G1 Solicitation Specs Ft Novosel BK IU.pdf
PDF 30 MB Posted
- Attached to
- Ft Novosel, Alabama- Burger King Image Update
- Solicitation number
- GNFR-FC-NVO-25-23244
- Issued by
-
Department of Defense
About this file
This is a solicitation package containing detailed technical specifications for renovating an existing Burger King facility at Fort Novosel, Alabama (Project #0843-23-000001). The scope includes interior and exterior renovations to meet Burger King's current "Garden Grill" standards, including new finishes, modified mechanical and electrical systems, and updated branding elements.
Key work elements include installation of new Nichiha composite wall panels in Cedar finish, brick masonry repairs, replacement of interior finishes, new lighting fixtures, plumbing fixture upgrades in restrooms, and modifications to bring non-ADA compliant areas into compliance. The project requires phased construction to maintain building operations, with Phase 1 focusing on dining area renovations and exterior work except drive-through, and Phase 2 addressing the drive-through area and kitchen improvements. The package includes extensive environmental protection requirements specific to Fort Novosel, including procedures for handling waste, stormwater management, and hazardous materials. Contractors must coordinate with base DPW, Fire Department and privatized utilities for permits and scheduling.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IMAGE UPGRADE:
BURGER KING
FORT NOVOSEL, AL
AAFES Project No: 0843-23-001 Quorum Project No. 23042
January 10, 2025
PROJECT MANUAL
SOLICITATION SUBMITTAL
Architect
Quorum Architects, Inc.
825 West Vickery Boulevard, Suite 100
Fort Worth, Texas 76104
MEP Consultant
DC4 Mechanical
1827 Hill Ridge Drive
Flower Mound, TX. 75028
A T
T S
XETE
FO
S A
D A
V
I D
G. DUM
A N
14 3 0 5
R E G
IS
TE
RED ARCH
IT
E C
T
David Duman
2025.01.21 17:07:58-06'00'
BURGER KING IMAGE UPGRADE
FORT NOVOSEL, AL.
Exchange Project No. 0843-23-001
SOLICITATION ISSUE
10 January 2025 TABLE OF CONTENTS
IMAGE UPGRADE: BURGER KING, FORT NOVOSEL, AL.
EXCHANGE Project No: 0843-23-001/Quorum Project No. 23042
VOLUME 1
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
00 00 001 EXCHANGE CEO LETTER ON ASBESTOS AND LEAD BASED PAINT
00 00 002 FORT NOVOSEL RECORD OF ENVIRONMENTAL CONSIDERATION
00 00 003 OWNER INSTRUCTION FOR SODA MACHING INSTALLATION
DIVISION 1 - GENERAL REQUIREMENTS
01 10 13 SUMMARY OF WORK
01 10 17 EXCHANGE FURNISHED AND INSTALLED EQUIPMENT
01 10 18 EXCHANGE FURNISHED CONTRACTOR INSTALLED EQUIPMENT
01 10 60 SAFETY POLICIES AND PROCEDURES
01 10 60.1 SAMPLE SAFETY PLAN
01 10 60.2 SAMPLE CONSTRUCTION HAZARD PLAN
01 12 16 CONSTRUCTION PHASING
01 13 00 SAFETY REGULATIONS AND CODES
01 13 10 WASTE DISPOSAL
01 14 50 CUTTING AND PATCHING
01 23 00 OPTIONS
01 25 00 SUBSTITUTION PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL REQUIREMENTS
01 33 10 TIME EXTENSION-WEATHER TABLE
01 35 43 ENVIRONMENTAL PROTECTION
01 40 00 QUALITY CONTROL
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 51 00 TEMPORARY UTILITIES
01 59 00 FIELD OFFICES AND SHEDS
01 65 00 STARTING OF SYSTEMS
01 65 00.1 DOD 1354 INSTRUCTION
01 71 00 CLEANING
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 77 00 PROJECT CLOSEOUT
01 78 23 OPERATING AND MAINTENANCE DATA
01 78 36 WARRANTIES AND BONDS
01 78 39 PROJECT RECORD DOCUMENTS
THIS PAGE INTENTIONALLY LEFT BLANK
DIVISION 2 – EXISTING CONDITIONS
02 22 00 EXISTING CONDITIONS ASSESSMENT
02 41 16 SELECTIVE DEMOLITION
02 41 26 SELECTIVE ELECTRICAL DEMOLITION
DIVISION 3 – CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
DIVISION 4 – MASONRY
04 05 13 MORTAR AND MASONRY GROUT
04 21 13 BRICK MASONRY UNITS
04 21 14 WALL FLASHING
04 80 40- THIN BRICK VENEER MASONRY
DIVISION 5 – METALS
05 50 00 METAL FABRICATIONS
DIVISION 6 – WOOD AND PLASTICS
06 10 00 MISCELLANEOUS ROUGH CARPENTRY
06 20 00 FINISH CARPENTRY & MILLWORK
DIVISION 7 – THERMAL AND MOISTURE PROTECTION
07 21 00 BUILDING INSULATION AND VAPOR RETARDER
07 25 00 WEATHER BARRIERS
07 42 43 COMPOSITE WALL PANELS
07 62 00 METAL FLASHING AND TRIM
07 92 00 JOINT SEALANTS
DIVISION 8 – OPENINGS
08 11 13 HOLLOW METAL DOOR FRAMES
DIVISION 9 – FINISHES
09 22 16 NON-LOAD-BEARING STEEL FRAMING
09 29 00 GYPSUM BOARD
09 30 00 TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 90 00 PAINTING
DIVISION 10 – SPECIALTIES
10 14 00 PLASTIC SIGNS
10 21 13 TOILET COMPARTMENTS
10 28 13 TOILET ACCESSORIES
10 73 16 FLAT SOFFIT CANTILEVERED CANOPY
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS – NOT USED
DIVISION 13 – SPECIAL CONSTRUCTION – NOT USED
DIVISION 21 - FIRE SUPPRESSION
DIVISION 22 – PLUMBING
22 00 00 PLUMBING - GENERAL PROVISIONS
22 01 00 START-UP, CLEANING, TESTING AND ADJUSTMENT
22 05 00 BASIC MATERIALS AND METHODS FOR PLUMBING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 07 00 PLUMBING INSULATION
