A2. PC_PWS_IORC Cubicle Rearrangement.pdf
PDF 93 KB Posted
- Attached to
- Cubicle Rearrangement IORC JBLM WA.
- Solicitation number
- FY25-W91GHK0012344916
- Issued by
-
Department of the Army National Guard
About this file
This Performance Work Statement (PWS) details a cubicle rearrangement project at the IORC involving three designated areas: S3 Area, S1 Area, and Collateral Space Area. The project scope includes reconfiguring existing cubicle spaces into bullpen-style workspaces, with specific tasks for each area: the S3 Area will transform 8 cubicle stations into a new layout, the S1 Area will convert 8 stations into a bullpen with 9 stations, and the Collateral Space Area will involve moving 10 workstations 3-5 feet and extending electrical connections.
The contractor responsibilities include performing all reconfiguration tasks, ensuring compliance with building and fire codes, completing electrical work, and collaborating with the customer to finalize design and layout. Customer responsibilities involve moving existing items, designating a storage area for excess cubicle parts, and providing building access during business hours. The project timeline will be determined collaboratively, with all work performed during regular business hours. The budget will be established based on the scope of work and agreed upon by both parties before project commencement, with acceptance criteria focused on meeting building codes, ensuring electrical functionality, and successfully reconfiguring workspaces according to the agreed design.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Cubicle Rearrangement at the IORC
Project Overview:
The purpose of this project is to reconfigure cubicle spaces in three designated areas: S3 Area, S1 Area, and Collateral Space Area. The reconfiguration will involve rearranging existing cubicle components, creating bullpen-style workspaces, and relocating workstations as specified. All work will comply with current building and fire codes, and any required electrical work will be completed by the contractor or subcontracted as necessary.
Scope of Work:
The contractor will perform the following tasks:
1. S3 Area:
o Reconfigure the current 8 cubicle stations into a bullpen-style workspace.
o Utilize existing cubicle components for the reconfiguration.
o Perform or subcontract any required electrical work to ensure functionality.
o Collaborate with the customer to ensure the design meets current building and fire codes.
o Relocate any excess cubicle parts to a storage area designated by the customer.
o All work will be performed during regular business hours.
2. S1 Area:
o Reconfigure the current 8 cubicle stations into a bullpen-style workspace with 9 stations.
o Utilize existing cubicle components for the reconfiguration.
o Perform or subcontract any required electrical work to ensure functionality.
o Collaborate with the customer to ensure the design meets current building and fire codes.
o Relocate any excess cubicle parts to a storage area designated by the customer.
o All work will be performed during regular business hours.
3. Collateral Space Area:
o Move 10 workstations approximately 3 to 5 feet to new positions.
o Extend electrical connections as needed to accommodate the move.
o Perform or subcontract any required electrical work to ensure functionality.
o All work will be performed during regular business hours.
Customer Responsibilities:
• Move all existing items from workspaces to accommodate the reconfiguration.
• Designate a storage area for excess cubicle parts.
• Provide access to the building during regular business hours.
Contractor Responsibilities:
• Perform all reconfiguration tasks as outlined in the scope of work.
• Ensure all designs and configurations comply with current building and fire codes.
• Complete or subcontract any required electrical work.
• Collaborate with the customer to finalize the design and layout.
• Relocate excess cubicle parts to the designated storage area.
Deliverables:
• Reconfigured bullpen-style workspace in the S3 Area.
• Reconfigured bullpen-style workspace with 9 stations in the S1 Area.
• Relocated workstations in the Collateral Space Area with extended electrical connections.
Timeline:
• All work will be completed during regular business hours.
• The project timeline will be determined in collaboration with the customer and contractor prior to the start of work.
Acceptance Criteria:
• All reconfigurations meet current building and fire codes.
• Electrical work is completed and functional.
• Workspaces are reconfigured as per the agreed-upon design.
• Excess cubicle parts are relocated to the designated storage area.
Budget:
• The budget for this project will be determined based on the scope of work and agreed upon by both parties prior to the start of work.