FY27 Elevators RFB.pdf

PDF 1 MB Posted

Attached to
(2) Elevators Project
Solicitation number
PE-30125-NONST-2027-000000029
Issued by
Pickens County, Georgia

About this file

This Request for Bids (RFB) is issued by Polk County Government in Cedartown, Georgia, for the removal of two existing elevators and the purchase and installation of two new hydraulic passenger elevators. Elevator #1 is located at 144 West Avenue, Cedartown, and Elevator #2 is located at 102 Prior Street, Cedartown; both are in 2-story buildings. The project requires complete turnkey replacement including removal of existing equipment, disposal of regulated materials, and installation of new code-compliant hydraulic passenger elevators for two stops. Sealed bids are due by 10:00 AM EST on Wednesday, October 21, 2026, at the Polk County Commissioners Office, 216 Main Street, Cedartown, Georgia 30125. Contractors may coordinate site visits by emailing chooper@polkga.org, and photographs of existing elevators are provided in the RFB document. The estimated award date is early November 2026. No withdrawal of bids is permitted for 90 days after the submission deadline. The contract term is not specified in the document.

Contractors must submit pricing separately for each elevator along with a total project price. Elevator #1 currently has 1,600 lbs capacity with a desired minimum of 2,000 lbs for the new installation if feasible; Elevator #2 has sufficient 2,000 lbs capacity. The successful contractor must provide Payment and Performance Bonds equal to 100% of the awarded contract cost, maintain liability insurance with limits of not less than $1,000,000 per occurrence and $2,000,000 aggregate, and secure workers' compensation coverage. All work must comply with Georgia Office of the Insurance and Safety Fire Commissioner regulations, ASME A17.1, and applicable federal, state, and local codes. Contractors must obtain all required permits and licenses and coordinate with building occupants, authorities having jurisdiction, and other trades. Buildings will remain occupied throughout the project, requiring contractors to maintain safe pedestrian access, secure barricades, prevent dust and noise impacts, and schedule extended shutdowns only with prior County written approval. The contractor must provide closeout documentation including inspection reports, test results, operating and maintenance manuals, training for County personnel, and warranty documentation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POLK COUNTY GOVERNMENT

216 MAIN STREET

CEDARTOWN, GA 30125

(770) 749-2100

REQUEST FOR BIDS

Date Issued: September 23, 2026

POLK COUNTY GOVERNMENT IS ACCEPTING SEALED BIDS FROM EXPERIENCED AND QUALIFIED

CONTRACTORS FOR PROVIDING ALL LABOR, EQUIPMENT, AND MATERIALS REQUIRED FOR THE

REMOVAL OF (2) EXISTING ELEVATORS, & THE PURCHASE & INSTALLATION OF (2) NEW

ELEVATORS. A CONTRACT WILL BE AWARDED TO THE CONTRACTOR WHOSE BID BEST SATISFIES

THE REQUIREMENTS FOR THIS REQUEST AND BEST SERVES THE INTEREST OF POLK COUNTY.

SEALED BIDS WILL BE ACCEPTED UNTIL 10:00AM EST ON WEDNESDAY, OCTOBER 21, 2026, IN THE

COMMISSIONERS OFFICE LOCATED AT 216 MAIN STREET IN CEDARTOWN, GA 30125.

Copies of proposal documents may be obtained from the Polk County Administration Office located at 216 Main Street, Cedartown, Georgia 30125. Requests for documents should be filed promptly with Polk County. Proposal documents are also available on the Polk County Website: polkga.org.

No bid may be withdrawn for a period of 90 days after the proposal deadline for submission.

Polk County Government reserves the right to a) reject any or all proposals or to make no award, b) require modifications to initial proposals, or c) to make partial or multiple awards. The County further reserves the right to excuse technical defects in a proposal and/or informalities when, in its sole discretion, such excuse is in the best interest of the County.

PROPOSAL PACKAGE MUST BE RETURNED IN SEALED ENVELOPE

AND CLEARLY MARKED

ELEVATORS REPLACEMENT PROJECT

WEDNESDAY, OCTOBER 21, 2026 AT 10:00AM

Request for Bids Elevators Replacement Project

POLK COUNTY GEORGIA

PROPOSAL TERMS AND CONDITIONS

REQUEST FOR BIDS (RFB)

GENERAL CONDITIONS AND CLAUSES

1 CHANGES: No change will be made to this RFB except by written modification by the County.

Requests for interpretation or changes should be directed to the Polk County Assistant Manager Connor Hooper, (chooper@polkga.org) and received at least (5) Five Calendar Days prior to the time set for opening of the bids.

