About this file

This document provides instructions for proposals submitted in response to the Environmental Security Technology Certification Program (ESTCP) Supplemental Broad Agency Announcement. Proposals are due by August 31, 2023 and should be submitted through the SERDP and ESTCP Management System. Proposals will be evaluated based on technical merit, cost/benefit of the technology, transition potential, and cost of the proposal. Technologies appropriate for demonstration must be sufficiently mature and not intended for full-scale cleanup. If selected, projects are expected to validate technology performance, generate cost data, support regulatory acceptance, and develop implementation guidance. Projects will be funded incrementally beginning in June 2024 and must include ESTCP reporting deliverables. The U.S. Army Corps of Engineers will manage the solicitation process and contracting.

View the file

Other files for this federal contract opportunity

Other files attached to Environmental Security Technology Certification Program (ESTCP) - Environmental Technology Demonstrations Supplemental Broad Agency Announcement, newest first.
File Type Posted
SERDP-ESTCP Projects Small Business Subcontracting Plan Template.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Supplemental BAA Proposal

Submittal Instructions

PROGRAM ANNOUNCEMENT FOR FY 2024 ENVIRONMENTAL

SECURITY TECHNOLOGY CERTIFICATION PROGRAM (ESTCP)

ESTCP Supplemental Broad Agency Announcement

Proposal Submittal Instructions

Reference: Broad Agency Announcement (BAA), July 26, 2023, U.S. Army Corps of Engineers, Humphreys Engineer Center Support Activity

1. INTRODUCTION

The Environmental Security Technology Certification Program (ESTCP) is the Department of

Defense’s (DoD’s) demonstration and validation (Dem/Val) program for environmental and installation energy technologies. Throughout this document, “technology” refers broadly to integrated systems based on any combination of hardware (equipment) and software (processing), materials engineering processes, and resource management devices, methods, tools, or models based on scientific principles. Technologies appropriate for demonstration and validation will be sufficiently mature that all required laboratory or other proof-of-concept work has been completed.

Commercial technologies already in use are not considered appropriate for demonstration and validation.

ESTCP is seeking proposals for innovative demonstrations as candidates for funding beginning in

Fiscal Year (FY) 2024. Descriptions of the topic areas and complete solicitation details are on the

ESTCP website.

This Broad Agency Announcement (BAA) is for Private Sector organizations. DoD organizations (Services and Defense Agencies) wishing to submit proposals to ESTCP should refer to the FY24 DoD Call for Proposals. Federal agencies outside DoD should refer to the FY24 Call for Proposals for Federal Organizations Outside DoD. Instructions for the DoD and Other Federal

Calls for Proposals may be found on the ESTCP website.

1.1 BACKGROUND

The purpose of ESTCP is to demonstrate and validate promising innovative technologies that target DoD’s most urgent environmental and installation energy needs and are projected to pay back the investment through cost savings, improved efficiencies, or improved outcomes. ESTCP responds to high priority DoD environmental and installation energy technology requirements and the need to improve defense readiness by reducing the drain on the Department’s operation and maintenance dollars caused by real world commitments such as environmental restoration, waste and facility management, range sustainability, energy security, and water conservation. The goal is to enable promising technologies to receive regulatory and end-user acceptance and be fielded and commercialized more rapidly. To achieve this goal, ESTCP projects create a partnership between technology developers, responsible DoD organizations, and the regulatory community. This program announcement is seeking proposals from the technology development community.

ESTCP demonstrations are conducted under operational conditions at DoD facilities or locations for which DoD holds environmental responsibility. Candidate technologies are expected to have successfully completed laboratory testing and, when applicable, initial small-scale field testing.

https://www.serdp-estcp.org/workingwithus https://www.serdp-estcp.org/workingwithus

2 Supplemental BAA Proposal

The demonstrations are intended to generate supporting cost and performance data for acceptance or validation of the technology. ESTCP demonstration projects also are required to support the future implementation of the tested technology through the development of appropriate guidance, design, and/or protocol documents. ESTCP will not support full-scale demonstrations that are primarily intended to solve an individual installation’s problem. Full-scale cleanup is not performed under ESTCP. ESTCP gives priority to those projects that address multi-Service or

DoD environmental requirements.

ESTCP projects must:

1. Execute the technology demonstration to validate the technology’s performance and expected operational costs:

• Each project develops one or more Demonstration Plans, as appropriate to the project, to govern the technical execution and management of the demonstration.

Guidance describing the requirements of the ESTCP Demonstration Plan can be found on the ESTCP website. The Demonstration Plan is reviewed and must be approved by the ESTCP Office prior to beginning any fieldwork.