22 11 00 FACILITY WATER DISTRIBUTION
22 13 00 FACILITY SANITARY SEWAGE
22 40 00 PLUMBING FIXTURES
DIVISION 23 - HEATING, VENTILATING AND AIR CONDITIONING
23 00 00 HVAC – GENERAL PROVISIONS
23 01 00 START UP CLEANING TESTING ADJUSTMENT
23 05 00 BASIC MATERIALS METHODS FOR HVAC
23 07 00 HVAC INSULATION
23 31 00 HVAC DUCTS AND CASINGS
23 37 00 AIR OUTLETS AND INLETS
DIVISION 26 - ELECTRICAL
26 05 00 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 53 IDENTIFICATIONS FOR ELECTRICAL SYSTEMS
26 24 16 PABELBOARDS
26 27 26 WIRING DEVICES
26 51 00 LIGHTING
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY – NOT USED
DIVISION 32 – SITE IMPROVEMENTS
32 12 36 ASPHALT SLURRY SEAL COAT
32 90 00 PLANTING
32 91 13 SOIL PREPARATION
VOLUME II
ADDITIONAL INFORMATION BY OTHERS
CANOPY INFORMATION
DRINK FOUNTAIN INSTALLATION INSTRUCTIONS
VOLUME IIl
EXISITING FACILITY PHOTOGRAPHS
THESE PHOTOGRAPHS ARE FOR INFORMATION ONLY AND NOT INTENDED TO REPLACE A PRE-BID
SURVEY TRIP AS REQUIRED BY OTHER SECTIONS OF THE CONTRACT DOCUMENTS.
ARMY & AIR FORCE EXCHANGE SERVICE
P.O. Box 650202
Dallas, TX 75236-0202
(214) 312-4011
Director/CEO Letter No. 17 24 April 2017
SUBJECT: Asbestos and Lead Based Paint (LBP) Abatement
All Exchange Associates
1. Asbestos is a hazardous air pollutant and a hazardous substance. Improper handling and disposal of asbestos exposes the Exchange to fines, penalties and the indefinite liability for future cleanup at any site where asbestos is disposed. Additionally, asbestos is regulated by the Occupational Safety and Health Act (OSHA) to protect workers. The following policy is intended to ensure proper minimization of the risks associated with asbestos, as well as protection of all concerned.
2. Asbestos was used extensively in military buildings and in equipment as fireproofing and fire retardant material through at least the 1970s. Military construction from World War II onward used asbestos extensively for its fire protection qualities. Exchange buildings from that period constructed to military standards also included extensive asbestos material. Even today, small amounts of asbestos are often found in roofing materials, floor tile and glue or mastic for floor coverings. Since asbestos remains legal for many uses today, no building, regardless of age, is certain to be free of asbestos.
3. The Exchange must include the cost of asbestos removal in renovation projects where asbestos is disturbed but could have otherwise be left in place. With this in mind, asbestos-related work by the Exchange must be done with great care.
4. The Exchange is also responsible for LBP encountered in renovation projects. All such work must use care for protection of human health and the environment, as outlined in the procedures attached.
5. It is the policy of the Exchange that if asbestos or LBP is suspected, a preconstruction survey by qualified experts will be accomplished and documented. All reasonable efforts will be made to avoid disturbing asbestos and LBP and minimize what must be disturbed. The Exchange will ensure that all applicable laws and regulations are carefully followed when dealing with asbestos or LBP.
6. All projects will follow rules, regulations and best management practices concerning protection of the health of project workers, Exchange patrons and associates, and others that may be involved in the abatement process. The specific guidance in the attached will be followed for all renovation projects.
This rescinds Director/CEO Letter 16-17 dated 14 March 2016.
Attachment THOMAS C. SHULL
Director/CEO
SECTION 00 00 01
Attachment
SPECIFIC GUIDANCE TO BE FOLLOWED FOR ALL EXCHANGE RENOVATION
PROJECTS
All work will be in accordance with applicable federal, state and local laws and regulations. All work will be consistent with applicable requirements of the base/post asbestos management plan, giving due deference to the base or post as owner of the building and of the asbestos or lead based paint being abated.
A. ASBESTOS
Definition: “qualified expert” or “qualified personnel” shall mean a person who has the requisite training and accreditation as an inspector, project designer, supervisor or worker (as applicable in context) as set out in the US Environmental Protection Agency (EPA) Model Accreditation program, including the equivalent training and certification required by state programs for the site of the work.
1. All projects involving renovation when asbestos is suspected must have a survey of the work area by a qualified expert and meet all applicable environmental and safety requirements. Samples will be taken as necessary, including chain of custody documentation, and will be analyzed in accredited laboratories using required and appropriate test methods. If a pre-existing survey by base, post or the Exchange is used to meet this requirement, then it must be approved as currently adequate by a qualified expert.
