FY26 Reactor Sharing and Outreach NOFO Part 2 - FINAL 6JAN2026.pdf
PDF 11 MB Posted
- Opportunity number
- DE-FOA-0003542
About this file
This document is a Department of Energy (DOE) Notice of Funding Opportunity (NOFO) Part 2 for the Fiscal Year 2026 University Reactor Sharing and Outreach program. The federal grant opportunity is administered by the DOE National Nuclear Security Administration under the Nuclear Energy Research, Development and Demonstration program (CFDA 81.121), seeking to strengthen nuclear science and engineering instruction, increase collaboration among faculty and students, improve public awareness of nuclear technology, and engage communities to recruit the next generation nuclear energy workforce.
The NOFO targets universities and educational organizations, with a focus on reactor sharing and outreach activities. Applicants must comply with comprehensive registration requirements, including SAM.gov, Grants.gov, and NEUP.gov registration. The application process involves submitting detailed technical volumes, budgets, and supporting documentation, with strict formatting and content guidelines. While specific award amounts are not explicitly stated, the opportunity emphasizes cost-sharing requirements, prohibitions on certain foreign collaborations, and compliance with various federal regulations including Buy America requirements and conflict of interest policies. Potential applicants must carefully review both Part 1 and Part 2 of the NOFO and prepare comprehensive submissions addressing the program's goals and evaluation criteria.
FY26 Reactor Sharing and Outreach NOFO Part 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY26 Reactor Sharing and Outreach NOFO Part 1 - FINAL 6JAN2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Financial Assistance Notice of Funding Opportunity
Part 2
Fiscal Year 2026 University Reactor Sharing and Outreach Notice of Funding Opportunity Number: DE-FOA-0003542
This is Part 2 of the Notice of Funding Opportunity (NOFO). The NOFO Part 2 is intended as a companion document to the NOFO Part 1. The NOFO Part 1 describes the specific DOE programmatic goals and evaluation criteria, eligibility, and other components that are specific to each funding opportunity.
Part 2 includes fixed DOE requirements that generally do not change from NOFO to NOFO. This document includes standard information for the application phase and describes expectations for award negotiations and post-award requirements for selected applications. Applicants should review both the NOFO Part 1 and the NOFO Part 2 prior to applying.
Notice of Funding Opportunity Part 2 Table of Contents
I. GET REGISTERED
A. SAM.gov Registration B. Unique Entity Identifier (UEI) C. Grants.gov Registration D. NEUP.gov
II. ELIGIBILITY
A. Cost Sharing
1. Legal Responsibility
2. Cost Share Allocation
3. Cost Share Types and Allowability
4. Unallowable Cost Share Sources
5. Cost Share Contributions by FFRDCs
6. Cost Share Verification
7. Cost Share Calculation Examples
B. Other Eligibility Information
1. Questions Regarding Eligibility
2. Entity of Concern Prohibition
3. Artificial Intelligence (AI) Application Use
III. PROGRAM DESCRIPTION
A. Informational Webinar
IV. APPLICATION CONTENT AND FORM
A. Application Format Summary B. Application Content Requirements
1. Conflict of Interest (COI) Acknowledgement
2. Application for Federal Assistance (SF-424)
3. Project/Performance Site Location(s)
4. Project Summary/Abstract
5. Project Summary Slide
6. Technical Volume
7. Resumes
8. Budget Information for Non-Construction Programs (SF-424A)
9. Cost Sharing Letter(s) of Commitment
10. Budget Justification
11. Vendor Quotes
12. Current and Pending Support
13. Potentially Duplicative Funding Notice
14. Lobbying Activities
15. Transparency of Foreign Connections
16. Impacted Indian Tribes Documentation (if applicable)
C. Funding Restrictions
1. Allowable Costs
2. Pre-Award Costs
3. Performance of Work in the United States (Foreign Work Waiver) Requirement
4. Foreign Travel
5. Lobbying
6. Equipment and Supplies
7. Davis-Bacon Act Requirements
V. SUBMISSION REQUIREMENTS AND DEADLINES
VI. APPLICATION REVIEW INFORMATION
A. Standard Evaluation and Selection Processes
1. Pre-Selection Clarification
2. Recipient Responsibility and Qualifications
3. Due Diligence Review for Research, Technology and Economic Security
4. Evaluation and Administration by Non-Federal Personnel
5. Selection
VII. SELECTION AND AWARD NOTICES
A. Selection Notices
1. Ineligible Submissions
2. Application Notifications
3. Applicants Selected for Award Negotiations
4. Alternate Selections
5. Applicants Not Selected for Award Negotiations
B. Post-Selection Information Requests
1. Example Information Requests
2. Entity Risk Assessment
3. Environmental Review in Accordance with National Environmental Policy Act (NEPA)
4. Flood Resilience
5. Trafficking in Persons
6. Operations Workforce Continuity Plan
C. Award Notices
VIII. AWARD ADMINISTRATION INFORMATION
A. Post-Award Requirements and Administration
1. Award Administrative Requirements
2. Subaward and Executive Reporting
3. National Policy Requirements
4. Applicant Representations and Certifications
5. Statement of Federal Stewardship
6. Uniform Commercial Code (UCC) Financing Statements
7. Interim Conflict of Interest Policy for Financial Assistance
8. Whistleblower Protections
9. Fraud, Waste, and Abuse
10. Participants and Collaborating Organizations
11. Current and Pending Support
12. Prohibition Related to Malign Foreign Talent Recruitment Programs
13. Foreign Collaboration Considerations
14. U.S. Manufacturing Commitments
15. Subject Invention Utilization Reporting
16. Intellectual Property Provisions
17. Conference Spending
18. Invoice Review and Approval
19. Cost Share Payment
20. Implementation of Executive Order 13798, Promoting Free Speech and Religious Liberty
21. Pay Transparency Requirements
22. Human Subjects Research
B. Reporting
IX. OTHER INFORMATION
A. Government Right to Reject or Negotiate B. Commitment of Public Funds C. Treatment of Application Information D. Notice Regarding Eligible/Ineligible Activities E. Notice of Right to Conduct a Review of Financial Capability F. Requirement for Full and Complete Disclosure G. Retention of Submissions H. Title to Subject Inventions I. Government Rights in Subject Inventions J. Copyright K. Export Control L. Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment M. Personally Identifiable Information (PII) N. Annual Independent Audits O. Buy America Requirements for Infrastructure Projects; Required Use of American Iron, Steel, Manufactured Products, and Construction Materials Produced in the United States P. Acronyms
Section I: Get Registered
I. Get Registered
There are several required one-time actions applicants must take before applying to this Notice of Funding Opportunity (NOFO). Some of these actions may take several weeks, so it is vital applicants build in enough time to complete them. Failure to complete these actions could interfere with application or negotiation deadlines or the ability to receive an award if selected. If you are already registered, make sure your registration is active and up to date. All registrations are free.