• Each project is expected to generate sufficient pertinent and high-quality data to scientifically validate all claims made for the technology.

• Cost and performance data will be collected during the demonstration(s) to allow realistic estimates to be derived for full-scale implementation of the technology at the demonstration site and other DoD sites.

2. Transfer the technology:

• Identify and work with the intended DoD user community to achieve their acceptance and feedback on the usefulness of the technology.

• Publish appropriate user guidance, design, and/or protocol documents to assist the future implementation of the technology.

• Publish a Final Report based on the ESTCP Final Report guidance.

• Publish the results of the demonstration in the scientific peer reviewed literature and present results at technical conferences, as appropriate.

• Identify pathways to implementation of the technology.

3. Provide data and support to achieve regulatory and end-user acceptance:

• Technologies needing regulatory approval for use will be required to engage the regulatory community at the outset of project execution. Feedback from regulators must be solicited and incorporated into the project’s Demonstration Plan.

• No single approach for working with the regulatory community is prescribed by the program. Interaction with individual state regulatory organizations, interstate groups, and the U.S. Environmental Protection Agency (EPA) is encouraged. The approach taken should be appropriate for the technology being demonstrated and the regulatory issues associated with implementing the technology.

Proposers selected for demonstration will be teamed with a DoD liaison who will be responsible for assisting in selecting the demonstration site, validating the technology’s cost and performance, https://www.serdp-estcp.org/workingwithus/templatesandguidance

3 Supplemental BAA Proposal interfacing with the regulatory and user community, and supporting the transfer of the technology across DoD.

1.2 GENERAL INFORMATION FOR PRIVATE SECTOR PROPOSERS

The solicitation will be managed by the ESTCP Office along with the U.S. Army Corps of

Engineers, Humphreys Engineer Center Support Activity (HECSA) in Alexandria, Virginia. For contracting or small business information regarding this BAA solicitation, contact Aimee

Johnson (703-428-6551; Aimee.N.Johnson@usace.army.mil), Shannon Benson (703-428-7407;

Shannon.N.Benson@usace.army.mil), or the HECSA Small Business Representative Monique

Holmes (202) 934-1816; HECSASmallBusinessProgram@usace.army.mil). General procedural questions may be referred to the ESTCP Office at 571-372-6565. For technical questions regarding this announcement, contact the individual listed within the topic area description.

Awardees under this BAA will be selected based on the review of a written proposal. Proposals marked with ITAR, EAR, a limited distribution statement, Controlled Unclassified Information

(CUI), or as company proprietary are not accepted. Please note, only government employees or

Department of Defense contractors who have signed non-disclosure agreements have access to

ESTCP proposals.

Based on evaluation of the written proposal, each proposer will be notified as to whether the

Government wishes to enter into negotiations for the award of a contract. Proposers are advised that only the Contracting Officer is legally authorized to commit the Government. ESTCP reserves the right to recommend for award any, all, or none of the proposals received. ESTCP also reserves the right to recommend a portion of the work proposed in any single proposal for award. There is no commitment by ESTCP or the HECSA Contracting Officer to make any contract awards, nor shall the Government be responsible for any money expended by the proposer before contract award is made. Due to the volume of proposals anticipated to be received, the Government will not provide debriefs on those that are not selected.

Cost realism and reasonableness may also be considered during the selection of acceptable proposals in accordance with FAR 35.016(e).

1.3 EVALUATION SCHEDULE

Proposals will be evaluated based on the following schedules.

mailto:Aimee.N.Johnson@usace.army.mil mailto:Shannon.N.Benson@usace.army.mil mailto:HECSASmallBusinessProgram@usace.army.mil

4 Supplemental BAA Proposal

Table 1: Evaluation Schedule

DATE ACTIVITY

July 26, 2023 BAA Released

August 31, 2023; 2:00 p.m. Eastern Time Proposals Due to ESTCP

September 2023 Evaluations by ESTCP Technical Committee

October 2023 Project Selection

June 2024 Anticipated Awards*

* Proposal packages will be sent to contracting in the first quarter of FY2024. Contract award is expected in the third quarter of 2024, but not guaranteed.

2. PROPOSAL INSTRUCTIONS

Proposals shall contain four sections, Abstract, Technical Section, Cost Section, and Appendices, submitted as one document. Each section is described in detail below. Proposals shall be prepared in accordance with the following:

• Type size should not be less than 11 point, any font.

• All margins (top, bottom, left, and right) should not be less than 1 inch.

