FY2023_01_NorthMainSidewalks_IFB.pdf

PDF 8 MB Posted

Attached to
North Main Street Sidewalk Improvements
Solicitation number
BD-20-1346-WBBOS-WBBOS-86530
Issued by
Worcester County, Ocean Grove CDP, Massachusetts

About this file

This document is an Invitation for Bids (IFB) issued by the Town of West Boylston, Massachusetts for the North Main Street Sidewalk Improvements project. The project involves the resurfacing of various streets, including sidewalk, curbing, and drainage improvements. The work must be completed by June 30, 2023. Sealed bids are due by 10:00 AM on April 14, 2023, and must include a 5% bid deposit. A mandatory site visit is highly recommended prior to bid submission. The contract will be awarded to the lowest responsible and responsive bidder.

The IFB includes pricing terms for various bid items such as earth excavation, gravel borrow, hot mix asphalt, and cement concrete sidewalk. It also specifies that prevailing wage rates, MassDOT prequalification, and 50% performance and payment bonds are required. The project is partially funded through the Massachusetts Chapter 90 Program, which allows for price adjustments on certain materials such as liquid asphalt and diesel fuel.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF WEST BOYLSTON

Massachusetts

INVITATION FOR BIDS

Bid # FY2023-01

North Main Street Sidewalk Improvements

Advertisement Date: March 29, 2023

Bid Opening Date: April, 14 2023 @ 10:00 AM

TOWN OF WEST BOYLSTON

Department of Public Works

35 Worcester St

West Boylston, MA 01583

(508) 835-4820

I. ADVERTISEMENT/PUBLIC NOTICE

TOWN OF WEST BOYLSTON - DEPARTMENT OF PUBLIC WORKS

INVITATION FOR BIDS

FY2023-01

North Main Street Sidewalk Improvements

Sealed bids for the Resurfacing of Various Streets Town of West Boylston (hereinafter referred to as “The OWNER”) will be received at the West Boylston Town Hall located at 140 Worcester

Street until 10:00 a.m., Friday April. 14, 2023 at which time they will be publicly opened and read. No late bids accepted.

Obtaining Bid Packages: Specifications, general instructions, and Bid Forms must be obtained at the Town Administrators office located at 140 Worcester Street between the hours of 9:00 a.m. and 3:00 p.m., Monday through Thursday or by emailing dpw@westboylston-ma.gov.

Bidders are required to submit bids on the Bid Forms provided.

Bid Deposit: All bids shall be accompanied by a bid deposit in the amount of five percent (5%) of the bid in the form of cash, a bid bond, or a certified check made payable to the Town of

West Boylston. The bid deposit will be forfeited if the bidder fails to execute the contract and satisfactory Bond within ten (10) days after the contract may have been awarded to him.

Conditions of Contract: All awarded contracts shall be subject to the Special Contract

Conditions that accompany this bid package. Successful Bidders will be required produce a certificate of insurance. All work being performed requires 50% Performance Bond and a 50%

Payment Bond in accordance with G.L. c.149, section 29. Work under this contract shall be completed by June 30, 2023.

Wage Rates: All wage rates will comply with those established by the Commonwealth

Department of Labor and Workforce Development, M.G.L., Chapter 149, Sections 26-27G as set forth in the contract documents.

Prequalification: Bidders for all projects that cost over $50,000.00 must be prequalified by the

Massachusetts Department of Transportation (formerly Mass. Highway Department). All bidders shall be subject to Section 34 of Chapter 90, must be prequalified in accordance with

720 CMR 5.00 “Prequalification’s of Contractors”. This will apply to horizontal construction only.

Award/Rejection: The OWNER reserves the right to reject any or all bids, and to waive minor informalities in the bids, or to accept the bid deemed best for the OWNER. The OWNER further reserves the right to award all portions of the contract to one bidder. In this case, the price bid by the bidder for each item as detailed on the Bid Form shall remain the same. The contract, will be awarded to the lowest, responsible and eligible bidder.

II. GENERAL INFORMATION/ INSTRUCTIONS

Purchasing Entity: Town of West Boylston

Address: Town of West Boylston

140 Worcester Street

West Boylston, MA 01583

Telephone: (508) 835-4820

Title of Bid: FY2023-01 North Main Street Sidewalk Improvements

Contact Person: Kevin Duffy – Director of Public Works

1) Submittal Deadline and Format:

Sealed bids must be submitted by 10:00 a.m., Friday, April 14, 2023 to the Town

Administers Office located at 140 Worcester Street. Postmarks and faxed bids will not be considered. One original and one copy of the bid, prepared in accordance with the

Submittal Requirements listed in Section 2, below, must be submitted in a sealed envelope indicating the firm’s name and address. The envelope must be marked in the lower left-hand corner as follows:

“FY2023-01: North Main Street Sidewalk Improvements”

2) Submittal Requirements

All bids shall contain the following completed attachments and additional information:

Signed Bid Form (Att. 1)

References (Att. 2)

5% Bid Deposit

Non-Collusion Certification (Att. 3)

Tax Certification (Att. 4)

Certificate of authority, if applicable (Att. 5)

3) Time for Award

A contract shall be awarded to the lowest responsible and responsive bidder within fourteen (14) days of the opening of bids. The time for award may be extended for up to fourteen (14) additional days by mutual agreement between the OWNER and the apparent lowest responsive and responsible bidder.

4) Right to Cancel/Reject Bids:

The OWNER reserves the right to cancel this Invitation for Bids (IFB), to reject any and all bids, wholly or in part, to waive informalities when in the best interest of the OWNER, and to make awards in a manner deemed to be in the best interest of the OWNER.

5) General Requirements

a) The bidder shall be bound by all applicable statutory provisions of the laws of the

Federal Government, the Commonwealth of Massachusetts, and the OWNER.

b) This bid must cover all contingencies, including all labor, materials, transportation, etc., necessary for the delivery of these supplies as required.

c) The procurement officer shall unconditionally accept a bid without alteration or correction, except as provided in this paragraph. A bidder may correct, modify, or withdraw a bid by written notice received in the office designated in the IFB prior to the time and date set for the bid opening. After bid opening, a bidder may not change the price or any other provision of the bid in a manner prejudicial to the interests of the governmental body or fair competition. The procurement officer shall waive minor informalities or allow the bidder to correct them. If a mistake and the intended bid are clearly evident on the face of the bid document, the procurement officer shall correct the mistake to reflect the intended correct bid and so notify the bidder in writing, and the bidder may not withdraw the bid. A bidder may withdraw a bid if a mistake is clearly evident on the face of the bid document but the intended correct bid is not similarly evident.

d) Before submitting a bid, each bidder must make a careful study and fully assure itself of the requirements of this IFB. By signing and submitting its bid, the bidder agrees to all terms and conditions of this IFB, including but not limited to the specifications and contract terms.

e) Bid Deposits: If the Invitation for Bid requires a bid deposit, such deposit shall be submitted in the form of cash, bid bond, cashier’s check, treasurer’s check, or certified check on a responsible bank, payable to the Town of West Boylston, and must be filed with the original bid. Failure to do so will lead to rejection of the bid. The bid deposit will be returned to the successful bidder within seven (7) days of execution of award and approval by the OWNER of any performance and/or payment bond(s). In case of default, the bid deposit shall be forfeited to the OWNER.

f) Performance and/or Payment Bonds: If so stated in the Invitation for Bid, the

Contractor will be required to furnish a performance and/or a labor and material payment bond in an amount, in a form and with a surety satisfactory to the OWNER.