2. All contract specifications for asbestos surveys and for abatement must be drafted or approved by qualified experts.
Specifications will comply with all applicable environmental laws and regulations as well as all applicable health and safety regulations. These include, but are not limited to, the Clean Air Act; Toxic
Substances Control Act; CERCLA; and the OSHA.
3. Abatement projects will follow all normal project requirements, such as post or base environmental approvals.
4. All work must be done by experienced, qualified contractor personnel with qualified supervisory personnel.
a. Contractor must demonstrate at least five years’ experience in asbestos abatement work for renovations or demolitions in projects of similar scope to the subject of the contract.
b. Contractor must demonstrate a clean record of no violations of state or federal environmental, health or safety violations in the last five years.
c. Contactor must provide adequate insurance coverage for claims that may occur before the expiration of any applicable statute of limitations. The Exchange Finance and Accounting Directorate will approve the insurance coverage as to policy and amount, considering all relevant factors and in consultation with Exchange General Counsel and Exchange Real Estate (RE) Environmental or other expert consultants, if needed.
d. Contractor must submit a final report to the Exchange on abatement work done, including required certifications, protective measures used, monitoring results, work logs, worker health and training records, summaries of any problems encountered during the job that might raise safety or health concerns, any disposal of materials containing asbestos and any other deliverables under the contract.
5. All appropriate work site measures must be taken to ensure the health and safety of abatement workers, Exchange customers, Exchange associates and the general public.
6. All work must be documented with appropriate records including daily logs, sample and monitoring results, and photographs of protective measures and work underway.
7. Disposal of asbestos waste from abatement projects will be done by the base or post.
Reimbursement of disposal costs will be included in project costs if base or post funds are certified not sufficient or not available. At a minimum the base or post must always designate the disposal site and sign the disposal manifest as owner, with documentation of the disposal site designation and manifest kept in the Exchange Asbestos Abatement file on the project as set out in paragraph 9 below on retention of records.
8. Asbestos abatement for renovations at Exchange facilities not on an installation controlled by the Army, Air Force or Navy, such as Exchange Headquarters or a distribution facility, will follow the same procedures as on bases and posts. Since disposal of asbestos must be done by the Exchange, the following will apply:
a. If disposal can be done economically through the worldwide Memorandum of Agreement between the Exchange and the Defense Logistics Agency-Disposition Services (DLA-DS), then use DLA-DS to dispose of asbestos debris.
b. If disposal is by the Exchange, then the disposal site will be selected by the Exchange after a due diligence investigation of the disposal site is conducted by the Exchange contracting officer. This investigation will include financial and operational responsibility of the site operator, disclosure by the contractor of all environmental, safety issues within the last five years, such as citations, notices of violation or other enforcement actions by the United States, EPA or OSHA, or state or local equivalent regulatory authorities. Contractor must also disclose all pending legal proceedings related to asbestos abatement or disposal, against the contractor or contractor’s employees. The same responsibility determination will apply to transporters of asbestos if contracted directly by the Exchange.
9. All abatement projects will have a qualified supervisory expert who is independent of the abatement contractor and under direct contract with the Exchange or a fully qualified Exchange associate who must:
a. Review and approve surveys and specifications prior to contract solicitation.
b. Review abatement contractor work plans (including monitoring plans), site protective measures, worker training records, worker personal protective equipment and monitoring equipment prior to start of abatement work.
c. Adequately oversee all stages of work, including independent air monitoring, where appropriate, and having authority to recommend or require immediate work stoppage and suggest corrective action.
d. Reviews and recommend whether contractor records and submittals should be approved by the Exchange contracting officer or if additional documentation is required.
e. Submit a review of abatement contractor’s final report for the Exchange on abatement work done, concurring with report, or noting any errors and recommending any appropriate corrective action to cure the report errors.
f. Have certification as an asbestos supervisor and designer.
10. The Exchange will retain all essential asbestos records for at least 30 years, including surveys, laboratory reports, contractor close-out reports, copies of insurance policies and disposal records.
These surveys will be submitted by contractors in electronic format and will be retained by the Exchange RE Directorate in electronic format. All recordkeeping requirements of the applicable federal, state and local regulators, if different, will also be followed by contractors and by Exchange associates involved in surveys or abatement. The Exchange will coordinate all records with the building owner.
B. LEAD BASED PAINT
1. LBP can be a health hazard to workers and others who may come in contact with it, and to the environment at disposal sites. It is federally regulated under the Resource Conservation and Recovery Act (RCRA), CERCLA or the Superfund and OSHA, as well as many applicable state programs on hazardous and solid waste.
2. For each renovation project a qualified person shall review the facility and its history of construction and renovation if LBP is suspected.
a. For projects in which there is an A-E of record, if lead paint is not suspected, the A-E shall state so in writing for the project file and the project can precede with a note to the renovation contractor the LBP is not expected to be present. However, stop work and notify the contracting office of the need to take appropriate action if it is discovered or suspected on the work site.
b. If the A-E believes there is a reasonable possibility that LBP is present in the intended work area, the A-E will provide specifications and statement of work or work plan to remove or abate such lead paint as necessary for the renovation project. These work plans will fully comply with OSHA, particularly 29 CFR 1926.62, RCRA, other applicable state and federal regulations, and follow industry best practices.