• Pages should be numbered.

• Proposals should use the section headers provided in section 1.2. These section headers correspond to evaluation criteria that will be used to review, evaluate, and select proposals.

• Table of contents, introduction, executive summary, or any other elements not prescribed by this guidance are neither required nor desired.

You must submit your proposal via the SERDP and ESTCP Management System (SEMS). No electronic mail, faxed, or hard copy proposals will be accepted. All proposals must be submitted prior to 2:00 p.m. Eastern Time on August 31, 2023. All proposals must be accompanied by the signature of an individual authorized to commit the lead organization to execute the proposed work. Complete submittal instructions can be found in Section 3 of this document.

2.1 ABSTRACT

In one page or less, provide a brief summary of the proposed effort following the structure outlined below. The abstract is not included in the page limitation. If your proposal is selected for funding, the abstract will serve as the basis for a project overview to be posted on the ESTCP website.

Therefore, please ensure it is written as a public-facing document. Items 1-4 must be located at the top of the first page:

1. Proposal Number: The proposal number is generated by SEMS when the proposal details are entered.

https://sems2.serdp-estcp.org/

5 Supplemental BAA Proposal

2. Proposal Title

3. Lead Principal Investigator

4. Lead Organization

5. Objective: Provide a succinct statement of the project’s overall objective in the context of the environmental or resilience problem that the proposed technology will address.

Indicate the relevance and importance of this problem to the Department of Defense (DoD).

Include specific technical objectives if relevant.

6. Technology Description: Describe the proposed technology, in particular the innovative aspects of the technology that will be demonstrated in the project. Summarize what the project will attempt to demonstrate and what will constitute success.

7. Expected Benefits: Briefly describe the anticipated cost and performance benefits of the technology to the DoD as compared to current practice or state-of-the-art technology, if one exists.

2.2 TECHNICAL SECTION

The technical section must contain all content elements outlined here and must not exceed 10 pages. It is expected that each section will provide sufficient information that responds directly to the evaluation criteria. The emphasis should be on the technical approach. Throughout this document, “technology” refers broadly to integrated systems based on any combination of hardware (equipment) and software (processing), materials engineering processes, and resource management devices, methods, tools, or models based on scientific principles.

1. Short Descriptive Title

2. ESTCP Topic Area: Indicate the ESTCP topic area the proposal addresses.

3. Lead Organization: Project lead, organization, address, telephone number, and e-mail address.

4. Problem Statement: Clearly state the environmental or resilience problem the technology demonstration is addressing and its relevance and importance to DoD. Identify the current approach (if one exists) to this problem and its shortcomings.

5. Plain Language Summary: Provide an approximately 200-word summary of the work proposed to meet problem statement. Specifically include a brief description of the technology being demonstrated and the approach that will be taken during the project. This section should be written so that it is easily understood by a manager whose expertise is outside the focus of the demonstration project.

6. Technology Demonstration: The technology description should include the following information:

a. Technical Objective: Discuss the objective(s) of the proposed effort.

b. Technology Description: Describe the technology in sufficient detail to provide an accurate and factual understanding of its theory, functionality, and operation. If appropriate, provide an overall schematic of the technology. Discuss how the technology is innovative. Identify the specific performance issues that require validation.

c. Technology Maturity: Provide evidence that the technology is mature enough for demonstration. Include references and past funding history. Discuss any development or design work that is required prior to demonstration.

6 Supplemental BAA Proposal

d. Technical Approach: Provide a detailed overview of how the project will be conducted to address the technical objectives. For clarity, proposers should present this section in terms of specific tasks. Within this construct, the proposer should ensure that the following issues are addressed:

• Include a brief description of a proposed demonstration site(s), if known. If the site has not yet been selected, discuss required site characteristics for an optimal demonstration.

• Provide the performance objectives for the technology. These are the primary criteria established by the investigator for evaluating the performance and costs of the technology. Performance objectives may be related to qualitative or quantitative parameters. Discuss data required to evaluate the performance objectives and the criteria to determine whether objectives are successfully met.

Refer to the ESTCP demonstration plan guidance on the ESTCP website for more detailed information and examples.

• Provide a broad overview of the experimental design. Discuss the scope of the proposed demonstration and relate the planned data collection to the performance objectives. Include a discussion of controls, various operational phases, and/or other means to evaluate the technology performance. Include any assumptions that have been made for costing purposes.

• Include a description of the data analyses that will be conducted to determine whether the success criteria for the performance objectives have been met. Include a description of statistical analyses to be conducted.

e. Technical Risks: Identify potential issues of concern and technical risks in taking the technology from the research phase to the proposed scale of the demonstration.