The bidder shall be responsible for the cost of the bond(s).

g) The successful bidder will be required to enter into a contract with the OWNER.

h) The bidder will be required to indemnify the OWNER for all damage to life and property that may occur due to its negligence or that of its employees, subcontractors, etc., during the period of this project

i) Purchases made by the municipalities are exempt from the payment of Federal Excise

Taxes and Massachusetts Sales Taxes and any such taxes must not be included in the quoted price(s). Tax exempt documents will be provided, as necessary.

j) All questions concerning this IFB and requests for interpretation of these documents shall be submitted in writing to the Procurement Officer / OWNER’S representative no less than three (3) business days before the due date for submissions. Written responses will be mailed, faxed or emailed to all bidders on record as having picked up/received the IFB.

k) If it becomes necessary to revise any part of this IFB or if additional data is necessary to enable an exact interpretation of provisions, such addenda will be provided to all firms that have requested this IFB. No addenda will be issued within the immediate three (3) business days prior to the bid deadline. If an addendum is issued, all bidders shall acknowledge receipt of each addendum with their bid.

l) The successful bidder shall maintain such insurance as will protect it from claims under

Workmen’s’ Compensation Acts and from any other claims for property damage or personal injury, including death, which may arise from operations under this contract.

m) The right of the successful bidder to proceed may be terminated at any time by the

OWNER if it is determined that the bidder, the bidding firm, or its agent(s) offered or gave a gratuity to an employee of the OWNER in order to obtain a contract or receive favorable treatment under a contract. The contractor shall certify by the execution of bid documents that the bid is rendered independently, without fraud, collusion or in connection with any other bidder and that no official or employee of the OWNER is peculiarly interested in the solicitation of any resultant contract.

n) In the event that the OWNER receives low quotes/bids in identical amount from two or more responsive and responsible bidders, the OWNER shall select the successful bidder by a blind selection process such as flipping a coin or drawing a name from a hat. The low bidders who are under consideration will be invited to attend and observe the blind selection process.

o) The contract is effective when signed by both the CONTRACTOR and the OWNER, and shall extend from May 1, 2023 through June 30, 2023.

p) This contract is subject to escalation per MGL Part I, Title III, Section 38A; Price

Adjustment clause in contracts for road, bridge, water and sewer projects awarded under Sec. 39M.

6) MassDOT Prequalification Requirement: Prospective Bidders must be prequalified by MassDOT in accordance with 720 CMR 5.00, “Prequalification of Contractors”. Bids received by Contractors not on the official or waiver contractor lists issued by the MassDOT Prequalification Office will be considered not qualified and their bid will not be opened.

III. ESCALATION

Price Adjustment Bituminous Concrete Mixtures

It is the intention of the OWNER to allow price adjustments in the award of this Contract as it is partially funded by the Massachusetts Chapter 90 Program. Municipalities are required to include price adjustment clauses for diesel fuel, gasoline, liquid asphalt, Portland cement concrete, structural steel and reinforcing steel in the bid documents of all construction contracts funded by the Chapter 90

Program.

This contract contains a Price Adjustment for Bituminous Concrete Mixtures. The price adjustment will be based on the variance in price for the liquid asphalt component of Bituminous Concrete Mixtures from the base price to the period price. It shall not include transportation or other charges. The base price of liquid asphalt on this project will be a fixed price based on the most current posted price for liquid asphalt as determined and published by the Massachusetts Highway Department.

The price adjustment, as herein provided, upwards and downwards, will be made at the end of each two-month period in which work was accomplished. The adjustment to cover the previous two months will be determined by the variance between the period price of liquid asphalt and the base price of liquid asphalt. The asphalt content, for the purpose of the adjustment will be 5.5% (0.055) for each ton of Bituminous Concrete Mixture, regardless of the percentages established in the Job Mix Formula. The price adjustment will be a separate payment item. It will be determined by multiplying the number of tons of Bituminous Concrete Mixture placed during each previous two-month periods by (0.055) times the variance in price between base price and period price of liquid asphalt.

The base price for liquid asphalt on this project is $665.00 per ton (March 2023 New Method).

The base price for diesel on this project is $3.405 per gallon (February 2023 New Method).

The base price for portland cement on this project is $181.15 per gallon (March 2023 New Method).

SPECIAL PROVISIONS MONTHLY PRICE ADJUSTMENT FOR HOT MIX ASPHALT (HMA) MIXTURES

ENGLISH AND METRIC UNITS

Revised: 07/08/2016

This provision applies to all projects using greater than 100 tons (91 megagrams) of hot mix asphalt

(HMA) mixtures containing liquid asphalt cement as stipulated in the Notice to Contractors section of the bid documents.

Price Adjustments will be based on the variance in price, for the liquid asphalt component only, between the Base Price and the Period Price. They shall not include transportation or other charges. Price

Adjustments will occur on a monthly basis.

Base Price

The Base Price of liquid asphalt on a project as listed in the Notice to Contractors section of the bid documents is a fixed price determined by the Department at the time of the bid using the same method as the determination of the Period Price detailed below. The Base Price shall be used in all bids.

Period Price

The Period Price is the price of liquid asphalt for each monthly period as determined by the Department using the average selling price per standard ton of PG64-28 paving grade (primary binder classification) asphalt, FOB manufacturer's terminal, as listed under the "East Coast Market - New England, Boston, Massachusetts area" section of the Poten & Partners, Inc. "Asphalt Weekly Monitor". This average selling price is listed in the issue having a publication date of the second Friday of the month and will be posted as the Period Price for that month. The Department will post this Period Price on its website at http://www.mhd.state.ma.us/ within two (2) business days following its receipt of the relevant issue of the "Asphalt Weekly Monitor". Poten and Partners has granted the Department the right to publish this specific asphalt price information sourced from the Asphalt Weekly Monitor. This method of period price determination was formerly called the New Asphalt Period Price Method. Separate website postings using both the New Asphalt Period Price Method and the Old Asphalt Period Price Method were discontinued after June 2013.

Price Adjustment Determination, Calculation and Payment

The Contract Price of the HMA mixture will be paid under the respective item in the Contract. Price

Adjustments, as herein provided, either upwards or downwards, will be made after the work has been performed using the monthly period price for the month during which the work was performed.