A. SAM.gov Registration You must have an active account with SAM.gov, the System for Award Management (SAM). This includes having a Unique Entity Identifier (UEI).
• What is it? SAM is a federal procurement database. All entities that want to do business with the federal government MUST be registered in SAM.
• Existing SAM registrations must be updated annually.
• Duration to complete: can take several weeks.
• Registration Link: https://sam.gov/content/home o NOTE: Subrecipients are not required to obtain an active SAM registration but must obtain a Unique Entity Identifier.
• HELP: https://sam.gov/content/help Applicants must allow several weeks for the SAM process to complete. All registrations rely on completion of the SAM registration. (START Early)
B. Unique Entity Identifier (UEI)
• What is it? UEI is a non-proprietary identifier that has replaced the Federal Government use of
Data Universal Numbering System (DUNS) number effective April 4, 2022.
• Applicants must obtain a UEI from the SAM to uniquely identify the entity. The UEI is available in the SAM entity registration record.
• Note: Subawardees/subrecipients at all tiers must also obtain an UEI from the SAM and provide the UEI to the recipient before the subaward can be issued.
• Duration to complete: can take several weeks.
• Registration Link: https://sam.gov/content/entity-registration
• HELP: https://www.fsd.gov/gsafsd_sp
C. Grants.gov Registration You must have an active Grants.gov registration to receive automatic updates when modifications to this NOFO are posted. Doing so requires a Login.gov registration as well.
• What is it? Website used to enable federal grant-making agencies to notify potential applicants of funding opportunities. Please note that letters of intent, concept papers, and applications will not be accepted through Grants.gov (see NEUP.gov information below).
• Step-by step instructions for applicants at How to Apply for Grants website https://grantsgovprod.wordpress.com/2021/04/28/how-to-apply-for-a-federal-funding-opportunity-on-grants-gov/.
• Duration to complete: can take several days.
• Registration Link: https://grants.gov https://sam.gov/content/home https://sam.gov/content/home https://sam.gov/content/help https://sam.gov/content/entity-registration https://www.fsd.gov/gsafsd_sp https://www.grants.gov/forms/forms-repository/sf-424-family https://grantsgovprod.wordpress.com/2021/04/28/how-to-apply-for-a-federal-funding-opportunity-on-grants-gov/ https://grantsgovprod.wordpress.com/2021/04/28/how-to-apply-for-a-federal-funding-opportunity-on-grants-gov/ https://grantsgovprod.wordpress.com/2021/04/28/how-to-apply-for-a-federal-funding-opportunity-on-grants-gov/ https://grants.gov/
Section I: Get Registered
• HELP: https://apply07.grants.gov/help/html/help/index.htm#t=GetStarted%2FGetStarted.htm
D. NEUP.gov Register and create an account at www.NEUP.gov. Electronic applications and instructions are available at the NEUP.gov website. To access these materials: (1) go to www.NEUP.gov; (2) select “Sign In” from the top right-hand corner of the screen; (3) enter your user credentials; (4) select “Applications” from the menu; and (5) click on “Create New Application” for the type of application you are creating.
If you have any questions about NEUP site registration, application processes, eligibility, or application document requirements contact the Innovative Nuclear Research (INR) Integration Office at neup@inl.gov.
DISCLAIMER:
Applicants are discouraged from submitting information considered proprietary unless it is deemed essential for proper evaluation of the application. If the application contains information that the applicant organization considers to be trade secrets, information that is commercial or financial, or information that is privileged or confidential, the pages containing that information should be identified as specified in the application instructions. When such information is included in the application, it is furnished to the federal government in confidence, with the understanding that the information will be used or disclosed only for evaluation of the application.