FORT NOVOSEL RECORD FOR
ENVIRONMENTAL CONSIDERATION
ENVIRONMENTAL PROTECTION PLAN
1.0 GENERAL. Minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work must be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility. No requirement in this Section will relieve the Contractor of any applicable Federal, State, and local environmental protection laws and regulations.
1.1 Subcontractors. The Contractor shall ensure compliance with this section by all subcontractors.
1.3 Environmental Permits and Commitments. Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility. All permit applications associated with the project must be reviewed by the Fort Novosel DPW- ENRD prior to submission to ADEM or other permit authority.
1.4 Compliance Requirements. The Contracting Officer and DPW-ENRD personnel may inspect any of the project sites and lay down areas operated by the Contractor.
Access for inspection shall be granted upon notice from the COR or at the request of DPW-ENRD personnel.
1.5 Inspection by Regulatory Agencies. The Contractor shall, without delay, notify the Contracting Officer and DPW-ENRD by phone of any inspection visit by an agent or agents of any regulatory agency. The Contractor shall submit a written report, by close of business of the next working day following completion of the inspection/visit, to include the names, identification numbers, agency of the inspectors, and the reason for the visit. The Contractor shall submit a copy of all reports received. Samples shall be accompanied by a statement signed by the inspector validating their authenticity.
1.6 Citations or Notices of Violation. Citations or Notices of Violation issued to the contractor or the government for noncompliance with environmental standards in association with this contract is a matter for resolution between the Contracting Officer, DPW-ENRD and the issuing office of EPA or State of Alabama regulatory authorities.
Payment of fines or penalty charges associated with citations issued by Federal, State or local officials shall be paid by the Contractor when it is determined that the contractor is at fault for the non-compliance.
2.0 CHEMICAL MANAGEMENT AND WASTE DISPOSAL.
2.1 Hazardous Materials. The Contractor shall adhere to all safety requirements as specified by Federal and Alabama State laws and OSHA (29 CFR 1910) regulations.
2.1.1 Hazardous Material Management Plan. The Contractor shall submit with the proposal a plan for handling hazardous material. This plan includes, but is not limited to:
identifying how Safety Data Sheets (SDS) are obtained, filed, maintained and provided for worker Right-to-Know compliance; how hazardous materials will be stored, handled, transported, and disposed of; a listing of equipment that will be used (i.e. brushes, rollers, sprayers, etc.), how cleaning of the equipment will be conducted and procedures to collection and turning in of wastes and what personal protection equipment will be furnished to employees, spill prevention and control measures and the point of contact for safety and compliance with the regulations and laws.
The Contractor shall submit the hazardous material- handling plan for approval by the Contracting Officer within 15 days of contract award. The Government shall have 30 days to review the plan and return it with comments for the Contractor to incorporate in a revised final plan, which will be due within 15 days after receiving the Government comments.
2.1.2 Personal Protective Equipment (PPE). The Contractor shall provide necessary equipment and personnel to safely and properly transport hazardous waste/hazardous material.
2.1.3 SDS and Approvals. The Contractor shall obtain SDS for all materials or supplies as required by Federal, State, or local regulations and policies. The Contractor shall submit to the Contracting Officer and Fort Novosel DPW-ENRD copies of SDS for all hazardous materials five days prior to bringing the materials on post. No hazardous materials shall be brought on post without prior approval of the Contracting Officer and DPW-ENRD. An SDS must be readily available (at the project site) for any paint or chemicals used as part of any project.
2.1.4 Storage. Hazardous materials must be stored in accordance with storage instructions listed on the SDS, and also in a manner that will prevent them from discharging to the ground. This includes keeping materials under cover from precipitation as well as utilizing appropriate secondary containment. At no time will hazardous materials be stored directly on the ground. The cleaning of paint brushes or other equipment MUST NOT be discharged to the ground or in any drains. If any hazardous material gets on the ground, in a drain or in a waterway it must immediately be reported by dialing 911 and notifying Fort Novosel DPW-ENRD.
2.1.5 Spill Prevention Control and Countermeasures (SPCC) Plan. The contractor shall also include SPCC plan that covers the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. Include in this plan, as a minimum:
(1) The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual will immediately notify the Contracting Officer and the local Fire Department. The Fort Novosel DPW- ENRD will coordinate reporting to the appropriate agencies as legally required by Federal, State, and local reporting channels if a reportable quantity is released to the environment. Include in the plan a list of the required reporting channels and telephone numbers.
(2) The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
(3) Training requirements for Contractor's personnel and methods of accomplishing the training.
(4) A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
(5) The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
(6) The methods and procedures to be used for expeditious contaminant cleanup.
(7) A copy of Contractor Hazardous Waste Management (ENV-SW010) which outlines manifest authority and installation specific procedures in the event that a hazardous waste is generated from the spill.
2.2 Non-Hazardous Solid Waste Disposal. All recyclable materials such as cardboard, paper, metal, unpainted wood, clean (no paint and no rebar) concrete and asphalt must be separated by material type and transported to an ADEM Registered Recycling Facility in accordance with Chapter 335-13-3 of Alabama Administrative Code.
Construction and Demolition Debris to be discarded and not recycled will be disposed of in an ADEM Permitted Construction and Demolition (C&D) Landfill (either Coffee County Landfill or Rose Hill Landfill). The Contractor shall submit a plan identifying the methods and locations for solid waste disposal to include the following:
2.2.1 General. Place solid wastes (excluding clearing debris) in containers which are emptied on a regular schedule. Handling, storage, and disposal must be conducted to prevent contamination. Employ segregation measures so that no hazardous or toxic waste will become co-mingled with solid waste.