Price Adjustments will be paid only if the variance from the Base Price is 5% or more for a monthly period. The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward adjustments.

The Price Adjustment applies only to the actual virgin liquid asphalt content in the mixture placed on the job in accordance with the Standard Specifications for Highways and Bridges, Division III, Section

M3.11.03.

Price Adjustments will be separate payment items. The pay item numbers are 999.401 for a positive price adjustment (a payment) and 999.402 for a negative price adjustment (a deduction). Price

Adjustments will be calculated using the following equation:

Price Adjustment = Tons of HMA Placed X Liquid Asphalt Content % X RAP Factor X (Period Price - Base

Price)

No Price Adjustment will be allowed beyond the Completion Date of this Contract, unless there is a

Department-approved extension of time.

******** END OF DOCUMENT ********

DOCUMENT 00812

SPECIAL PROVISIONS

MONTHLY PRICE ADJUSTMENT FOR DIESEL FUEL AND GASOLINE –

ENGLISH UNITS

Revised: 01/26/2009

This monthly fuel price adjustment is inserted in this contract because the national and worldwide energy situation has made the future cost of fuel unpredictable. This adjustment will provide for either additional compensation to the Contractor or repayment to the

Commonwealth, depending on an increase or decrease in the average price of diesel fuel or gasoline.

This adjustment will be based on fuel usage factors for various items of work developed by the

Highway Research Board in Circular 158, dated July 1974. These factors will be multiplied by the quantities of work done in each item during each monthly period and further multiplied by the variance in price from the Base Price to the Period Price.

The Base Price of Diesel Fuel and Gasoline will be the price as indicated in the Department’s web site (www.mhd.state.ma.us) for the month in which the contract was bid, which includes

State Tax.

The Period Price will be the average of prices charged to the State, including State Tax for the bulk purchases made during each month.

This adjustment will be effected only if the variance from the Base Price is 5% or more for a monthly period. The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward adjustments.

No adjustment will be paid for work done beyond the extended completion date of any contract.

Any adjustment (increase or decrease) to estimated quantities made to each item at the time of final payment will have the fuel price adjustment figured at the average period price for the entire term of the project for the difference of quantity.

The fuel price adjustment will apply only to the following items of work at the fuel factors shown:

The fuel price adjustment will apply only to the following items of work at the fuel factors shown: ITEMS COVERED

FUEL FACTORS

Diesel Gasoline

Excavation: and Borrow Work: Items 120, 151 (Both Factors used)

0.29 Gallons /

CY.

0.15 Gallons /

CY

Surfacing Work: All Items containing Hot

Mix Asphalt

2.90 Gallons /

Ton

Does Not

Apply

DOCUMENT 00812

SPECIAL PROVISIONS

PRICE ADJUSTMENT FOR PORTLAND CEMENT CONCRETE MIXES

Revised: 01/12/2009

This provision applies to all projects using greater than 100 Cubic Yards (76 Cubic Meters) of

Portland cement concrete containing Portland cement as stipulated in the Notice to

Contractors section of the Bid Documents. This Price Adjustment will occur on a monthly basis.

The Price Adjustment will be based on the variance in price for the Portland cement component only from the Base Price to the Period Price. It shall not include transportation or other charges.

The Base Price of Portland cement on a project is a fixed price determined at the time of bid by the Department by using the same method as for the determination of the Period Price (see below) and found in the Notice to Contractors. The Period Price of Portland cement will be determined by using the latest published price, in dollars per ton (U.S.), for Portland cement

(Type I) quoted for Boston, U.S.A. in the Construction Economics section of ENR Engineering

News-Record magazine or at the ENR website http://www.enr.com under Construction

Economics. The Period Price will be posted on the MassHighway website the Wednesday immediately following the publishing of the monthly price in ENR, which is normally the first week of the month.

The Contract Price of the Portland cement concrete mix will be paid under the respective item in the Contract. The price adjustment, as herein provided, upwards or downwards, will be made after the work has been performed, using the monthly period price for the month during which the work was performed.

The price adjustment applies only to the actual Portland cement content in the mix placed on the job in accordance with the Standard Specifications for Highways and Bridges, Division III, Section M4.02.01. No adjustments will be made for any cement replacement materials such as fly ash or ground granulated blast furnace slag.

The Price Adjustment will be a separate payment item. It will be determined by multiplying the number of cubic yards of Portland cement concrete placed during each monthly period times the Portland cement content percentage times the variance in price between the Base Price and Period Price of Portland cement.

This Price Adjustment will be paid only if the variance from the Base Price is 5% or more for a monthly period. The complete adjustment will be paid in all cases with no deduction of the 5% from either upward or downward adjustments.

No Price Adjustment will be allowed beyond the Completion Date of this Contract, unless there is a Department-approved extension of time.

IV. SPECIFICATIONS

Unless otherwise stated in the Technical Specifications - Special Provisions (Appendix B), contractor shall perform the work on all bid items in accordance with the 2023 Commonwealth of Massachusetts

Department of Transportation Standard Specification for Highways and Bridges.

Time and Manner of Doing Work

The CONTRACTOR shall begin work within fifteen (15) days of the date of signing the contract, unless otherwise directed, and shall prosecute the work expeditiously. The time in which various items of the whole of the Contract are to be completed is the essence of this Contract.

Change Orders

Any substantial deviation in the contract quantities or scope of work must be detailed in writing and submitted to the OWNER in the form of a change order.

Contracts Subject to Appropriation

The execution of a contract is subject to adequate financial appropriations for the item(s) or project(s) advertised. The lack of adequate financial appropriation by the OWNER for the Bid item(s) or project(s) constitutes grounds to reject all Bids or those Bids that exceed the financial limitations imposed by the

OWNER.

Acceptance and Approval of Work

All work shall be inspected at the time of production and installation. The OWNER shall have the right to request any and all contractor quality control documents for review. Acceptance of all work shall be in accordance with MDOT Specifications. All work meeting the specified requirements shall be approved no more than 30 days after installation.

All questions pertaining to the specifications are to be directed to the PUBLIC WORKS DIRECTOR, by telephone at (508) 835-4820, or electronically to dpw@westboylston-ma.gov, between the hours of

7:00 a.m. and 3:00 p.m., Monday through Friday.

Additional Information:

1. Prevailing wage rates apply

2. MADOT Pre-Qualification Required

3. Bid Security deposit of 5% of the value of the total bid will be required

4. 50% payment bond and 50% performance bond are required with execution of the contract

5. OSHA Training Certification

6. Consultation with West Boylston Department of Public Works 508-835-4820 to review scope of work and permitting requirements prior to submission of bid as well as a site visit is highly recommended

7. Contractor responsible for contacting Dig Safe and obtaining all required permits; local permit fees will be waived by the OWNER and should not be included in the bid price.