The information contained in the application will be protected by the Department of Energy (DOE) from unauthorized disclosure, consistent with the need for merit review of applications of financial assistance awards to assure the integrity of the competitive process and the accuracy and completeness of the information. If a federal financial assistance award is made as a result of or in connection with an application, the federal government has the right to use or disclose the information to the extent authorized by law. This restriction does not limit the federal government’s right to use the information if it is obtained without restriction from another source.
https://apply07.grants.gov/help/html/help/index.htm#t=GetStarted%2FGetStarted.htm https://www.neup.gov/ https://www.neup.gov/ mailto:neup@inl.gov
Section II. Eligibility
II. Eligibility
Please refer to the NOFO Part 1, Eligibility for the eligibility criteria specific to your application. This section includes additional information to help applicants understand the standard eligibility requirements across all DOE NOFOs.
A. Cost Sharing This section contains additional information to help applicants understand federal cost sharing requirements. Please refer to the NOFO Part 1, Eligibility—Cost Sharing for the cost sharing criteria specific to your application.
1. Legal Responsibility Although the cost share requirement applies to the entire project, including work performed by members of the project team other than the recipient, the recipient is legally responsible for paying the entire cost share. The recipient’s cost share obligation is expressed in the Assistance Agreement as a static amount in U.S. dollars (cost share amount) and as 1a percentage of the Total Project Cost (cost share percentage). If the funding agreement is terminated prior to the end of the project period, the recipient is required to contribute at least the cost share percentage of total expenditures incurred through the date of termination.
The recipient is solely responsible for managing cost share contributions by the project team and enforcing cost share obligation assumed by project team members in subawards or related agreements.
2. Cost Share Allocation Each project team is free to determine how best to allocate the cost share requirement among the team members. The amount contributed by individual project team members may vary, as long as the cost share requirement for the entire project is met.
3. Cost Share Types and Allowability Cost share must meet requirements set forth in 2 C.F.R. §§ 200.306 and 910.130, and cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352. In addition, cost share must be verifiable upon submission of the full application. Cost share may be provided in the form of cash or cash equivalents, or in-kind contributions. Cost share must come from non-federal sources (unless otherwise allowed by law), such as project participants, state or local governments, or other third-party financing. DOE Loan Guarantees cannot be leveraged by applicants to provide the required cost share or otherwise support the same scope that is proposed under a project.
Cost share may be provided by the recipient, subrecipients, or third parties (entities that do not have a role in performing the scope of work). Vendors/contractors may not provide cost share. Any partial donation of goods or services is considered a discount and is not allowable.
Cash contributions include but are not limited to personnel costs, fringe costs, supply and equipment costs, indirect costs, and other direct costs.
https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-D/section-200.306 https://www.ecfr.gov/current/title-2/subtitle-B/chapter-IX/part-910/subpart-B/section-910.130 https://www.ecfr.gov/current/title-2/subtitle-A/chapter-II/part-200/subpart-E/subject-group-ECFR1f52baf5ea70fff/section-200.400 https://www.ecfr.gov/current/title-2/subtitle-B/chapter-IX/part-910/subpart-D/section-910.352
In-kind contributions are those where a value of the contribution can be readily determined, verified, and justified but where no actual cash is transacted in securing the good or service comprising the contribution. Allowable in-kind contributions include but are not limited to the donation of volunteer time or the donation of space or use of equipment.
Project teams may use funding or property received from state or local governments to meet the cost share requirement, so long as the federal government did not provide the funding to the state or local government.
Cost share contributions must be specified in the project budget, verifiable from the recipient’s records, and necessary and reasonable for proper and efficient accomplishment of the project. As all sources of cost share are considered part of total project cost, DOE will review the cost share dollars according to the same federal regulations as federal dollars to the project. Every cost share contribution must be reviewed and approved in advance by the Grants Officer and incorporated into the project budget before the expenditures are incurred.
4. Unallowable Cost Share Sources The recipient and subrecipient(s) may not use the following sources to meet cost share obligations:
• Cost share derived from federal sources (unless otherwise authorized by law).
• Cost share that does not meet:
o Requirements set forth in 2 C.F.R. §§ 200.306 and 910.130;
o Cost principles set forth in 2 C.F.R. §§ 200.400-476 and 2 C.F.R. §§ 910.352;
o For State Energy Programs, refer to 10 C.F.R. §§ 420.
• Cost share derived from the DOE loan program.
• Revenues or royalties from the prospective operation of an activity beyond the project period;
• Proceeds from the prospective sale of an asset of an activity;
• Federal funding or property (e.g., federal grants, equipment owned by the federal government);
• Expenditures that were reimbursed under a separate federal program.
• Cash or in-kind contributions used to meet cost share requirements for another federal project or program;
• Existing data as an in-kind contribution (e.g., data owned by an entity, that is not routinely sold commercially but is instead donated to the project and assigned a value);
• In general, deferred or avoided costs such as unrealized tax credits; or
• If applicable, other items as identified by DOE Programs and as specified in the applicable NOFO
Part 1, Eligibility—Cost Sharing.
5. Cost Share Contributions by FFRDCs Because FFRDCs are funded by the federal government, costs incurred by FFRDCs generally may not be used to meet the cost share requirement. FFRDCs may contribute cost share only if the contributions are paid directly from the contractor’s Management Fee or another non-federal source.
6. Cost Share Verification Applicants are required to provide written assurance of their proposed cost share contributions in their applications. If selected for award negotiations, applicants are required to provide additional information and documentation regarding their cost share contributions. Please refer to the NOFO Part 1, Eligibility—Cost Sharing for specific requirements.