2.2.2 Disposal Locations and Waste Haulers. Identify any subcontractors responsible for the transportation and disposal of solid waste. Using USAACE Form 2720 - Debris Recovery Plan and Statement, submit names, licenses or permits for solid waste disposal sites that will be utilized for waste disposal. These locations must be permitted through the Alabama Department of Environmental Management (ADEM) and must be approved by the Fort Novosel Environmental and Natural Resources Division (DPW-ENRD).
Construction and demolition debris that cannot be recycled must be disposed of in accordance will all Federal, State and local regulations at a subtitle D landfill or an ADEM approved construction debris landfill. Verify that the selected transporters and disposal facilities have the necessary permits and licenses to operate.
2.2.3 Recycling and Solid Waste Diversion. As required by EO 13514 and the ADUSD-IE Memorandum (issued 01 February 2008) that implements the solid waste and recycling requirements of EO 13423, materials such as cardboard, paper, metal, unpainted wood, clean concrete and asphalt shall be recycled. Detail in the plan the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government sponsored recycling programs to reduce the volume of solid waste at the source. Any proposed reutilization or recycling of construction and demolition debris that will occur in a location other than an ADEM approved disposal site must be approved by DPW-ENRD prior to removal of the material from the installation.
2.2.4 Reporting. Attach a copy of each of the Non-hazardous Solid Waste Diversion Reports (utilize USAACE Form 2720, Debris Recovery Plan and Statement) to the disposal plan. Submit the report on the 10th day of each month for the previous month’s disposal, starting with the first month that non-hazardous solid waste has been disposed and/or diverted. Indicate in the report the total amount of waste generated and total amount of waste diverted in cubic yards or tons. This report must include copies of all weigh tickets from any ADEM permitted landfill utilized for disposal. A copy of this report will also be furnished to DPW-ENRD Solid Waste Program Manager by the 10th day of each month as outlined above.
2.3 Special Wastes. Special wastes are wastes that are not hazardous wastes but are required to be disposed of in a particular manner. This includes universal waste.
2.3.1 Fluorescent Bulbs. Any fluorescent bulbs to be removed and disposed of will be managed as mercury containing lamps which are classified as a universal waste. Please see ENV-SW003, Used Lamp Management. Should a mercury containing lamp be broken, the lamp(s) are to be managed as hazardous waste. The contractor is responsible for properly containerizing bulbs and arranging turn in through the Hazardous Waste Program Manager, DPW-ENRD.
2.3.2 Mercury Containing Thermostats. Any mercury containing thermostats to be removed must be containerized and turned in by coordinating with the Hazardous Waste Program Manager, DPW-ENRD.
2.3.3 Smoke Detectors. Any smoke detectors to be removed must be separated by model and type, containerized, and turned in through DPW-ENRD. DPW-ENRD will arrange either turn in through the radiation safety office for ionizing smoke detectors, or through the electronic waste recycling for photo-electric smoke detectors.
2.3.4 Batteries. Each non-alkaline battery will be placed in an individual sealable bag or have both ends taped. Batteries will be consolidated and turned in by coordinating with the Hazardous Waste Program Manager, DPW-ENRD to be properly managed as a Universal Waste. This includes batteries associated with exit lights that are removed with the intention of disposal. Please see ENV-SW002, Used Battery Management.
2.3.5 Refrigerant. Any air conditioning equipment to be disposed of must have the refrigerant removed prior to disposal. Refrigerant must not be released into the environment and must not be given away or sold. Removal will be done by a certified technician. Certifications will be provided to the Air Program Manager, DPW–ENRD prior to removal of refrigerant. Certain refrigerants must be turned into the Ozone Depleting Substance (ODS) Reserve. In the event that a project results in the removal of one of these refrigerants, turn in procedures will be provided to the Contractor by DPW-
ENRD.
All new HVAC equipment must meet the certification requirements of EPA’s Significant New Alternatives Program (SNAP) per Title VI of the Clean Air Act; 40 CFR Part 82, Section 612.
2.4 Hazardous Waste. Hazardous wastes are defined in 40 CFR 261 or are as defined by applicable State and local regulations. At a minimum, manage and store hazardous waste in compliance with 40 CFR 262 in accordance with the Installation hazardous waste management plan. Take sufficient measures to prevent spillage of hazardous and toxic materials during dispensing. Segregate hazardous waste from other materials and wastes; protect it from the weather by placing it in a safe covered location and take precautionary measures such as berming or other appropriate measures against accidental spillage. Storage, describing, packaging, labeling, marking, and placarding of hazardous waste and hazardous material in accordance with 49 CFR 171 - 178, State, and local laws and regulations is the Contractor's responsibility. Transport Contractor generated hazardous waste off Government property within 60 days in accordance with the Environmental Protection Agency and the Department of Transportation laws and regulations. Dispose of hazardous waste in compliance with Federal, State and local laws and regulations. Transportation and disposal costs are the Contractor’s responsibility.
Spills of hazardous or toxic materials must be immediately reported to the Contracting Officer and the Fort Novosel Fire Department. The Fire Department will notify the Fort Novosel Environmental and Natural Resources Division. Cleanup and cleanup costs due to spills are the Contractor's responsibility. The disposition of Contractor generated hazardous waste, and excess hazardous materials are the Contractor's responsibility. The Contractor must follow the instructions as outlined in ENV-SW010, Contractor Hazardous Waste Management. Disposal and manifesting must be coordinated the Fort Novosel Hazardous Waste Program Manager. Manifest signature authority for all waste generated on Fort Novosel belongs DPW-ENRD.