Identify any assumptions that have been made that, if not realized, could impact the successful implementation of the project. Discuss how risks will be managed. If the demonstration is not at full scale, discuss any scale-up issues that will remain at the conclusion of a successful demonstration.

f. Related Efforts: Provide information on any relationship to other similar projects.

Identify funding sources for these efforts.

7. Expected DoD Benefit: To the extent possible, include the following: (1) describe the expected benefit in terms of environmental or resilience impact and/or reduced cost; (2) assess the environmental or resilience benefit per site or implementation and the expected aggregate benefit for DoD; (3) provide realistic projections of the number of DoD sites or facilities where the technology can be deployed; (4) discuss how the information obtained from the demonstration will enable adoption of the technology throughout DoD; (5) estimate the expected return on investment and the time for payback; and (6) discuss the life-cycle cost advantages over current approaches.

8. Schedule of Milestones: Provide a project schedule with expected milestones and deliverables for the duration of the project in the form of a Gantt chart. Include all required

ESTCP deliverables in the Gantt chart. Reporting requirements are found on the ESTCP website. Include an additional, zero-cost contingency year in the Gantt chart following the completion of all project tasks and deliverables. There should be no tasks during this contingency period.

https://www.serdp-estcp.org/workingwithus/templatesandguidance

7 Supplemental BAA Proposal

• Explicitly identify any development, design, baseline characterization, or treatability work that is required prior to demonstration.

• Estimate the time required for the demonstration. Include the planned initiation and completion dates for critical events, including but not limited to equipment installation, monitoring, fieldwork, data analysis, and other key activities as appropriate.

• Include expected submission dates to the ESTCP Office for the first draft and completed final document for Demonstration Plans and Final Reports. Separate first draft and final submission dates by a two-month period to allow time for ESTCP review.

9. Technology Transition: Technology Transition should be included as a separate task in your project structure. All proposals are expected to include a description of specific technology transition approaches and products that will aid in the transition of the technology to the end user. Reliance on presentations at conferences, scientific publications, or final project deliverables (i.e., Final Report) is not acceptable. Strong transition approaches should focus on highlighting key lessons learned from the technology demonstration as well as an overview of the technology. Consider innovative methods to convey such information including user guides and web- or video-based approaches.

Specify how technology transfer methods will differ to reach appropriate audiences (e.g., regulators, consultants, etc.). Describe any proposed guidance documents that will assist in future implementation (e.g., guidance, design, and/or protocol documents). Explicitly identify potential first DoD users and follow-on implementation. If there are known institutional or regulatory barriers that affect the transition, they should be described in this section along with recommendations for addressing these barriers.

10. Disposition of Equipment: Identify any major equipment to be purchased for the demonstration. Indicate plans for disposition of major equipment to be purchased by the government.

11. Performers: List the name and organization of the lead person(s) for each organization involved in the proposed demonstration and summarize their expected contributions.

12. Acronym List: Include a list defining all acronyms used in the proposal. This section is not included in the page limitation.

8 Supplemental BAA Proposal

2.3 COST SECTION

The cost section of the proposal is an estimate of the total project cost. The cost spreadsheet template is found on the ESTCP website. Cost sections in formats other than this template will not be accepted. The cost spreadsheet for the lead organization should reflect the entire project costs.

Separate cost spreadsheets are required for each co-performer or sub-contractor whose costs exceed $50,000. Co-performers and sub-contractors are only required to complete the cost spreadsheet located on the ESTCP website. Subcontractors with costs over $50,000 should complete all tabs as applicable. Subcontractors under $50K may complete only the first tab. An accompanying cost breakdown narrative is required as an appendix. Cost information must be rounded to the nearest dollar.

If selected for funding, proposers will be required to provide a certificate of current cost or pricing data prior to award in accordance with Federal Acquisition Regulation (FAR) 15.403-4(a)(1) if the total contract value is expected to exceed $2,000,000.00 to the cognizant contracting office.

All ESTCP projects are funded incrementally, with funds provided in the year in which they are expected to be expended. The cost section should be structured to indicate annual, incremental funding required. For planning purposes, proposers should assume a project initiation date of June

1, 2024. The first year’s planned funding should run through January 31, 2025, and each subsequent year should span February 1-January 31, until anticipated project completion. Include an additional, zero-cost contingency year in the cost spreadsheet following the final year of planned project execution. The contingency year must also be included on the proposal signature page generated in SEMS. Additional information is provided below regarding cost categories.