IV. QUALITY REQUIREMENTS

Bidders must comply with instructions listed in Section II, “General

Information/Instructions.”

Bidders must have been in the business of providing the above-described services for a minimum of three (3) years.

Bidders must be able to provide references from a minimum of three customers for whom the bidder has performed similar work within the past five years.

V. AWARD OF CONTRACT

The OWNER intends to award this contract to the lowest eligible responsive and responsible bidder. The OWNER shall consider the following criteria in making that determination:

Price (lowest base price)

Compliance with requirements of this Invitation for Bids and applicable laws

Ability of bidder to undertake and complete the work or service for this contract.

Ability of OWNER to obtain satisfactory responses from references contacted.

Availability of funds.

The OWNER’S past experience with a bidder.

The contract will be awarded no later than fourteen (14) days after bid opening, during which period bids may not be withdrawn.

Attachment 1

FORM FOR BID

FY2023-01: North Main Street Sidewalk Improvements

Bid of (Company Name and Address):

(Hereinafter the Bidder)

The Bidder, in compliance with the OWNER’S Invitation for Bids for North Main Street Sidewalk

Improvements and understanding the specifications and requirements of this IFB, offers the following

Bid Prices. The Bidder agrees to perform all the work described in Section III of the bid documents for the proposed Contract Prices of:

ITEM DESCRIPTION QTY

UNIT UNIT

PRICE

EXTENDED PRICE

120. EARTH EXCAVATION 590 CY

151. GRAVEL BORROW 430 CY

170. FINE GRADING AND COMPACTING – Subgrade Area 2570 SY

220. DRAINAGE STRUCTURE ADJUSTED 4 EA

220.5 DRAINAGE STRUCTURE ADJUSTED 1 EA

415.2 PAVEMENT FINE MILLING 490 SY

451. HMA FOR PATCHING 12 TON

452. ASPHALT EMULSION FOR TACK COAT 60 GAL

460.22 SUPERPAVE SURFACE COURSE – 9.5 (SSC – 9.5) 55 TON

470. HOT MIX ASPHALT BERM, TYPE A 2 TON

504.2 GRANITE CURB TYPE VA4 – SPLAYED END 9 EA

509. GRANITE TRANSITION CURB FOR PEDESTRIAN CURB

RAMPS - STRAIGHT

70 FT

509.1 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB

RAMPS - CURVED

140 FT

510. GRANITE EDGING TYPE SA 60 FT

570.3 HOT MIX ASPHALT CURB TYPE 3 700 FT

581. CURB INLET REMOVED AND RESET 3 EA

583. EDGING REMOVED AND RESET 260 FT

701. CEMENT CONCRETE SIDEWALK 530 SY

701.1 CEMENT CONCRETE SIDEWALK AT DRIVEWAYS 40 SY

701.2 CEMENT CONCRETE PEDESTRIAN CURB RAMP 100 SY

702. HOT MIX ASPHALT SIDEWALK OR DRIVEWAY 350 TON

767.121 SEDIMENT CONTROL BARRIER 200 FT

999.001 TRAFFIC POLICE - ALLOWANCE 1 LS $10,000 $10,000

999.002 TEMPORARY TRAFFIC CONTROL 1 LS

999.300 MATERIALS INSPECTION, SAMLPING AND TESTING -

ALLOWANCE

1 LS $3,000 $3,000

999.401 HMA Escalation – Price Increase (PAYMENT) - - - -

999.402 HMA Escalation – Price Decrease (CREDIT) - - - -

TOTAL BID AMOUNT (IN NUMBERS):

TOTAL BID AMOUNT (IN WORDS):

These prices are to cover all expenses incurred in performing the work required under these bid documents, of which this bid sheet is a part.

Note regarding quantities: By submission of a bid, the bidder understands that the quantities stated are approximate and should not be interpreted as the actual quantities the OWNER will purchase or be committed to purchase. The quantities set forth in the Bid are provided for bid comparison only and the actual quantity of work to be done may vary, as determined by the OWNER.

Bidder acknowledges Addenda:

Addendum # DATE SIGNATURE

Labor Harmony Clause: I certify that I am able to furnish labor that can work in harmony with all other elements of labor employed or to be employed in the work and that s/he will comply fully with all laws and regulations applicable to awards made subject to section forty-four of M.G. L. chapter 30, s. 39M.

The undersigned further certifies under penalty of perjury that the said undersigned is not presently debarred from doing public construction work in the Commonwealth under the provisions of section twenty-nine F of chapter twenty-nine, or any other applicable debarment provisions of any other chapter of the General Laws or any rule or regulation promulgated thereunder.

Date Name of Bidder

Social Security or FID No. Business Address

Telephone # Signature and Title of Person Signing Bid

Town of West Boylston Date:

Project: North Main Street Sidewalk Improvements - Contract# FY2023-01

IN WITNESS WHEREOF, the Contractor and the Town have caused this instrument to be executed under seal on the day and year first above written.

FOR THE CONTRACTOR BY:

Signature: _____________________________________

By: __________________________________

Title: ________________________________

Date Signed: ___________

[The name for the contractor must match the name on the Certificate of Vote form, if corporation.]

FOR THE WEST BOYLSTON BY:

Signature: _____________________________________

By: Jennifer Warren-Dyment

Title: Town Administrator

Date Signed: ___________

Attachment 2

REFERENCES

Bidder must provide references of at least three customers who have had similar work performed within the past five (5) years.

Reference: __________________________________________________________________________

Contact: ____________________________________________________________________________

Address: ____________________________________________________________________________

Telephone: ______________________________________ Fax: _______________________________

Description of Work Performed: __________________________________________________________

Address: ____________________________________________________________________________

Telephone: ______________________________________ Fax: _______________________________

Description of Work Performed: __________________________________________________________

Address: ____________________________________________________________________________

Telephone: ______________________________________ Fax: _______________________________

Description of Work Performed: __________________________________________________________

ATTACHMENT 3

CERTIFICATE OF NON-COLLUSION

The undersigned certifies under penalties of perjury that this bid or proposal has been made and submitted in good faith and without collusion or fraud with any other person. As used in this certification, the word “person” shall mean any natural person, business, partnership, corporation, union, committee, club or other organization, entity or group of individuals.

Signature:

Date:

Name [Printed]:

Title:

Company:

ATTACHMENT 4

TAX ATTESTATION CERTIFICATION

Pursuant to M.G.L., Ch. 62C, s. 49A, I certify under the penalties of perjury that, to the best of my knowledge and belief, I am in compliance with all laws of the Commonwealth relating to taxes, reporting of employees and contractors, and withholding and remitting child support.

Signature of Individual or Corporate Officer

Company Name

Social Security Number or Federal

Identification Number*

* Your Social Security Number will be furnished to the Massachusetts Department of Revenue to determine whether or not you have any tax filing or tax payment obligations. Providers who fail to correct their non-filing or delinquency will not have a contract or other agreement issued, renewed, or extended. This request is made under the authority of Chapter 62C, Section 49A, of the

Massachusetts General Laws.

Attachment 5

CERTIFICATE OF AUTHORITY

(Required if a Corporation)

At a duly authorized meeting of the Board of Directors of the _____________________________ (Name of Corporation) held on ___________________ at which all the Directors were present or waived notice, (Date) it was voted that ______________________________________________ of the company be and (Officer and Title) hereby is authorized to execute contracts and bonds in the name and on behalf of said company, and affix its corporate seal thereto, and such execution of any contract of obligation in this company’s name on its behalf of such ___________________ under (Officer) seal of the company shall be valid and binding upon this company.

A TRUE COPY,

Attest: _____________________________________________________ (Signature/Title)

Place of Business: _______________________________________________

I hereby certify that I am the ______________ of the _______________________ (Title) (Corporation) and that _________________________ is the duly elected _______________________ (Name of Officer) (Title) of said company, and the above vote has not been amended or rescinded and remains in full force and effect as of the date of this contract.

Signature: ________________________

Date: ________________________

Name/Title: ________________________

(Corporate Seal)

Notary Public

APPENDIX A

PREVAILING WAGE RATES

THE COMMONWEALTH OF MASSACHUSETTS

DEPARTMENT OF LABOR STANDARDS

As determined by the Director under the provisions of the

Massachusetts General Laws, Chapter 149, Sections 26 to 27H

EXECUTIVE OFFICE OF LABOR AND WORKFORCE DEVELOPMENT

Prevailing Wage Rates

MAURA HEALEY LAUREN JONES

SecretaryGovernor

MICHAEL FLANAGAN

Reconstruction of Town sidewalks, ramps and curbing on North Main Street

Director

Awarding Authority: Town of West Boylston

City/Town:Contract Number: WEST BOYLSTON

Description of Work:

Job Location: 140 Worcester Street

Wage Request Number: 20230321-067Issue Date: 03/23/2023

Information about Prevailing Wage Schedules for Awarding Authorities and Contractors

• The wage rates will remain in effect for the duration of the project, except in the case of multi-year public construction projects. For construction projects lasting longer than one year, awarding authorities must request an updated wage schedule no later than two weeks before the anniversary of the date the contract was executed by the awarding authority and the general contractor. For multi-year CM AT RISK projects, the awarding authority must request an annual update no later than two weeks before the anniversary date, determined as the earlier of: (a) the execution date of the GMP Amendment, or (b) the execution date of the first amendment to permit procurement of construction services. The annual update requirement is not applicable to 27F “rental of equipment” contracts. The updated wage schedule must be provided to all contractors, including general and sub-contractors, working on the construction project.

• This wage schedule applies only to the specific project referenced at the top of this page and uniquely identified by the “Wage Request

Number” on all pages of this schedule.

• An Awarding Authority must request an updated wage schedule if it has not opened bids or selected a contractor within 90 days of the date of issuance of the wage schedule. For CM AT RISK projects (bid pursuant to G.L. c.149A), the earlier of: (a) the execution date of the

GMP Amendment, or (b) the bid for the first construction scope of work must be within 90-days of the wage schedule issuance date.

• The wage schedule shall be incorporated in any advertisement or call for bids for the project as required by M.G.L. c. 149, § 27. The wage schedule shall be made a part of the contract awarded for the project. The wage schedule must be posted in a conspicuous place at the work site for the life of the project in accordance with M.G.L. c. 149 § 27. The wages listed on the wage schedule must be paid to employees performing construction work on the project whether they are employed by the prime contractor, a filed sub-bidder, or a sub-contractor.

• Apprentices working on the project are required to be registered with the Massachusetts Division of Apprentice Standards (DAS).

Apprentices must keep their apprentice identification card on their persons during all work hours on the project. An apprentice registered with DAS may be paid the lower apprentice wage rate at the applicable step as provided on the prevailing wage schedule. Any apprentice not registered with DAS regardless of whether they are registered with another federal, state, local, or private agency must be paid the journeyworker's rate.

• Every contractor or subcontractor working on the construction project must submit weekly payroll reports and a Statement of

Compliance directly to the awarding authority by mail or email and keep them on file for three years. Each weekly payroll report must contain: the employee’s name, address, occupational classification, hours worked, and wages paid. Do not submit weekly payroll reports to DLS. For a sample payroll reporting form go to http://www.mass.gov/dols/pw.

• Contractors with questions about the wage rates or classifications included on the wage schedule have an affirmative obligation to inquire with DLS at (617) 626-6953.

• Contractors must obtain the wage schedules from awarding authorities. Failure of a contractor or subcontractor to pay the prevailing wage rates listed on the wage schedule to all employees who perform construction work on the project is a violation of the law and subjects the contractor or subcontractor to civil and criminal penalties.

• Employees not receiving the prevailing wage rate set forth on the wage schedule may file a complaint with the Fair Labor Division of the office of the Attorney General at (617) 727-3465.

KIM DRISCOLL

Lt. Governor

Classification Total RateBase Wage Health Pension Supplemental

Unemployment Effective Date

Construction

(2 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$65.37 12/01/2021 $13.41 $0.00 $35.95 $16.01

(3 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$65.44 12/01/2021 $13.41 $0.00 $36.02 $16.01

(4 & 5 AXLE) DRIVER - EQUIPMENT

TEAMSTERS JOINT COUNCIL NO. 10 ZONE B

$65.56 12/01/2021 $13.41 $0.00 $36.14 $16.01

ADS/SUBMERSIBLE PILOT

PILE DRIVER LOCAL 56 (ZONE 2)

$135.57 08/01/2020 $9.40 $0.00 $103.05 $23.12

For apprentice rates see "Apprentice- PILE DRIVER"

AIR TRACK OPERATOR

LABORERS - ZONE 2

$63.65 12/01/2022 $9.10 $0.00 $37.91 $16.64

$64.55 06/01/2023 $9.10 $0.00 $38.81 $16.64

$65.45 12/01/2023 $9.10 $0.00 $39.71 $16.64 For apprentice rates see "Apprentice- LABORER"

AIR TRACK OPERATOR (HEAVY & HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$63.55 12/01/2022 $9.35 $0.00 $37.31 $16.89

$64.45 06/01/2023 $9.35 $0.00 $38.21 $16.89

$65.35 12/01/2023 $9.35 $0.00 $39.11 $16.89

$66.68 06/01/2024 $9.35 $0.00 $40.44 $16.89

$68.01 12/01/2024 $9.35 $0.00 $41.77 $16.89

$69.40 06/01/2025 $9.35 $0.00 $43.16 $16.89

$70.78 12/01/2025 $9.35 $0.00 $44.54 $16.89

$72.22 06/01/2026 $9.35 $0.00 $45.98 $16.89

$73.66 12/01/2026 $9.35 $0.00 $47.42 $16.89 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

