FY21 Manitowoc Industry Day.pptx
PPTX presentation 5 MB Posted
- Attached to
- Industry Day for Manitowoc FFR, WI Renovation
- Solicitation number
- W912QR-MANITOWOCFFR
About this file
This document includes slides from an industry day presentation and details regarding a federal contract opportunity for renovations at the Manitowoc Federal Facility Reserve Center in Manitowoc, WI. The opportunity involves design-build repairs and upgrades to the existing 12,578 square foot Army Reserve Center, including replacing aging floors, ceilings, doors and mechanical/electrical systems. The project scope also includes modifications to the building interior, site work, and ensuring compliance with anti-terrorism and sustainability requirements. The solicitation is expected to be issued on March 21st with proposals due in April. The source selection board will evaluate proposals based on past performance, technical evaluation, small business participation plans, and pricing. Award is planned for August 2021. The industry day call-in information is provided to review project details and respond to questions.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Betty Beck – Project Manager Stephen Ramsey – Contract Specialist Contracting Officer – Emily Moore Industry day FY21 FFR Manitowoc wi
“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”
.59
AGENDA
Project Scope of Work
Schedule
Procurement Process
Questions
PROJECT LOCATION
File Name
Project Scope of work
PROJECT SCOPE:
File Name ACQUISITION STRATEGY: Design-Build EST. CONSTRUCTION DURATION: 760 days
This project is a design-build project to Alter, repair, and upgrade the existing 12,578 SF Army Reserve Center (ARC). Redesign Personally Owned Vehicle (POV) lot and access road to comply with Anti-Terrorism/Force Protection (AT/FP) guidelines. Repairs will replace aging floors, ceilings, doors, and mechanical/electrical systems with new, modern materials and systems that meet current codes (to include ADA-compliance considerations). The project will modify the building interior to include entrances, exclusive/common administrative offices, classrooms, latrines, lobby area, increased electrical capacity, and other modifications to improve functional efficiency. New systems furniture will be installed in administrative office areas and classrooms.
Limited site work includes landscaping, fencing, gates, signage, handicapped parking/ramps, access road and privately-owned vehicle (POV) parking. Supporting facilities include land clearing, paving, fencing, general site improvements and utility connections. Accessibility for the disabled will be provided. Antiterrorism/Force Protection (AT/FP) and physical security measures will be incorporated into the design including maximum standoff distances from roads, parking areas and vehicle unloading areas. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 50 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance.
SITE LAYOUT
For Reference Only
Demolition floor plan
Conceptual floor plan
SCHEDULE
DATES ARE APPROXIMATE AND SUBJECT TO CHANGE
File Name ISSUE SOLICITATION Mar 21
PHASE 1 Apr 21
EVALUATION BOARD Apr 21
PHASE 2 May 21
EVALUATION BOARD Jun 21
AWARD Aug 21
Procurement process
Stephen Ramsey – Contract Specialist Louisville District Office Phone: 502-315-6214 Email: Stephen.d.ramsey@usace.army.mil Project award will be made on a “Best Value Trade-off” basis as described in the evaluation criteria.
Proposals must be submitted on time. The Louisville District is in the Eastern time zone.
The Source Selection Evaluation Board (SSEB) will evaluate contractors’ proposals based on specific factors which are defined in the RFP Package.
PROCUREMENT PROCESS
HOW TO OBTAIN THE SOLICITATION
Announcement information: beta.sam
• Solicitation Numbers TBD (will begin with ‘W912QR’)
• View interested vendors list and register as an interested vendor.
• Register to receive notifications and updates / amendments.
• RFP technical information will be posted on the beta.sam
Obtaining THE ISSUE DOCUMENTS Requirements to download Technical Data Package:
1) Need to be registered in System for Award Management (SAM)
2) Need to be registered in FBO
• Any amendments issued to the RFP will also be posted on FBO.
• Pre-Solicitation Notice – will be posted to FBO at least 15 days prior to the initial issuance of the Solicitation package.
• Advertisement – minimum 30 days to prepare proposals.
