FY26 HEALY MDE SOW 2932.docx
DOCX document 113 KB Posted
- Attached to
- USCGC HEALY MDE TECHNICAL OVERHAUL SERVICES
- Solicitation number
- 70Z8526Q002932
About this file
This is a Statement of Work (SOW) for main diesel engine (MDE) technical representative and shop overhaul services for USCGC HEALY (WAGB 20) during fiscal year 2026. The work involves inspection and maintenance of four Sulzer 12ZAV40S Main Diesel Engines manufactured by Wartsila Inc., with a period of performance from February 16, 2026 through May 25, 2026 at Vigor Marine Drydock in Portland, Oregon. The contractor must provide a Defense Maritime Solutions, Inc. certified Technical Representative who is a certified Mechanical Superintendent of Wartsila Inc. and must be present during all disassembly, inspection, reassembly, and testing of diesel engine components during normal work hours (Monday-Friday, 0700-1600), with potential weekend and extended hour requirements to maintain schedule.
The scope of work includes crank pin bearing inspections, camshaft bearing inspections, camshaft inspections, crankshaft web deflection inspections, crankshaft counterweight stud inspections, main bearing inspections, fuel pump injection inspections, camshaft thrust bearing inspections, and pre-lube pump renewal across the four engines. Government-furnished property includes main bearing kits, big end bearing kits, cam bearing shells, fuel delivery valves, fuel injector o-rings, and a pre-lube pump screw type unit. The contractor must supply all remaining required parts, gaskets, and specialized tools not provided by the Government, ensure compliance with Coast Guard Technical Publications and applicable safety standards, submit weekly progress reports and condition-found reports with photographic documentation, and provide a comprehensive final report within three weeks of completion including inspection measurements compared to allowable clearance readings and assessment of bearing and component wear.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| NOTICE OF INTENT TO SOLE SOURCE 70Z8526Q002932.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC HEALY (WAGB 20)
SPECIFICATION FOR HEALY MDE TECHNICAL REPRESENTATIVE AND SHOP OVERHAUL SERVICES FY26
Developed By: LT Sarah Passilla (12 December 2025)
Revisions Record This page is used to record specification revisions, which may have occurred after a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel with a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV # |
| CHANGES MADE |
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to provide the services of a Defense Maritime Solutions, Inc. certified repair facility and technical representative to oversee main diesel engine maintenance listed in Table 1.
1.2 Government-furnished property (GFP).
| MTI |
| ITEM DESCRIPTION |
| NSN |
| P/N |
| QTY |
| N |
| MAIN BEARING KIT |
| 016545783 |
KS12100
| N |
| BIG END BEARING KIT |
| 016548091 |
| KS33260 |
| 08 |
| N |
| CAM UPPER BEARING SHELL |
| 014460425 |
| KS42171 |
| 08 |
| N |
| CAM LOWER BEARING SHELL |
| 014461424 |
| KS42172 |
| 08 |
| N |
| CAM LAPPED BEARING RING HALVES |
| 014461431 |
| KS42180 |
| 02 |
| N |
| FUEL DELIVERY VALVE AND PIPE SEAL |
| 01HLY0273 |
| KS27266 |
| 96 |
| N |
| FUEL INJECTOR O-RING |
| 014648552 |
| KS27025 |
| 144 |
| N |
| FUEL INJECTOR O-RING |
| 014648530 |
| KS27027 |
| 50 |
| N |
| Pre-Lube Pump, Screw Type |
| 123534694 |
| SLS440ER52U12.1W1-PN16PN16 |
| 01 |
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 420-WAGB 801-1, Rev K, Booklet of General Drawings Coast Guard Drawing 420-WAGB 259-001, Rev H, Diagram Combustion Air & Exhaust Gas System Coast Guard Drawing 420-WAGB-233-528, Rev F, Arrangement of Pipe Connections - Diesel Generator Set Coast Guard Drawing 420 WAGB 259-005, Rev C, Machinery Plant Exhaust Gas Piping A & D
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 5016, 20-APR-16, S9233-Dh-MMC-010 - Main Diesel Engine (MDE) (Volume 1) Coast Guard Technical Publication (TP) 5017, 01-JAN-97, S9233-Dh-MMC-020 - Main Diesel Engine (MDE) (Volume 2) Coast Guard Technical Publication (TP) 5018, 01-JAN-97, S9233-Dh-MMC-030 - Main Diesel Engine (MDE) (Volume 3) Coast Guard Technical Publication (TP) 5019, 01-JAN-97, S9233-Dh-MMC-040 - Main Diesel Engine (MDE) (Volume 4) Coast Guard Technical Publication (TP) 5020, 14-JUN-06, S9233-Dh-MMC-050 - Main Diesel Engine (MDE) (Volume 5, Part 1) Coast Guard Technical Publication (TP) 5020, 14-JUN-06, S9233-Dh-MMC-050 - Main Diesel Engine (MDE) (Volume 5, Part 2) Coast Guard Technical Publication (TP) 5022, 02-JUN-06, S6265-A4-MMC-010 - Main Generators, Synchronous Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2020, Occupational Safety and Health Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
3.1.1 Hazardous Waste disposal. Contractor shall comply with Surface Forces Logistics Center (SFLC) Std. Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities for hazardous waste (HW) disposal.
3.1.2 Schedule and Progress. The Contractor shall provide planning document(s) IAW SFLC Std Spec 0000 and hold a weekly progress meeting for all stakeholders. The Contractor shall also hold a daily production meeting with Port Engineer staff.
3.1.3 Condition Found Report (CFR) Submission. The Contractor is not required to sign CFRs.
3.1.3.1 All CFRs that include a recommended repair shall include proposed change language to the specification.
3.1.3.2 The Contractor shall maintain a spreadsheet tracking all CFR deliverables required by the contractor. The spreadsheet will be provided to the Port Engineer weekly.
3.1.4 Technical Representative. The Contractor shall provide the services of a Defense Maritime Solutions, Inc. certified Technical Representative (Tech Rep), who is familiar with - the Sulzer 12ZAV40S Diesel Engine, manufactured by Wartsila Inc., to accomplish the following tasks – on site:
· Provide manufacturer's proprietary information, software, and tools pertinent to the equipment/system.
· Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system.
3.1.4.1.1 Tech Rep shall be present for all disassembly, inspection, reassembly, and testing of the Diesel Engine components.
3.1.4.1.2 The Contractor shall provide a Tech Rep that is a certified Mechanical Superintendent of Wartsila Inc.
3.1.4.1.3 The Contractor shall submit the name and resume of the Tech Rep to the Port Engineer at the award of the contract.
3.1.1.1 The Contractor shall be required to have this Tech Rep present during the period of performance during normal work hours.
3.1.4.2.1 Protective measures. The Contractor shall take protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3, as applicable, in addition to all other requirements that may be specified in individual work items, to prevent contamination and surface damage of non-affected shipboard equipment, components, and spaces.
3.1.4.2 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.1.5 General Information.
3.1.5.1 Period of Performance: The period of performance begins on or around 16 February 2026 and ends on 25 May 2026. Additional labor and per diem may be recommended via a Condition Found Report. The contractor is not authorized to incur additional labor or per diem costs without approval.
3.1.5.1.1 Normal work hours will be Monday through Friday, 0700-1600. Work outside of the normal work hours shall be communicated to the Port Engineer.
3.1.5.1.2 The Contractor may be required to work outside of the normal working hours and days, to include weekends to maintain schedule.
3.1.5.2 Recognized Federal Holidays: The following holidays will not be workdays for the Government or the Contractor unless otherwise agreed upon between the Contractor and the Port Engineer.
· President’s Day (Monday, 16 February 2026)
3.1.5.3 Place of Performance: The work to be performed under this contract will be conducted at the shipyard awarded the drydock availability of USCGC HEALY. The place of performance will be:
Vigor Marine Drydock 5555 N Channel Ave, Portland, OR 97217
3.1.5.4 Reporting Requirements: Contractor personnel shall report to the Port Engineer any information or circumstances of which they are aware that may pose a threat to the security or safety of U.S. Coast Guard personnel, contractor personnel or resources, immediately.
3.1.5.5 Occupational Safety and Health and Environmental Standards: The Contractor must provide all required personal safety equipment for their employees, such as, but not limited to; safety helmet, safety glasses and shoes, floatation devises, and hearing protection. All safety equipment must meet OSHA standards. Failure of the Contractor employees to comply with the above requirements could result in a shutdown of operations. The Contractor must also have a current Safety Plan, which shall be submitted for review as part of their quote.
3.1.2.4.1 The Contractor is responsible to comply with all applicable Federal, State and local environmental laws and regulations including but not limited to the Clean Water Act, the Oil Pollution Act, the Endangered Species Act, and the Coastal Zone Management Act.
3.2 Scope.
3.2.1 The HEALY is equipped with four (4) Sulzer 12ZAV40S Main Diesel Engines (MDE). Each MDE is attached to a propulsion generator.
3.2.2 The work to be accomplished on each MDE is listed in Table 1. The contractor is to supply all parts to complete this work not provided as GFP in paragraph 1.2.
3.2.5 All engine work in Table 1 shall be conducted in accordance with Coast Guard Technical Publication (TP) 5018, 01-NOV-03, S9233-Dh-MMC-030 - Main Diesel Engine (MDE) (Volume 3) unless otherwise specified in this document.
TABLE 1 – WORK TO BE ACCOMPLISHED
CLIN 001 - MDE NO. 1 (ENGINE SERIAL NUMBER 2028/740389)
| Description of Work |
| Amplifying Info |
| Tech Pub Reference |
| Crank Pin Bearings Inspection (M-H-7352) |
| Bearings A1, B1 |
| Vol 3. 3302-1/A1 |
| Camshaft Bearing Inspection (M-H-7353) |
| Bearings A3, B3 |
| Vol 3. 4201-1/A1 |
| Camshaft Inspection (M-H-7347) |
| All Camshafts |
| Vol 3. 4101-1/A1, 4201-1/A1 |
Crankshaft Web Deflection Inspection (M-C- 10722)
| All Cranks |
| Vol 3. 3101-1/A1 |
| Crankshaft Counterweight Studs Inspection (M-A-7521) |
| All Counterweights |
| Vol 3. 3101-3/A1 |
| MDE Main Bearing Inspection (M-H-7354) |
| Bearings 3, 6 |
| 1201-2/A1 |
Pre-Lube Pump Renew (M-C-7334)
Number 1 Complete Pump Renewal
Camshaft Thrust Bearings
Bearings A, B 4201−1/A1
CLIN 002 - MDE NO. 2 (ENGINE SERIAL NUMBER 2025/740386)
| Description of Work |
| Amplifying Info |
| Tech Pub Reference |
| Crank Pin Bearings Inspection (M-H-7352) |
| Bearings A1, B1 |
| Vol 3. 3302-1/A1 |
| Camshaft Bearing Inspection (M-H-7353) |
| Bearings A3, B3 |
| Vol 3. 4201-1/A1 |
| Camshaft Inspection (M-H-7347) |
| All Camshafts |
| Vol 3. 4101-1/A1, 4201-1/A1 |
Crankshaft Web Deflection Inspection (M-C- 10722)
| All Cranks |
| Vol 3. 3101-1/A1 |
Crankshaft Counterweight Studs Inspection (M-A-7521)
| All Counterweights |
| Vol 3. 3101-3/A1 |
| MDE Main Bearing Inspection (M-H-7354) |
| Bearings 3, 6 |
| 1201-2/A1 |
| Fuel Pump Injection Pumps (M-H-7358) |
| All |
| Vol 3. 5501-1/5501-2 |
CLIN 003 - MDE NO. 3 (ENGINE SERIAL NUMBER 2026/740387)
| Description of Work |
| Amplifying Info |
| Tech Pub Reference |
| Crank Pin Bearings Inspection (M-H-7352) |
| Bearings A1, B1 |
| Vol 3. 3302-1/A1 |
| Camshaft Bearing Inspection (M-H-7353) |
| Bearings A3, B3 |
| Vol 3. 4201-1/A1 |
| Camshaft Inspection (M-H-7347) |
| All Camshafts |
| Vol 3. 4101-1/A1, 4201-1/A1 |
Crankshaft Counterweight Studs Inspection (M-A-7521)
| All Counterweights |
| Vol 3. 3101-3/A1 |
Crankshaft Web Deflection Inspection (M-C-10722)
| All Cranks |
| Vol 3. 3101-1/A1 |
| MDE Main Bearing Inspection (M-H-7354) |
| Bearings 3, 6 |
| 1201-2/A1 |
CLIN 004 - MDE NO. 4 (ENGINE SERIAL NUMBER 2027/740388)
| Description of Work |
| Amplifying Info |
| Tech Pub Reference |
| Crank Pin Bearings Inspection (M-H-7352) |
| Bearings A1, B1 |
| Vol 3. 3302-1/A1 |
| Camshaft Bearing Inspection (M-H-7353) |
| Bearings A3, B3 |
| Vol 3. 4201-1/A1 |
| Camshaft Inspection (M-H-7347) |
| All Camshafts |
| Vol 3. 4101-1/A1, 4201-1/A1 |
Crankshaft Web Deflection Inspection (M-C-10722)
| All Cranks |
| Vol 3. 3101-1/A1 |
Crankshaft Counterweight Studs Inspection (M-A-7521)
| All Counterweights |
| Vol 3. 3101-3/A1 |
| MDE Main Bearing Inspection (M-H-7354) |
| Bearings 3, 5, 6 |
| 1201-2/A1 |
| Camshaft Thrust Bearings |
| Bearings A, B |
| 4201−1/A1 |
3.2.4 Labor to accomplish engine work will be provided by the Coast Guard Naval Engineering Department Seattle, HEALY Port Engineers, and/or Ship’s force.