7. Cost Share Calculation Examples
Cost sharing is calculated as a percentage of the Total Project Cost. FFRDC costs must be included in Total Project Costs.
Example 1, Standard Cost Share Calculation The following is an example of how to calculate cost sharing amounts for a project with $1 million in federal funds with a minimum 20% non-federal cost sharing requirement:
• Formula: Federal share ($) divided by federal share (%) = Total Project Cost
Example: $1,000,000 divided by 80% = $1,250,000
• Formula: Total Project Cost ($) minus federal share ($) = Non-federal share ($)
Example: $1,250,000 minus $1,000,000 = $250,000
• Formula: Non-federal share ($) divided by Total Project Cost ($) = Non-federal share (%)
Example: $250,000 divided by $1,250,000 = 20%
Example 2, Blended Cost Share Calculation The following example shows the math for calculating required cost share for a project with $2 million in federal funds, with four tasks requiring different non-federal cost share percentages:
Task Proposed Federal Share
Federal Share % Recipient Share %
Task 1 (R&D) $1,000,000 80% 20% Task 2 (R&D) $500,000 80% 20% Task 3 (Demonstration) $400,000 50% 50% Task 4 (Outreach) $100,000 100% 0%
Federal share ($) divided by federal share (%) = Task Cost
Each task must be calculated individually as follows:
Task 1
• $1,000,000 divided by 80% = $1,250,000 (Task 1 Cost)
• Task 1 Cost minus federal share = non-federal share
• $1,250,000 - $1,000,000 = $250,000 (non-federal share)
Task 2
• $500,000 divided 80% = $625,000 (Task 2 Cost)
• Task 2 Cost minus federal share = non-federal share
• $625,000 - $500,000 = $125,000 (non-federal share)
Task 3
• $400,000 / 50% = $800,000 (Task 3 Cost)
• Task 3 Cost minus federal share = non-federal share
• $800,000 - $400,000 = $400,000 (non-federal share)
Task 4
• Federal share = $100,000
• Non-federal cost share is not mandated for outreach = $0 (non-federal share)
The calculation may then be completed as follows:
Tasks $ Federal Share
% Federal Share
$ Non-Federal Share
% Non-Federal Share
Total Project Cost
Task 1 $1,000,000 80% $250,000 20% $1,250,000 Task 2 $500,000 80% $125,000 20% $625,000 Task 3 $400,000 50% $400,000 50% $800,000 Task 4 $100,000 100% $0 0% $100,000 Totals $2,000,000 $775,000 $2,775,000
Blended Cost Share %
• Non-federal share ($775,000) divided by Total Project Cost ($2,775,000) = 27.9% (non-federal)
• Federal share ($2,000,000) divided by Total Project Cost ($2,775,000) = 72.1% (federal)
B. Other Eligibility Information Refer to NOFO Part 1, Eligibility—Eligible Applicants for NOFO-specific eligibility information. The information below is standard for DOE NOFOs.
1. Questions Regarding Eligibility DOE will not make eligibility determinations for potential applicants prior to the date on which applications to the NOFO Part 1 must be submitted. The decision to apply in response to the NOFO Part 1 lies solely with the applicant.
2. Entity of Concern Prohibition
Prohibition DOE is prohibited by law from funding any grant, contract, cooperative agreement, or loan of $10 million or more in DOE funds to Entities of Concern. In addition, such entities (including an individual that owns or controls, is owned or controlled by, or is under common ownership or control with an Entity of Concern) are prohibited from receiving any funds or performing work under any award involving Department activities authorized under Division A or B of Public Law 117-167, subject to certain penalties. See section 10114 of Public Law 117-167 (42 USC 18912) and section 310 of Public Law 118-42 and other applicable law for additional information.
By submitting an application to this NOFO, the applicant is certifying that neither the applicant nor any of the project participants qualify as Entities of Concern.
Definitions Entity of Concern is defined as in section 10114 of Public Law 117-167 (42 USC 18912), also known as the CHIPS and Science Act, as any entity, including a national, that is—
(A) identified under section 1237(b) of the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999 (50 U.S.C. 1701 note; Public Law 105–261);
(B) identified under section 1260H of the William M. (Mac) Thornberry National Defense Authorization Act for Fiscal Year 2021 (10 U.S.C. 113 note; Public Law 116– 283);
(C) on the Entity List maintained by the Bureau of Industry and Security of the Department of Commerce and set forth in Supplement No. 4 to part 744 of title 15, Code of Federal Regulations;
(D) included in the list required by section 9(b)(3) of the Uyghur Human Rights Policy Act of 2020 (Public Law 116–145; 134 Stat. 656); or
(E) identified by the Secretary, in coordination with the Director of the Office of Intelligence and Counterintelligence and the applicable office that would provide, or is providing, covered support, as posing an unmanageable threat—
(i) to the national security of the United States; or
(ii) of theft or loss of United States intellectual property.
3. Artificial Intelligence (AI) Application Use
Any use of artificial intelligence in the creation of any part of an application for this NOFO must be appropriately attributed. Even with the use of artificial intelligence, each applicant is responsible for and is representing to the U.S. Government that the information in its application documents is accurate, that the applicant is fully capable of performing the work described in the application, and that the submission of the application does not and will not infringe or violate any rights of any third party or entity.
Section III. Program Description
III. Program Description
Refer to NOFO Part 1, Program Description for all information related to the specific NOFO goals, objectives, and topic areas, if any.
