FY26-Rail-Vehicle-Replacement-Program-Supplemental-Form.pdf
PDF 183 KB Posted
- Attached to
- FY 2026 Competitive Funding Opportunity: Competitive Grants for Rail Vehicle Replacement Program
- Opportunity number
- FTA-2026-009-TPM-RAIL
About this file
This document is a PDF loading error message, not a federal grant opportunity file. The PDF failed to render properly and only displays Adobe Reader troubleshooting instructions directing users to upgrade their PDF viewer software. No grant-related information, funding details, agency information, deadlines, or other substantive content is present in this document.
Supplemental Form
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026-10532.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Please wait...
If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.
You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.
For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.
Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.
v1.0.0 Page of FY 2026 Competitive Grants for Rail Vehicle Replacement Program (Rail Program) FY 2026 Competitive Grants for Rail Vehicle Replacement Program (Rail Program) Applicant and Proposal Profile Is this a resubmission due to an invalid/error message from FTA?
Is this a resubmission due to an invalid/error message from FTA?
Section I. Applicant Information Section I. Applicant Information (if applicable) FTA Recipient ID Number (30 characters) (Name and Direct Phone Number) Organization CEO (200 characters) Applicant Eligibility:
Applicant Eligibility:
Eligible Recipient or Subrecipient of 49 U.S.C. 5307, 5310, or 5311?
Project Location:
Project Location:
Eligible Recipient or Subrecipient of 49 U.S.C. 5307, 5310, or 5311?
Congressional Districts (Project Location) Congressional Districts (Project Location) Congressional District Section II. Project Information Section II. Project Information About the Project About the Project (Descriptive title of this project) Project Type:
Project Type:
Vehicle Replacement Vehicle Replacement Please complete the table below with information about the existing rail rolling stock to be replaced and the new vehicles planned for procurement.
Please complete the table below with information about the existing rail rolling stock to be replaced and the new vehicles planned for procurement.
NTD Revenue Vehicle Inventory (RVI) ID (existing) NTD Revenue Vehicle Inventory (RVI) ID (existing) Number of vehicles to be replaced (existing) Number of vehicles to be replaced (existing) Years in revenue service (existing list in number of years) Years in revenue service (existing list in number of years) Maximum vehicle passenger capacity (existing each) Maximum vehicle passenger capacity (existing each) Number of vehicles (new) Number of vehicles (new) Maximum vehicle passenger capacity (new each) Maximum vehicle passenger capacity (new each) Did any of these existing vehicles undergo rebuilds*?
Did any of these existing vehicles undergo rebuilds?
*Rebuild is defined as a capital expense associated with rolling stock that occurs at or near the end of a unit of rolling stock's useful life, and which results in an extended useful life for the unit of rolling stock consistent with the extent of the rebuilding (FTA Circular 5300 1).
*Rebuild is defined as a capital expense associated with rolling stock that occurs at or near the end of a unit of rolling stock's useful life, and which results in an extended useful life for the unit of rolling stock consistent with the extent of the rebuilding (FTA Circular 5300 1).
Did any of these existing vehicles undergo rebuilds?
Section III. Evaluation Criteria Section III. Evaluation Criteria Demonstration of Need Demonstration of Need Transit Asset Management Transit Asset Management Local Financial Commitment Local Financial Commitment Project Budget Project Budget Description
QTY
Rail Program Grant Amount Requested Other Federal Funds Total Project Cost Local Funds Total:
State of Good Repair Formula Funds (SGR) State of Good Repair Formula Funds (SGR) Please list the funding amount the applicant receives as part of the State of Good Repair Formula Grant Problem (49 U.S.C. 5337) apportionment.
Please list the funding amount the applicant receives as part of the State of Good Repair Formula Grant Problem (49 U.S.C. 5337) apportionment.
Project Scalability Project Scalability Is project scope scalable?
Is project scope scalable?
Procurement Strategy Procurement Strategy Project Proposed Milestones (Timeline) Project Proposed Milestones (Timeline) Timeline Item Description Timeline Item Date Technical, Legal, and Financial Capacity Technical, Legal, and Financial Capacity 9.0.0.2.20120627.2.874785
| CurrentPage: |
| PageCount: |
| ResetButton1: |
| btnValidate: |
| programCodeHidden: FTA-2026-009-TPM-RAIL |
| programVersionHidden: 1 |
| Yes: |
| No: |
| lbl_hidden_rbl_Resubmission: Is this a resubmission due to an invalid/error message from FTA? |
| cFocus: |
| Grants.gov Tracking Number (13 characters): |
| lbl_hidden_txt_grantsNumber: Grants.gov Tracking Number |
| Organization Legal Name (200 characters): |
| lbl_hidden_txt_orgLegalName: Organization Legal Name |
| FTA Recipient ID Number (30 characters): |
| lbl_hidden_txt_ftaRecipientIdNumber: FTA Recipient ID Number |
| Organization CEO (200 characters): |
| lbl_hidden_txt_orgCEO: Organization CEO |
| State: |
| Local Governmental Entity: |
| lbl_hidden_rbl_ApplicantEligibility: Applicant Eligibility |
| Large Urbanized Area (200,000+ people): |
| Small Urbanized Area (50,000-199,999 people): |
| Rural (less than 50,000 people): |
| lbl_hidden_rbl_ProjectLocation: Project Location |
| Description of Service Provided and Areas Served: (4000 characters): |
| lbl_hidden_txt_descriptionOfAreaServed: Description of Service Provided and Areas Served |
| Congressional District: |
| lbl_hidden_gridItem_ddl_congressDist: Congressional District |
| Remove Project Timeline Item: |
| lbl_hidden_gridTable_congressDistRepeatable: Congressional Districts |
| Insert Congressional District Item: |
| Project Title (200 characters): |
| lbl_hidden_txt_projectTitle: Project Title |
| Project Executive Summary (4000 characters): |
| lbl_hidden_txt_summaryOfReq: Project Executive Summary |
| Replacement of Locomotive (Propulsion Engine): 0 |
| lbl_hidden_cb_locomotive: Replacement of Locomotive (Propulsion Engine) |
| Replacement of Passenger Vehicle/Car: 0 |
| lbl_hidden_cb_passenger: Replacement of Passenger Vehicle/Car |
| lbl_hidden_cbl_ProjectType: Project Type |
| Specify propulsion type: (200 characters): |
| lbl_hidden_txt_propTypeLocomotive: Specify propulsion type (Replace of Locomotive): |
| Specify propulsion type: (200 characters): |
| lbl_hidden_txt_propTypePassenger: Specify propulsion type (Replacement of Passenger Vehicle/Car): |
| NTD Revenue Vehicle Inventory (RVI) ID (existing): |
| lbl_hidden_gridItem_num_NTDFleetId: NTD Revenue Vehicle Inventory (RVI) ID (existing) |
| Number of vehicles to be replaced (existing): |
| lbl_hidden_gridItem_num_vehiclesReplaced: Number of vehicles to be replaced (existing) |
| Years in Revenue Service (existing list in number of years): |
| lbl_hidden_gridItem_num_yearsRevenue: Years in revenue service (existing list in number of years) |
| Maximum vehicle passenger capacity (existing each): |
| lbl_hidden_gridItem_num_maxCapacity: Maximum vehicle passenger capacity (existing each) |
| Number of vehicles (new): |
| lbl_hidden_gridItem_num_vehiclesNew: Number of vehicles (new) |
| Maximum vehicle passenger capacity (new each): |
| lbl_hidden_gridItem_num_maxCapacityNew: Maximum vehicle passenger capacity (new each) |
| lbl_hidden_gridTable_vehicleRepeatable: Vehicle Replacement |
| Insert Project Budget Item: |
| lbl_hidden_rbl_IsOverhauls: Did any of these existing vehicles undergo rebuilds? |
| If yes, please explain: (4000 characters): |
| lbl_hidden_txt_overhaulsExpl: If yes, please explain |
| Demonstration of Need (4000 characters): |
| lbl_hidden_txt_demonstrationOfNeed: Demonstration of Need |
| Transit Asset Management (4000 characters): |
| lbl_hidden_txt_transitAssetManagement: Transit Asset Management |
| Matching Funds Amount: |
| lbl_hidden_num_matchingFunds: Matching Funds Amount |
| Provide information on the source, availability, and supporting documentation: (4000 characters): |
| lbl_hidden_txt_sourceMatchingFunds: Provide information on the source, availability, and supporting documentation |
| Item Description (100 characters): |
| lbl_hidden_gridItem_txt_Desc: Description |
| Quantity: |
| lbl_hidden_gridItem_num_Qty: Quantity |
| A. Rail Program Grant Amount Requested: |
| lbl_hidden_gridItem_num_FederalAmnt: Rail Program Grant Amount Requested |
| B. Other Federal Funds: |
| lbl_hidden_gridItem_num_LocalMatch: Other Federal Funds |
| C. Other Non-Federal Funds: |
| lbl_hidden_gridItem_num_OtherFederal: Other Non-Federal Funds |
| D. Total Cost: |
| lbl_hidden_gridItem_num_TotalCost: Total Cost |
| lbl_hidden_gridTable_budgetRepeatable: Project Budget |
| A. Grand Total - Rail Program Grant Amount Requested: |
| lbl_hidden_num_TotalFederalAmnt: Grand Total - Rail Program Grant Amount Requested |
| B. Grand Total - Other Federal Funds: |
| lbl_hidden_num_TotalLocalMatch: Grand Total - Other Federal Funds |
| C. Grand Total - Other Non-Federal Funds: |
| lbl_hidden_num_TotalOtherFederal: Grand Total - Other Non-Federal Funds |
| D. Grand Total - Total Cost: |
| lbl_hidden_num_TotalTotalCost: Grand Total - Total Cost |
| Applicant's FY2023 SGR Funding Allocation: |
| lbl_hidden_num_FY21SGR: Applicant's FY2023 SGR Funding Allocation |
| Applicant's FY2024 SGR Funding Allocation: |
| lbl_hidden_num_FY22SGR: Applicant's FY2024 SGR Funding Allocation |
| Applicant's FY2025 SGR Funding Allocation: |
| lbl_hidden_num_FY23SGR: Applicant's FY2025 SGR Funding Allocation |
| lbl_hidden_rbl_IsScalable: Is project scope scalable? |
| If Yes, specify minimum Federal Funds necessary: |
| lbl_hidden_num_minFederalFunds: If Yes, specify minimum Federal Funds necessary |
| Provide explanation of scalability with specific references to the budget line items above: (4000 characters): |
| lbl_hidden_txt_scalabilityExpl: Provide explanation of scalability with specific references to the budget line items above |
| Procurement Strategy (4000 characters): |
| lbl_hidden_txt_procurementStrategy: Procurement Strategy |
| Timeline Item Description (100 characters): |
| lbl_hidden_gridItem_txt_tlDesc: Timeline Item Description |
| Timeline Item Date (format MM/DD/YYYY): |
| lbl_hidden_gridItem_datetime_tlDate: Timeline Item Date |
| lbl_hidden_gridTable_timelineRepeatable: Project Timeline |
| Insert Project Timeline Item: |
| Technical, Legal, and Financial Capacity (4000 characters): |
| lbl_hidden_txt_technicalCapacity: Technical, Legal, and Financial Capacity |
File details come from the government source that posted it. Updated .