FY28 OMNI Sources Sought Notice (SSN) R1 20260512.docx

DOCX document 47 KB Posted

Attached to
FY28 FIRE CONTROL STRATEGIC SYSTEMS PROGRAMS (SSP) DEVELOPMENT, SUSTAINMENT, PRODUCTION AND OPERATIONS SUPPORT
Solicitation number
N0003028R1005
Issued by

About this file

This is a Sources Sought Notice (SSN) issued by the Department of the Navy Strategic Systems Programs (SSP) for market research purposes regarding FY28 Fire Control Strategic Systems Programs development, sustainment, production, and operations support. No proposals are being requested or accepted at this time, and no contract will be awarded from this notice. The SSN is designed to identify capable contractors to provide specialized tactical engineering services, logistics services, and Fire Control SPALT (Strategic systems Programs Alteration) services across multiple submarine-based weapons systems, including development, testing, repair, and maintenance of Fire Control Subsystems, Auxiliary Subsystems, and Attack Weapon Control Systems supporting TRIDENT II and Tactical Tomahawk weapon systems deployed on U.S. OHIO and COLUMBIA Class submarines as well as UK Vanguard and Dreadnought Class submarines.

Required services encompass technology development for obsolescence mitigation, software and hardware development for next-generation systems, modernization and maintenance of advanced logistics and simulator systems, tactical electronic component repair and maintenance, on-board system installation and operational support, production and installation of Fire Control and related subsystems, and coordination of material transportation and delivery. The anticipated contract requires greater than 745 Full-Time Equivalent personnel performing at multiple locations including Pittsfield, Massachusetts; Kings Bay, Georgia; Bangor, Washington; Quonset Point, Rhode Island; Groton, Connecticut; and various UK locations. The Period of Performance includes a base year (October 1, 2027–September 30, 2028) and one one-year option period, with contract award estimated for October 1, 2027. Contract types will include Cost Plus Incentive Fee, Cost Plus Fixed Fee, and Cost Only CLINs. White Paper Capability statements must be submitted by May 26, 2026, at 4:00 p.m. EST and should not exceed 10 pages (exclusive of administrative information). Respondents must demonstrate minimum qualifications including recent experience with U.S. Navy SSBN Strategic Weapons Systems and AWCS, in-depth knowledge of SSP directives and processes, specialized field engineering expertise, and personnel trained in development, installation, and repair of strategic weapons systems. Relevant and recent experience is defined as performing similar efforts with annual incurred costs of approximately $292 million sustained over at least three years within the past five years. Small business concerns, including veteran-owned, service-disabled veteran-owned, HUBZone, small disadvantaged, and women-owned small business entities, are encouraged to respond and must comply with FAR 52.219-14 limitations on subcontracting. Facility clearance at TOP SECRET level and a computing facility cleared for SECRET data processing are required.

View the file

Other files

File Type Posted
Encl 1 SOW FY28 OMNI SSN R1 20260512.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY28 FIRE CONTROL

STRATEGIC SYSTEMS PROGRAMS (SSP)

DEVELOPMENT, SUSTAINMENT,

PRODUCTION AND OPERATIONS SUPPORT

1.0 Product Service Code (PSC)

1230 - FIRE CONTROL SYSTEMS COMPLETE

2.0 NAICS & PSC Codes

The applicable North American Industry Classification System (NAICS) code is 541330 – Engineering Services.

3.0 Contracting Office Address

Strategic Systems Programs (SSP) 1250 10th Street, Suite 4600 Washington DC 20374

4.0 Synopsis

This is a SOURCES SOUGHT NOTICE (SSN) announcement. SSNs are issued to assist the Agency in performing market research to determine industry interest and capability. No proposals are being requested or accepted with this synopsis. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. Therefore, no proposals are being requested or accepted in response to this SSN.

5.0 Purpose

In accordance with (IAW) Federal Acquisition Regulation (FAR) Part 10, SSP is conducting market research to identify potential sources capable of successfully performing the requirements identified in this SSN. Specifically, SSP is seeking capable firms to provide support of the Strategic Weapon System (SWS), Fire Control Sub-System (FCS), and other designated SWS sub-systems through the following:

· Specialized Tactical Engineering Services, Logistics Services and Fire Control Strategic Systems Programs Alteration (SPALT) Services to develop, test, repair, and maintain Fire Control Subsystem (FCS) and related support equipment in support of the existing TRIDENT II strategic weapons system.

· Specialized Tactical Engineering Services, Logistics Services, and Fire Control SPALT Services to develop, test, repair, and maintain Auxiliary Subsystems and related support equipment in support of the existing TRIDENT II strategic weapon system.

· Specialized Tactical Engineering Services, Logistics Services, and Attack Weapon Control System (AWCS) SPALT services to develop, test, repair, and maintain the AWCS Subsystem and related support equipment in support of the Tactical Tomahawk Weapon Control System (TTWCS).

· Research in the application of technologies to support obsolescence mitigation on the TRIDENT II MK98 FCS to include system requirements definition and concept development. This effort is a part of the SSP Modernization Program. Concepts will be required to meet requirements on the MK98 FCS, future MK99 FCS, and associated systems, which will be deployed on the U.S. OHIO & COLUMBIA Class and UK Vanguard & Dreadnought Class submarines.

· Development of technologies to support the future Fire Control modifications for the TRIDENT II follow-on missile and applicable MK7 RB, to include development and associated production efforts toward future deployable technologies.

· The development and testing of revisions to the currently deployed FCS tactical, training, auxiliary, and support software and hardware which will meet the requirements of the next generation of the SWS. This effort shall include development of follow-on updates to the deployed FCS tactical, training, auxiliary, and support software and hardware.

· Continued Modernization and maintenance of the SSP Advanced Inventory and Logistics (SAIL) system and Attack Weapon Interface Simulator (AWIS) hardware, software architecture for the AWCS, and efforts toward the Strategic Weapon Interface Simulator (SWIS).

· Engineering Services, facilities, and equipment to test, troubleshoot, repair and return tactical electronic components required to maintain the ready spare inventory for the, SWS, various SWS Subsystems, TRIDENT II and AWCS weapon systems.

· Specialized Tactical Engineering Services and Logistic Services to Install strategic weapon systems on-board U.S. and UK SSBNs, SSGNs, training, and development systems in shore based facilities.

· Specialized Tactical Engineering Services, Logistics Services, and Fire Control SPALT Services to develop, test, produce, repair, maintain and install the SWS, FCS and related support equipment in support of the strategic weapon system for the U.S. OHIO, U.S. COLUMBIA, UK Vanguard, UK Dreadnought class submarines and future deployed technologies. Efforts may include, but not limited to: the SWS, FCS, FCS/Shipboard Data Subsystem (SDS), including installation and Checkout (I&C) kit, for U.S. Missile Control Center Module (MCCM) mounted equipment, FCS, including I&C kit for U.S. and UK Missile Tube Module (MTM) mounted equipment, Navigation (NAV) Subsystem Cabinets/Consoles, including I&C Kit, for U.S. and UK MCCM mounted equipment, and Spares as provisioned for all installed equipment.

· Specialized Tactical Engineering Services, Logistics Services, and Fire Control SPALT Services to build, test inspect, repair, and maintain the SWS Subsystems, Auxiliary Subsystems and related support equipment in support of the existing TRIDENT II strategic weapon system and future TRIDENT II systems. Efforts shall include, but not limited to: SPALT Modification Kits, FCS Modification SPALT Kits, Refresh SPALT Kits, Spares Kits, Hardware Kits and associated support equipment.

· Specialized Tactical Engineering Services and Logistics Services to provide operational support, install and maintain strategic weapon systems and specialized system upgrades on-board U.S. OHIO, UK Vanguard, U.S. COLUMBIA and UK Dreadnought SSBNs and training systems in shore based facilities to include program planning, installation support, operational support, maintenance, repair, upgrade, issue resolution and reporting.

· Support Services and touch labor relating to design and development efforts, documentation, logistics, engineering, hardware, and associated documentation services.

· Coordination, transportation, and tracking of all produced and delivered materials to locations as required.

The contract types will include Cost Plus Incentive Fee, Cost Plus Fixed Fee, and Cost Only Contract Line Item Numbers (CLINs). The Period of Performance (PoP) includes base year FY28 effort from 1 October 2027 – 30 September 2028, and (1) corresponding one-year option period.

NOTE: Given the highly technical nature of SSP’s mission set as a major weapons systems command and corresponding technical requirements, respondents must provide recent and relevant past performance data (as detailed below) to demonstrate and substantiate the respondents’ ability to successfully execute requirements detailed in this SSN.