2 LIABILITY: The County is not liable for any cost incurred in the preparation of the proposal. Nor is the County responsible for costs or damages incurred by Respondents, member(s), partners, subcontractors or other interested parties in connection with the RFB process, including but not limited to costs associated with participating in any conferences, site visits, product/system demonstrations, oral presentations or negotiations. The County shall not be bound by any information provided unless reduced to writing and distributed as a written addendum.

3 BID ACCEPTANCE TIME: Proposals requiring acceptance by the County in less than 90 calendar days could be rejected.

4 BID IDENTIFICATION: All Proposals submitted as a result of this RFB must be returned in a sealed envelope with the following information in the lower left-hand corner of the envelope:

ELEVATORS REPLACEMENT PROJECT

WEDNESDAY, OCTOBER 21, 2026 AT 10:00AM

5 BID SUBMISSION FORMAT: Bids should be bound or stapled whereby county staff can easily make additional copies. Pages should be 8 ½” X 11” in size with larger sheets folded to fit within bindings. The proposal should be ordered in the following format:

Vendor’s Proposal All Forms in Attachment “A”

6 WITHDRAWAL OF BIDS: Bids may be withdrawn by written request only, if the request is received prior to the deadline for submittals. Negligence on the part of a Contractor during the preparation of a proposal establishes no right of withdrawal or modification of a proposal after a proposal has been accepted. No proposal may be withdrawn for a period of 90 days after the deadline for proposal submittals.

7 CLARIFICATION OF BIDS: The County reserves the right to seek clarification of any point in a respondent’s proposal, or to obtain additional information.

mailto:chooper@polkga.org

8 DISQUALIFICATION: Bids may be disqualified for: a) receipt of the bid by the County past the stated deadline; b) any irregularities; c) unbalanced unit price or extensions; d) unbalanced value of any items; e) failure to comply with any requirement of this RFB. If in the opinion of the Polk County Board of Commissioners, the Contractor is not in a position to fulfill the contract, the proposal may be disqualified. The County reserves the right to waive any minor informality or irregularities.

9 AWARD OF CONTRACT: An award will be made based upon the proposal that best conforms to this

RFB and best serves the interest of the County. The County reserves the right to a) reject any or all proposals or to make no award, b) require modifications to initial proposals, or c) to make partial or multiple awards. The County further reserves the right to excuse technical defects in a proposal and/or informalities when, in its sole discretion, such excuse is in the best interest of the County. A binding contract must be signed by both parties prior to providing services.

10 EXCEPTIONS TO SPECIFICATIONS: Any award resulting from this RFB shall bind a Contractor to all

Terms, Conditions, and Specifications set forth in this RFB. Contractors whose bids do not conform should so note on either a separate page or in the Proposal. While the County reserves the right to make an award based upon a nonconforming proposal, when in the best interest of the County, such awards will not be readily made, and Contractors are urged to conform to the greatest extent possible. No exceptions will be considered to have been taken unless it is properly set out as provided above. No exception will be deemed to have been taken by the County unless incorporated in an award resulting from this RFP and so stated.

11 BID RESULTS: Interested parties may request, in writing, a summary of the proposals by sending a self addressed, stamped envelope with their request to the Polk County Board of Commissioners, P.O. Box 268, Cedartown, Georgia 30125, or by emailing the Administration Office, attention County Clerk.

12 CERTIFICATE OF INSURANCE: The successful Contractor shall purchase from and maintain in a company or companies authorized to do business in the state of Georgia the following types of insurance.

Statutorily required workers’ compensation insurance

Liability insurance, with an endorsement naming the County as an additional insured, and with limits of not less than $1,000,000.00 per occurrence and $2,000,000.00 aggregate

The Contractor shall provide the County with certificates of insurance prior to the start of the contracted services and thirty (30) days’ written notice prior to cancellation.

13 PAYMENT AND PERFORMANCE BOND: The successful Contractor shall be required to provide the County with Payment and Performance Bonds in amounts equal to 100% of the awarded cost of the project with a corporate surety approved by the Owner, for the faithful performance of the Contract. Attorneys-in-fact who sign Payment Bonds and Performance Bonds must file with each BOND a certified and effective dated copy of their power of attorney.

