SOW_Fume_Hood_Exhaust_Fans_4.10.2015_(2).doc

DOC document 44 KB Posted

Attached to
ADD SECONDARY EXHAUST FANS-LAB
Solicitation number
G15PS00350
Issued by

About this file

Performance Base Statement of Work

View the file

Other files

File Type Posted
Release_of_Claims_DI-137.doc DOC document
Sol_G15PS00350.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Payroll_form_WH-347.pdf PDF
SOW_Fume_Hood_Exhaust_Fans_4.10.2015_(2).doc DOC document
Standard_Form_1413.pdf PDF
Davis_Bacon_Wage_Determination.pdf PDF
Payroll_form_WH-347.pdf PDF
Standard_Form_1413.pdf PDF
Release_of_Claims_DI-137.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE-BASED WORK STATEMENT

Fume Hood Exhaust Fan Installation

I. GENERAL INFORMATION

A. Introduction Our mission statement at the USGS Southeast Ecological Science Center (SESC) is to provide USGS science to Florida, the Southeastern States, the U.S. Caribbean, and elsewhere in the world. We are also leaders in seeking new and innovative ways to meet the critical need for sound, objective scientific information that can be applied to issues of local to international concern.

B. Background The Main Research and Development building was constructed in 1985 and has ten research laboratories encompassing 3,200 SF. Recently 3 of the existing fume hoods were removed and replaced. When the project was complete, during the testing of the installed fume hoods it was discovered that these particular hoods required an additional inline exhaust fans. During initial research into the correct fume hoods nothing was found that indicated an additional fan would be needed. Neither the manufacture of the hoods nor the fume hood installer realized the need for an additional fan until troubleshooting the hoods. Therefore in order for the hoods to be completed and usable a secondary blower fan will need to be installed. Currently we are not able to work in these labs until the fume hoods are completed and tested for safety.

C. Scope The purpose of this requirement is to install 3 inline exhaust fans into existing new acid resistant exhaust pipes including all necessary support brackets, electrical connections, and fume hood connections. These exhaust fans are described below.

II. WORK REQUIREMENTS

A. Technical Requirements for new inline exhaust fans.

1. It is mandatory that the fans are acid resistant, and be inline fans. Exhaust fans must provide enough exhaust air flow (CFM) to provide 100% negative air with in the Fume hoods, meaning that all of the air with in the fume hood shall be completely exhausted out through the existing exhaust ductwork to the exterior of the building. All seams and connections from the exhaust fans shall be completely sealed to provide a leak free seal, so that 100% of the exhaust air is exhausted outside.

2. Provide and install (2) two in line fans on the (2) two 48” hoods exhaust duct. (1) fan per fume hood.

a) Polypropylene Construction on all parts in contact with airstream.

b) 12.4” Slip Collar Inlet.

c) 12.4” Slip Collar Outlet.

d) Shaft Seal.

e) 1 ½ HP, 1800 RPM, 1-60-115/230V TEFC Motor.

f) PVC Butterfly Balancing Damper, w/ Manual Operator.

g) NEMA 3R Disconnect Switch Wired and Mounted to Blower.

h) Blowers are all assembled, Balanced and Tested prior to shipment.

i) Tested and rated in accordance with AMCA Std. 210 Air performance.

j) Provide and install electrical connection to the existing hoods.

k) Reconfigure the existing duct as needed to mount the new fan in the ceiling space and connect the exhaust fans to the exhaust duct.

l) Exhaust fan shall be mounted on spring supports to prevent any vibration and or sound continuation.

3. Provide and install (1) one in line fans on the (1) one 96” hood exhaust duct.

a) 12.4” Slip Collar Inlet.

b) 12.4” Slip Collar Outlet.

c) Shaft Seal.

d) Belt Guard.

e) V-Belt Drive

f) 2 HP, 1800 RPM, 1-60-115/230V TEFC Motor.

g) PVC Butterfly Balancing Damper, w/ Manual Operator.

h) NEMA 3R Disconnect Switch Wired and Mounted to Blower.

i) Blowers are all assembled, Balanced and Tested prior to shipment.

j) Tested and rated in accordance with AMCA Std. 210 Air performance.

k) Provide and install electrical connection to the existing hoods.

l) Reconfigure the existing exhaust duct as needed to mount the new fan in the ceiling space and connect the exhaust fan to the exhaust duct.

m) Exhaust fan shall be mounted on spring supports to prevent any vibration and or sound continuation.

B. Technical Specs for existing fume hoods.

1. Two 48” and one 96” Vertical Laminar Airflow Fume Hoods intended for high acid and trace metal analysis are installed in the interior laboratory corridor. Each are individually ducted and discharged to building exterior.

2. All Existing new hoods are manufactured by NuAire INC. The 96” hood is a Model Number NU-156-824. The 48” hoods are both model numbers NU-156-424.

D. Criteria for acceptance of Product or Service:

1. Job acceptance will be based on completion of technical requirements stated in this document and all hoods must be fully functional and certified safe for use at job completion.

E. CODES, STANDARDS, AND DEPARTMENTAL PUBLICATIONS. The following manuals, handbooks, industry standards and codes are incorporated by reference.

ASHRAE 110 – Fume Hood Standards

OSHA 29 CFR 1910 – Laboratory Flooring Standards

Facilities Standards for two public buildings service - GSA PBS-Q100.1

Uniform Federal Accessibility Standards

National Electrical Code

ICBO Uniform Building Code

NFPA, National Fire Codes

NFPA, 101 LIFE SAFETY CODE

NFPA 45

Other Special Purpose Code Publications as applicable.

Uniform Plumbing Code

Uniform Mechanical Code

Underwriters Laboratories Fire Resistance Directory

Underwriters Laboratories Building Materials Directory

III. SUPPORTING INFORMATION

A. Place of Performance:

Southeast Ecological Science Center

7920 NW 71st Street

Gainesville, Florida 32653

B. Period of Performance Contractor will begin work within 2 weeks of Notice to Proceed and will complete project within 180 calendar days of project initiation.

C. Government Furnished Property (GFP): NONE D. Special Considerations.

1. Key personnel qualifications:

A. All work under this contract must be performed by personnel who are experienced and qualified to provide professional services.

2. Data Rights, Safety, and Environment:

A. Safety Requirements: Contractor must perform this contract in a safe manner, observing any necessary safety precautions. The contractor will promptly correct any condition, which in the opinion of the Contracting Officer, or his authorized representative, endangers the safety of personnel and/or property during the performance of this contract. Failure to observe this requirement will result in contract termination, with the Contractor liable for any such damages that may occur. The Contractor is obligated to perform a thorough inspection each working day of all areas to assure that all necessary safeguards relative to safety and fire hazards are being taken. Special instructions on biological hazardous areas must be complied with at all times.

3. Security/Privacy issues:

A. Facilities/Storage Space: Limited facilities and storage spaces will be made available to the contractor without cost to him for new equipment waiting to be installed. Facilities and spaces assigned to the Contractor will be maintained in a clean and sanitary manner. Light, heat, electricity, water, and telephone service as required for the performance of this contract will be made available to the Contractor. The Contracting Officer or his designated representative will have access to the facilities, spaces, and equipment at any time for inspection or for other purposes as required. The areas assigned will be returned at the completion of this contract in the same condition than existed at the beginning of this contract. These facilities will be available for the joint use of the Contractor and Center staff.

B. Damage Reporting: In all instances where Government property or equipment is damaged, a full report of the fact and extent of such damage will be submitted in writing to the Contracting Officer or his authorized representative within twenty-four (24) hours.