A. Informational Webinar Refer to the NOFO Part 1, Basic Information—Key Dates to determine if DOE plans to conduct an informational webinar while the NOFO is open.
If applicable, DOE will conduct an informational webinar during the NOFO process. It will be held after the initial NOFO release but before the application due date.
Attendance is not mandatory and will not positively or negatively impact the overall review of any applicant submissions. The webinar will be open to all potential applicants who wish to participate.
Applicants should refrain from asking questions or communicating information that would reveal confidential and/or proprietary information specific to their project.
The rest of this page is intentionally left blank.
Section IV. Application Content and Form
IV. Application Content and Form
This section contains supplemental information to help applicants understand the application content and form requirements outlined in the NOFO including detailed information on the content and naming conventions of the application content. Please refer to the NOFO Part 1, Application Content and Form section for the application contents and form specific to your application.
Note that some of the required application elements below have separate requirements for Research and Development (R&D) versus non-R&D NOFOs. Refer to the NOFO Part 1, Application Content Requirements section for specific instructions.
A. Application Format Summary All submissions must conform to the form and content requirements described below. Refer to the NOFO Part 1, Application Content and Form for the page limits.
Format Requirements
Parameter Requirement
File Format Portable Document Format (PDF) unless stated otherwise
Language English
Paper Size 8.5" x 11"
Margins Not less than 1" (>= 1") on every side
Font A neutral consistent font style for each document that is Times New Roman, with a black font color. A symbol font may be used to insert Greek letters or special characters.
Font Size Font size not smaller than 11-point (except in figures or tables, which may be 10-point font).
References References must be included as footnotes or endnotes in a font size of 10 or larger. Footnotes and endnotes are counted toward the maximum page requirement.
Control Number A control number will be issued when an applicant begins the NEUP.gov application process. The control number must be included with all application documents. Specifically, the control number must be prominently displayed on the upper right corner of the header of every page and included in the file name (i.e., Control Number_Applicant Name_Application).
Page Numbers Page numbers must be included in the footer of every page.
Each submission must not exceed the specified maximum page limit, including cover page, charts, graphs, maps, and photographs when printed using the formatting requirements set forth above and single spaced.
Page Count Limitations If applicants exceed the maximum page limitations, DOE will review only the authorized number of pages and disregard any additional pages.
B. Application Content Requirements The NOFO Part 1, Application Content Requirements identifies which of the following application documents are required including the program-specific requirements such as the technical volume and specified page limits. Each application must be limited to a single concept and must not exceed the stated page limits.
DOE provides detailed guidance on the content and form of each component below.
1. Conflict of Interest (COI) Acknowledgement The DOE interim Conflict of Interest Policy for Financial Assistance (COI Policy) can be found at https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance. This policy is applicable to all non-Federal entities applying for, or that receive, DOE funding by means of a financial assistance award (e.g., a grant, cooperative agreement, or technology investment agreement) and, through the implementation of this policy by the entity, to each Investigator who is planning on participating in, or is participating in, the project funded wholly or in part under the DOE financial assistance award. DOE’s interim COI Policy establishes standards that provide a reasonable expectation that the design, conduct, and reporting of projects funded wholly or in part under DOE financial assistance awards will be free from bias resulting from financial conflicts of interest or organizational conflicts of interest. The applicant is subject to the requirements of the interim COI Policy and within each application for financial assistance, the applicant must certify that it is, or will be, by the time of receiving any financial assistance award, compliant with all requirements in the interim COI Policy. The applicant must flow down the requirements of the interim COI Policy to any subrecipient non-Federal entities.
The applicant is required to disclose, manage, and report conflicts of interest as per the DOE interim COI Policy. Check the appropriate box on the application form certifying compliance with the COI Policy. If any disclosures need to be made, upload a COI document to the COI disclosure area of the application form.
Save file as: FY26 COI [TRACKING ID#].pdf
2. Application for Federal Assistance (SF-424)
Applicants must complete the SF-424, Application for Federal Assistance, which is available here, (https://www.energy.gov/management/articles/sf-424-research-and-related-budget-rr) and on the NEUP Documents page here: https://neup.inl.gov/resources/documents/. Complete all required fields in accordance with the instructions on the form. The System for Award Management (SAM) is the central repository for common government-wide certifications and representations required of Federal grants recipients. As registration in SAM is required for eligibility for a federal award and registration must be updated annually, Federal agencies use SAM information to comply with award requirements and avoid increased burden and costs of separate requests for such information, unless the recipient fails to meet a federal award requirement, or there is a need to make updates to their SAM registration for other purposes.
Please ensure that the dates (Block 17) and dollar amounts (Block 18) on the SF-424 are for the complete project period and not just the first project year, first phase, or another subset of the project period.
https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance https://www.energy.gov/management/department-energy-interim-conflict-interest-policy-requirements-financial-assistance https://www.energy.gov/management/articles/sf-424-research-and-related-budget-rr https://neup.inl.gov/resources/documents/
Save file as: FY26 SF424 [TRACKING ID#].pdf
3. Project/Performance Site Location(s) Insert the primary site where the work will be performed. If a portion of the project will be performed at any other site(s), identify the site location(s) in the blocks provided.
NOTE: The Project/Performance Site Congressional District is entered in the format of the two-digit state code followed by a dash and a three-digit Congressional district code (i.e., VA-001). Hover over the field in the form for additional instructions.