The spreadsheet provided is a template and is not a one size fits all. Offerors should modify the spreadsheet as needed to incorporate all applicable indirect rates per DCAA/DHHS agreements.

Below is a sample of common charges:

1. Labor Costs: Show the projected labor rates in units of hourly rate or annual salary to be charged by the PI(s), associates, and assistants. Indicate in the footnote to the cost table the units you are using. In the units column, indicate the number of hours or the fraction of annual salary to be charged. The total column is the amount per year to be paid to each performer on the project. Labor costs should be unburdened.

2. Indirect Charge #1: Indicate burden or fringe rate applied to salaries and the total cost per year. Provide an explanation in the table footnote of what is included in this indirect charge.

3. Indirect Charge #2: Indicate other relevant indirect charges such as G&A. Provide an explanation in the table footnote of what is included in this indirect charge and to which cost elements it will be applied.

4. Contractor Acquired Property: Provide an itemized list of contractor-acquired property

(CAP), if any, to be acquired in support of the project, showing the cost for each item. Use the second tab in the cost spreadsheet located on the ESTCP website as a template. CAP includes permanent equipment, defined as any article of non-expendable, tangible property having a useful life of more than two years and an acquisition cost of $5,000 or more per unit.

5. Materials, Supplies and Consumables: Provide a general description and total estimated https://www.serdp-estcp.org/page/dd2b9569-94cc-46f8-b85d-2ac562f86f62 https://www.serdp-estcp.org/page/dd2b9569-94cc-46f8-b85d-2ac562f86f62

9 Supplemental BAA Proposal cost of expendable equipment and supplies. Include a separate itemized list using the third tab of the cost spreadsheet template located on the ESTCP website.

6. Subcontracts and Government Partners: For any co-performer or subcontract totaling

$50,000 or more, provide a breakout of the tasks and associated costs in a separate cost estimate using the cost spreadsheet template on the ESTCP website. Government partners will be provided a separate allocation of funds directly based upon this separate estimate.

Funds provided directly from ESTCP to government partners are not to be subject to contractor indirect charges or fees. The lead organization should plan to manage all subcontracts to non-government partners.

7. Travel Costs: Estimate total travel costs. List the number of trips, the destinations, purposes, and costs per trip using reasonable and allowable rates in accordance with FAR

31.205-46 for all proposed travel. Rates for lodging and per-diem should not exceed the rates found in the General Service Administration’s data for destinations within the United

States, or exceed rates found in the US State Department data for destinations outside of the United States. Offerors are not entitled to fee or profit on travel. Use the fourth tab in the cost spreadsheet located on the ESTCP website as a template for the travel budget breakdown. Multiple trips to the same location that are for the same duration and same number of personnel can be included in a single table. For trips where the specific destination has not yet been determined, budget for a representative location. For planning purposes, consider the following:

• ESTCP conducts an annual in-progress review of management and technical status of each project in the Arlington, VA area. New start projects funded to begin in 2024 will likely be reviewed first in February 2025, with additional annual reviews in either

April/May or October/November thereafter for multi-year projects; actual review dates may change based on the progress of the project.

• ESTCP will support attendance at one domestic technical meeting each year.

• ESTCP intends to sponsor an annual technical Symposium in the Washington, D.C.

area. Investigators are encouraged to budget for students working on the project to attend the Symposium in the total travel costs. In years when the Symposium takes place, investigators are expected to attend. In the event the Symposium is not held, investigators may attend an appropriate meeting of their choice at comparable cost.

8. Publication and Report Costs: Estimate the costs of publishing and reporting results, including the direct charges for clerical preparation, page or illustration charges, and distribution. The ESTCP reporting requirements are found on the ESTCP website. Include a separate itemized list using the fifth tab of the cost spreadsheet template located on the

ESTCP website.

9. Service Contract Reporting (SCR): In accordance with DFARS 204.1703 Reporting requirements, Department of Defense (DoD) contractors with contracts in excess of

$3,000,000.00 will begin reporting manpower data under applicable service contracts in the Service Contract Reporting (SCR) section of the System for Award Management

(SAM) (http://sam.gov) to support the requirements of title 10, U.S.C, section 235 and

2330a. Contracts subject to reporting requirements will have DFARS 252.204-7023

Reporting Requirements for Contracted Services added into to the contract. Please see the

“Guidebook for Service Contract Reporting in the System for Award Management”

Version 2.0 dated 21 October 2020 for additional information. Contracts under

$3,000,000.00 are not subject to Service Contract Reporting requirements.

https://www.serdp-estcp.org/page/dd2b9569-94cc-46f8-b85d-2ac562f86f62 https://www.serdp-estcp.org/page/dd2b9569-94cc-46f8-b85d-2ac562f86f62 http://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol1/pdf/CFR-2010-title48-vol1-sec31-205-46.pdf http://www.gpo.gov/fdsys/pkg/CFR-2010-title48-vol1/pdf/CFR-2010-title48-vol1-sec31-205-46.pdf https://www.serdp-estcp.org/page/dd2b9569-94cc-46f8-b85d-2ac562f86f62

10 Supplemental BAA Proposal

10. Fixed Fee/Profit: Eligible organizations shall list the fixed fee (i.e., profit), if any, applied to the demonstration project. Indicate in the footnote to the table the cost elements included in the basis for the fixed fee. Offerors are not entitled to fee or profit on travel.

11. Cost by Task Summary Table: Provide a breakout of cost per task. The sixth tab in the cost spreadsheet located on the ESTCP website provides a template. These numbers must match those on the main cost spreadsheet.

2.4 APPENDICES

Appendices are not included in the page count for the proposal.

1. Required, if literature is cited, Literature Citations: Provide literature citations for any material cited in the technical section or the supporting technical data.

2. Required, Abbreviated Curricula Vitae (CV) (3 pages or less per CV): CVs are required for all key technical personnel at the lead organization and the lead individual for all key co-performers or subcontractors.

3. Optional, Letters of Support: If you have received letters of support or commitment from installations or site managers, provide them in this section.

4. Optional, Supporting Technical Data (limited to 5 pages): Include data sheets, charts, and excerpts from referenced research.

5. Required, Cost Breakdown Narrative: Provide a 1-2 page narrative discussing each cost element in sufficient detail to explain why the cost proposed is considered fair and reasonable, including the techniques used to determine subcontractor costs fair and reasonable.

11 Supplemental BAA Proposal

3. SUBMITTAL INSTRUCTIONS

Proposals are submitted via SEMS. No electronic mail, faxed, or hard copy proposals will be accepted. Proposals must be submitted prior to 2:00 p.m. Eastern Time on August 31, 2023.

Complete all steps below in order to submit a proposal.

• Log in to SEMS.

• Enter all required proposal details into SEMS. Proposal details may be saved and edited prior to final submission.

• Download or print the “Proposal Details” page. This must be signed by an individual with the authority to commit the lead organization to execute the proposed work. The document may be electronically or hand-signed. Ensure all information on the signed summary matches the proposal file. Please note, the contracting process is subject to a number of delays and may not be completed until late September in the year following selection. If possible, pricing valid until September 30, 2024 will minimize requests for new cost information before contract award. The “Proposal Details” page must include the zero-cost contingency year requested in Section 1.3.

• Upload the signed “Proposal Details” page.

• Add the system-generated proposal number, project title, lead PI name and organization to first page of proposal as instructed in Section 1.1 above.

• Create a single PDF file that contains all required sections outlined in the proposal guidance.

• Upload the final proposal file.

• Submit the proposal. Only proposals that have been submitted will be considered.

Proposals with a “Saved” status will not be reviewed.

Once the proposal has been submitted, SEMS will display an on-line confirmation message and will send an email notification to the proposer. It is the sole responsibility of the proposer to verify the proposal is properly received by ESTCP.

The proposer may continue to modify proposal details and upload revised proposal files until the due date. Prior versions of the proposal will be over-written and only the last version uploaded will remain in the system. Ensure the proposal details entered into the system match the contents of the PDF proposal file. It is recommended that proposals are uploaded as early as possible prior to the deadline to ensure a successful and timely submission.

For proposal upload questions, contact the ESTCP Office at 571-372-6565.

https://sems2.serdp-estcp.org/

12 Supplemental BAA Proposal

4. EVALUATION FACTORS FOR PROPOSALS

The following evaluation factors will be the sole basis for reviewing proposals submitted in response to this BAA. Among the evaluation factors, Technical Merit is more important than

Cost/Benefit of Technology and Transition Potential, which are more important than Cost of

Proposal.

TECHNICAL MERIT

Proposal reviewers will assess the technical merit of the proposal. Factors to be considered include: (a) the methodology is scientifically sound; (b) the technology is innovative and is the current state-of-the-art; (c) the technical risks are well characterized; and (d) the technical team is qualified to execute the proposed project.

COST/BENEFIT OF TECHNOLOGY

Proposal reviewers will assess the cost/benefit of the proposed technology, if it were deployed.

Factors to be considered include: (a) the projected cost savings and/or risk reduction are significant; (b) the projected benefits are reasonable and consistent with the proposed technology;

and (c) the payoffs from the proposed technology are commensurate with the projected costs and risks.

TRANSITION POTENTIAL

Proposal reviewers will assess the potential for a successful transfer of the technology to the DoD user. Factors to be considered include: (a) there is a well-defined DoD user for the technology;

(b) there are clearly identified activities that will support and enhance the transfer of the technology; and (c) the technology can be implemented within DoD.

COST OF PROPOSAL

Proposal reviewers will assess the reasonableness of the proposed cost. Costs should be appropriate and traceable to the level of effort required to execute the project.

5. REQUIREMENTS FOR PROPOSALS SELECTED FOR FUNDING

Please be aware of the following requirements for proposals that are selected for funding. These requirements are considered part of the proposal process and the associated costs are to be borne by the proposer.

5.1 REVISED PROPOSAL

Proposals selected for funding may require revision following the selection process and prior to contract award. Common revisions include adjustments to schedule, task structure, funding profile, or specification of required deliverables.

5.2 SUBCONTRACTING PLAN

The Subcontracting Plan is not required at the proposal stage. If your proposal is selected for funding, you may be required to submit a Subcontracting Plan if the criteria below apply to your proposal. In accordance with the Federal Acquisition Regulation (FAR) Subpart 19.7, all

13 Supplemental BAA Proposal businesses, other than small business concerns and businesses outside the United States which will perform their contracts entirely outside of the United States, are required to submit a subcontracting plan for contract proposals that exceed $750,000. The subcontracting plan should reflect realistic, challenging, achievable positive percentage and dollars goals for subcontracting with Small Business concerns. The subcontracting plan must address a goal for each of the statutory required elements: Small Business, Small Disadvantaged Business, Woman-Owned

Small Business, Service-Disabled Veteran-Owned Small Business, Veteran-Owned Small

Business, and Historically Underutilized Business Zones. If the subcontracting plan contains zero percent goals for any of the respective elements listed above, an explanation must be provided as to why a goal greater than zero cannot be achieved.

The Subcontracting plan must be reviewed, negotiated and accepted by the Contracting Officer and is subject to review by the Department of Defense’s Office of Small Business and the Small

Business Administration prior to contract award. The Small Business Subcontracting Plan shall be prepared in accordance with FAR 52.219-9 Small Business Subcontracting Plan and elements as described in the checklist in DFARS PGI 219.705-4. Additional information can be found on the

Department of Defense Office of Small Business Programs website. The U.S. Army Corps of

Engineers, Humphreys Engineer Center Support Activity (HECSA) Small Business Office website provides information on how to prepare a subcontracting plan, along with links to find small businesses to participate. For guidance on creating an acceptable subcontracting plan or for information on locating small business concerns, contact the HECSA Small Business

Representative Monique Holmes at HECSASmallBusinessProgram@usace.army.mil or 202) 934-

1816. Please use the attached Small Business Subcontracting Plan template for this Broad

Agency announcement. The attached template is specifically tailored to this Broad Agency

Announcement.

5.3 ACCOUNTING AND AUDITING REQUIREMENTS

ESTCP projects are generally awarded as cost-type contracts. To be eligible for such an award, a contractor must have an approved accounting system and an accepted up-to-date government audit.

Details on these requirements can be found at the web sites for Defense Contract Audit Agency and Defense Contract Management Agency. Contractors selected for award who do not meet these requirements should inform their program manager immediately, as the process for approval can be time consuming. In some cases, if the work is appropriate to a firm fixed price contract and requirements for a cost-type contract cannot be fulfilled, successful proposers will be given the opportunity to enter into a firm fixed price contract.

5.4 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT REPORTING

DFARS Clause 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident

Reporting (OCT 2016) as prescribed in DFARS 204.7304(c) is a mandatory clause that will be included in all ESTCP contracts. DFARS 204.7304(c) reads:

“(c) Use the clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber

Incident Reporting, in all solicitations and contracts, including solicitations and contracts using

FAR part 12 procedures for the acquisition of commercial items, except for solicitations and contracts solely for the acquisition of commercially available off-the-shelf (COTS) items.”

https://business.defense.gov/Acquisition/Subcontracting/ http://www.usace.army.mil/HECSA/HECSASmallBusiness.aspx mailto:HECSASmallBusinessProgram@usace.army.mil http://www.dcaa.mil/ http://www.dcma.mil/ https://www.acq.osd.mil/dpap/dars/dfars/html/current/252204.htm#252.204-7012

14 Supplemental BAA Proposal

Most ESTCP projects do not result in defense covered information. A written determination will be made by the ESTCP office at final project acceptance for those that do. However, any resultant contract will not include addendums or local text regarding this mandatory clause.

DFARS 252.204-7012 is a mandatory clause that will not be removed from any contract for an ESTCP project, nor will DFARS 252.204-7012 be altered in any way. For more information please see the link below:

https://business.defense.gov/Small-Business/Cybersecurity/

5.5 SYSTEM FOR AWARD MANAGEMENT

In accordance with 4.1102 Policy, paragraph (a), All offerors are required to be registered in

SAM at the time an offer is submitted in order to comply with the annual representations and certifications.

Offerors who are not registered and active in SAM, or without the required representations and certifications ARE NOT eligible for a contract award.

5.6 COVERED TELECOMMUNICATIONS EQUIPMENT

In accordance with Section 889(a)(1)(B) of the National Defense Authorization Act (NDAA) for

Fiscal Year 2019 the provision at FAR 52.204– 24, Representation Regarding Certain

Telecommunications and Video Surveillance Services or Equipment, and the clause at FAR

52.204–25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance

Services or Equipment will be included with all contracts issued in connection with this Broad

Agency Announcement. Additionally, all contracts awarded under this Broad Agency

Announcement will include the clause at FAR 52.-204-26 Covered Telecommunications

Equipment or Services. Contractors submitting proposal shall ensure their representations are up to date in the System for Award Management (SAM.gov) as applicable IAW FAR

52.204-24, FAR 52.204-25 and, or FAR 52.204-26. Contracts WILL NOT be issued to

Contractors who do not have their representations and certifications updated in SAM.gov.

5.7 EFFECTIVE DATES OF AWARDED CONTRACTS

All contracts awarded from this BAA require bilateral execution and will be executed in counterparts. Any contract awarded from this BAA will first be sent to the successful offeror(s) for signature and execution of the offeror’s counterpart. No contracts which are executed solely by the successful offeror(s) are effective. Offerors shall not begin performance prior to the receipt of a fully executed contract. Offeror(s) who begin performance prior to receipt of a fully executed contract are performing at their own cost and at their own risk.

***Contracts are not effective until the Government’s Contracting Officer signs and executes the

Government’s counterpart and the counterpart with the Government’s Contracting Officer’s signature is distributed to the successful offeror(s).***

5.8 OTHER COST AND PRICING DATA

All successful offeror(s) will be required to submit Other Cost and Pricing Data for the

Government’s required pre-award contract price/cost analysis. Submitting this data along with the https://business.defense.gov/Small-Business/Cybersecurity/

15 Supplemental BAA Proposal final proposal will help expedite the contract process. Successful offers with expected contract values above $2,000,000 must provide certified data (see Section 2.3 above). Other Cost and

Pricing Data includes:

1. For contractors requesting a cost type contract, provide a recent audit report documenting the contractor’s accounting system adequacy for determining costs applicable to cost type contracts. Contractors lacking an accounting system adequacy determination shall submit firm-fixed price proposals.

2. Cost Proposal Backup Documents including:

a. Payroll backup documents which show wages and fringe;

b. Defense Contract Audit Agency (DCAA) Rate Agreement, Forward Pricing Rate

Agreement (FPRA), Forward Pricing Rate Recommendations, Department of Health and Human Services College Rate Agreement, or Navy Rate Agreement, and the point of contact for the same. In the event of no established rate agreement, submit the last three years of actual incurred rate data (cost base and cost pool) for analysis;

c. Details with respect to Materials, Supplies, and Consumables (MSCs) or Contract

Acquired Property (CAP) including quantities and type of MSCs (ex. 500 gal. hydrogen peroxide at $2/gal or, 20 large columns at $50/column, etc.) which includes evidence of quotes and suppliers for MSCs (actual quotes are preferred);

d. Quotes for any subcontracted services detailed as Other Direct Costs and not directly allocable to subcontractor expenses (i.e. if lab costs are listed, the lab pricing info);

e. Travel specifics (who, where, when, purpose, mode of transportation), etc. *GSA per-diem and lodging rates are the maximum rates that may be used for the destination cities*

***Offers with subcontractor costs in excess of $50,000 shall include a cost sheet and backup data with similar details as the Offeror for each subcontractor exceeding $50,000 in costs.***

File details come from the government source that posted it. Updated .