ASBESTOS WORKER (PIPES & TANKS)

HEAT & FROST INSULATORS LOCAL 6 (WORCESTER)

$60.35 12/01/2020 $12.80 $0.00 $38.10 $9.45

ASPHALT RAKER

LABORERS - ZONE 2

$63.15 12/01/2022 $9.10 $0.00 $37.41 $16.64

$64.05 06/01/2023 $9.10 $0.00 $38.31 $16.64

$64.95 12/01/2023 $9.10 $0.00 $39.21 $16.64 For apprentice rates see "Apprentice- LABORER"

ASPHALT RAKER (HEAVY & HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$63.05 12/01/2022 $9.35 $0.00 $36.81 $16.89

$63.95 06/01/2023 $9.35 $0.00 $37.71 $16.89

$64.85 12/01/2023 $9.35 $0.00 $38.61 $16.89

$66.18 06/01/2024 $9.35 $0.00 $39.94 $16.89

$67.51 12/01/2024 $9.35 $0.00 $41.27 $16.89

$68.90 06/01/2025 $9.35 $0.00 $42.66 $16.89

$70.28 12/01/2025 $9.35 $0.00 $44.04 $16.89

$71.72 06/01/2026 $9.35 $0.00 $45.48 $16.89

$73.16 12/01/2026 $9.35 $0.00 $46.92 $16.89 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

Issue Date: Wage Request Number:03/23/2023 Page 2 of 4020230321-067

Unemployment Effective Date

ASPHALT/CONCRETE/CRUSHER PLANT-ON SITE

OPERATING ENGINEERS LOCAL 4

$83.93 12/01/2022 $14.25 $0.00 $53.63 $16.05

$85.18 06/01/2023 $14.25 $0.00 $54.88 $16.05

$86.43 12/01/2023 $14.25 $0.00 $56.13 $16.05

$87.73 06/01/2024 $14.25 $0.00 $57.43 $16.05

$89.18 12/01/2024 $14.25 $0.00 $58.88 $16.05

$90.48 06/01/2025 $14.25 $0.00 $60.18 $16.05

$91.93 12/01/2025 $14.25 $0.00 $61.63 $16.05

$93.23 06/01/2026 $14.25 $0.00 $62.93 $16.05

$94.68 12/01/2026 $14.25 $0.00 $64.38 $16.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

BACKHOE/FRONT-END LOADER

OPERATING ENGINEERS LOCAL 4

$83.93 12/01/2022 $14.25 $0.00 $53.63 $16.05

$85.18 06/01/2023 $14.25 $0.00 $54.88 $16.05

$86.43 12/01/2023 $14.25 $0.00 $56.13 $16.05

$87.73 06/01/2024 $14.25 $0.00 $57.43 $16.05

$89.18 12/01/2024 $14.25 $0.00 $58.88 $16.05

$90.48 06/01/2025 $14.25 $0.00 $60.18 $16.05

$91.93 12/01/2025 $14.25 $0.00 $61.63 $16.05

$93.23 06/01/2026 $14.25 $0.00 $62.93 $16.05

$94.68 12/01/2026 $14.25 $0.00 $64.38 $16.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

BARCO-TYPE JUMPING TAMPER

LABORERS - ZONE 2

$63.15 12/01/2022 $9.10 $0.00 $37.41 $16.64

$64.05 06/01/2023 $9.10 $0.00 $38.31 $16.64

$64.95 12/01/2023 $9.10 $0.00 $39.21 $16.64 For apprentice rates see "Apprentice- LABORER"

BLOCK PAVER, RAMMER / CURB SETTER

LABORERS - ZONE 2

$63.65 12/01/2022 $9.10 $0.00 $37.91 $16.64

$64.55 06/01/2023 $9.10 $0.00 $38.81 $16.64

$65.45 12/01/2023 $9.10 $0.00 $39.71 $16.64 For apprentice rates see "Apprentice- LABORER"

BLOCK PAVER, RAMMER / CURB SETTER (HEAVY &

HIGHWAY)

LABORERS - ZONE 2 (HEAVY & HIGHWAY)

$63.55 12/01/2022 $9.35 $0.00 $37.31 $16.89

$64.45 06/01/2023 $9.35 $0.00 $38.21 $16.89

$65.35 12/01/2023 $9.35 $0.00 $39.11 $16.89

$66.68 06/01/2024 $9.35 $0.00 $40.44 $16.89

$68.01 12/01/2024 $9.35 $0.00 $41.77 $16.89

$69.40 06/01/2025 $9.35 $0.00 $43.16 $16.89

$70.78 12/01/2025 $9.35 $0.00 $44.54 $16.89

$72.22 06/01/2026 $9.35 $0.00 $45.98 $16.89

$73.66 12/01/2026 $9.35 $0.00 $47.42 $16.89 For apprentice rates see "Apprentice- LABORER (Heavy and Highway)

BOILER MAKER

BOILERMAKERS LOCAL 29

$74.75 01/01/2023 $7.07 $0.00 $47.37 $20.31

$75.79 01/01/2024 $7.07 $0.00 $48.12 $20.60

Issue Date: Wage Request Number:03/23/2023 Page 3 of 4020230321-067

Unemployment Effective Date

BOILERMAKER - Local 29Apprentice -

01/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $30.79 $7.07 $13.22 $0.00 $51.08 65

2 $30.79 $7.07 $13.22 $0.00 $51.08 65

3 $33.16 $7.07 $14.23 $0.00 $54.46 70

4 $35.53 $7.07 $15.24 $0.00 $57.84 75

5 $37.90 $7.07 $16.25 $0.00 $61.22 80

6 $40.26 $7.07 $17.28 $0.00 $64.61 85

7 $42.63 $7.07 $18.28 $0.00 $67.98 90

8 $45.00 $7.07 $19.32 $0.00 $71.39 95

01/01/2024

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $31.28 $7.07 $13.22 $0.00 $51.57 65

2 $31.28 $7.07 $13.22 $0.00 $51.57 65

3 $33.68 $7.07 $14.23 $0.00 $54.98 70

4 $36.09 $7.07 $15.24 $0.00 $58.40 75

5 $38.50 $7.07 $16.25 $0.00 $61.82 80

6 $40.90 $7.07 $17.28 $0.00 $65.25 85

7 $43.31 $7.07 $18.28 $0.00 $68.66 90

8 $45.71 $7.07 $19.32 $0.00 $72.10 95

Notes:

Apprentice to Journeyworker Ratio:1:4

BRICK/STONE/ARTIFICIAL MASONRY (INCL. MASONRY

WATERPROOFING)

BRICKLAYERS LOCAL 3 (WORCESTER)