Use the “Next Site” button to expand the form to add additional Project/Performance Site Locations.
Save file as: FY26 Site Location [TRACKING ID#].pdf
4. Project Summary/Abstract The one (1) page project summary/abstract must contain a summary of the proposed activity suitable for dissemination to the public. It should be a self-contained document that identifies the applicant’s name, names of major participants, the project title, the objectives of the project, and a description of the project, including methods to be employed, the potential impact of the project (i.e., benefits, outcomes), and major participants (for collaborative projects). Do not include any proprietary or sensitive business information in this document, because, if an award is made, the Department may make it available to the public. The required template can be found here:
Summary of Public Release Content
Applicant Name Provide the legal name of the applicant.
Major Participant Names List all significant project participants and their roles.
Lead Project Manager / Principal Investigator(s)
Provide names and titles.
Project Title Provide the title for the planned project.
Project Objectives Identify the overarching project objectives aligned with requirements set forth in the NOFO.
Project Description The description must include methods to be employed, the potential impact of the project (e.g., benefits, outcomes
Publicly Releasable (Unlimited Rights)
This document must not include any proprietary or business-sensitive information, as DOE may make it available to the public after selections are made.
Page Limit Clarification The summary must not exceed the stated page limit when printed, using standard 8.5” x 11” paper with 1” margins (top, bottom, left, and right) with font not smaller than 11-point.
Save template as: FY26 Abstract [TRACKING ID#].pdf
5. Project Summary Slide The one (1) slide project summary file must contain the following information: a graphical summary to illustrate the proposed activities, a one sentence project summary, list of key project goals and a summary of the project impact. The summary slide should be a self-contained document that also clearly identifies the name of the prime applicant, the project director/principal investigator(s), the project title, partner and participating institutions, project period, and the budget request and cost-share (if applicable). Do not include any proprietary or sensitive business information in this document, because, if an award is made, the Department may make it available to the public.
Summary Slide Content
Project Title Provide the title for the planned project.
Prime Applicant Provide the legal name of the applicant.
Project Location(s) Provide the locations(s) of work for the proposed project.
PI/LPM and Key Personnel Information
Provide names and titles.
Requested DOE Funds Identify Federal funds requested for the project.
Proposed Cost Share Provide the amount of cost share contribution.
Project Summary Describe the project proposed.
Outreach Impact Describe the impact of the proposed outreach if the project is successful.
Project Goals Identify the overarching project goals.
Key Graphics Illustrations, charts and/or tables
Key Idea / Takeaway Describe the key takeaway that you would like to provide to the DOE.
Save file as: FY26 Summary Slide [TRACKING ID#].pdf
6. Technical Volume
The Technical Volume must conform to the following content and form requirements. This volume must address the technical review criteria as discussed in the Technical Volume Content Requirements Overview below.
Applicants must provide sufficient citations and references to the primary research literature to justify the claims and approaches made in the Technical Volume. However, DOE and reviewers are under no obligation to review cited sources.
The Technical Volume to the application may not be more than 8 pages, including the cover page, table of contents, and all citations, charts, graphs, maps, photos, or other graphics, and must include all information below. The narrative must also comply with all document format instructions. The applicant should consider the weighting of each of the technical review criteria when preparing the Technical Volume.
Technical Volume Content Requirements Overview
Section Approximate Percent Content of the Technical Volume
Cover Page and Table of Contents N/A
Buy America Requirements for Infrastructure Projects
N/A
Project Goals and Objectives 30%
Schedule and Task Descriptions 40%
Relevance and Outcomes/Impacts 20%
Roles of Participants 5%
Facilities, Complementary Equipment, and Other Resources
5%
NOTE: Each review criterion is identified in the following recommended (but not required) technical volume outline and content percentages by volume below:
(1) Cover Page:
The cover page must include all the following:
• The project title
• Specific NOFO topic areas (if applicable)
• Technical and business POCs (e-mail addresses and telephone numbers)
• The project team, including the names of the PI and key personnel, entity type and names of all team member organizations where applicable
• The project location(s)
• The proposed total federal funding level, cost share and period of performance
• The proposed federal funding level and cost share for each project participant
• Statements regarding confidentiality, if applicable
(2) Table of Contents: Applicant to capture, at a minimum, all the required sections identified in the table. The Table of Contents can be included on the Cover Page.
(3) Buy America Requirements for Infrastructure Projects. On or before the second (2) page of the narrative, include a short statement on whether the project will involve the construction, alteration, maintenance, and/or repair of public infrastructure in the United States. See Build America, Buy America (https://www.energy.gov/management/build-america-buy-america) for applicable definitions and other information to inform this statement.
NOTE: The applicant must assume that the Build America, Buy America Act requirements are applicable to the purchase of equipment.
(4) Project Goals and Objectives (30%): This introductory section should provide a clear, concise statement of the specific objectives/aims of the proposed project. A "goal" is an outcome the proposed team would like to achieve, while an objective is an action or outcome related to a metric.
https://www.energy.gov/management/build-america-buy-america
Goals and objectives should encompass the following where applicable (in no particular order):
• Overall goal(s) of the proposed effort with the team must incorporate a minimum of two (2) of the NOFO goals. The goal(s) may include multiple components or aspects and may be linked to specific measurable objectives.
o The NOFO goals and objectives are (1) Strengthen nuclear science and engineering instruction in the curricula of colleges and universities that do not own research reactors (hereby referred to as “User Institutions”), (2) Increase opportunities for collaboration among faculty and students on nuclear science and engineering, (3) Improve public awareness and understanding of nuclear science, engineering, and technology through research reactor visits and other outreach opportunities, and (4) Engage with communities to promote nuclear science, engineering, and technology to educate and recruit the next generation nuclear energy workforce.
