FY24_Statement_of_Work_for_Fuel_Booming.pdf

PDF 190 KB Posted

Attached to
FundedPR to create a new BPA for boom services in
Solicitation number
1333MK24Q0008
Issued by

About this file

This Statement of Work outlines requirements for fuel boom deployment and retrieval services at NOAA facilities in Pascagoula, MS. The contractor must provide personnel and equipment to deploy and retrieve containment booms during scheduled fueling events for NOAA vessels at the Gulf Marine Support Facility and Singing River Naval Complex.

The work includes up to 26 anticipated events through September 30, 2024, with an option period for additional events from October 2024 through September 2025. The contractor must deploy booms of varying lengths (450-700 feet) for partial enclosure of vessel fueling operations, with specific requirements listed for multiple vessels including Oregon II, Pisces, Nancy Foster, Ronald Brown, and Gordon Gunter. Key requirements include ability to schedule boom delivery within one week of request, deployment and recovery before/after each event, and capability to handle full-enclosure or larger boom requirements with longer lead times. Events may occur on holidays and weekends.

View the file

Other files

File Type Posted
Sol_1333MK24Q0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Fuel Boom Deployment and Retrieval

Description Provide all personnel and equipment required to deploy and retrieve a boom during a scheduled fueling event for NOAA Vessels located at NOAA’s Gulf Marine Support Facility and Singing River Naval Complex during multiple events over the coming months. These listed dates are subject to change. Ship schedules after September 30th are unknown, so option clauses will be added to allow for further events as schedules are clarified.

Requirement

• Provide and deploy up to fuel boom for partial enclosure of vessel fueling/oil transfer operations.

• Deploy and Recover fuel boom prior to and after event.

• Event dates may include holidays and weekends

• Be able to schedule boom delivery within one calendar week of receipt of request from Contracting

Officer

• Additional full-enclosure or larger boom requirements met with longer lead times.

Place of Performance NOAA Gulf Marine Support Facility 151 Watts Ave Pascagoula, MS 39567 Or

Singing River Naval Complex 107 USS Parsons Way Pascagoula, MS 39502

Period of Performance

• Up to 26 anticipated events through Sep 30, 2024

• CLIN 0002 Unknown number of events from 10/01/24 through 09/30/25 (contract option)

Description
Requirement
Place of Performance
Period of Performance

File details come from the government source that posted it. Updated .