3.2.5 Any parts that are being reused shall be installed in the same location from which they were removed.
3.2.6 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel perform an initial operational test of the engines and exhaust system to demonstrate existing operational condition. Submit a CFR to Port Engineer.
NOTE
Other contractors and Coast Guard personnel may be conducting maintenance within the generator rooms. Coordination with these contractors and the Port Engineer will be paramount for the successful completion of all work items.
3.2.7 Final Report. The contractor shall submit a final and comprehensive report in the form of a condition-found report (CFR) to the Port Engineer containing the results of all inspections in Table 1 and work accomplished. Include all measurements taken compared with allowable clearance readings and a written assessment of the bearing and component wear. Include high resolution color photos of each bearing removed and any item presenting unusual wear. One electronic format (CD or DVD) and two-color hard copies of the report shall be delivered to the Port Engineer within three weeks of completion of sea trials.
3.3 Engine Parts.
3.3.1 Only certified OEM components, whether new or reconditioned, will be accepted.
3.3.2 The Contractor shall supply all required gaskets to complete all work listed in Table 1.
3.4 General Conditions
3.4.1 Specialized tools listed in the manufacturer's technical instructions, which are required to remove the bearing shells for inspection, are available aboard the vessel.
3.5 Work plan. The Contractor shall develop a plan for collecting and disposing of waste and submit to the plan to the Port Engineer via CFR. The Contractor shall perform this work upon receiving Port Engineer approval of the plan.
3.6 Camshaft Bearing Inspection/Bearing Renewal (M-H-7353)
3.6.1 Contractor shall conduct a visual inspection of camshafts and running surfaces including but not limited to lobes and drive gear teeth within the first 50% of the period of performance. Submit CFR to Port Engineer.
3.6.2 Contractor shall measure cam gear backlash and axial thrust clearance. Submit CFR to Port Engineer.
3.6.3 If A1 camshaft bearings are being inspected, the Contractor shall remove governor drive housing and/or over-speed housing and any other interferences required to conduct camshaft bearing inspections.
3.8 Acceptance Testing
3.8.1 Test Performance. All acceptance tests shall be performed in the presence of the Coast Guard Inspector. Only Coast Guard personnel will operate the Cutter’s equipment. Submit CFR to the Port Engineer of all test results within one week of test completion.
3.8.2 Test Plan. The Contractor shall submit a Test Plan via CFR to the Port Engineer for approval at least 2 weeks before any testing is conducted. The Test Plan shall include the load requirements for each test, duration of each test, and list any inspections to be performed during the testing.
3.8.3 Operational Test – Post Repairs. After completion of work, the Contractor shall witness an operational test by Coast Guard personnel of all items or shipboard devices that have been disturbed, used, repaired, altered, or installed, to prove that they are in satisfactory operating condition. Submit a CFR to Port Engineer.
3.8.4 Restore all systems and clear tags in accordance with the SFLC Standard Specification 0000 - General Requirements.
NOTE
The ship's electrical load may not be able to supply the required electrical loads. In this case, the engine will be operated up to the electrical load available.
3.8.5 Final Acceptance – The Coast Guard will accept the engine repairs as complete when these specifications are complete and the engines are operating within the OEM parameters with no discrepancies. If full load cannot be obtained due to insufficient electrical load requirements, the engine will be accepted based on testing with the available electrical load.
4. NOTES
This section is not applicable to this work item.
Rev-1 Rev-1 Rev-0 image1.jpg