• Primary objectives that will be achieved during the effort with quantifiable metrics. The type and quantity of objectives are established by the applicant. The following are examples of objectives:
o Minimum number of hours collaborating with K-12 schools and organizations.
o Data produced from an experiment performed at the Host Institution in support of a
User Institution student project.
o Minimum number of tours with active engagement over the award.
• How the proposed effort outcome or process will tie into the NE mission.
• Describe the Nuclear Science and Engineering program at the Host Institution, User Institution, and/or educational organization (where applicable). If there is no current program, briefly describe intentions or plans to establish a program or pathway to future collaboration.
(5) Schedule and Task Descriptions (40%): This section should include a scope of work and execution plan with detail appropriate to the complexity of the project. In addition, this section should describe, in detail, the individual tasks and their connection to the overall effort. Successful applicants must use their proposed project timetable to report progress. Include the following:
• An overall timeline and key milestones of the proposed tasks (e.g., Gantt chart, timeline, etc.).
• Key milestones linked to metrics.
• The role of each task in achieving the goals and objectives.
(6) Relevance and Outcomes/Impacts (20%): This section is a justification for the proposed effort and should explain the relevance of the effort to the mission of NE and connect with the goals and objectives. This section should include a clear statement of the importance of the project in terms of the utility of the outcomes and the target community of beneficiaries.
(7) Roles of Participants (5%): Describe the capabilities and qualifications of the PI and key personnel involved to accomplish the proposed effort. This should include descriptions of specific personnel expertise required to accomplish the proposed effort. Specific individuals and skillsets should be referred to throughout the technical volume where appropriate and highlighted in this section.
Directly state whether there is any expertise that must be acquired to complete the project and the plan to acquire the expertise (e.g. new hires, consultants, etc.).
(8) Facilities, Complementary Equipment, and Other Resources (5%): Identify the facilities (e.g., office, laboratory, computer, etc.), equipment (computers, oscilloscopes, etc.), and other resources (machine shops, electronic shops, etc.) to be used at each performance site. Describe utilization of facilities, equipment, and other resources that are directly applicable to the proposed work. Include pertinent capabilities, capacities, relative proximity, and extent of availability to the project.
Save template as: FY26 Technical Volume [TRACKING ID#].pdf
7. Resumes A resume provides information reviewers can use to evaluate an individual’s relevant skills and the experience of the key project personnel. Applicants must submit a resume for each project manager, Senior/Key Personnel, and all covered individuals as defined in the NOFO Part 1, Application Content and Form—Application Content Requirements, Covered Individual Definition, Designation and Responsibility.
DOE reserves the right to not proceed with merit reviews for incomplete applications. Applicants must screen resumes to ensure that they do not contain PII such as personal addresses, personal landline/cell phone numbers, and personal emails.
Resumes must include the following at a minimum:
Resume Requirements
Contact Information
Phone, email, and address
Education All academic institutions attended, major/area, degree
Training Examples include certification or credential from a Registered Apprenticeship or Labor Management Partnership
Professional Experience
Beginning with the current position, list professional/academic positions in chronological order with a brief description
Current Appointments
All current academic, professional, or institutional appointments, foreign or domestic, at the applicant institution or elsewhere, whether or not remuneration is received, and whether full-time, part-time, or voluntary.
Additional Criteria
There should be no lapses in time over the past 10 years or since age 18, whichever period is shorter.
Page Limitations Each resume must not exceed 3 pages. If applicants exceed the maximum page limitations on any document, DOE will review only the authorized number of pages and disregard any additional pages.
As an alternative to a resume, it is acceptable to use the biographical sketch format approved by the National Science Foundation (NSF). The biographical sketch format may be generated by the Science Experts Network Curriculum Vitae (SciENcv), a cooperative venture maintained at https://www.ncbi.nlm.nih.gov/sciencv/, and is also available at https://new.nsf.gov/policies/pappg/24- 1/ch-2-proposal-preparation#ch2D2hi. The use of a format required by another agency is intended to reduce the administrative burden to researchers by promoting the use of common formats.
Save individual resumes as: FY26 Resume [LAST NAME] [TRACKING ID#].pdf
8. Budget Information for Non-Construction Programs (SF-424A)
Applicants must provide a separate budget for each year of support requested and a cumulative budget for the total project period of performance. Use the SF 424A Form, “Budget Information – Non- Construction Programs” form on the DOE Financial Assistance Forms page at https://www.ncbi.nlm.nih.gov/sciencv/ https://new.nsf.gov/policies/pappg/24-1/ch-2-proposal-preparation#ch2D2hi https://new.nsf.gov/policies/pappg/24-1/ch-2-proposal-preparation#ch2D2hi https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients. Alternatively, a link to the form is located here: https://neup.inl.gov/resources/documents/
Applicants may request funds under any of the Object Class Categories as long as the item and amount are necessary to perform the proposed work, meet all the criteria for allowability under the applicable Federal cost principles, and are not prohibited by the funding restrictions outlined in the NOFO Part 1, Application Content and Form—Funding Restrictions.
