This is a Performance Work Statement (PWS) for the overhaul and repair of Wisconsin Model V-465D1 engines, 65 horsepower gasoline-fired internal combustion engines with electronic ignition, at Naval Base Coronado (NAS North Island).

The contractor shall perform complete engine overhauls at its own repair facility, with up to 5 engines repaired during the base year and 5 engines repaired in each subsequent option year. Engines will be delivered one at a time with at least 10 days' notice, and each overhaul must be completed within 30 days of delivery. The government will furnish the engines; the contractor must furnish all tools, equipment, materials, supervision, and quality control. Specific repair work includes replacement of pistons, piston rings, bearings, gasket sets, valves, valve springs, lifters, oil pump, and timing kits, along with extensive labor operations including cylinder boring, crankshaft grinding, magnaflux testing, valve jobs, head and block surfacing, and exterior painting to "like new" condition. Repair work must comply with manufacturer's technical manuals and NAVAIR Overhaul guide specifications, with no full test run required but engines must have turning crankshafts with compression capability. The contractor shall provide a minimum one-year warranty on parts and labor commencing upon government acceptance. Engines will be returned dry with oil drained, crated for storage, and inspected at the contractor's facility by a government representative. The designated government representative is Mr. Mark Sojourner, Commander Navy Region Southwest Air Operations Director. Payment will be made via Wide Area Workflow, and the contractor must provide a summary report of completed repairs upon engine delivery.

View the file

Other files

File Type Posted
Wisconsin_V460D_V461D_V465D_Repair_WM20250.pdf PDF
NAVAIR_Wisconsin Overhauls-E28 Manual Section X.pdf PDF
Wisconsin Motors Canada Engine Specs.pdf PDF
IMG_0815.jpg JPG image
IMG_0814.jpg JPG image
Wisconsin_v465-ILLUSTRATED PARTS CATALOG.pdf PDF
Sources Sought.docx DOCX document
IMG_0813.jpg JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS

02/17/2026

PERFORMANCE WORK STATEMENT (PWS)

for

Wisconsin Model V-465D1 Engine Overhauls Naval Base Coronado (NAS North Island)

A. General:

1. Introduction: The Contractor shall provide all personnel, equipment, tools, materials, supervision, quality control and other items and non-personal services necessary to perform repair service for 65 horse power, gasoline fired internal combustion engines, Electronic ignition, Wisconsin Model V-465D1 as defined in this PWS. The Contractor shall perform to the standards in this contract and return engines to original operating specifications. Up to 5 engines repaired in the base year and 5 engines repaired in each subsequent option year.

2. Background: Commander Navy Region Southwest (CNRSW), has Wisconsin (Model V-465D1) engines in need of overhaul repair. The engines are diagnosed with a range of problems including: seized pistons, scuffing of the cylinders and debris from the pistons in the bearings. A full list of required parts and labor is detailed in section E.1.

Engines will be delivered to contractor facility as they fail and are identified in need of overhaul.

Overhaul and repair of each engine to be completed within 30 days after delivery to contractor facility.

B. General Information:

1. Place and Performance of Services: Contractor’s repair facility.

2. Identification of Contractor Employees: All contactor personnel shall wear identifiable clothing and display their temporary badge (if visit to Government property becomes necessary).

3. Designated Representative: The requiring activity representative is Mr. Mark Sojourner, Commander Navy Region Southwest Air Operations Director. Telephone: 619-705-5305; email:

mark.e.sojourner.civ@us.navy.mil

C. Government Furnished Property, Material, Equipment and Services (GFP/M/E/S):

The engines are located at various locations and shall be provided to contractor after contract award.

The engines will be delivered in shipments of 1 each, during the period of performance, with at least 10 days notice to contractor. Last engine will be delivered NLT 45 days prior to end of period of performance

D. Contractor Furnished Property, Materials, Equipment (CFP/M/E):

All tools and equipment necessary for repair of engine.

E. Contractor Requirements

1. The Contractor shall perform the following repairs and replacement:

New Parts

• Pistons & pins

• Piston rings

• Rod, main, & cam bearings

• Timing kit – domestic OHV

• Rod bearings (if used)

• Brass freeze plug kit

• Cam & oil galley plugs

• Camshaft-reground-new available

• New valve springs (as required)

• New valve lifters

• New exhaust valves

• Rockers & push rods (as required)

• Unleaded exhaust seats (as required)

• Oil pump

• Full gasket set

• Timing kit - OHC

Labor

• Clean & magnaflux block

• Bore cylinders

• Power hone cylinders

• Surface blocks

• Align hone main saddles

• Resize connecting rods and align

• Rebush rods (as required)

• Grind crankshaft

• Install all oil & freeze plugs

• Install cam bearings

• Assemble short block

• Clean & magnaflux heads

• Three angle valve job

• Repair all guides (as required)

• Surface heads

• Install heads-lifters-valves

• Train & adjust

• Paint exterior to resemble “like new” condition

2. Repair work to be completed in accordance with manufacturer’s technical manuals and drawings provided by Government. Repair work shall include a minimum one-year warranty on parts and labor, which commences upon acceptance by government representative.

3. Inspection and acceptance shall be performed at the Contractor’s repair facility by a government representative. Upon satisfactory completion of acceptance inspection, contractor will crate the engines appropriately for medium to long-term storage and government representative will transport engines back to the appropriate installation.

4. Deliverables:

4.1 Minimum Performance Specifications (see NAVAIR Overhaul guide, Reference 1). No test run is expected, however the engine crankshaft shall turn and make compression.

4.2 Engines shall be returned to the government dry, with oil drained (only assembly lubrication remaining from the rebuilding process). A new filter does not need to be installed for shipping. Cover all openings covered to preserve integrity and crate for storage (unless otherwise instructed).

4.3 The fuel strainer shall be cleaned and replaced

4.4 Bore cylinder and grind crankshaft as necessary to return engine to operating condition.

4.5 Reuse all fasteners, oil lines and fuel lines unless unusable. Replace unusable items.

4.6 Oil pressure relief valve shall be replaced.

5. Additional Details:

• Engines are delivered with various external accessories removed. External accessories and lines are not expected to be replaced; only internal rework is required.

• The following items are not part of this servicing requirement:

Fuel pump Governor

Heat Deflectors Starter Starter Switch Starter Gear Accessory Drives Alternators Gauge Switch Panel Oil Pressure Ammeter Battery Voltage Ignition Switch Ignition Systems Distributor Points (part of distributor) Electronics Plug wires Plugs Ignition coil

F. Reports- Provide summary of repairs completed upon delivery of engine to US Government.

G. Method of payment-Method of payment shall be via Wide Area Workflow.

H. Instructions/References:

(1) NAVAIR 51-5-31 Section X, Overhaul Instructions

(2) Wisconsin Models V465D, V460D, V461D Repair Manual

(3) Wisconsin Motors Canada Quick Reference Specifications

(4) Wisconsin V456 Manufacturers Parts Breakdown

(5) Engine Photo 1

(6) Engine Photo 2

(7) Engine Photo 3

New Parts
Pistons & pins
Piston rings
Rod, main, & cam bearings
Timing kit – domestic OHV
Rod bearings (if used)
Brass freeze plug kit
Cam & oil galley plugs
Camshaft-reground-new available
New valve springs (as required)
New valve lifters
New exhaust valves
Rockers & push rods (as required)
Unleaded exhaust seats (as required)
Oil pump
Full gasket set
Timing kit - OHC
Labor
Clean & magnaflux block
Bore cylinders
Power hone cylinders
Surface blocks
Align hone main saddles
Resize connecting rods and align
Rebush rods (as required)
Grind crankshaft
Install all oil & freeze plugs
Install cam bearings
Assemble short block
Clean & magnaflux heads
Three angle valve job
Repair all guides (as required)
Surface heads
Install heads-lifters-valves
Train & adjust
Paint exterior to resemble “like new” condition
2. Repair work to be completed in accordance with manufacturer’s technical manuals and drawings provided by Government. Repair work shall include a minimum one-year warranty on parts and labor, which commences upon acceptance by government represent...

File details come from the government source that posted it. Updated .