14 INCLUSION: All items and/or services standard, expected, necessary, and/or routine to such services as this and not actually stated in this RFB will be the responsibility of the contractor to provide at no additional cost to the County unless so stated on the Contractor’s proposal as additional cost items and accepted by the County at the time of the award and/or contract.

15 REGULATORY AGENCIES: Contractor will be responsible for obtaining all required permits or license required by regulatory agencies of the City, County, State, or Federal Governments. Further, the contractor will be responsible for meeting all requirements of any regulation(s) or guideline(s) of any of the said Governments or any independent agency recognized by said Governments as publisher of any such regulation(s) or guideline(s).

16 INDEPENDENT CONTRACTORS: By submitting a proposal in response to this RFB, the Contractor represents to POLK COUNTY that it is fully licensed, experienced and properly qualified to perform the services requested herein and that it is properly equipped, organized, and financed to perform such services. The Contractor shall finance its own operations hereunder, shall operate as an independent contractor and not as an agent of Polk County and nothing contained in this RFB or a contract resulting from same shall be construed to constitute the Contractor or any of its employees, servants, agents, or subcontractors as a partner, employee, servant, or agent of the County nor shall either party have any authority to bind the other in any respect; it being intended that each shall remain an independent contractor. As stated in Section 9, Any bidder that plans to hire a subcontractor to complete the work, MUST specify this in the proposal.

17 ASSIGNMENT OF CONTRACTUAL RIGHTS: It is agreed that the Contractor will not assign, transfer, convey, or otherwise dispose of a contract that results from this invitation or its right, title, or interest in or to the same, or any part thereof, without written consent of the County.

18 INDEMNITY: Contractor agrees, if entering into a contract as a result of this RFB, to defend, indemnify, and hold harmless Polk County from any and all courses of action or claims of damages arising out of or related to Contractor’s performance or actions or those of its employees or agents, under said contract.

19 ANTI-DISCRIMINATION CLAUSE: Polk County does not discriminate against any person because of race, color, religion, national origin, or handicap in employment or service provided.

BID SPECIFICATIONS

Introduction Polk County is requesting bids from reputable and qualified contractors for providing all labor, equipment, and materials required for the replacement of (2) elevators in Polk County Government facilities. Elevator #1 is located at 144 West Avenue, Cedartown, GA 30125. This building is a 2-story building. Elevator #2 is located at 102 Prior Street, Cedartown, GA 30125. This building is also a 2-story building. This bid is for the replacement of the two existing elevators with brand new elevators and any new equipment associated with the replacement of the two elevators. To coordinate a time to view the elevators, please e-mail chooper@polkga.org. Photos have been attached later in the document for viewing of existing elevators.

GENERAL SCOPE

The Contractor shall furnish all labor, supervision, materials, equipment, permits, inspections, testing, and incidental work necessary to remove the existing passenger elevators, and furnish and install complete, new, operational hydraulic passenger elevators.

The work shall be performed as complete turnkey elevator replacements. The Contractor shall be responsible for coordinating all elevator-related work with the County, building occupants, applicable authorities having jurisdiction, and other trades.

The Contractor shall field-verify all existing conditions, dimensions, equipment, electrical requirements, pit conditions, hoistway conditions, machine-room/control-space conditions, entrances, structural conditions, and other conditions affecting the work prior to ordering equipment.

EXISTING ELEVATOR REMOVAL

The Contractor shall:

• Disconnect, remove, and legally dispose of existing elevator equipment designated for replacement.

• Remove existing hydraulic elevator equipment, controller, pump unit, door equipment, car operating equipment, hall stations, fixtures, wiring, and associated components as necessary to provide a complete replacement installation.

• Remove equipment in a manner that does not damage the existing building or components intended to remain protect existing floors, walls, doors, finishes, furnishings, equipment, and occupied areas.

• Properly dispose of removed equipment and debris off County property.

• Coordinate removal and disposal of hydraulic oil and other regulated materials in accordance with applicable laws and environmental requirements.

mailto:chooper@polkga.org

NEW ELEVATOR

Provide complete new hydraulic passenger elevators for two (2) stops. All parts shall be new. The elevators shall include, as applicable:

• Hydraulic passenger elevator system & New hydraulic power unit & controller.

• New hydraulic jack/cylinder or other approved hydraulic lifting equipment.

• New elevator car and platform & New car operating panel.

• New hall call stations at each landing.

• New automatic horizontal sliding doors and door operators.

• New landing entrances, frames, sills, tracks, and associated equipment.