Save file as: FY26 SF424A [TRACKING ID#].xlsx
9. Cost Sharing Letter(s) of Commitment
Submit letters of commitment from all third-party cost share providers (i.e. a party other than the organization submitting the application). The letter must state that the third party is committed to providing a specific minimum dollar amount of cost sharing or in-kind contributions allocated to cost sharing. Submitting signed letters with the application provides assurance that the commitments have been agreed upon. Letters of support or endorsement for the project from entities that do not have a substantive role in the project will not be accepted.
Letters of Commitment Content
Organization Name Phone, email, and address
Proposed Dollar Amount to be Provided
Value of the contribution and percentage of the total project costs
Cost Sharing Type Cash or In-Kind contribution (or both)
Each letter must not exceed one page.
Save file as: FY26 Cost Share LOCs [TRACKING ID#].pdf
10. Budget Justification Applicants are required to provide a detailed budget justification for the project as a whole, including all work to be performed by the Applicant and its Subrecipients and Contractors, and provide all requested documentation (e.g., a Federally-approved rate agreement, contractor quotes). Applicants should include costs associated with the Buy America Requirements for Infrastructure projects required annual audits and incurred cost proposals in their proposed budget documents. Such costs may be reimbursed as direct or indirect costs.
The budget justification detailed requirement instructions are available at NEUP.gov (https://neup.inl.gov/resources/documents/). Although the data requested is required, the use of the budget justification workbook is not.
Applicants must justify the costs proposed in each Object Class Category/Cost Classification category.
Funding restrictions for this NOFO:
• Consumables, materials, and supplies are allowable for activities exclusively supporting reactor sharing, teaching, education, and outreach;
• Equipment purchases greater than or equal to $10,000 are not allowed;
https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients https://www.energy.gov/management/financial-assistance-forms-and-information-applicants-and-recipients https://neup.inl.gov/resources/documents/ https://neup.inl.gov/
• Upgrades to increase operational profit or support directly for commercial activities are not allowed;
• Foreign travel is not allowed; and
• Non-university collaborators, in composite, can have no more than 20% of the total funds provided by the Government.
Provide an equipment list with the following information:
• Clearly identified equipment (e.g., description, manufacturer part number, etc., if known);
• Explain how the proposed equipment meets the definition of “equipment” at 2 CFR 200.33, as opposed to items of supply;
• Explain the need for the equipment to accomplish the project;
• Indicate the unit cost and quantity for each item to be purchased; and
• Explain how the cost estimates for equipment purchases are established, are determined to be fair and reasonable, and are consistent with applicant institution’s established procurement procedures (compliant with 2 CFR 200.17-200.326). Include available supporting documents such as quotes or catalog pricing for the proposed equipment.
If cost sharing is proposed, provide an explanation of the source, nature, amount, and availability.
• the name of the organization;
• the proposed dollar amount to be provided;
• the amount as a percentage of the total project cost; and
• the proposed cost sharing - cash, services, or property.
Foreign travel is not allowed for awards made under this NOFO. Any foreign travel added to the budget justification will not be approved upon issuance of the grant.
DOE understands that projects selected under this NOFO may require the use of existing data. For purposes of this NOFO, DOE will consider data that is commercially available at an established price to be an allowable cost under the project (either as DOE share or non-federal cost share) but DOE will not consider in-kind data (e.g., data, owned by an entity, that is not routinely sold commercially but is instead donated to the project and assigned a value) to be an allowable cost under the project, including as Recipient cost share. Estimation methods used by the Recipient to assign a value to in-kind data cannot be objectively verified by DOE and therefore will not be accepted by DOE as an allowable cost under any project selected from this NOFO. Consequently, DOE will not recognize in-kind data costs in any resulting approved DOE budget.
Save file as: FY26 Budget Justification [TRACKING ID#].pdf
11. Vendor Quotes Submit vendor quotes, referenced costs (e.g., catalog pricing), or other basis for estimate for any single item over $10,000. This is required even though the proposer may intend to submit the contract for open bids following award. Save vendor quotes in one single file.
Save file as: FY26 Vendor Quotes [Tracking ID#].pdf
12. Current and Pending Support Current and pending support is intended to allow the identification of potential duplication, overcommitment, potential conflicts of interest or commitment, and all other sources of support. As part of the application, the Principal Investigator or Lead Project Manager and all covered individuals as defined in the NOFO Part 1, Application Content Requirements—Covered Individual Definition, Designation, and Responsibility at the applicant and subrecipient level must provide a list of all sponsored activities, awards, and appointments, whether paid or unpaid; provided as a gift with terms or conditions or provided as a gift without terms or conditions; full-time, part-time, or voluntary; faculty, visiting, adjunct, or honorary; cash or in-kind; foreign or domestic; governmental or private-sector;
directly supporting the individual’s research or indirectly supporting the individual by supporting students, research staff, space, equipment, or other research expenses. All connections with malign foreign talent recruitment programs must be identified in current and pending support.
Information Required for Each Activity
Sponsor of the Activity
The sponsor of the activity or the source of funding.
Award Number The federal award number or any other identifying number.
Award Title If the title of the award or activity is not descriptive, add a brief description of the research being performed that would identify any overlaps or synergies with the proposed research.
Total Cost or Value The total cost or value of the award or activity, including direct and indirect costs and cost…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .