are electrical and gas utility lines within the building footprint, and these are expected to be relocated prior to construction of the planned structure.
The borings for the wash bay building encountered layers of gravel 0.6 to 1 feet thick. This layer was underlain by very stiff to hard lean clay to the depth of termination at 16.5 feet in each boring. Fill composed of native soils were encountered to a depth of just over 5 feet in the NW and SW borings. The fill is expected to be related to the construction of the adjacent structure to the west and was noted to be free of deleterious material and very stiff to hard in our borings.
Groundwater was not encountered during this investigation but may vary with seasonal precipitation.
Recommendations
The following recommendations are based upon information provided regarding the proposed building and conditions observed during the foundation investigation. We understand the proposed facility has a standardized foundation system designed based on a maximum bearing pressure of 2,000 pounds per square foot (psf). A net allowable maximum bearing capacity of 2,000 psf may be
Fi3125 – Gallatin Wash Bay February 6, 2026 used for the proposed structure bearing in controlled fill or existing very stiff to hard lean clay at this location following the recommendations below. In addition, estimated settlement is expected to be less than one inch following these recommendations.
Site preparation should include grubbing the site. In addition, existing fill was noted in the westerly borings and fill soils are likely to persist along the westerly building wall. The fill was observed to be composed of lean clay substantially free of any deleterious material and appeared to be well compacted. However, if soft conditions, or any construction or other deleterious debris is encountered within this fill during foundation excavation, they should be removed in their entirety.
After making any grading excavation and before any fill placement, proof roll all cut and fill areas. Any rutting or pumping soils should be over excavated and replaced with controlled fill.
It is recommended that any new fill material be lean clay or better. However, use of granular fill material is preferred if feasible. Fill should be compacted to 95% of standard proctor maximum dry density (ASTM D 698). Non-granular fill material should be compacted at a moisture content ranging from two percentage points below optimum moisture content to four percentage points above optimum moisture content as determined by ASTM D 698.
Shallow foundations shall be embedded a minimum of 36 inches below finished grade for frost protection. Individual spread footings shall have a minimum width of 2.5 feet, while strip footings shall have a minimum width of 1.5 feet.
Site grading should be designed to maintain positive drainage away from the building. We recommend a minimum surface grade of 5 percent away from the building on gravel or landscape areas in the first 10 feet outside the building. We recommend a minimum surface grade of 2 percent away from the building on all paved surfaces in the first 20 feet away from the building.
NC/zt Attachments
PP = 4.50 tsf Torvane = 0.90 tsf
PP = 4.00 tsf
PP = 2.50 tsf Torvane = 0.65 tsf
PP = 2.25 tsf
PP = 3.50 tsf
PP = 4.50 tsf
0.0-0.6' GRAVEL
0.6-5.5' Brownish gray, LEAN CLAY, hard to very stiff, moist, Fill
5.5-16.5' Gray mottled black, LEAN CLAY trace fine gravel, very stiff to hard, moist, Glacial Till
Bottom of borehole at 16.5 feet.
2-5-5 (15)
2-3-3 (9)
2-4-5 (14)
2-3-6 (14)
Qu Test Results UCS = 4.00 ksf
MC = 23%
moist = 125.2 pcf
MC = 27.8%
MC = 16.8%
sat = 134 pcf(1)
MC = 24.2%
MC = 27.0%
sat = 123 pcf(1)
MC = 24.2%
sat = 126 pcf(1)
LL = 48
PL = 18
MC = 23.1%
sat = 127 pcf(1)
G ra ph ic
D ep th (f t)
BORING NO. NW Boring
F ie ld T es ts
Description
E le va tio n (f t)
S am pl e
T yp e
R E
C
(R Q
D
B lo w C o un ts (N
S he ar D at a
In de x T e st s
N60 = (Em/60)Nm N60 - Corrected N value for standard 60% SPT efficiency; Em - Measured hammer efficiency in percent; Nm - Observed N-value; (1) = Assumed, (2) = Actual
Missouri Department of Transportation Construction and Materials
Job No.: FI3125
Operator: Justin ReynoldsBent:
Easting: 2919326.4
Location Note:
Equipment: CME 45 , Date of Work: 12/22/25-12/22/25
Logged By: Noah Calton
Location:
Route:County: Daviess
Skew:
Station:
Offset:
Requested Station:
Requested Offset:
Requested Northing:
Requested Easting:
Depth Hole Open:
Northing: 1366099.5
Time Change:
Design:
Depth to Water:
Elevation: 981.6
Requested Elevation:
Drilling Method: Hollow Stem AugerHammer Efficiency: 90.8%Drill No.: G-9577
Coordinate Zone: Missouri West Coordinate Proj. Factor:Coordinate System: U.S. State Plane 1983
Coordinate Datum: NAD 83 (CONUS)
* Persons using this information are cautioned that the materials shown are determined by the equipment noted and accuracy of the "log of materials" is limited thereby and by judgement of the operator. THIS INFORMATION IS FOR DESIGN PURPOSES ONLY.