PROPOSAL REQUIREMENTS
Source Selection Criteria for an Unrestricted “Best Value Trade-off” usually consists of four elements:
| 1) Past Performance Evaluation | |
| 2) Technical Evaluation TBD (i.e. Management Plan, Schedule, | etc.) |
| 3) Small Business Participation Plan | |
| 4) Pro-Forma Evaluation (Price, JV agreements, Bonding, etc.) |
• Submit your best proposal the 1st time. If we receive an initial proposal that is awardable, discussions may not be opened.
• Assuming an Unrestricted procurement, each offeror is to submit a Small Business Participation Plan
| • This is an evaluated element in your proposal (Reference | Section 00 22 00 in the RFP). |
| • Must be submitted by both Large AND Small business | offerors. |
PROPOSAL REQUIREMENTS (CONTINUED)
• Large Business offerors MUST also submit a Small Business Subcontracting Plan.
• Although this is not a rated element as a part of the Source Selection process, it is a condition of award.
• Instructions for submitting a Request for Information (RFI) will be included in the Solicitation.
| • RFIs for the projects will be received and answered through | the ProjNet system |
| • Any RFIs submitted directly to the project team will not receive | a response, and will be directed to the ProjNet system. |
| • The project will have a Projnet Bidder’s Key, which is used to | post your RFIs to the proper project. |
QUESTIONS ??
image6.png image7.emf
G
EXISTING
BUILDING
EXISTING
MEP
W
S O
U T
H
R
E
GPS CONTROL
POINT #1
SET REBAR WITH
CEC CONTROL CAP
N
L
V
VENT PIPE
SS
PPOL/
8F0
IP
SIGN
I
C
UC
X
WV
PPOL/ 8F0717
EX SEWER CLEANOUT
RIM: 651.09'
INV INLET: 647.54'
EX SEWER CLEANOUT
RIM: 649.16'
INV INLET: 642.37'
BOLLARD
GPS CONTROL POINT #2
GPS CONTROL POINT #3
EX SEWER MH
RIM: 626.95'
INV OUTLET: 616.80'
INV INLET: 617.71'
RIM: 641.83'
INV OUTLET: 633.23'
24"
10"
8"
6"
18"
10"
30"
5"
BORING 3
BORING 1
BORING 1A
BORING 6
BORING 2
BORING 5
BORING 4
GATE
GATE
DUMPSTER
LOCATION
FFE: 649.73'
FFE: 652.54'
FFE: 647.02'
FFE: 652.45'
FFE: 652.42'
FFE: 652.57'
BORING 1/HAND AUGER
PULL-UP BARS
FFE: 652.51'
CABLE TV
TELEPHONE
FIBER OPTIC
OE
RIM: 649.50'
INV OUTLET: 645.44'
INV INLET: 645.49'
MOTOR
VEHICLE
STORAGE
SHED
S88°31'18"W
449.73'
N88°31'24"E
450.26'
IL
K
P A
D
US Army Corps of Engineers ®
SHEET ID
M
Y
F
B
Z
2 3 4 5 6 7 8 9 10
L
L
CERTIFIED FINAL RFP - NOT FOR CONSTRUCTION
J
SCALE: 1" = 40'
0 20' 40' 80' 120'
PLAN NORTH
A1
EXISTING CONDITIONS PLAN
d w g
VF101
SHEET KEYNOTES
1. GAUGE HYDRANT 09/09/20
2. FLOW HYDRANT 09/09/20
3. 24" EXISTING WATER MAIN LINE
4. BURIED FUEL TANK
EXISTING SANITARY SEWER
EXISTING WATER LINE
EXISTING GAS LINE
EXISTING UNDERGROUND
COMMUNICATIONS
EXISTING OVERHEAD POWER LINE
EXISTING FENCE
W W
SS SS
G G
UC UC
OE OE
LEGEND
CONCRETE PAVEMENT
BITUMINOUS PAVEMENT
X X X
GENERAL SHEET NOTES
1. ALL EXISTING INFORMATION SHOWN HEREON WAS
COMPLETED BY FIELD RUN TOPOGRAPHIC SURVEY AND
RECORD INFORMATION.
SURVEY NOTES
1. TOPOGRAPHIC SURVEY WAS COMPLETED IN WISCONSIN
STATE PLANE - SOUTH ZONE NAD83 WITH VERTICAL DATUM IN
NAVD88. ALL WORK WAS COMPLETED IN US SURVEY FEET.