$91.35 02/01/2023 $11.49 $0.00 $58.21 $21.65

$93.40 08/01/2023 $11.49 $0.00 $60.26 $21.65

$94.65 02/01/2024 $11.49 $0.00 $61.51 $21.65

$96.75 08/01/2024 $11.49 $0.00 $63.61 $21.65

$98.05 02/01/2025 $11.49 $0.00 $64.91 $21.65

$100.20 08/01/2025 $11.49 $0.00 $67.06 $21.65

$101.55 02/01/2026 $11.49 $0.00 $68.41 $21.65

$103.75 08/01/2026 $11.49 $0.00 $70.61 $21.65

$105.15 02/01/2027 $11.49 $0.00 $72.01 $21.65

Issue Date: Wage Request Number:03/23/2023 Page 4 of 4020230321-067

Unemployment Effective Date

BRICK/PLASTER/CEMENT MASON - Local 3 WorcesterApprentice -

02/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $29.11 $11.49 $21.65 $0.00 $62.25 50

2 $34.93 $11.49 $21.65 $0.00 $68.07 60

3 $40.75 $11.49 $21.65 $0.00 $73.89 70

4 $46.57 $11.49 $21.65 $0.00 $79.71 80

5 $52.39 $11.49 $21.65 $0.00 $85.53 90

08/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $30.13 $11.49 $21.65 $0.00 $63.27 50

2 $36.16 $11.49 $21.65 $0.00 $69.30 60

3 $42.18 $11.49 $21.65 $0.00 $75.32 70

4 $48.21 $11.49 $21.65 $0.00 $81.35 80

5 $54.23 $11.49 $21.65 $0.00 $87.37 90

Apprentice to Journeyworker Ratio:1:5

BULLDOZER/GRADER/SCRAPER

OPERATING ENGINEERS LOCAL 4

$83.35 12/01/2022 $14.25 $0.00 $53.05 $16.05

$84.59 06/01/2023 $14.25 $0.00 $54.29 $16.05

$85.83 12/01/2023 $14.25 $0.00 $55.53 $16.05

$87.11 06/01/2024 $14.25 $0.00 $56.81 $16.05

$88.55 12/01/2024 $14.25 $0.00 $58.25 $16.05

$89.83 06/01/2025 $14.25 $0.00 $59.53 $16.05

$91.27 12/01/2025 $14.25 $0.00 $60.97 $16.05

$92.55 06/01/2026 $14.25 $0.00 $62.25 $16.05

$93.99 12/01/2026 $14.25 $0.00 $63.69 $16.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

CAISSON & UNDERPINNING BOTTOM MAN

LABORERS - FOUNDATION AND MARINE

$71.05 12/01/2022 $9.35 $0.00 $43.73 $17.97

$72.05 06/01/2023 $9.35 $0.00 $44.73 $17.97

$73.30 12/01/2023 $9.35 $0.00 $45.98 $17.97

$74.78 06/01/2024 $9.35 $0.00 $47.46 $17.97

$76.25 12/01/2024 $9.35 $0.00 $48.93 $17.97

$77.75 06/01/2025 $9.35 $0.00 $50.43 $17.97

$79.25 12/01/2025 $9.35 $0.00 $51.93 $17.97

$80.80 06/01/2026 $9.35 $0.00 $53.48 $17.97

$82.30 12/01/2026 $9.35 $0.00 $54.98 $17.97 For apprentice rates see "Apprentice- LABORER"

Issue Date: Wage Request Number:03/23/2023 Page 5 of 4020230321-067

Unemployment Effective Date

CAISSON & UNDERPINNING LABORER

LABORERS - FOUNDATION AND MARINE

$69.90 12/01/2022 $9.35 $0.00 $42.58 $17.97

$70.90 06/01/2023 $9.35 $0.00 $43.58 $17.97

$72.15 12/01/2023 $9.35 $0.00 $44.83 $17.97

$73.63 06/01/2024 $9.35 $0.00 $46.31 $17.97

$75.10 12/01/2024 $9.35 $0.00 $47.78 $17.97

$76.60 06/01/2025 $9.35 $0.00 $49.28 $17.97

$78.10 12/01/2025 $9.35 $0.00 $50.78 $17.97

$79.65 06/01/2026 $9.35 $0.00 $52.33 $17.97

$81.15 12/01/2026 $9.35 $0.00 $53.83 $17.97 For apprentice rates see "Apprentice- LABORER"

CAISSON & UNDERPINNING TOP MAN

LABORERS - FOUNDATION AND MARINE

$69.90 12/01/2022 $9.35 $0.00 $42.58 $17.97

$70.90 06/01/2023 $9.35 $0.00 $43.58 $17.97

$72.15 12/01/2023 $9.35 $0.00 $44.83 $17.97

$73.63 06/01/2024 $9.35 $0.00 $46.31 $17.97

$75.10 12/01/2024 $9.35 $0.00 $47.78 $17.97

$76.60 06/01/2025 $9.35 $0.00 $49.28 $17.97

$78.10 12/01/2025 $9.35 $0.00 $50.78 $17.97

$79.65 06/01/2026 $9.35 $0.00 $52.33 $17.97

$81.15 12/01/2026 $9.35 $0.00 $53.83 $17.97 For apprentice rates see "Apprentice- LABORER"

CARBIDE CORE DRILL OPERATOR

LABORERS - ZONE 2

$63.15 12/01/2022 $9.10 $0.00 $37.41 $16.64

$64.05 06/01/2023 $9.10 $0.00 $38.31 $16.64

$64.95 12/01/2023 $9.10 $0.00 $39.21 $16.64 For apprentice rates see "Apprentice- LABORER"

CARPENTER

CARPENTERS -ZONE 2 (Eastern Massachusetts)

$74.43 03/01/2023 $8.68 $0.00 $45.78 $19.97

CARPENTER - Zone 2 Eastern MAApprentice -

03/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $22.89 $8.68 $1.73 $0.00 $33.30 50

2 $27.47 $8.68 $1.73 $0.00 $37.88 60

3 $32.05 $8.68 $14.78 $0.00 $55.51 70

4 $34.34 $8.68 $14.78 $0.00 $57.80 75

5 $36.62 $8.68 $16.51 $0.00 $61.81 80

6 $36.62 $8.68 $16.51 $0.00 $61.81 80

7 $41.20 $8.68 $18.24 $0.00 $68.12 90

8 $41.20 $8.68 $18.24 $0.00 $68.12 90

Notes:

% Indentured After 10/1/17; 45/45/55/55/70/70/80/80

Step 1&2 $30.71/ 3&4 $36.93/ 5&6 $56.82/ 7&8 $63.06

Apprentice to Journeyworker Ratio:1:5

CARPENTER WOOD FRAME

CARPENTERS-ZONE 3 (Wood Frame)

$35.67 04/01/2022 $7.21 $0.00 $23.66 $4.80

$36.17 04/01/2023 $7.21 $0.00 $24.16 $4.80 All Aspects of New Wood Frame Work

Issue Date: Wage Request Number:03/23/2023 Page 6 of 4020230321-067

Unemployment Effective Date

CARPENTER (Wood Frame) - Zone 3Apprentice -

04/01/2022

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $14.20 $7.21 $0.00 $0.00 $21.41 60

2 $14.20 $7.21 $0.00 $0.00 $21.41 60

3 $15.38 $7.21 $0.00 $0.00 $22.59 65

4 $16.56 $7.21 $0.00 $0.00 $23.77 70

5 $17.75 $7.21 $3.80 $0.00 $28.76 75

6 $18.93 $7.21 $3.80 $0.00 $29.94 80

7 $20.11 $7.21 $3.80 $0.00 $31.12 85

8 $21.29 $7.21 $3.80 $0.00 $32.30 90

04/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $14.50 $7.21 $0.00 $0.00 $21.71 60

2 $14.50 $7.21 $0.00 $0.00 $21.71 60

3 $15.70 $7.21 $0.00 $0.00 $22.91 65

4 $16.91 $7.21 $0.00 $0.00 $24.12 70

5 $18.12 $7.21 $3.80 $0.00 $29.13 75

6 $19.33 $7.21 $3.80 $0.00 $30.34 80

7 $20.54 $7.21 $3.80 $0.00 $31.55 85

8 $21.74 $7.21 $3.80 $0.00 $32.75 90

Notes:

% Indentured After 10/1/17; 45/45/55/55/70/70/80/80

Step 1&2 $17.86/ 3&4 $20.22/ 5&6 $27.57/ 7&8 $29.94

Apprentice to Journeyworker Ratio:1:5

CEMENT MASONRY/PLASTERING

BRICKLAYERS LOCAL 3 (WORCESTER)

$85.81 01/01/2023 $12.75 $0.87 $49.45 $22.74

$86.95 07/01/2023 $12.75 $0.87 $50.59 $22.74

$88.09 01/01/2024 $12.75 $0.87 $51.73 $22.74

Issue Date: Wage Request Number:03/23/2023 Page 7 of 4020230321-067

Unemployment Effective Date

CEMENT MASONRY/PLASTERING - WorcesterApprentice -

01/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $24.73 $12.75 $15.49 $0.00 $52.97 50

2 $29.67 $12.75 $22.74 $0.87 $66.03 60

3 $32.14 $12.75 $22.74 $0.87 $68.50 65

4 $34.62 $12.75 $22.74 $0.87 $70.98 70

5 $37.09 $12.75 $22.74 $0.87 $73.45 75

6 $39.56 $12.75 $22.74 $0.87 $75.92 80

7 $44.51 $12.75 $22.74 $0.87 $80.87 90

07/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $25.30 $15.49 $0.00 $0.00 $40.79 50

2 $30.35 $15.49 $8.12 $0.00 $53.96 60

3 $32.88 $15.49 $8.12 $0.00 $56.49 65

4 $35.41 $15.49 $8.12 $0.00 $59.02 70

5 $37.94 $15.49 $8.12 $0.00 $61.55 75

6 $40.47 $15.49 $8.12 $0.00 $64.08 80

7 $45.53 $15.49 $8.12 $0.00 $69.14 90

Steps 3,4 are 500 hrs. All other steps are 1,000 hrs.

Apprentice to Journeyworker Ratio:1:3

CHAIN SAW OPERATOR

LABORERS - ZONE 2

$63.15 12/01/2022 $9.10 $0.00 $37.41 $16.64

$64.05 06/01/2023 $9.10 $0.00 $38.31 $16.64

$64.95 12/01/2023 $9.10 $0.00 $39.21 $16.64 For apprentice rates see "Apprentice- LABORER"

CLAM SHELLS/SLURRY BUCKETS/HEADING MACHINES

OPERATING ENGINEERS LOCAL 4

$84.98 12/01/2022 $14.25 $0.00 $54.68 $16.05

$86.25 06/01/2023 $14.25 $0.00 $55.95 $16.05

$87.53 12/01/2023 $14.25 $0.00 $57.23 $16.05

$88.85 06/01/2024 $14.25 $0.00 $58.55 $16.05

$90.33 12/01/2024 $14.25 $0.00 $60.03 $16.05

$91.66 06/01/2025 $14.25 $0.00 $61.36 $16.05

$93.13 12/01/2025 $14.25 $0.00 $62.83 $16.05

$94.46 06/01/2026 $14.25 $0.00 $64.16 $16.05

$95.94 12/01/2026 $14.25 $0.00 $65.64 $16.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

Issue Date: Wage Request Number:03/23/2023 Page 8 of 4020230321-067

Unemployment Effective Date

COMPRESSOR OPERATOR

OPERATING ENGINEERS LOCAL 4

$65.38 12/01/2022 $14.25 $0.00 $35.08 $16.05

$66.20 06/01/2023 $14.25 $0.00 $35.90 $16.05

$67.02 12/01/2023 $14.25 $0.00 $36.72 $16.05

$67.87 06/01/2024 $14.25 $0.00 $37.57 $16.05

$68.82 12/01/2024 $14.25 $0.00 $38.52 $16.05

$69.67 06/01/2025 $14.25 $0.00 $39.37 $16.05

$70.62 12/01/2025 $14.25 $0.00 $40.32 $16.05

$71.48 06/01/2026 $14.25 $0.00 $41.18 $16.05

$72.43 12/01/2026 $14.25 $0.00 $42.13 $16.05 For apprentice rates see "Apprentice- OPERATING ENGINEERS"

DELEADER (BRIDGE)

PAINTERS LOCAL 35 - ZONE 2

$87.76 01/01/2023 $8.65 $0.00 $56.06 $23.05

$88.96 07/01/2023 $8.65 $0.00 $57.26 $23.05

$90.16 01/01/2024 $8.65 $0.00 $58.46 $23.05

$91.36 07/01/2024 $8.65 $0.00 $59.66 $23.05

$92.56 01/01/2025 $8.65 $0.00 $60.86 $23.05

PAINTER Local 35 - BRIDGES/TANKSApprentice -

01/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $28.03 $8.65 $0.00 $0.00 $36.68 50

2 $30.83 $8.65 $6.27 $0.00 $45.75 55

3 $33.64 $8.65 $6.84 $0.00 $49.13 60

4 $36.44 $8.65 $7.41 $0.00 $52.50 65

5 $39.24 $8.65 $19.63 $0.00 $67.52 70

6 $42.05 $8.65 $20.20 $0.00 $70.90 75

7 $44.85 $8.65 $20.77 $0.00 $74.27 80

8 $50.45 $8.65 $21.91 $0.00 $81.01 90

07/01/2023

Health Pension Supplemental

UnemploymentStep Apprentice Base Wage Total Ratepercent

Effective Date -

1 $28.63 $8.65 $0.00 $0.00 $37.28 50

2 $31.49…

This is the start of the file's text. The full file is on GovTribe.