Coordinate Units: U.S. Survey Feet
L E
T T
E R
B O
R E
H O
L E
M
O D
O T
.G
D T
/5 /2
:3
Z
C M
\S G
\G
IN
T \P
R O
JE
C
T F
IL
E
S \F
I3
D
A V
IE
S
S C
O
G A
LL
A
T
IN
M A
IN
T
E N
A N
C E
S H
E D
.G P
J
PP = 2.75 tsf
PP = 4.00 tsf
PP = 4.50 tsf
0.0-0.8' GRAVEL
0.8-10.1' Brownish gray, LEAN CLAY trace fine gravel, very stiff, moist
10.1-16.5' Tannish gray, LEAN CLAY trace fine gravel, hard, moist, Glacial Till
Bottom of borehole at 16.5 feet.
5-4-6 (15)
3-5-7 (18)
2-5-6 (17)
LL = 30
PL = 17
MC = 21.8%
sat = 128 pcf(1)
MC = 18.5%
sat = 132 pcf(1)
MC = 23.2%
sat = 127 pcf(1)
G ra ph ic
D ep th (f t)
BORING NO. NE Boring
F ie ld T es ts
Description
E le va tio n (f t)
S am pl e
T yp e
R E
C
(R Q
D
B lo w C o un ts (N
S he ar D at a
In de x T e st s
N60 = (Em/60)Nm N60 - Corrected N value for standard 60% SPT efficiency; Em - Measured hammer efficiency in percent; Nm - Observed N-value; (1) = Assumed, (2) = Actual
Missouri Department of Transportation Construction and Materials
Job No.: FI3125
Operator: Justin ReynoldsBent:
Easting: 2919357.6
Location Note:
Equipment: CME 45 , Date of Work: 12/22/25-12/22/25
Logged By: Noah Calton
Location:
Route:County: Daviess
Skew:
Station:
Offset:
Requested Station:
Requested Offset:
Requested Northing:
Requested Easting:
Depth Hole Open:
Northing: 1366099.4
Time Change:
Design:
Depth to Water:
Elevation: 981.1
Requested Elevation:
Drilling Method: Hollow Stem AugerHammer Efficiency: 90.8%Drill No.: G-9577
Coordinate Zone: Missouri West Coordinate Proj. Factor:Coordinate System: U.S. State Plane 1983
Coordinate Datum: NAD 83 (CONUS)
* Persons using this information are cautioned that the materials shown are determined by the equipment noted and accuracy of the "log of materials" is limited thereby and by judgement of the operator. THIS INFORMATION IS FOR DESIGN PURPOSES ONLY.
Coordinate Units: U.S. Survey Feet
L E
T T
E R
B O
R E
H O
L E
M
O D
O T
.G
D T
/5 /2
:3
Z
C M
\S G
\G
IN
T \P
R O
JE
C
T F
IL
E
S \F
I3
D
A V
IE
S
S C
O
G A
LL
A
T
IN
M A
IN
T
E N
A N
C E
S H
E D
.G
PP = 2.00 tsf
PP = 3.00 tsf
PP = 4.50 tsf
0.0-0.6' GRAVEL
0.6-5.4' Brown, LEAN CLAY trace fine gravel, trace Asphalt, stiff, moist, Fill
5.4-10.7' Dark brownish gray, LEAN CLAY, very stiff, moist
10.7-16.5' Tannish gray, LEAN CLAY trace fine gravel, very stiff, moist, Glacial Till
Bottom of borehole at 16.5 feet.
3-4-5 (14)
2-3-5 (12)
2-4-5 (14)
MC = 27.8%
sat = 122 pcf(1)
MC = 22.2%
sat = 128 pcf(1)
MC = 20.8%
sat = 130 pcf(1)
G ra ph ic
D ep th (f t)
BORING NO. SW Boring
F ie ld T es ts
Description
E le va tio n (f t)
S am pl e
T yp e
R E
C
(R Q
D
B lo w C o un ts (N
S he ar D at a
In de x T e st s
N60 = (Em/60)Nm N60 - Corrected N value for standard 60% SPT efficiency; Em - Measured hammer efficiency in percent; Nm - Observed N-value; (1) = Assumed, (2) = Actual
Missouri Department of Transportation Construction and Materials
Job No.: FI3125
Operator: Justin ReynoldsBent:
Easting: 2919317.5
Location Note:
Equipment: CME 45 , Date of Work: 12/22/25-12/22/25
Logged By: Noah Calton
Location:
Route:County: Daviess
Skew:
Station:
Offset:
Requested Station:
Requested Offset:
Requested Northing:
Requested Easting:
Depth Hole Open:
Northing: 1366027
Time Change:
Design:
Depth to Water:
Elevation: 983.0
Requested Elevation:
Drilling Method: Hollow Stem AugerHammer Efficiency: 90.8%Drill No.: G-9577
Coordinate Zone: Missouri West Coordinate Proj. Factor:Coordinate System: U.S. State Plane 1983
Coordinate Datum: NAD 83 (CONUS)
* Persons using this information are cautioned that the materials shown are determined by the equipment noted and accuracy of the "log of materials" is limited thereby and by judgement of the operator. THIS INFORMATION IS FOR DESIGN PURPOSES ONLY.
Coordinate Units: U.S. Survey Feet
L E
T T
E R
B O
R E
H O
L E
M
O D
O T
.G
D T
/5 /2
:3
Z
C M
\S G
\G
IN
T \P
R O
JE
C
T F
IL
E
S \F
I3
D
A V
IE
S
S C
O
G A
LL
A
T
IN
M A
IN
T
E N
A N
C E
S H
E D
.G
PP = 2.00 tsf Torvane = 0.50 tsf
PP = 3.00 tsf
PP = 3.00 tsf Torvane = 0.75 tsf
PP = 3.50 tsf
PP = 2.50 tsf
PP = 4.00 tsf
0.0-0.8' GRAVEL
0.8-7.5' Brownish gray mottled black, LEAN CLAY trace fine gravel, very stiff, moist
7.5-16.5' Tannish gray, LEAN CLAY trace fine gravel, very stiff to hard, moist, Glacial Till
Bottom of borehole at 16.5 feet.
2-3-4 (11)
1-3-6 (14)
2-3-6 (14)
2-3-6 (14)
Qu Test Results UCS = 7.39 ksf
MC = 25%
moist = 122.3 pcf
Qu Test Results UCS = 6.60 ksf
MC = 18.1%
moist = 129.1 pcf
MC = 24.1%
LL = 45
PL = 21
MC = 26.1%
sat = 124 pcf(1)
MC = 26.6%
LL = 42
PL = 18
MC = 18.9%
sat = 132 pcf(1)
MC = 27.1%
sat = 123 pcf(1)
MC = 21.9%
sat = 128 pcf(1)
G ra ph ic
D ep th (f t)
BORING NO. SE Boring
F ie ld T es ts
Description
E le va tio n (f t)
S am pl e
T yp e
R E
C
(R Q
D
B lo w C o un ts (N
S he ar D at a
In de x T e st s
N60 = (Em/60)Nm N60 - Corrected N value for standard 60% SPT efficiency; Em - Measured hammer efficiency in percent; Nm - Observed N-value; (1) = Assumed, (2) = Actual
Missouri Department of Transportation Construction and Materials
Job No.: FI3125
Operator: Justin ReynoldsBent:
Easting: 2919364.3
Location Note:
Equipment: CME 45 , Date of Work: 12/22/25-12/22/25
Logged By: Noah Calton
Location:
Route:County: Daviess
Skew:
Station:
Offset:
Requested Station:
Requested Offset:
Requested Northing:
Requested Easting:
Depth Hole Open:
Northing: 1366034.9
Time Change:
Design:
Depth to Water:
Elevation: 981.7
Requested Elevation:
Drilling Method: Hollow Stem AugerHammer Efficiency: 90.8%Drill No.: G-9577
Coordinate Zone: Missouri West Coordinate Proj. Factor:Coordinate System: U.S. State Plane 1983
Coordinate Datum: NAD 83 (CONUS)
* Persons using this information are cautioned that the materials shown are determined by the equipment noted and accuracy of the "log of materials" is limited thereby and by judgement of the operator. THIS INFORMATION IS FOR DESIGN PURPOSES ONLY.
Coordinate Units: U.S. Survey Feet
L E
T T
E R
B O
R E
H O
L E
M
O D
O T
.G
D T
/5 /2
:3
Z
C M
\S G
\G
IN
T \P
R O
JE
C
T F
IL
E
S \F
I3
D
A V
IE
S
S C
O
G A
LL
A
T
IN
M A
IN
T
E N
A N
C E
S H
E D
.G
CLIENT
PROJECT NUMBER FI3125
PROJECT NAME Gallatin Maintenance Shed
PROJECT LOCATION
ABBREVIATIONS
TV
PID
UC
ppm
TORVANE
PHOTOIONIZATION DETECTOR
UNCONFINED COMPRESSION
PARTS PER MILLION
Split-Spoon Sampler
Shelby Tube
SAMPLER SYMBOLSLITHOLOGIC SYMBOLS
(Unified Soil Classification System)
WELL CONSTRUCTION SYMBOLS
KEY TO SYMBOLS
Water Level at Time of Drilling
Water Level at End of Drilling
Water Level after Drilling
LL
PI
W
DD
NP
-200
PP
Qu
LIQUID LIMIT (%)
PLASTIC INDEX (%)
MOISTURE CONTENT (%)
DRY DENSITY (PCF)
NON PLASTIC
PERCENT PASSING NO. 200 SIEVE
POCKET PENETROMETER (TSF)
UNCONFINED COMPRESSIVE STRENGTH (PSF)
USCS Low Plasticity Clay
Fill (made ground)
USCS Poorly-graded Gravel
Glacial Till
K E
Y T
O S
Y M
B O
L S
M
O D
O T
.G D
T
/5
/2
:5
Z
C
M \S
G \G
IN
T
\P R
O
JE
C T
F
IL
E S
\F I3
D A
V
IE
S S
C O
G
A L
L A
T
IN
M A
IN
T
E N
A N
C E
S H
E D
.G P
Missouri Department of Transportation
30 17 2.75
4.0
4.5
48 18
4.5
4.0
2.5
2.25
3.5
4.5
4.00
2.0
3.0
3.0
3.5
2.5
4.0
7.39
6.60
2.0
3.0
4.5
PROJECT LOCATION
CLIENT
USCS Poorly-graded Gravel USCS Low Plasticity Clay Glacial Till
Fill (made ground) E le va tio n ft)
Distance Along Baseline (ft)
PROJECT NAME Gallatin Maintenance Shed
PROJECT NUMBER FI3125
SUBSURFACE DIAGRAM
M
O D
O T
D Y
N A
M
IC
F E
N C
E
J
P
-A
.G P
J
/5
/2
:4
Z
C
M \S
G \G
IN
T
\P R
O
JE
C T
F
IL
E S
\F I3
D A
V
IE
S S
C O
G
A
LL
A T
IN
M
A
IN
T E
N A
N C
E S
H E
D .G
P J
Missouri Department of Transportation
NE Boring
ELEV.981.10
LL
PL
PP
(tsf)
N60 or
[RQD]
MC
Qu (ksf)
NW Boring
ELEV.981.60
LL
PL
PP
(tsf)
N60 or
[RQD]
MC
Qu (ksf)
SE Boring
ELEV.981.70
LL
PL
PP
(tsf)
N60 or
[RQD]
MC
Qu (ksf)
SW Boring
ELEV.983.00
LL
PL
PP
(tsf)
N60 or
[RQD]
MC
Qu (ksf)
File details come from the government source that posted it. Updated .