2. THE LOCATION OF THE WATER SERVICE TO THE BUILDING IS
BASED ON AS-BUILT PLANS PROVIDED BY THE CITY OF
MANITOWOC.
3. THE CHAINLINK FENCE IS 7 FEET HIGH AND 8 FEET HIGH TO
THE TOP OF THE BARBWIRE.
4. REFER TO RFP FOR HYDRANT FLOW DATA
POWER POLE
GUY ANCHOR
BUSH
LIGHT POLE
MAILBOX
FOUND SURVEY MONUMENT
SANITARY SEWER MANHOLE
HYDRANT
WATER VALVE
GPS CONTROL POINT
MISCELLANEOUS POINT
TREE (DIAMETER NOTED)
UTILITY VAULT
BORING LOCATION
FLAGPOLE
SPLASH PAD
AutoCAD SHX Text image8.emf
1 1 1
7 7
AD101
A5
1 1 1 1 1 1 1 1 1
1 1 1 113 13 13 13 13
OPT. A
DEMOLITION LEGEND
REMOVE EXISTING WALL CONSTRUCTION IN ITS ENTIRETY FROM
FLOOR TO STRUCTURE ABOVE INCLUDING DOORS, DOOR FRAMES,
VISION PANELS, BASE, ASSOCIATED ELEC./ MECH. WORK ETC.
(EXTENT SHOWN BY BROKEN LINES). PATCH EXISTING ADJACENT
AREAS AS REQUIRED THAT HAVE BEEN DISTURBED BY
DEMOLITION AND PREPARE SURFACES TO RECEIVE NEW FINISHES.
REMOVE EXISTING DOOR OR VISION PANEL, GLAZING AND
HOLLOW METAL FRAME ASSEMBLY. CLOSE OPENING WITH LIKE
MATERIALS TO MATCH EXISTING WALL CONSTRUCTION. ALIGN
NEW WORK FLUSH WITH EXISTING ADJACENT PARTITION. MATCH
EXISTING WALL THICKNESS AND PREPARE SURFACE AS
REQUIRED TO RECEIVE NEW FINISHES.
PROVIDE OPENING IN EXISTING PARTITION AS REQUIRED TO
RECEIVE NEW HOLLOW METAL DOOR FRAME OR CASED OPENING.
PATCH AND PREPARE ADJACENT SURFACES AS REQUIRED TO
RECEIVE NEW FINISHES.
REMOVE EXISTING CASEWORK, COUNTERS, SHELVING,
EQUIPMENT, SUPPORTS, AND INTERSECTING WALLS. PATCH
EXISTING WALL AND FLOOR AREAS DISTURBED BY DEMOLITION
PLAN AND PREPARE SURFACES AS REQUIRED TO RECEIVE NEW
FINISHES.
CONTRACTOR TO REMOVE ALL EXISTING PLUMBING FIXTURES
AND PIPING BACK TO THE POINT OF ENTRY INTO THE BUILDING,
AND SHALL BE RESPONSIBLE FOR PATCHING AND REPAIRING
AREAS WHERE AFFECTED BY THEIR REMOVAL. ANY FLOOR
PENETRATIONS DUE TO THE REMOVAL OF PIPING ARE TO BE
FILLED WITH AN UL APPROVED MATERIAL TO MATCH EXISTING
CONSTRUCTION TYPE.
DEMOLITION FLOOR PLAN LEGEND
ASBESTOS-CONTAINING MATERIAL - VINYL FLOOR TILE
IN
IG
IT
IZ
IS
IC
IO
File Path:
Plot Date:
\\10.0.174.12\BRC_Folder\Projects\Manitowoc FFA & FFR\Drawings\MANITOWOC FFA-FFR_A18.rvt
10/14/2020 10:54:16 AM
AD101
IR
1/8" = 1'-0"
FLOOR PLAN - DEMOLITION
0' 2' 4' 8' 16'
GENERAL SHEET NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR DESIGN OF ALL STRUCTURAL
MODIFICATIONS NEEDED TO ACCOMMODATE NEW WALL OPENINGS,
INCLUDING BUT NOT LIMITED TO LINTELS, JAMBS AND SLAB REPAIR.