2.4.1 Polychlorinated Biphenyls (PCBs). Repairs to PCB transformers and equipment will not be made by the contractor. The Contractor shall be required to notify the Government of any spill or release of PCB contaminated fluid.
2.4.2 Ballasts. Ballasts to be disposed of which contain no statement regarding PCB content must be assumed to contain PCB's and managed as hazardous waste.
2.4.3 Building Materials. PCB’s have been found in building materials such as caulking and grout in floor and wall joints, oil-based paints, mastic and adhesives used for floor tiles and carpet, window glazing, gaskets around windows, doors, HVAC systems and ducting, roofing and sidings. EPA/ADEM requires that these building materials be tested for the presents of PCB’s. Coordinate any demolition activities with the DPW-ENRD.
2.5 Fuel and Lubricants. Storage, fueling and lubrication of equipment and motor vehicles must be conducted in a manner that affords the maximum protection against spill and evaporation, to include conducting these operations on impervious surfaces. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded must be stored in marked corrosion-resistant containers and recycled or disposed in accordance with 40 CFR 279, State, and local laws and regulations. Contact DPW-ENRD to coordinate removal. Storage of fuel on the project site will be in accordance with all Federal, State, and local laws and regulations, and will be done in appropriate secondary containment.
Oil changes and other maintenance for vehicles and equipment must be done outside of Fort Novosel.
3.0 LAND RESOURCES. Confine all activities to areas defined by the drawings and specifications. Identify any land resources to be preserved within the work area prior to the beginning of any construction. Do not remove, cut, deface, injure, or destroy land resources including trees, shrubs, vines, grasses, topsoil, and landforms without approval, except in areas indicated on the drawings or specified to be cleared. All tree removal must be coordinated prior to the project start through DPW-ENRD to ensure timber is identified and appraised for value and reimbursement is provided to the DOD Forestry Account. Trees cannot be given to a contractor without compensation to the DoD Forestry Account prior to harvesting. Please see attachment regarding timber on construction sites. Ropes, cables, or guys will not be fastened to or attached to any trees for anchorage unless specifically authorized. Provide effective protection for land and vegetation resources at all times, as defined in the following subparagraphs. Remove stone, soil, or other materials displaced into un-cleared areas.
3.1 Erosion and Sediment Controls. Providing erosion and sediment control measures in accordance with Federal, State, and local laws and regulations is the Contractor's responsibility. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. Construct or install temporary and permanent erosion and sediment control best management practices (BMPs) as specified in the Alabama Handbook for Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas. BMPs may include, but not be limited to, vegetation cover, stream bank stabilization, slope stabilization, silt fences, construction of terraces, interceptor channels, sediment traps, inlet and outfall protection, diversion channels, and sedimentation basins. Remove any temporary measures after the area has been stabilized. Straw bales are no longer recognized on Fort Novosel as appropriate BMPs, and therefore will not be used. Please see ENV-WA001, Stormwater Construction Inspection Program.
3.1.1 Projects Requiring Permitting. If the construction area is 1 acre or greater (to include laydown areas and trenching for utilities), the contractor must submit a Draft Notice of Intent (NOI) and Construction Best Management Practice Plan (CBMPP) to
DPW-ENRD for approval prior to submitting the NOI to the Alabama Department of Environmental Management for a Construction Storm Water Permit. The contractor must also comply with all applicable requirements of ADEM Regulation 335-6-6-.23, including the development and implementation of a Construction Best Management Practices Plan. If the construction area is within the ADEM Priority Watershed there is a 30-Day waiting period after the NOI is submitted to ADEM prior to beginning work.
The contractor is responsible for all inspections required by the permit; to include having a State of Alabama certified Qualified Credentials Inspector or Professional (QCI/QCP) to perform said inspections. The contractor is also responsible for achieving final stabilization as defined in the Construction Stormwater General Permit once the contractor believes that site stabilization has been reached, they must notify DPW- ENRD. DPW-ENRD will make a site visit, if DPW-ENRD agrees the site is stabilized, written notification will be provided to the contractor. Then the contractor may submit their application for a Notice of Termination (NOT) of permit coverage. A copy of the NOT application must also be submitted to DPW-ENRD when submitted to ADEM. The contractor is responsible for the site until ADEM grants the NOT and a copy is provided to DPW-ENRD. The contractor is then responsible for removing any silt fencing or other temporary BMP's from the site.
3.1.2 All Other Projects with Land Disturbance. The contractor shall install temporary and permanent erosion and sediment control best management practices (BMPs) as specified in the Alabama Handbook for Erosion Control, Sediment Control and Stormwater Management on Construction Sites and Urban Areas. All disturbed areas must meet the definition of final stabilization as outlined in the Construction Stormwater General Permit ALR100000, Part IV, Section T (17) regardless of project size or requirement to register under a permit. ADEM defines final stabilization as the application and establishment of the permanent ground cover (vegetative, pavements of erosion resistant hard or soft material or impervious structures) planned for the site to permanently eliminate soil erosion to the maximum extent practicable. Established vegetation will be considered final if 100% of the soil surface is uniformly covered in permanent vegetation with a density of 85% or greater. Permanent vegetation shall consist of; planted trees, shrubs, perennial vines; an agricultural or a perennial crop of vegetation appropriate for the region. Final stabilization applies to each phase of construction.
3.2 Borrow and Stockpile Areas. No project-site borrow areas will be created, except for reutilization of excavated material. Fort Novosel maintains an ADEM permitted borrow pit for clay. If the soil meets compaction requirements for the project, the Contractor may utilize this borrow pit free of charge. If the soil does not meet compaction requirements, or the project site is not located near the main cantonment area, the Contractor is authorized to use material from an off post borrow pit if the pit is permitted through ADEM and approved by DPW-ENRD.
Spoil areas are typically not located on the project site. Fort Novosel maintains an unclassified fill and topsoil stockpile area that can be utilized for spoil, or the spoil can be hauled to another permitted facility with the approval of the Fort Novosel Environmental and Natural Resources Division. In special circumstances, on site spoil areas can be developed with prior approval from DPW-ENRD. Spoil material that contains more than 5% rock or debris must be disposed of in an off-site ADEM permitted location that has been approved by DPW-ENRD. Please see ENV-WA002, Soil Stockpiling and Borrow Pit Use.
3.3 Solid Waste Management Units. Any disturbance of a former Solid Waste Management Unit (SWMU) site will require prior written notification and approval by ADEM. The Fort Novosel DPW-ENRD will coordinate the notification with ADEM if the project site includes a SWMU site.
4.0 WATER RESOURCES. Monitor all water areas affected by construction activities to prevent pollution of surface and ground waters. Do not apply toxic or hazardous chemicals to soil or vegetation unless otherwise indicated. For construction activities immediately adjacent to impaired surface waters, the Contractor must be capable of quantifying sediment or pollutant loading to that surface water when required by State or federally issued Clean Water Act permits.
4.1 Stream Crossings. Stream crossings must allow movement of materials or equipment without violating water pollution control standards of the Federal, State, and local governments. Stream crossings may require a permit issued by ADEM and the Mobile District Corps of Engineers. Permit applications will be coordinated with the Fort Novosel DPW-ENRD prior to submission to the permitting authority.
4.2 Wetlands. Do not enter, disturb, destroy, or allow discharge of contaminants into any wetlands. Work to be conducted within a wetland may require a permit issued by ADEM and the Mobile District Corps of Engineers. Permit applications will be coordinated with the Fort Novosel DPW-ENRD prior to submission to the permitting authority.
4.3 Ground Water Monitoring Wells. Ground water monitoring wells within a project footprint will be safeguarded at all times. Any damage caused to these wells will become the responsibility of the contractor to correct, at no additional cost to the government.
4.4 Wastewater. The contractor shall not discharge any wastewater that is in violation of a water quality standard or National Pollutant Discharge Elimination System (NPDES) permits in accordance with 40 CFR 131 to the ground or stormwater collection system.
In addition, the contractor will not discharge any wastewater to the sanitary sewer that will cause upset of the wastewater treatment plants or cause a violation of the treatment plants NPDES permit. Review and coordination for specific wastewater discharges will be done through DPW-ENRD and the DPW Utilities Branch. The contractor may be required to containerize or filter wastewater prior to discharge based on the specific hazardous constituents that may be present.
4.4.1 Concrete Washout. Waste water from construction activities, such as onsite material processing, concrete curing, foundation and concrete clean-up, water used in concrete trucks, forms, etc. will not be allowed to enter water ways or to be discharged prior to being treated to remove pollutants. Dispose of the construction related wastewater by collecting and placing it in a lined retention pond where suspended material can be settled out and/or the water can evaporate to separate pollutants from the water. The site for the retention pond must be coordinated and approved with the Contracting Officer and the Fort Novosel DPW-ENRD. The residue left in the pond prior to completion of the project will be removed, tested, and disposed off-Government property in accordance with Federal, State, and local laws and regulations.
4.4.2 Flushing and Hydrostatic Testing. Water generated from the flushing of lines after disinfection or disinfection in conjunction with hydrostatic testing will be discharged into the sanitary sewer with prior approval and/or notification to DPW- ENRD, DPW Utilities Branch, and the Wastewater Treatment Plant's Operator.
4.4.3 Detergents, Cleansers and Solvents. DPW-ENRD must review the SDS and approve all detergents, cleansers, and solvents that may be discharged to the sanitary sewer or storm sewer prior to use. This includes detergents used in interior/exterior pressure washing and solvents used in concrete and masonry cleaning.
5.0 AIR RESOURCES. Equipment operation, activities, or processes will be in accordance with all Federal and State air emission and performance laws and standards.
5.1 Permits. Any gas fired equipment that will be installed such as boilers or emergency generators, as well as modifications or installation of new surface coating equipment (paint booths) will be coordinated through the Fort Novosel DPW-ENRD Air Program Manager. The Fort Novosel DPW-ENRD will work with the Contractor to ensure permitting is accomplished through ADEM. Any permitting fees required will be paid by the contractor. Equipment will not be installed nor operated prior to obtaining required permits and approval from DPW-ENRD.
5.2 Particulates. Dust particles; aerosols and gaseous by-products from construction activities; and processing and preparation of materials, such as from asphaltic batch plants; must be controlled at all times, including weekends, holidays and hours when work is not in progress. Maintain excavations, stockpiles, haul roads, permanent and temporary access roads, plant sites, spoil areas, borrow areas, and other work areas within or outside the project boundaries free from particulates which would cause the Federal, State, and local air pollution standards to be exceeded, or which would cause a hazard or a nuisance. Sprinkling, chemical treatment of an approved type, bag house, scrubbers, electrostatic precipitators or other methods will be permitted to control particulates in the work area. Sprinkling, to be efficient, must be repeated to keep the disturbed area damp at all times. Provide sufficient, competent equipment available to accomplish these tasks.