• Position indicators and direction lanterns.

• Emergency lighting & Emergency communication system.

• Required alarm and emergency operating features.

• Firefighter/emergency operation as required by applicable codes.

• Safety devices and governors as applicable.

• New traveling cable and associated elevator wiring.

• Machine/control-space equipment and wiring.

• Required pit equipment and safety devices.

• New lighting/receptacles associated with the elevator installation where required.

• All other items necessary for a complete, code-compliant and operational elevator.

PERFORMANCE REQUIREMENTS

The Contractor shall provide elevators with capacity, speed, travel, clearances, door dimensions, car dimensions, and other performance characteristics suitable for the existing building and compliant with applicable codes. Elevator #1 has a weight capacity of 1,600lbs and a minimum of 2,000lb capacity is desired for the new elevator if possible. Elevator #2 has a weight capacity of 2,000lbs and this capacity is sufficient.

The Contractor shall base its bid on a standard passenger elevator configuration appropriate for a two-story public building and shall identify all proposed performance characteristics in its bid and submittals.

The Contractor shall not reduce the existing elevator's useful capacity, accessibility, or functionality.

The County expects an overall improvement of the elevator’s useful capacity, accessibility, or functionality.

OCCUPIED BUILDING REQUIREMENTS

The buildings will remain occupied throughout the project. The Contractor shall plan and execute the work to protect building occupants, County employees and the public at all times.

The Contractor shall:

• Maintain safe pedestrian access to occupied portions of the building & provide secure barricades around all construction areas.

• Prevent unauthorized access to the elevator shaft, pit, machine/control areas, and construction work areas.

• Maintain required fire exits and means of egress at all times.

• Control dust, noise, odors, and other construction impacts.

• Maintain the building in a clean and safe condition.

• Coordinate work that may affect building utilities or life-safety systems with the County in advance.

• Provide advance notice of planned elevator shutdowns.

• Schedule extended shutdowns and disruptive work with the County to minimize impact on building operations. No extended elevator shutdown shall occur without prior written approval from the County.

CODE COMPLIANCE

The complete installation shall comply with all applicable federal, state, and local laws, regulations, codes, standards, and amendments in effect and applicable to the project.

The work shall comply with applicable requirements of the Georgia Office of the Insurance and Safety Fire Commissioner, including the Georgia rules governing elevators and applicable provisions of ASME A17.1.

The project shall also comply with applicable Georgia-adopted building, fire, electrical, accessibility, and life-safety requirements.

The Contractor shall be responsible for obtaining and maintaining all permits and approvals required for the work and for coordinating required inspections.

TESTING & INSPECTION

The Contractor shall coordinate & perform all required tests and inspections necessary to place the elevators into lawful operation.

The elevators shall not be considered substantially complete or available for normal public use until all required inspections, testing, corrections, approvals, and certifications have been completed.

The Contractor shall provide the County with copies of all inspection reports, test results, certificates, permits, approvals, and other closeout documentation.

ELECTRICAL & FIRE ALARM COORDINATION

The Contractor shall coordinate all elevator electrical requirements with the existing building electrical system. Work shall include all elevator-related electrical modifications necessary for a complete installation.

The Contractor shall coordinate elevator operation with the existing fire alarm system and provide all required interfaces, wiring, devices, programming, testing, and documentation.

All work affecting the building's fire alarm or life-safety systems shall be coordinated with the County and applicable authorities before work begins.

RESTORATION

The Contractor shall repair and restore all building surfaces, finishes, walls, floors, ceilings, doors, frames, and other components disturbed or damaged by the work.

Restoration shall match adjacent existing construction as closely as reasonably possible.

No exposed unfinished construction, abandoned wiring, piping, holes, openings, or damaged finishes shall remain at project completion.

CLOSEOUT OF PROJECT

Upon completion, the Contractor shall provide:

• Final inspection documentation.

• Operating instructions & Maintenance manuals.

• Manufacturer's documentation & Warranty documentation.

• Electrical and control diagrams.

• Hydraulic system documentation.

• Required permits and certificates & Final test results.

• Keys and tools required for normal operation and maintenance.

• Training for designated County personnel.

The elevator shall be delivered clean, fully operational, adjusted, tested, and ready for public use.

BID FORM

TO: Polk County Government 216 Main Street Cedartown, GA 30125

Bid Package: ELEVATORS REPLACEMENT PROJECT

Expected # of Weeks of Construction: _____________________

References Project: Project:

Contact Info (Name/Phone #): Contact Info (Name/Phone #):

ELEVATOR #1 PRICE: __________________

ELEVATOR #2 PRICE: __________________

TOTAL PRICE FOR REPLACEMENT OF (2) ELEVATORS: _____________________

Name of Individual, Partner Company or Corporation Title Address

Authorized Signature City, State, Zip Code

Company phone number

The County reserves the right to a) reject any or all proposals, or to make no award, b) require modifications to initial proposals or c) to make partial or multiple awards. The County further reserves the right to excuse technical defects in a proposal when, in its sole discretion, such excuse is in the best interest of the County.

PROPOSAL SCHEDULE

ACTIVITY DATE ACTION

Request for Bids Issued 9/23/2026 Begin Advertisement Bid Submission Deadline 10/21/2026 Submit Bids to Polk County Estimated Award Date Early November Board of Commissioners

ELEVATOR 1: 144 West Avenue

ELEVATOR 1: 144 West Avenue

ELEVATOR 2: 102 Prior Street

ATTACHMENT A

POLK COUNTY, GEORGIA

NON-COLLUSION AFFIDAVIT

The following affidavit shall accompany the proposal:

STATE OF: __________________________________

COUNTY OF: ___________________________________

Owner, Partner or Officer of Contractor: __________________________________________

Company Name, Address, County and State:

The undersigned, being of lawful age, being first duly sworn, on oath says that he/she is the agent authorized by the Contractor to submit the attached proposal and that neither he/she nor the Contractor has directly or indirectly violated any of the provisions of Section 36-91- 21(d) of the Official Code of Georgia Annotated. In making such representation, affiant further states for himself/herself and on behalf of Contractor, that he/she is not a party to any collusion among Contractors in restraint of competition or by agreement to submit a proposal at a fixed price or to refrain from submitting a proposal; or with any office of Polk County or any of its employees as to quantity, quality or price in the prospective contract; or any discussion between Contractors and any official of Polk County or any of its employees concerning exchange of money or other things of value for special consideration in submitting a Proposal for:

ELEVATORS REPLACEMENT PROJECT

CONTRACTOR NAME ________________________________________

SIGNATURE _____________________________________________

TITLE __________________________________________________

Subscribed as sworn to before me this day of 20 __ .

NOTARY PUBLIC ________________________________________

CONTRACTOR’S DECLARATION

The Contractor understands, agrees and warrants:

That the Contractor has carefully read and fully understands the full scope of the specifications.

That the Contractor has the capability to successfully undertake and complete the responsibilities and obligations in said specifications.

That this proposal may be withdrawn by requesting such withdrawal in writing at any time prior to October 21, 2026, but may not be withdrawn after such date and time.

That Polk County reserves the right to reject any or all proposals and to accept that proposal which will, in its opinion, best serve the public interest. Polk County reserves the right to waive any technicalities and formalities in the proposal process.

That by submission of this proposal the Contractor acknowledges that Polk County has the right to make any inquiry or investigation it deems appropriate to substantiate or supplement information supplied by the Contractor.

That the accompanying proposal is not the result of or affected by, any act of collusion with another person or company engaged in the same line of business or commerce, or any other fraudulent act punishable under Georgia or United States law.

Contractor’s Name: _________________________________________

Phone: _________________________________________________

Name Print: _____________________________________________

Signature: ______________________________________________

Date: __________________________________________________

Email __________________________________________________

DRUG-FREE WORKPLACE CERTIFICATE

By signature on this certificate, the Contractor certifies that the provisions of O.C.G.A. Section 50- 24-1 through 50-24-6 related to the “Drug-Free Workplace Act” will be complied with in full. The Contractor further certifies that:

1. A drug-free workplace will be provided for the Contractor’s employees during the performance of the contract; and

2. Each Contractor who hires a subcontractor to work in a drug-free workplace shall secure from that subcontractor the following written certification: “As part of the subcontracting agreement with (Contractor’s name), (subcontractor’s name) certifies to the Contractor that a drug-free workplace will be provided for the subcontractor’s employees during the performance of this contract pursuant to O.C.G.A. Section 50-24-3(b)(7).”

By signature on this certificate, the Contractor further certifies that it will not engage in the unlawful manufacture, sale, distribution, dispensation, possession, or use of a controlled substance or marijuana during the performance of the contract.

Contractor:________________________________________________________

By: ____________________________________________________________

Name Printed: __________________________________________________

Title: _________________________________________________________

Date: __________________________________________________________

CERTIFICATE OF NON-DISCRIMINATION

In connection with the performance of work under this contract, the Contractor agrees as follows:

The Contractor agrees not to discriminate against any employee or applicant for employment because of race, creed, color, sex, national origin, ancestry or disability. The Contractor shall take affirmative action to insure that employees are treated without regard to their race, creed, color, sex, national origin, ancestry or disability. Such action shall include, but not be limited to the following: employment, upgrading, demotion, transfer, recruiting or recruitment, advertising, lay-off or termination, rates of pay or other compensation and selection for training, including apprenticeship.

In the event of the Contractor is in non-compliance with this non-discrimination clause, the contract may be canceled or terminated by Polk County. The Contractor may be declared, by Polk County, ineligible for further contracts with Polk County until satisfactory proof of intent to comply shall be made by the Contractor.

The Contractor agrees to include this non-discrimination clause in any sub-contracts connected with the performance of this agreement.

CONTRACTOR

SIGNATURE

TITLE

O.C.G.A. § 50-36-1(e)(2) S.A.V.E Affidavit

By executing this affidavit under oath, as a contractor for contracted services, as referenced in O.C.G.A.

§ 50-36-1, from Polk County Georgia, the undersigned applicant verifies one of the following with respect to my application for a public benefit:

1) I am a United States Citizen.

2) I am a legal permanent resident of the United States.

3) I am a qualified alien or non-immigrant under the Federal Immigration and

Nationality Act with an alien number issued by the Department of Homeland Security or other federal immigration agency.

My alien number issued by the Department of Homeland Security or other federal immigration agency is: .

The undersigned applicant also hereby verifies that he or she is 18 years of age or older and has provided at least one secure and verifiable document, as required by O.C.G.A. § 50-36-1(e)(1), with this affidavit.

The secure and verifiable document provided with this affidavit can best be classified as:

In making the above representation under oath, I understand that any person who knowingly and willfully makes a false, fictitious, or fraudulent statement or representation I any affidavit shall be guilty of a violation of O.C.G.A. § 16-10-20, and face criminal penalties as allowable by such criminal statute.

Executed in (city), (state).

Signature of Applicant

Printed Name of Applicant

SUBSCRIBED AND SWORN

BEFORE ME ON THIS THE

DAY OF , 20 .

NOTARY PUBLIC

My Commission Expires:

E-VERIFY COMPLIANCE AFFIDAVIT

By executing this affidavit, the undersigned contractor verifies its compliance with O.C.G.A. § 13-10-91, stating affirmatively that the individual, firm or corporation which is engaged in the physical performance of services on behalf of Polk County, Georgia has registered with, is authorized to use and uses the federal work authorization program commonly known as E-Verify, or any subsequent replacement program, in accordance with the applicable provisions and deadlines established in O.C.G.A. § 13-10-91. Furthermore, the undersigned contractor will continue to use the federal work authorization program throughout the contract period and the undersigned contractor will contract for the physical performance of services in satisfaction of such contract only with subcontractors who present an affidavit to the contractor with the information required by O.C.G.A, § 13-10-91 (b). Contractor hereby attests that its federal work authorization user identification number and date of authorization are as follows:

Federal Work Authorization User Identification number (Not Required if Less than 10 Employees)

Signature (if less than 10 employees)

Date of Authorization

Name of Contractor

Name of Project

Name of Public Employer

I hereby declare under penalty of perjury that the foregoing is true and correct.

Executed on _________, ____, 20____ in ____________(city) ____________ (state).

Signature of Authorized Officer or Agent

Printed Name and Title of Authorized Officer or Agent

SUBSCRIBED AND SWORN BEFORE ME

ON THIS THE _____ DAY OF ______________, 20_____

NOTARY PUBLIC

My Commission Expires:

PROPOSAL PACKAGE MUST BE RETURNED IN SEALED ENVELOPE
WEDNESDAY, OCTOBER 21, 2026 AT 10:00AM
POLK COUNTY GEORGIA
5 BID SUBMISSION FORMAT: Bids should be bound or stapled whereby county staff can easily make additional copies. Pages should be 8 ½” X 11” in size with larger sheets folded to fit within bindings. The proposal should be ordered in the following format:
ATTACHMENT A
CONTRACTOR’S DECLARATION
PROPOSAL SCHEDULE
DRUG-FREE WORKPLACE CERTIFICATE