2. CONTRACTOR IS RESPONSIBLE FOR ALL SHORING AND BRACING
OPERATIONS WHILE STRUCTURAL MODIFICATIONS ARE BEING PERFORMED.
3. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND REMOVING ALL
ELECTRICAL AND TELECOMMUNICATIONS SYSTEMS, IN ITS ENTIRETY,
WITHIN THE BUILDING. COORDINATE DISCONNECTION OF ELECTRICAL
SERVICE WITH LOCAL ELECTRIC UTILITY. COORDINATE REMOVAL OF
DEMARCATION EQUIPMENT AND DISCONNECTION OF TELEPHONE SERVICE
WITH LOCAL TELEPHONE COMPANY.
4. CONTRACTOR TO REVIEW PRE-RENOVATION HAZARDOUS MATERIALS
SURVEY REPORT, ABATE HAZARDOUS MATERIALS AS REQURIED.
5. ALL PAINT SHALL BE ABATED AS LEAD-BASED PAINT (LBP).
6. ABATE ALL VINYL FLOOR TILE MASTIC AS ASBESTOS-CONTAINING MATERIAL
(ACM) THROUGHOUT THE FACILITY.
7. TRENCH EXISTING CONCRETE SLAB AS NEEDED FOR MODIFICATIONS AND
RELOCATION OF PLUMBING SYSTEMS. SEE AE101 FOR NEW RESTROOM
/SHOWER LAYOUTS AND "SMALL" KITCHEN LOCATED WITHIN ASSEMBLY
HALL.
8. SALVAGE DEMOLISHED BRICK. USE SAVED MASONRY FOR INFILL AND
BLENDING WITH NEW BRICK TO MATCH EXISTING.
9. REMOVE ALL FLOOR FINISHES, DOWN TO CONCRETE SLAB, THROUGHOUT
FACILITY AND PREP SLAB TO RECIEVE NEW FINISHES.
10. REMOVE ALL CEILINGS THOUGHOUT FACILITY INCLUDING ASSOCIATED
ELECTRICAL AND LIGHTING, HVAC EQUIPMENT AND OTHER BUILDING
COMPONENTS.
11. DEMOLISH THE ENTIRE EXISTING COMBUSTIBLE (WOODEN) MEZZANINE
STRUCTURE WITHIN THE ASSEMBLY HALL / HIGH BAY AREA.
12. ALL EXISTING WINDOWS TO BE DEMOLISHED AND REMOVED.
SHEET KEYNOTES:
A5
MEZZANINE - DEMOLITION
1. REMOVE WINDOW AND FRAME. PREPARE OPENING FOR NEW UFC 4-010-01
COMPLIANT WINDOW FRAME AND GLAZING.
2. REMOVE EXISTING DOOR, WOOD SIDING AND EXISTING INFILL. REPLACE
WITH CMU TO MATCH ADJACENT WALLS AND PROVIDE OPENING FOR NEW
DOOR SHOWN ON AE101.
3. REMOVE WOOD SIDING AND EXISTING INFILL AT TOP OF ASSEMBLY HALL
"HIGH" BAY AREA. CONTRACTOR TO PROVIDE ELEVATION DESIGNS
INDICATING INFILL TYPE AND MATERIALS FOR EXTERIOR WALLS
INCLUDING INFILL MATERIAL AT TOP OF ASSEMBLY HALL.
4. NEW DOOR OPENING. PROVIDE HEADER AND JAMB FOR CMU WALL.
5. REMOVE BRICK VENEER PORTION OF WALL AT HIGH BAY AS NEEDED FOR
EXECUTION OF BID OPTION A, PROVIDE LINTEL FOR SUPPORT OF REMAINING
BRICK ABOVE.
6. REMOVE OVERHEAD COILING DOOR AND INFILL WITH LIKE MATERIALS.
7. REMOVE ALL PLUMBING FIXTURES AND/OR EQUIPMENT IN ROOM.
8. DEMOLISH FLOOR SLAB AS REQUIRED FOR NEW MEZZANINE FOUNDATIONS.
9. REMOVE FIBER DERMACATION EQUIPMET, RACK, DISTRIBUTION PANEL
AND ALL TELECOMMUNICATIONS INFRASTRUCTURE WITHIN THE BUILDING.