Perform particulate control as the work proceeds and whenever a particulate nuisance or hazard occurs. Comply with all State and local visibility regulations.
5.3 Odors. Odors from construction activities must be controlled at all times. The odors must be in compliance with State regulations and/or local ordinances and may not constitute a health hazard.
5.4 Burning. Burning is prohibited on the Government premises.
6.0 OTHER HAZARDS.
6.1 Asbestos. The Contractor shall comply with current regulations issued by the EPA (Clean Air Act), OSHA (29 CFR 1910), DOT, the Alabama Department of Environmental Management (ADEM), and Fort Novosel for handling of asbestos. These regulations require the use of respirators and personal protective equipment, training and accreditation of personnel; containment and engineering controls to reduce the fiber levels; and proper disposal of all waste.
When removal of asbestos containing material is required, an abatement operation utilizing an Alabama Safe State accredited asbestos contractor shall be performed. The asbestos abatement plan must be submitted to the Fort Novosel DPW-ENRD for approval prior to work beginning. The abatement plan must follow the USAACE Form 2739, Asbestos Abatement Work Plan and ENV-AS002, Asbestos Abatement Procedures formatting and guidelines.
Close out documents and air monitoring results must be submitted to the DPW-ENRD once the abatement operation is complete. ACM will be shipped from the installation utilizing USAACE Form 2736. The form must be signed by the DPW-ENRD PRIOR to the ACM leaving the installation.
10 days prior to any building demolition or asbestos abatement, an ADEM Form 496, Notice of Demolition and/or Asbestos Removal must be submitted to the state. A copy of the ADEM Form 496 must also be provided to DPW-ENRD.
Prior to building demolitions, all friable and Category II Non-Friable asbestos containing material must be removed using a State accredited asbestos abatement contractor.
6.2 Lead Based Paint. In areas that contain lead-based paint, the contractor shall follow all OSHA 1926.62 standards for working with paint with lead. This regulation requires the use of personal protective equipment, respirators, air monitoring, and engineering controls to minimize exposure to all individuals. If removal of lead-based paint is required, the paint must be sampled by the DPW-ENRD to determine if it also over regulatory limits for disposal. In the event that the waste is over regulatory limits, it will be managed and disposed of as hazardous waste by the contractor as outlined above in Section 2.4 and ENV-SW010.
7.0 PESTICIDES. The use of pesticides by the Contractor shall be limited to the application of termiticides as soil treatments to prevent infestation by subterranean termites in new construction and renovation projects. Termiticides used under this specification shall be registered by the U.S. Environmental Protection Agency for the proposed use, listed on the Fort Novosel Pesticide Use List (PUL) and approved by the COR and Pest Management Coordinator prior to application. All termiticide applications shall be processed, handled, and applied in strict accordance with the manufacturer's label. Personnel selecting, mixing or applying termiticides shall be certified by the State of Alabama in the commercial applicator permit category Wood Destroying Organisms Certified Operator (WDC). The type and amount of pesticide used must be reported to DPW-ENRD using USAACE Form 2740, Pest Management Maintenance Record.
Empty pesticide containers and rinsates shall be removed from the installation and disposed of in accordance with applicable State and Federal laws, regulations and policies.
8.0 HISTORICAL, ARCHAEOLOGICAL AND CULTURAL RESOURCES. If
during excavation or other construction activities any previously unidentified or unanticipated historical, archaeological, and cultural resources are discovered or found, all activities that may damage or alter such resources will be temporarily suspended.
Resources covered by this paragraph include but are not limited to: any human skeletal remains or burials; artifacts; shell, midden, bone, charcoal, or other deposits; rock or coral alignments, pavings, wall, or other constructed features; and any indication of agricultural or other human activities. Reference Fort Novosel ENV-CR001, Cultural Resources Identification. Upon such discovery or find, immediately notify the Contracting Officer and DPW-ENRD. In the case human remains are discovered, the Provost Marshall must also be notified. These individuals will make a determination as to their significance and what, if any, special disposition of the finds should be made. Cease all activities that may result in impact to or the destruction of these resources. Secure the area and prevent employees or other persons from trespassing on, removing, or otherwise disturbing such resources. Suspected archaeological materials must not be removed from the site in accordance with 32 CFR Part 229.
9.0 BIOLOGICAL RESOURCES. The contractor shall minimize interference with, disturbance to, and damage to fish, wildlife, and plants including their habitat. The protection of threatened and endangered animal and plant species, including their habitat, is the Contractor's responsibility in accordance with Federal, State, Regional, and local laws and regulations. Any removal of trees or land disturbance requires evaluation and possibly a survey for gopher tortoise burrows to be conducted by the Fort Novosel DPW- ENRD in accordance with the Gopher Tortoise Candidate Conservation Agreement. If gopher tortoises are found, they will be relocated by the DPW-ENRD prior to the start of construction. Projects with tree removal must also be reviewed for compliance with the Migratory Bird Treaty Act by the DPW-ENRD. Projects requiring work that will affect streams or other waterways on Fort Novosel will also require a review to ensure there are no protected mussels within the waterway. Projects that require clearing of existing forestland must be evaluated for possible impacts on listed bat species.
10.0 MILITARY MUNITIONS. In the event military munitions, as defined in 40 CFR 260, are discovered or uncovered, the Contractor will immediately stop work in that area and immediately inform the Contracting Officer. The Directorate of Public Safety and
Range Control should be notified.
This is the start of the file's text. The full file is on GovTribe.