6.0 White Paper Capability Statement Credentials

a. SSP is seeking detailed, complete, and thorough White Paper capability statements from interested firms who can demonstrate and document, with evidentiary support, that they 1) possess the minimum qualifications and experience identified in paragraph 7.0 which are critical to the successful execution of the requirements, and 2) demonstrate recent and relevant experience, as the Prime contractor, performing the same/similar efforts of the same/similar scope, size, and complexity to meet the enclosure (1) SSN SOW requirements identified in paragraph 8.0. Interested firms must demonstrate their existing capability, or potential to acquire the capability, to meet the enclosure (1) SSN SOW requirements by the time of contract award, estimated to be 1 October 2027.

6.1 Small Business Concerns

IAW FAR Subpart 19.2 Polices, SSP seeks to provide maximum practicable opportunities in its acquisitions to small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns. Small Business Concerns who possess the minimum qualifications and experience identified in paragraph 7.0 and who can demonstrate its concerns’ capability (or ability to obtain the capability by the contract award date) to execute the complete requirements identified in the enclosure (1) SSN SOW requirements identified in paragraph 8.0, as well provide the requisite past performance experience detailed in Section 9.0, are encouraged to respond to this SSN.

If a small business concern intends to partner with another entity, the small business concern must identify which specific enclosure (1) SOW efforts/tasks it intends to perform, as well as the specific efforts/tasks the partner will perform, with the substantiating data required in this SSN supporting the identified partnering roles and responsibilities. NOTE: 100% of the enclosure (1) SOW and SSN requirements must be addressed in any submitted partnering submittal if attainable.

NOTE: In the event this contract is set aside for small business concerns, the small business concern agrees that it will be in strict compliance and conformance with the percentage payment limitations for services, supplies, or construction (as applicable) to subcontractors that are not similarly situated entities in accordance with FAR 52.219-14 Limitations on Subcontracting and state such in their response.

7.0 Minimum Qualifications / Experience Requirements

Interested firms shall document and submit specific and evidenced / demonstrated possession of the minimum qualifications and experience requirements in the technical areas identified in bullets a through h below which are critical to the successful execution of the enclosure (1) SSN SOW requirements in paragraph 8.0. This experience shall be documented as specified in paragraph 9.0.

a. Familiarity and recent experience performing development, production, installation sustainment, repairs, and training for the U.S. Navy SSBN, Strategic Weapons System (SWS) and Attack Weapon Control System (AWCS), specifically the Fire Control System and associated sub-systems;

b. In depth knowledge and experience working with the Strategic Systems Programs Operational Directives (ODs), SSP Instructions (SSPINST), and the SSP Technical Program management processes as outlined in the T9001-C.

c. Detailed knowledge and understanding of the interfaces between the Submarine Launched Ballistic Missile (SLBM) and Strategic Weapon System (SWS) is required.

d. Specialized field engineering services for production, testing, and installation of strategic hardware on-board U.S. OHIO and COLUMBIA as well as UK Vanguard and Dreadnought Class submarines.

e. In depth knowledge and experience in development, production, installation and repair of the SWS, AWCS, systems, associated sub-systems and components.

f. Expertise and recent experience in delivering engineering services required to develop the training program and documentation for the operation of the Fire Control Sub-System on board the U.S. OHIO and COLUMBIA Class submarines as well as UK Vanguard and Dreadnought Class submarines.

g. Detailed understanding of and recent experience with coordinated interfaces between the Submarine Launched Ballistic Missile (SLBM) system, the AWCS, as well as implementation of emerging technologies and enhancements into these systems afloat and shore-based support facilities is required.

h. Sufficient Personnel trained, qualified, and experienced in the development, design, installation, maintenance, and completion of repairs to the SWS, SWS Sub-systems, SWS Components, and AWCS Fire Control Systems in conjunction with the SLBM and related Programs.

8.0 Description of Requirements

See enclosure (1) SSN SOW Requirements.

8.1 Quantity of Personnel Required / Place of Performance

It is anticipated that greater than 745 Full Time Equivalent (FTE) personnel will be necessary to complete the required efforts. Level of effort CLINs are identified in enclosure (1). This requirement will entail performance in Pittsfield Massachusetts; Kings Bay, Georgia; Bangor, Washington; Quonset Point Rhode Island; Groton Connecticut; and, various locations within the UK.

9.0 Evidentiary Qualifications/Experience Documentation Requirements

Interested firms must possess the requisite minimum qualifications and experience identified in paragraph 7.0 and demonstrated relevant and recent experience as it relates to the enclosure (1) SOW requirements in paragraph 8.0. White Paper Capability statements must include all of the content and details identified below:

9.1 Minimum Qualifications / Experience Requirements Validation

White Paper Capability statement submissions shall include a discrete section with the heading “Minimum Qualifications / Experience Requirements” and document, with specific information, each of the minimum qualifications identified in paragraph 7.0. This section may cite contract reference efforts detailed in Table A of paragraph 9.2 below provided that respondents provide context and rationale as to how that contract reference effort(s) demonstrate possession of the applicable Minimum Qualifications / Experience requirements of bullets a through h identified in paragraph 7.0 – or have capability of obtaining by contract award.

9.2 Relevant & Recent Experience / Supporting Narratives

In addition to demonstrating possession of the requisite Minimum Qualifications / Experience requirements identified in paragraph 7.0 above (or have capability of obtaining by contract award), interested firms shall demonstrate relevant and recent experience performing the same or similar efforts and or completion tasks (as applicable) to the enclosure (1) SSN SOW requirements in paragraph 8.0. Relevant experience is defined as performing efforts/tasks similar in scope, size, and complexity as the enclosure (1) SSN SOW requirements with an annual incurred cost/expense of approximately $292M, sustained over a period of at least 3 years. Recent experience is defined as work performed within 5 years of the SSN posting date. To substantiate the performance of relevant and recent efforts/tasks enclosure (1) SSN SOW requirements, White Paper Capability statements shall provide a list of current or previous contract references and the efforts/tasks performed thereunder detailing and evidencing a direct correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW using the specific outline provided in Table A below. Submitter’s responses shall include the following information per individual contract reference:

(i) Summary of relevant work performed and how that specific work demonstrates capability to perform the specific requirements identified in the enclosure (1) SSN SOW requirements;

(ii) Current / Prior Contract Number(s) and Customer/Agency Supported;

(iii) Identification of your role as the Prime or Subcontractor;

(iv) Contract Type;

(v) Period of performance of the specific contract reference effort performed;

(vi) Quantity of FTE personnel utilized on the specific contract reference effort, per annum, with distinction and FTE quantities identified between the respondents FTE employees and any subcontractor FTE employees;

(vii) Net Dollar value (base and options) for each contract reference and the Annual Incurred costs for each contract reference provided. NOTE: solely citing an IDIQ ceiling amount or base and all options aggregate value without the annual incurred costs for the submitted contract reference(s) is NOT acceptable – amounts must be specific to the actual incurred costs for a Contract CLIN(s) or Individual Task Order(s), for the contract reference(s) cited in Table A below; and

(viii) Customer point of contact with valid phone number and email.

TABLE A – SUMMARY OF RELEVANT & RECENT WORK EXPERIENCE

SSN SOW CLIN
Requirement
Contract Reference(s) Summary – Document the specific correlation of the contract reference efforts/tasks to the enclosure (1) SSN SOW CLIN efforts/tasks
0001
SWS OPS Support & SSBN Inactivation
0002
AWCS OPS Support & SSGN Inactivation
0004
Systems Engineering & Integration
0005
Systems Engineering & Integration
0006
Future Delivery System Development
0007
FC Infrastructure Development
0008
FC Lifecycle Integration
0009
SAIL Development
0010
Program Protection
0011
AUX Systems Refresh Development
0012
Strategic Weapon Interface Simulator (SWIS) Development
0013
Infrastructure Development EQ
0014
Infrastructure Material & Obsolescence Avoidance Block Buy
0015
Software EQ
0017
Technology & Concept Exploration (TRIAD)
0018
Future FCS Payload Development
0019
Advanced FCS Development
0020
Advanced FCS Development EQ
0021
Systems Engineering Analysis & Concept Maturation (SF1)
0022
COLUMBIA Class Engineering
0023
Dreadnought Class Engineering
0024
SWIT Sustainment
0025
FCS Software Development
0027
SDS MIN Application SPALT Proposal SPALT
0028
VIPr SPALT Proposal SPALT
0029
CLB Training Support & Development
0030
DRNT Training Support & Development
0031
US SWTS and NWS Training Maintenance and Support
0032
UK SWTS Training Maintenance and Support
0033
AWTS Maintenance and Support
0034
NWS Training Development
0035
Advanced FCS Training Support
0036
SSMP Training Development
0037
TTF Communications System Refresh
0038
COLUMBIA Repair & Support
0039
Dreadnought Repair & Support
0040
INS Refurbishment
0041
U.S. SWS Launcher Repair & Support
0042
U.S. SWS FC Repair & Support
0043
U.S. SWS Navigation Repair & Support
0044
U.S. SWS Missile Repair & Support
0045
SSGN FC Repair & Support
0046
UK SWS Launcher Repair & Support
0047
UK SWS FC Repair & Support
0048
UK SWS Navigation Repair & Support
0049
UK SWS Missile Repair & Support
0050
SP21 SERF Repairs
0051
US 09 Phase I Production
0052
GFE Transportation
0053
MT9 Production
0054
2nd DASO Support
0055
Refresh 2 In-Service Production
0056
COLUMBIA 4th Level Piece Parts
0057
UKSF Sub-System Testing
0058
GFE Transportation
0059
GFE Transportation
0060
U.S. In-Service Installation
0061
UK In-Service Installation
0062
U.S. - UK IWG
0063
COLUMBIA Shipyard Replacement Components
0064
COLUMBIA Spares & Outfitting
0065
Special Projects
0066
Dreadnought Shipyard Replacement Components
0067
Special Projects
0068
Future Delivery System Fire Control Enablers
0069
Future Delivery System Fire Control POR
0070
DEC Production
0071
DEC Installation
0072
Special Projects
0073
Special Projects
0074
Special Projects
0075
Special Projects
0076
Special Projects
0077
Special Projects
0078
Special Projects
0079
Special Projects

10.0 Company Information and Deadline for Submittal

White Paper Capability statements shall be submitted in Microsoft Word for Office 2000 compatible format or PDF format and are due no later than 26 May 2026, 4:00pm EST. The White Papers shall not exceed 10 pages in total, using 12-point Times New Roman and 1” margin and shall be submitted via e-mail to angela.frye@ssp.navy.mil.

ALL White Paper Capability submittals shall include the following information “not” included in the aforementioned maximum 10-page limit:

1. Company Administrative Information

a. Company Name:

b. Company Point of Contact (email and phone) and Title:

c. Company Address:

d. Unique Entity Identifier (UEI) No:

e. Cage Code:

2. Size of business, including; total annual revenue, by year, for the past five years and number of employees;

3. Ownership, including whether: small business, veteran-owned small business, service-disabled veteran-owned small business, HUBZone small business, small disadvantaged business, and women-owned small business concerns;

4. Number of years in business;

5. Identification of the current security clearance held at your facility that will provide support to the enclosure (1) SOW requirements. NOTE: Work to be performed under this contract shall require the contractor to have a facility clearance of TOP SECRET and a computing facility that is cleared to process SECRET data.

Respondents to this SSN shall indicate which portions of their response are proprietary and should mark them accordingly. It is the responsibility of the SSN respondent to monitor the sam.gov website for additional information pertaining to any potential acquisition.

11.0 Government Assessment

The White Paper Capability statement responses to this SSN must meet the requirements stated in the SSN and will be reviewed to determine whether each respondent is capable of performing the requirements. This review will be based solely on the specific data and supporting content provided by the respondents in their White Paper Capability statement submissions and responses to any follow-on clarification inquires submitted by the Government. Incomplete or generalized White Paper Capability statements, without specificity as it relates to the SSN content requirements, omitted content, or content which fails to address all of the requirements of this SSN, will have a direct affect upon the Government’s assessment of the White Paper submittal. The Government’s assessment will include, but is not limited to, the following:

(1) The respondent’s specific and evidenced / demonstrated possession of the Minimum Qualifications / Experience requirements identified in paragraph 7.0;

(2) The respondent’s demonstrated ability to manage, as a Prime or Subcontractor, the types and magnitude of requirements identified in the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity;

(3) The respondent’s demonstrated technical ability, as a Prime or Subcontractor, to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts/tasks in terms of scope, size, and complexity; and

(4) The respondent’s demonstrated capacity to execute the enclosure (1) SSN SOW requirements based on their relevant and recent performance of same/similar efforts in terms of scope, size, and complexity, the quantity of personnel required, and the contract award date.

12.0 SSN Disclaimer

This SSN is issued solely for Market Research purposes. It does not constitute a Request for Proposal (RFP) nor a promise to issue an RFP in the future. This SSN does not commit the Government to solicit or award a contract. The information provided in the SSN is subject to change and is not binding on the Government. Respondents are advised that ALL costs associated with responding to this SSN, including any requests for follow-up information, will be solely at the interested parties’ expense and the Government will not pay for any information or costs incurred or associated with submitting a SSN White Paper Capability statement or follow-on responses.

The Government reserves the right to consider a set-aside for small businesses or one of the small business preference groups. (e.g., small business, service-disabled veteran-owned small business, 8(a), HUBZone small business, and women-owned small business programs).

File details come from the government source that posted it. Updated .