10. REMOVE TELEPHONE BACKBOARD, COPPER TERMINATION BLOCKS, AND ALL
TELECOMMUNICATIONS INFRASTRUCTURE WITHIN THE BUILDING IN ITS
ENTIRETY. COORDINATE DISCONNECTION OF TELEPHONE SERVICE WITH
LOCAL TELEPHONE COMPANY.
11. DEMOLISH ELECTRICAL SERVICE ENTRANCE PANELBOARD, ALL ELECTRICAL
EQUIPMENT AND ALL ELECTRICAL INFRASTRUCTURE WITHIN THE BUILDING
IN ITS ENTIREY. COORDINATE DISCONNECTION OF ELECTRICAL SERVICE
WITH LOCAL ELECTRIC UTILITY.
12. LOCATION OF NEW DOOR OPENING.
13. WINDOW TO BE REMOVED. INFILL WITH MASONRY, VENEER TO MATCH
EXISTING.
14. DEMOLISH THE ENTIRE MEZZANINE STRUCTURE WITHIN ASSEMBLY HALL.
15. DEMOLISH EXISTING STEEL VAULT IN ITS ENTIRETY.
16. TRENCH CONCRETE SLAB AS NEEDED FOR BID OPTION A, SMALL KITCHEN.
RE: AE101
17. ABATE ASBESTOS CONTAINING MATERIAL, BLACK MASTIC, UNDER RED /
BLACK VINYL FLOOR TILE AT THRESHOLD.
18. ABATE ASBESTOS CONTAINING MATERIAL, BLACK MASTIC, UNDER BROWN/
TAN PATCHWORK VINYL FLOOR TILE.
image9.emf
DN
258 SF
RETENTION OFFICE
164 SF
FAMILY SUPPORT
OFFICE
120 SF
ARA
141 SF
MT CHIEF
120 SF
NCO
65 SF
ADMIN. SUPPORT
80 SF
TER
48 SF
EF
508 SF
MECH
48 SF
FIRE RISER
170 SF
ELECTRICAL
80 SF
LACTATION
45 SF
JAN
155 SF
W. LOCKER
128 440 SF
PHYSICAL
READINESS
185 SF
BREAK ROOM
156 SF
COMMANDER
132 SF
1ST SGT
195 SF
WOMEN
79 SF
VESTIBULE
269 SF
LOBBY
2125 SF
UNIT STORAGE
30 SF
VEST
791 SF
CORRIDOR
400 SF
CLASSROOM
99 SF
STORAGE
ACFT
153 SF
STAGING AREA
530 SF
UNIT COMMON
480 SF
105 SF
TABLES & CHAIR
STOR. AREA
127 SF
ARMORER
119 SF
STAIR
70 SF
125 SF
SUPPLY OFFICE
54 SF
TOILET
MEZZANINE
ABOVE
294 SF
1542 SF
ASSEMBLY HALL
187 SF
M. LOCKER
130 167 SF
MEN
97 SF
M. SHOWERS
32 SF
W. SHOWERS
2 3
35'-2"
'-8
UP
UP
5 5 5 5 5
670 SF
KITCHEN
223 SF
ARMS VAULT
474 SF
CIRCULATION
CHASE
AE101
C6
90 SF
C. CORRIDOR
FLOOR PLAN LEGEND
BASE BID - REPAIR OR REPLACEMENT WORK
UNDER EXISTING ROOF
BID OPTIONS - "NEW WORK" BUILDING ADDITIONS
450 SF
420 SF
TEAMING ROOM
STAIR
2537 SF
OPEN CORRIDOR
'-6
50'-0"
26'-0" 24'-0"
TOP OF KITCHEN TOP OF ARMS VAULT
5' -6
IG
IZ
File Path:
Plot Date:
\\10.0.174.12\BRC_Folder\Projects\Manitowoc FFA & FFR\Drawings\MANITOWOC FFA-FFR_A18.rvt
10/14/2020 10:54:19 AM
AE101
IR
CONCEPT FLOOR PLAN
GENERAL SHEET NOTES:
1. ALL WORK UNDER EXISTING ROOF TO BE CONSIDERED REPAIR AND/OR
REPLACEMENT COST. RE: FLOOR PLAN LEGEND
2. MEZZANINE EGRESS STAIR AND UNIT STORAGE ADDITIONS ARE
CONSIDERED "NEW WORK". CONTRACTOR TO SHOW UNIT STORAGE
AS BID OPTION A AND PROVIDE SEPARATE LINE ITEM COST.
3. PROVIDE ROOM SIZES, FINISHES AND STC RATINGS PER THE
GUIDELINES OF UFC 4-171-05.
4. ALL REMAINING WINDOWS OPENINGS TO RECEIVE NEW OPERABLE
THERMALLY BROKEN INSULATED ALUMINUM FRAMED WINDOWS WITH
DUAL PANE LOW-E GLAZING COMPLYING WITH UFC 4-010-01.
5 ARMY RESERVE STANDARD "SMALL" KITCHEN DESIGN SHOWN ON
PLAN.
1" = 40'-0" B9
KEY PLAN
0' 7' 20' 40' 80'
C6
CONCEPT MEZZANINE
1. BASE BID - EXISTING OVERHEAD DOOR OPENING TO BE INFILLED WITH
MASONRY.
2. BID OPTION A - UNIT STORAGE ADDITION, FLOOR ELEVATION SET 1'-0"
BELOW EXISTING FLOOR SLAB ELEVATION. RE: CIVIL FOR EXISTING
FLOOR ELEVATION. CONTRACTOR TO PROVIDE SEPARATE LINE ITEM
COST FOR SUSPENDED GYPSUM BOARD CEILING AND SUSPENDED LAY-IN
ACOUSTIC CEILING TILE (ACT) CEILING SYSTEMS. HEIGHT OF CEILING TO
BE FLUSHED WITH TOP OF UNIT STORAGE CASES.
3. BID OPTION F - UNIT STORAGE CAGES, 8'-2" WIDE x 12'-2" DEEP x 9'-0" HIGH (MIN) STEEL CAGE, CONSTRUCTED OF STEEL ANGLES AND 10-GAUGE 1"x2"
WIRE MESH PANELS FOR PARTITIONS. TOP OF CAGE SHALL BE WIRE
MESH OR WALLS MAY EXTEND TO BOTTOM OF ROOF DECK. SHELVING
FOR UNIT STORAGE CAGES SHALL BE HEAVY-DUTY OPEN STEEL
SHELVING UNITS WITH FIVE ADJUSTABLE SHELVES. SHELVING ARE 4'-0"
WIDE x 2'-0" DEEP x 7'-0" HIGH. SIX (6) SHELVING UNITS WITHIN EACH UNIT
STORAGE CAGE. ONE LIGHT FIXTURE REQUIRED AT EACH 8'-2" X 12'-2"
CAGE. CONTRACTOR FURNISHED AND CONTRACTOR INSTALLED
EQUIPMENT (CFCI), OMAR FUNDED.
4. CONCRETE RAMP, 1:12 MAXIMUM SLOPE
5 EXISTING WINDOW TO BE REMOVED. MASONRY INFILL AT EXISTING
WINDOW OPENING.
6 ACCESSIBLE DRESSING BENCH. 20" - 24" IN DEPTH, 42" MINIMUM IN
LENGTH AND SEAT HEIGHT 17" - 19" ABOVE FINISH FLOOR.
7 DRESSING BENCH, 12" - 14" IN DEPTH, 48" - 54" LENGTH AND SEAT HEIGHT
17" - 19" ABOVE FINISH FLOOR.
8 OPERABLE THERMALLY BROKEN INSULATED ALUMINUM FRAMED
WINDOW WITH DUAL PANE LOW-E GLAZING COMPLYING WITH UFC
4-010-01. PLACE WINDOW WITHIN EXISTING DOOR OPENING, MATCH
WINDOW SIZE AND SILL HEIGHT WITH EXISTING WINDOWS, INFILL
REMAINING PORTION WITH MASONRY.
9 WALK-OFF MAT
10 FLOOR TO CEILING BUILT-IN MILLWORK FOR MEMORIAL AND TROPHY
DISPLAY.
SHEET KEYNOTES: